Rules and Guideline UMANG
Rules and Guideline UMANG
As per academic curriculum of B.Tech. Programme, students of Sem. VIII (Mechanical Engineering) are required to undergo major project/training work for the
duration of 16 weeks, with the major objective of getting an exposure to various design and manufacturing practices. In the following pages, a detailed outline of the
rules, regulations and guidelines pertaining to Major Project are presented.
RULES AND REGULATIONS:
1.
Joining the project: The student is required to send a Project Joining Report (PJR), to the Department Mentor, after completing the official formalities of
joining the project. A format for Project Joining Report (PJR) is separately enclosed.
2.
Attendance on Site: The student is required to attend & participate in various activities for five/six days a week, and working for minimum 8 hours
per day. The total attendance at project site shall be for 16 weeks. Any absence observed on company, shall be compensated by extension of Major Project. No
leaves will be granted without prior permission.
3.
Regular Reports: The student is required to send various reports to the Faculty mentor, at department. This is compulsory and part of curricular
requirement of Major Project. A separate schedule for submission for various reports is enclosed. The student must strictly observe the submission date, while
sending reports.
4.
Maintaining Discipline at Company: The student shall maintain discipline while working for project and shall not violate rules & regulations of the
company / organizations, where the student is undergoing major project. The student shall follow all necessary instructions, given by the in-charge of the Project.
5.
Evaluation: Three reviews as per academic calendar shall be held to take a review / monitor the progress of student’s project work.
Review I/II: A student shall present his/her project work (Objective/Background/Literature review/Methodology) before an examination panel, consisting of faculty
members in the month of February/April. During the Review I, the students will be given suggestions and guidance for the next phase of study.
Review III: A student shall present his/her progress in project work before an examination panel, consisting of faculty members in the month of May. During the
Review II, the students will be given suggestions and guidance for the next phase of stud.
6.
Final Review / Presentation: The student shall make a presentation of his/her detailed report of project studies, before the examination panel of faculty
members and invited experts from field.
7.
Detailed Comprehensive Report: Besides
regular reports being sent by student during project work, the student shall submit a detailed comprehensive typed Report, at the end of Project. The requirements
-------------------------------------------------------------------------------------------------------------------------------------
Institute of Technology Nirma University Page No. 1
-------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------
Major Project, Sem VIII Department of Mechanical Engineering
------------------------------------------------------------------------------------------------------------------------------------------
and the guidelines for preparation of such a report are separately given. This comprehensive report is required to be certified by the Faculty Guide, before
submission.
Certificate from Project Authority: At the end of the project, the student is required to obtain a certificate from the Project Authority (In-charge), regarding the
satisfactory completion of the project work
8.
Assessment / Evaluation of Student’s Work: The evaluation of student’s work shall be based on continuous evaluation including regular reports,
detailed comprehensive report, and presentation during interim and final review.
9.
Successful Completion of Project: The student shall be granted a successful completion of the term, if all the reports and performance of students, are
found to be “acceptable” by the examination panel. Those students, whose performance falls below “acceptable standards”, shall repeat the Major Project work.
-------------------------------------------------------------------------------------------------------------------------------------
Institute of Technology Nirma University Page No. 2
-------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------
Major Project, Sem VIII Department of Mechanical Engineering
------------------------------------------------------------------------------------------------------------------------------------------
LIST OF REPORTS
The student is required to submit following reports to their mentors, during his/her major project work.
st
1 PJR Project Joining Report 1 day on joining Organization
st
4 PAR Project Activity Report Every month on 1 day
-------------------------------------------------------------------------------------------------------------------------------------
Institute of Technology Nirma University Page No. 3
-------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------
Major Project, Sem VIII Department of Mechanical Engineering
------------------------------------------------------------------------------------------------------------------------------------------
● A brief note, explaining the salient features of project including major objective of the project.
● Proposed Project Progress schedule, in form of Bar chart. This should be given for both planned progress & actual progress.
● Company Organization chart, along with nature of job for each manpower.
Following are the general guidelines for information to be collected and included in DCR.
OFFICE INFORMATION:
PROJECT INFORMATION:
-------------------------------------------------------------------------------------------------------------------------------------
Institute of Technology Nirma University Page No. 4
-------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------
Major Project, Sem VIII Department of Mechanical Engineering
------------------------------------------------------------------------------------------------------------------------------------------
● Location of project
● Type of Project
● Project summary
● Scope of works
● Time frame
Following are the general guidelines for information to be collected and included in DCR.
The report contents should be including all annexure, tables and figures, arranged in proper sequence of:
- Certificate
- Acknowledgement
- Abstract
- Contents:
The chapters as:
Introduction:
This chapter should include introduction of the project and objectives of the work.
Literature Review:
The research papers/literature reviewed for the project is to be included in this chapter along with the critique.
Data Acquisition:
This chapter should be dealt with Data acquired for the present study in detail and also should include the source of data.
Methodology & Problem Formulation:
This chapter should deal with the detailed method/methods adopted for the study, along with the software used if any and with the formulation of the problem.
Analysis, Results and Discussions, Conclusions and References.
-------------------------------------------------------------------------------------------------------------------------------------
Institute of Technology Nirma University Page No. 5
-------------------------------------------------------------------------------------------------------------------------------------
ANNEXURE – I
Department of Mechanical Engineering, Institute of Technology, Nirma University
4.
Name of Company /
____________________________________
5.
Address of Project Site : ____________________________________
6.
Name of Contact Person : ____________________________________
7.
Mobile Number & E-mail Id
8.
Address of Student (Local)
9. Reporting to (Name of
10.
Working Hours : From __________ am to ____________ pm
14 25/1/25 Analysis of Load Index, Tyre sizes and Speed Symbol 9-6 9
21 5/2/24 Leave 0 0
22 6/2/24 Leave 0 0
23 7/2/24 Leave 0 0
Compiling data of
45 7/3/24 9-6 9
FY21-22-23
Compiling data of
48 12/3/24 9-6 9
FY21
Compiling data of
49 13/3/24 9-6 9
FY21
Compiling data of
50 14/3/24 9-6 9
FY21
Compiling data of
51 15/3/24 9-6 9
FY22
Compiling data of
52 18/3/24 9-6 9
FY22
Compiling data of
53 19/3/24 9-6 9
FY23
Compiling data of
54 20/3/24 9-6 9
FY23
55 21/3/24 9-6 9
56 22/3/24 9-6 9
58 26/3/24 9-6 9
59 27/3/24 9-6 9
60 28/3/24 9-6 9
61 29/3/24 9-6 9
62 1/4/24 9-6 9
63 2/4/24 9-6 9
64 3/4/24 9-6 9
65 4/4/24 9-6 9
66 5/4/24 9-6 9
67 8/4/24 9-6 9
68 9/4/24 9-6 9
69 10/4/24 9-6 9
71 12/4/24 9-6 9
72 15/4/24 9-6 9
73 16/4/24 9-6 9
75 18/4/24 9-6 9
76 19/4/24 9-6 9
77 22/4/24 9-6 9
78 23/4/24 9-6 9
79 24/4/24 9-6 9
80 25/4/24 9-6 9
81 26/4/24 9-6 9
82 29/4/24 9-6 9
83 30/4/24 9-6 9
84 1/5/24 9-6 9
85 2/5/24 9-6 9
86 3/5/24 9-6 9