CONCRETE POUR CARD

Date:- Pour card no:- WAP/ABRPL/2023-24/

Client:- Assam Bio-Refinery Private Limited (ABRPL)

Contractor:- WAPCOS Ltd Sub-contractor: MEEPL

Name of Work:- Storm Water Treatment Plant (EPC)

Structure:- Location:

Reference drawing no:- Rev:-

Grade of Concrete:- Type of Concrete:-

Levels From:- To:-

Estimated volume of concrete:- Actual volume of concrte:-

Start of concreting:- Finish time of concreting:_


Reinforcement Details Nos Dia Length
1) Lapping
2) Spacer bar
3) Chairs
4) Any other
Pre concrete Inspection Checked Not Applicable
1) Survey/layout
2) Positioning and Lining
3) cleanliness
4) Cover to reinforcement
5) Inserts
6) Bolts
7) Sleeves/pockets
8) Water stopper
9) Formwork
10) Construction/ Expansion joints
11) Admixures
12) Any other
Remarks

Clearance for Electrical/ Mechanical dept etc :-

The above structure is finally inspected on……………………….. At ……………..AM/PM and found/not found satisfactory for concreting

Remarks if any……………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………..