Ompany Name in cell B2. TIME SCHEDULE LOAD SHEDDING DFO


PT. TUNAS MITRA NUSANTARA Rab, 3/1/2023
the Pr$$Oject
The Start date in cell E3. P$$O$$Oject Start: label is in cell C3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Displ November 2023 Des 2023 Jan 2024 Feb 2024
Cells 16 23 30 7 14 21 28 4 11 18 25 1 8 15 22 24

No. TASK PROGRESS START END DAYS PROGRESS % W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16

mula that is used to highlight the curren day within the project schedule. Plan % 1,71 3,32 6,71 9,16 13,05 20,79 30,26 37,74 46,14 56,19 67,42 81,29 87,74 98,58 99,35 100,00

Bobot Actual 0,64516 1,93548 1,93548

DFO Loadshedding 16-Nov-23 24-Feb-24 101 100,0% 1,9%


Material and Fabrication
1 Kick of meeting & detail site survey 100,0% 16-Nov-23 16-Nov-23 1 0,6% 0,6% 0,6%

2 Approval Material 0,0% 17-Nov-23 30-Nov-23 14 2,6% 0,0% 0,6% 0,8% 1,2%

3 Approval engineering drawing 10,0% 17-Nov-23 28-Dec-23 42 12,9% 1,3% 0,3% 0,6% 1,7% 1,9% 1,9% 3,2% 3,2%

4 Pengadaan material 0,0% 30-Nov-23 9-Feb-24 72 25,8% 0,0% 0,3% 0,5% 1,0% 2,1% 2,6% 2,6% 2,6% 3,1% 3,4% 3,9% 3,9%

5 Enclosure Pabrication 0,0% 15-Dec-23 11-Jan-24 28 6,5% 0,0% 0,3% 1,0% 1,3% 1,9% 1,9%

6 Assembling and wiring 0,0% 11-Jan-24 7-Feb-24 28 6,5% 0,0% 0,3% 1,6% 1,9% 2,6%

7 PLC Programming 0,0% 17-Dec-23 3-Feb-24 49 19,4% 0,0% 0,4% 1,0% 1,5% 1,9% 2,3% 3,5% 3,9% 4,8%

8 HMI Programming 0,0% 17-Dec-23 3-Feb-24 49 10,3% 0,0% 0,2% 0,5% 0,8% 1,0% 1,2% 1,9% 2,1% 2,6%

9 Internal Test 0,0% 9-Feb-24 15-Feb-24 7 6,5% 0,0% 2,6% 3,9%

10 Factory acceptance test 0,0% 16-Feb-24 19-Feb-24 4 6,5% 0,0% 6,5%

11 Punchlist Clearance 0,0% 20-Feb-24 23-Feb-24 4 1,3% 0,0% 0,5% 0,8%

12 Delivery of materials to Tripatra Jakarta 0,0% 24-Feb-24 24-Feb-24 1 0,6% 0,0% 0,6%

13 Work permit processing 0,0% 16-Nov-23 6-Dec-23 21 0,6% 0,0% 0,2% 0,2% 0,3%

Deviasi -1,0645 -1,3871 -4,7742

Pelaksana Disetujui PLAN


PT. TUNAS MITRA NUSANTARA PT. Tripatra Engineers and Constructors
REALIS
ASI
te a #######
mpany Name in cell B2. TIME SCHEDULE LOAD SHEDDING DFO
PT. TUNAS MITRA NUSANTARA Rab, 3/1/2023
he Pr$$Oject
The Start date in cell E3. P$$O$$Oject Start: label is in cell C3. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Displ Januari 2024 Feb 2024 Mar 2024 Apr 2024
Cells 15 22 29 5 12 19 26 4 11 18 25 1 8 15 22 24

No. TASK PROGRESS START END DAYS PROGRESS % W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16

mula that is used to highlight the curren day within the project schedule. Plan % 14,00 34,00 50,00 50,00 50,00 50,00 50,00 50,00 50,00 50,00 50,00 50,00 50,00 71,00 87,20 100,00

Bobot Actual
DFO Loadshedding 15-Jan-24 24-Apr-24 101 100,0% 0,0%
Site Services
1 Modifikasi wiring control MCC existing 0,0% 15-Jan-24 18-Jan-24 4 10,0% 0,0% 10,0%

2 Modifikasi wiring control Switchgear existing 0,0% 19-Jan-24 22-Jan-24 4 10,0% 0,0% 4,0% 6,0%

3 Modifikasi wiring control WIP 0,0% 23-Jan-24 26-Jan-24 4 10,0% 0,0% 10,0%

4 Modifikasi wiring control HVAC 0,0% 27-Jan-24 30-Jan-24 4 10,0% 0,0% 4,0% 6,0%

5 Modifikasi wiring control UCP GTG 0,0% 31-Jan-24 3-Feb-24 4 10,0% 0,0% 10,0%

6 Loop check & test 0,0% 16-Apr-24 20-Apr-24 5 15,0% 0,0% 15,0%

7 Site Acceptance Test (SAT) 0,0% 21-Apr-24 23-Apr-24 3 15,0% 0,0% 6,0% 9,0%

8 Commissioning 0,0% 23-Apr-24 24-Apr-24 2 18,0% 0,0% 7,2% 10,8%

9 On site training (operation) 0,0% 24-Apr-24 24-Apr-24 1 2,0% 0,0% 2,0%

Deviasi
Pelaksana Disetujui
PT. TUNAS MITRA NUSANTARA PT. Tripatra Engineers and Constructors PLAN
REALISASI