30MW SPVPP Landfill Project @ Brunei

Capacity : 30MWAC
Counrty : Brunei
PCC : 1. Subok (Spg. 564)
2. Polis (Sg. Akar)
3. GRU (Sg. Akar)
4. Mengkubau 11kV MIS
5. Kebangsaan 11kV MIS
Interconnection facilities concept from tender document

Private & Confidential 2


Interconnection facilities – Overall 11kV cable route from existing 11kV substation

11kV CABLE (ESTIMATE)

Mengkubau to Subok 11kV 8,851m

Mengkubau to Kebangsaan 11kV 8,200m

Polis Sg Akar to GRU Gurkha 1,976m


11kV

Polis Sg Akar to Subok 11kV 4,239m


Interconnection facilities – Subok (Spg 564) – Mengkubau 11kV MIS

Private & Confidential 4


Interconnection facilities – Subok (Spg 564) – Mengkubau 11kV MIS

11kV CABLE (ESTIMATE)


Site to Mengkubau 11kV 5,215m
Site to Subok 11kV 3,636m
Total Distance 8,851m
11kV Cable Size
Interconnection facilities – Kebangsaan 11kV MIS – Mengkubau 11kV MIS

Private & Confidential 6


Interconnection facilities – Kebangsaan 11kV MIS – Mengkubau 11kV MIS

11kV CABLE (ESTIMATE)


Site to Mengkubau 11kV 5,215m
Site to Kebangsaan 11kV 2,985m
Total Distance 8,200m
11kV Cable Size
Interconnection facilities – GRU (Sg. Akar) – Polis (Sg. Akar)

Private & Confidential 8


Interconnection facilities – GRU (Sg. Akar) – Polis (Sg. Akar)

11kV CABLE (ESTIMATE)


Site to Polis Sg Akar 11kV 603m
Site to GRU Gurkha 11kV 1,373m
Total Distance 1,976m
11kV Cable Size
Interconnection facilities – Polis (Sg. Akar) – Subok (Spg 564)

Private & Confidential 10


11kV CABLE (ESTIMATE)
Site to Polis Sg Akar 11kV 603m
Site to Subok 11kV 3,636m
Total Distance 4,239m
11kV Cable Size