Quote : MPA/R01-01 Date: 28th November 2023

To,
Maharashtra Police Academy
Nashik

S. Area /
Product Description Color Unit Qty Unit Price Total Amount
No. Project

Extention of ground upto 50'x10'. RemOving blocks & levelling the subgrade
Volleyball Square
1 Civil work strata. Supply & executing PCC M10 for subbase of the EPDM system. NA 2000 INR 145.00 INR 290,000.00
Ground Feet
Disposal of exesting material would be in clients scope.

Supply & Installation of "PLAYFLEX®" 15mm Thick (non spike) consisting of


sandwich two layers where base layer having 9mm Thickness would be made of
Black Styrene-Butadiene Rubber granules and finished layer of 6mm would be
Volleyball made of Per-Oxide Size 1-4mm Ethylene Propylene Diene Monomer granules with
Flooring 20% base polymer content, these granules to have gravity 1.6 kg/cm3, hardness
Square
2 (Extention of Playflex 15mm Shore A value 60-65, Tensile Strength >4.0 Mpa and elongation @ Break to be Multicolor 2000 INR 230.00 INR 460,000.00
Feet
ground upto >400%. These granules to be mechanically cut with proper sieve analysis. Raw
50'x10 ) material ingredients would be mixed with pale yellow colour Clear viscous liquid
Poly-urethane Binder in 50 kg drum having NOC Content within permissible limit
of 9.50 to 10.5%. Mixing ratio of Binder with weight of rubber material should not
be less then 18%. Warranty- 1 year on manufacturing defects.

Volleyball Poles - removing VB pole from the ground. Supply & installation of
fixed VB pole. *Height Adjustable
Made of 3" Pipe Black net with
3 Volleyball Pole Fixed Pole Comprises a Special Internal Ratchet System Red/Yellow No 2 INR 50,000.00 INR 100,000.00
Warranty - 1 year on manufacturing defects. Post

Basic Total INR 850,000.00


Add : GST@18% INR 153,000.00
Grand Total INR 1,003,000.00
Terms:

Taxes in Scope of : At actuals as applicable @18%

Installation Included in mentioned rate

Unloading & Freight Included in mentioned rate

Wastage Clients scope

Payment Terms # 100% Advance

Delivery If in stock 15-20 days or else 10 weeks from the date of advance & purchase order.

Authorized Signatory
Shlok J
BDM

Page 1 of 1