Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

PIC Check - 1 Check - 2 President Director

R&D
Development Request
Stamping QA Sales Material IT / HRU

Distribution
Request No LG-004-2024

Request Date 8-Jan-24 Model 55/65OLED G4

Department Requested R&D Part Name Body Top Metal, Stand

Part Number MGJ67532301 Unit EA

Specification Stamping + Pemnut Total Sample Request 10

Usage per set 1 Production quantities 4K / MONTH

Quotation Refer to RFQ Customer PT. LG EIN

Surface Treatment (Painting,


N/A Estimated Cost -
etc)

Consigned Material EGI T = 1.6 Date of material supplement Week-1 February 2024

Similar Part - Date of completion Week-3 February 2024

Drawing : 1 , Sample : , Color Chip :


Attachment
Specification : , ETC :

*) APPLY at SET TV MODEL OLED55/65 G4_NEW ITEM ALIH LOADING Y24

1.Process Stamping Dies FONT VIEW

- SEMI PRO --> 300 TON


- BENDING --> 150 TON
- PEMNUT --> 150 TON
FAD33766467 QTY 4 EA
BACK VIEW

2. Second Process
- CLEANING --> ULTRASONIC LT. 2
- TAPPING --> N/A
- ASSY PART --> N/A

SIZE PART : 322 mm x 107.30 mm x H32 mm

3. Process Develop Dies:


1. Fix Issue Alih Loading --> 08 Jan 24
2. Packing Dies From KR --> 16 Jan 24
3. Plan ETD KR -> WI --> 20 Jan 24
4. Plan ETA WI --> 03 Feb 24
5. Trial --> 05 Feb 24
6. Approval --> 20 Feb 24

4. Content detail at drawing product.


IWQ-COP-01-009 Starion PT. Wooin
Fix Issue Alih Plan Packing Dies
Loading From Korea

8-Jan-24 20-Jan-24
Plan ETA Dies
T0 T1
--> WI

3-Feb-24 8-Feb-24 10-Feb-24


Appproval

15-Feb-24

You might also like