The Land Owner, 10th August, 2023.

MRS. JENNIFER ONOSODE


Comtect Consult Limited,
Maitama, Abuja.
Dear Ma,
QUOTATION FOR TILING, EBM ALUMINUM PROFILE WINDOW, FLOOR AND
WALL TILES AND HIGH HDF WATER PROOF INTERNAL DOOR, EXTERNAL
DOORS SECURITY, THUNDER ARRESTOR, CCTV AND DSTV CABLING FOR
FIVE BEDROOM DUPLEX AT KATAMPE EXTENSION FCT ABUJA.
DESCRIPTION QTY UNIT RATE AMOUNT N
1 E.B.M aluminum window profile fabricator
with accessories, 5mm thickness with
reflective glass and installation according to Sum 3,150,000
building specification including paint house

2 1200mm X 600mm Nigeria tiles, 150 X


300mm wall tiles, 30X30 floor tiles
according to engineer description, high
quality with long san duration to meet the
building requirement and client taste.
For each building per square meter
i. total wall tiles 345sqm
ii. total floor tiles 450sqm
sum 6,200,000
iii. total granite 128sqm
iv. labour 923sqm

3 Supply and installation of high quality HDF


water resistance internal doors of various
sizes and Architraves to suit the client
demand and give value for money spent. 2,112,000
4 Security doors made Israeli to suit the
required and specification of building
including installation
i. size 2.1 X 1.2 Sum 420,000
ii. size 2.1 X 0.9 Sum 320,000

5 100% pure copper CCTV cabling 25mm


X25mm into provided pipes at appropriate
6 Point 46,000 276,000
positioning in the building.

6 100% pure copper DSTV cabling single core


Sum 180,000 180,000
into provided pipes in every rooms

Conduct piping for A/C ½ copper pipe, ¼


7
copper pipes, amoflex tube, water hose,
cable flex and spiral hose according to
building specification and architect 10 NO 47,000 470,000
instruction.

8 Installation of thunder arrestor with copper


tape, copper rod, copper mat, bedded animal
dump charcoal and industrial salt and
making good where necessary. Sum 220,000
9 10mm frameless tampered glass swing
doors, fixed window at the paint floor house
i. swing door 3m X 2.1m
ii. swing door 1.2m X 2.1m
iii. window 2.2mX 1.4m Sum 1,900,000

10 Apply cement molten (1:1) with water proof


substance screeding on floor in pant floor to
received floor tiles as a means of damp proof 48.000
course

Total N15,296,000

Overhead profit N 1,529,600

Ground Total 5% N 16,825,600

Cost for 1 unit N 16,825,600.

Cost for 2 units N 33,651,200.

Amount in word: Thirty Three Million, Six hundred and sixty five thousand, two hundred
Naira only.

Mode of Payment:
 Initial Payment- 85% (N 28,603,520).
 Final Payment- 15% (N 5,047,680).
 Window period for payment (from 11th August, 2023 to 24th August, 2023.
 Working period – 50 working days for the 2 units.
Kindly pay to the following account details
Account Name: Adeby properties & projects Limited
Account Number: 1215550999
Bank: Zenith

Best regard

For Adeby properties & Projects Limited

SURV. OLASUPO ADENIYI MICHEAL (Mnis)