A PEKERJAAN PERSIAPAN
1 Mob/Demob 1,00 Unit
2 Barrack 1,00 By Owner
3 Upah kerja, fabrikasi, eriction 1,00 Unit
B PEKERJAAN PONDASI
1 Pondasi 4 Unit
- Bobok beton 10cm (1600mm x 1600mm) 0,58 m³
- Gali Pondasi 4 Unit 5,76 m³
- Lean concrete 50mm 0,20 m³
- Besi beton Ø10mm @12m 11 Batang
- Besi beton Ø 6mm @12m 4 Batang
- Bekisiting/mall 5-6mm 9 m²
- Cor pondasi (Tapak & Pedestal) K225 2,90 m³
- Anchor bolt dia 1" M25 x 400mm 4,00 Unit
- Timbun kembali 4,32 m³
F PEKERJAAN ELETRICAL
1 Thresher No. 03 1 Unit
- MCCB 3 phase 50 Amp 1 Unit
- MCB 1 phase 5 Amp 1 Unit
- Contactor (K1) 30 Amp 1 Unit
- Contactor (K2) 30 Amp 1 Unit
- Contactor (K3) 18 Amp 1 Unit
- TOR 16-32 Amp 1 Unit
- Wiring control NYAF 4 x 0,25mm 1 Roll
- Cable NYY 4 x 6mm 1 Roll
- Pilot lamp red Ø22mm 1 Pcs
- Pilot lamp green Ø22mm 1 Pcs
- Pilot lamp blue Ø22mm 1 Pcs
- Push botton ON/OFF Ø22mm 1 Set
- Rellay omron MK2P 220V AC 2 Pcs
- Digital Amp meter AC 0-400 1 Pcs
- Analog HM 1 Pcs
- Auxiliary contact 1 no+nc 1 Pcs
E PEKERJAAN CONVEYOR
1 Extend empty bunch conveyor 2540mm c/w catwalk & handrailing 1 Unit
- Pondasi support conveyor 6 Unit
- UNP 100 x 50 x 5mm @6m Support conveyor 3 Batang
- L. 50 x 50 x 5 @6m Support conveyor 2 Batang