Budgeting Techniques and Project Management

Question Review from 5-8

1. Multiple question chapter 5-8 (optional)


2. Questions:
a. What is impact of evaluation after project completion in short and long run?
b. How many criteria of evaluation?
c. Design work break out structure of Build a House with information below:
1. Design
2. Structural
3. Utilities
4. iv. Finishing
5. v. Decide on plans
6. vi. Make changes of plans
7. vii Plumbing
8. Electrical
9. excavation and leveling
10. pour foundation
11. Framing
12. Drywalling
13. Roof joists
14. HVAC
15. painting
16. Windows
17. Roofing
18. Siding
19. Landscaping
3. Drawing from your understating of PCM, what do you think of project management techniques?
What is lesson learn from your group exercise on PCM? Explain
4. Please Design Task and duration base on group Project and filling responsible in the table below
5. What is role of project management in Monitoring and Evaluation?
6. How to achieving team member and self-control?
7. Calculate CP and construct scheduling below

Activity Predecessor Duration (days)

A - 30

B A 45

C A 25

D B,C 15

E D 20

F D,E 18

G F 10

H G,F 8

I H 5