DATE: March 24, 2024

Dear Sir/Maam,

This is for your reference.

Project Details:
Site Name:

Payment Terms ONLY for POLE ERECTION:


Php 10,000.00 mobilization amount will be given on your 1st day after working hours. The mobilization
amount will be deducted from the 50% of the next payment.
50% - Payment will be given after work completion of the project.
Full Payment - To be given 1-week after completion of the project.

Payment Terms for CABLING WORKS:


Php 5,000-Prepayment. To be billed after site staking and upon mobilization to the awarded site.
30%-On-going Mobilization. Payment processing is 15 days from INVOICE RECEIVE DATE
acknowledged by Accounting Department. (Prepayment is deducted).
60%-Completed/Accepted. To be billed upon completion of the project. The site is accepted with no
rectifications. All attachments such as Redline, as-built plan, FootMark and BOQ are complete and
signed by the proper signatories. Payment release is 15 calendar days after the approval of the Project
Manager.
10%-To be billed upon issuance of approved PSW (Project Scope of Work) from client. Payment
processing is 15 days from INVOICE DATE acknowledged by Accounting Department.

Terms and Conditions:


Rectifications of deficiencies must be completed within three (3) working days unless otherwise with
dependencies including materials, permits, and the like. Partners agree that by ignoring or non-attending to
rectification requirements within 3 calendar days after notice, the Partner authorizes the contractor to deduct all
the damages and all related expenses from the total amount of PO. AISA reserves the right to cancel the PO
immediately. The PO shall be valid for one (1) year from creation date.

NOTE: Boom truck will work the project independently.

Standard Unit Price:

Unit
Line UO REMARK
Description Pric
No M S
e
CABLING WORKS
1 PRO Installation of Drop Cable, 4-6 Core M 10
2 PRO Installation of Drop Cable, 12-48 Core M 13
3 PRO Installation and all accessories of Aerial Single Mode FOC, 24 Fibers M 18
4 PRO Installation and all accessories of Aerial Single Mode FOC, 48 Fibers M 19
5 PRO Installation and all accessories of Aerial Single Mode FOC, 72 Fibers M 22
6 PRO Installation and all accessories of Aerial Single Mode FOC, 96 Fibers M 24
7 PRO Installation and all accessories of Aerial Single Mode FOC, 144 Fibers M 25
8 PRO Installation and all accessories of Aerial Single Mode FOC, 216 Fibers M 26
9 PRO Installation of Underground Armored Cable FOC Type, 24F Fibers M 10
10 PRO Installation of Underground Armored Cable FOC Type, 48F Fibers M 15
11 PRO Installation of Underground Armored Cable FOC Type, 72F Fibers M 16
12 PRO Installation of Underground Armored Cable FOC Type, 144F Fibers M 19
13 PRO Installation of Underground Armored Cable FOC Type, 216F Fibers M 27
EAC
14 PRO Installation and all accessories of Closure including label 325
H
EAC
15 PRO Installation Grounding on Pole and accessories 250
H
16 PRO Installation of Cable Loop holder M 250
SPLICING WORKS
17 PRO Fiber splicing of LCP/NAP( total 1 core) /Core PCS 265
18 PRO Fiber splicing of LCP/NAP( total 2 to 9 cores) /Core PCS 250
19 PRO 10 to 24 Core Fiber Termination/Splicing on closure /Core PCS 190
20 PRO 25 to 48 Core Fiber Termination/Splicing on closure /Core PCS 160
21 PRO 49 to 72 Core Fiber Termination/Splicing on closure /Core PCS 130
22 PRO 73 to 144 Core Fiber Termination/Splicing on closure /Core PCS 114
103.
23 PRO 145 to 216 Core Fiber Termination/Splicing on closure /Core PCS
5
EAC
24 PRO Installation of Splitter for Upgrading scenario 170
H
EAC
25 PRO Installation of NAP/LCP and all accessories including Stencil 350
H
EAC
26 PRO Installation of NAP/LCP and all accessories without Stencil 250
H
POLE INSTALLATION WORKS
EAC 150
27 Pole Encasement
H 0
EAC 170
28 PRO Excavation and Installation of Pole, Concrete, 7.62m
H 0
EAC 130
28.1 Installation of Pole, Concrete, 7.62m
H 0
EAC 170
29 PRO Excavation and Installation of Pole, Concrete, 9.14m
H 0
EAC 130
29.1 Installation of Pole, Concrete, 9.14m
H 0
EAC 170
30 PRO Excavation and Installation of Pole, Concrete, 10.67m
H 0
EAC 130
30.1 Installation of Pole, Concrete, 10.67m
H 0
EAC
31 PRO Installation Extension Arm 44" 280
H
EAC
32 PRO Installation Extension Arm 10 pin 436
H
EAC 230
33 Manual Pole Erection
H 0
EAC
34 Excavation Only 300
H

SPECIAL CASES
PRO Installation and all accessories of Aerial Single Mode FOC, 24 Fibers (Laying or EAC
35 8
Fixing Only) H
PRO Installation and all accessories of Aerial Single Mode FOC, 48 Fibers (Laying or EAC
36 9
Fixing Only) H
PRO Installation and all accessories of Aerial Single Mode FOC, 72 Fibers (Laying or EAC
37 10
Fixing Only) H
PRO Installation and all accessories of Aerial Single Mode FOC, 96 Fibers (Laying or EAC
38 10.5
Fixing Only) H
PRO Installation and all accessories of Aerial Single Mode FOC, 144 Fibers (Laying or EAC
39 11
Fixing Only) H
PRO Installation and all accessories of Aerial Single Mode FOC, 216 Fibers (Laying or EAC
40 12
Fixing Only) H
EAC
41 PRO Installation of NAP/LCP Stencil Only 90
H

For your kind understanding and proper guidance.

Sincerely,

ANNALIZA D. NAVAL INOCENCIO DE GUZMAN JR.


Project Manager - AISA CEO/President - AISA