LMB2-E-FC-PIP-OCS-MS1-0015 Stress & Flexibility Analysis Report For Steam Separator LMB-A

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 30

Lumut Balai Unit 2 Geothermal

FCRS and Power Plant Project

C 2024.03.28 Re-Issued for Approval AR IS RBY YANG YU


B 2024.01.25 Re-Issued for Approval AR IS RBY YANG YU
A 2023.11.15 Issued for Approval AR IS RBY YANG YU
Rev. Date Modification Content Prepare Check Review Approval

OWNER:

CONSULTANT:

EPC CONTRACTOR:

Lumut Balai Unit 2 Geothermal FCRS and Power Plant Project

Approval RBY/HZ Check AR PIPE STRESS AND FLEXIBILITY ANALYSIS


REPORT FOR STEAM FROM LMB-A TO STEAM
Review IS Design ASW VESSEL

LMB2-E-FC-PIP-OCS-
Date 2024.03.28 Scale N/A Doc. No. Rev. C
MS1-0015
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

REVISION CONTROL SHEET

Rev. No Date Description

A 2023.11.15 Issued for Approval

B 2024.01.25 Re-Issued for Approval

C 2024.03.28 Re-Issued for Approval

Page 2 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

CONTENTS

REVISION CONTROL SHEET.....................................................................................2


CONTENTS..................................................................................................................3
1. INTRODUCTION.................................................................................................4
1.1 Scope.........................................................................................................5
1.2 Term...........................................................................................................5
2. CODES & SPECIFICATIONS.............................................................................6
2.1. Codes and Standards................................................................................6
2.2. Project Specifications & References..........................................................6
3. DESIGN CRITERIA.............................................................................................7
3.1. Pipe System Coordinate............................................................................7
3.2. Design Parameters....................................................................................7
3.3. Pipeline Data..............................................................................................8
3.4. Environmental Data....................................................................................8
4. LOAD CASES.....................................................................................................8
5. SRESS ANALYSIS RESULTS..........................................................................11
5.1. Code Compliance....................................................................................11
5.2. Maximum Stress Summary......................................................................11
5.3. Maximum Displacement Summary..........................................................12
5.4. Maximum Pipe Support Load and Moment Summary.............................13
5.5 Flange Check (NC-3658.3 Method).........................................................15
5.6 Nozzle Check...........................................................................................15
6. SUMMARY AND RECOMMENDATION...........................................................17
6.1. Conclusion...............................................................................................17
6.2. Recommendation.....................................................................................17
7. ATTACHMENT..................................................................................................17

Page 3 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

1. INTRODUCTION

PT. Pertamina Geothermal Energy (PGE) Area Lumut Balai intends to build

the 2nd unit of Geothermal Power Plant (GPP) to utilize steam for generation

source. Geothermal Area Lumut Balai is located at about 290 km southwest

of Palembang in the southern region of Sumatra with elevation around 1,000

masl, Indonesia.

Figure 1.1 Overview of PGE Area Lumut Balai 2

The power plant development is a single flash generation system. Limited to

scope of work, this project intends FCRS (Fluid Collecting & Reinjenction

System) design which are including mechanical equipment, piping systems,

control & instrumentation systems, electrical system, transmission systems,

utility system, and civil infrastructures.

Page 4 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

1.1 Scope
The scope of this document is to perform the piping stress analysis of the new

piping for Steam from Steam LMB-A to Steam Vessel for "FCRS LUMUT

BALAI PROJECT GEOTHERMAL”. The analysis is performed to check the

compliance of pipeline system with ASME B31.1 by using CAESAR II version

12.

1.2 Term
The following terms as used in this document, assume the meanings given

below:
EMPLOYER PT. Pertamina Geothermal Energy (PGE), the

owner of the PGE Lumut Balai FCRS Project

CONTRACTOR Konsorsium Mitsubishi Corporation, WIKA and

SepcoIII, appointed by EMPLOYER to execute

and to complete overall works EPC

(Engineering, Procurement, Construction) for

the PGE Lumut Balai FCRS Project

Vendor/Manufacturer The party which supply materials, equipment,

technical document/ drawing, and service to

perform the duties by the CONTRACTOR.

Third Party Inspector A third party inspector to be appointed by

EMPLOYER to inspect the works of

CONTRACTOR.

Project Documents All documents which are prepared, revised,

and issued for accelerating the project

execution, such as correspondence, drawings,

Page 5 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

specifications, requisitions, purchase orders,

vendor prints, etc.

2. CODES & SPECIFICATIONS

The following references and documents are used for the stress analysis of

line piping for Steam LMB-A to Steam Vessel.

2.1. Codes and Standards

No Code & Standard Description

1 ASME B 31.1 Power Piping

2 API 5L Specification of Line Pipe

4 ASME B16.5 Pipe Flanges and Flange Fittings

Large Diameter Steel Flanges NPS 26 Through


5 ASME B16.47
NPS 60
Factory-Made Wrought Steel Butt-Welding
6 ASME B16.9
Fittings
Face to Face and End to End Dimensions of
7 ASME B16.10
Valves
Forged Steel Fittings, Socket-Welding and
8 ASME B16.11
Threaded

9 ASME B16.34 Valve – Flange Threaded and Welding End

Metallic Gaskets for Pipe Flanges, Ring Joint,


12 ASME B 16.20
Spiral Wound and Jacketed

2.2. Project Specifications & References

No Document Number Document Title

LMB2-E-FC-PIP-BES-
1 Specification For Thermal Insulation Of FCRS
MS2-0002
LMB2-E-FC-PRO-OEL-
2 Line List
MS0-0002
LMB2-E-FC-PIP-BES- Specification For Piping and Valve Material Of
4
MS2-0001 FCRS
5 LMB2-E-FC-PIP-OCS- Pipeline Span Calculation

Page 6 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

No Document Number Document Title

MS1-0002
LMB2-E-FC-PIP-BES- Specification for Piping Flexibility Analysis of
6
MS1-003 FCRS
LMB2-E-FC-CIV-BES- General Specification/Design Criteria for Civil and
7
AA0-0001 Structural of FCRS
LMB2-E-FC-PIP-AIM-
8 Piping Arrangement Drawing for Cluster LMB-A
MS1-011
LMB2-E-FC-PIP-ADW-
9 Isometric Drawing for Cluster LMB-A
MS9-0022
LMB2-E-FC-PIP-ADI- Pipeline Alignment Sheet For Steam Cluster
10
MS1-0046 LMB-A To Steam Vessel Unit-2

3. DESIGN CRITERIA

This section provides the required data for stress analysis of line piping for

Steam LMB-A to Steam Vessel Unit 2.

3.1. Pipe System Coordinate


Pipe system coordinate used in the analysis is as follow:

Figure 4.1 CAESAR II Model Axis

Y : South Direction
X : West Direction
Z : Vertical Direction
3.2. Design Parameters
Table 3.1 Design Parameters

Pipe Wall Design Design


Line Pipe Size Thickness Pressure Temperature
(inch) (mm) (barg) (°C)
Steam LMB-A to Steam 44 9.52 9.00 179
Vessel Unit-2

Steam LMB-A to Silencer 30 7.14 9.00 179

Page 7 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

For detail of the design parameters used in this analysis are summarized in

Appendix A (Line List Stress Analysis)

3.3. Pipeline Data


The pipe data used in this analysis are summarized in appendix A (Line List

Stress Analysis).

3.4. Environmental Data


The environmental data used in this analysis are summarized in Table 3.1

below.
Table 3.1 Environmental Data

Parameters Unit Value

Average Ambient Temperature °C 20.3

Average Wind Speed m/s 35

Seismic g 0.3398

4. LOAD CASES

The piping system has been analyzed for the load cases described in Table

4.1.
Table 4.1 - Load Cases

Numbe
Load Combination Description
r
1 (SUS) WNC Sustain Load Case 1 – Weight No Content

Hydrostatic Load Case 2 - full of water weight for


2 (HYD) WW
the hydrotest (Case No Active)

Hydrostatic Load Case 3 – Hydrotest Pressure


3 (HYD) HP
(Case No Active)

Hydrostatic Load Case 4 - the line will be full of


4 (HYD) WW+HP
water for the hydrotest (Case No Active)

5 W (OPE) Sustain Load Case 5 – Full of Fluids Weight

Operating Load Case 6 - at Design Pressure and


6 (OPE) W+D1+T1+P1
Max Operation Temperature

Page 8 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Numbe
Load Combination Description
r
Operational Load Case 7 - at Design Pressure
(OPE)
7 and Temperature with seismic acceleration along
W+D1+T1+P1+U1
(+) X axis

Operational Load Case 8 - at Design Pressure


(OPE) W+D1+T1+P1-
8 and Temperature with seismic acceleration along
U1
(-) X axis

Operational Load Case 9 - at Design Pressure


(OPE)
9 and Temperature with seismic acceleration along
W+D1+T1+P1+U2
(+) Y axis

Operational Load Case 10 - at Design Pressure


(OPE) W+D1+T1+P1-
10 and Temperature with seismic acceleration along
U2
(-) Y axis

(OPE) Operational Load Case 11 - at Design Pressure


11
W+D1+T1+P1+WIN1 and Temperature with Wind Load X direction

(OPE) Operational Load Case 12 - at Design Pressure


12
W+D1+T1+P1+WIN2 and Temperature with Wind Load –X direction

(OPE) Operational Load Case 13 - at Design Pressure


13
W+D1+T1+P1+WIN3 and Temperature with Wind Load +Y direction

(OPE) Operational Load Case 14 - at Design Pressure


14
W+D1+T1+P1+WIN4 and Temperature with Wind Load –Y direction

Sustained Load Case 15 - the combination


15 (SUS) W+P1 between Internal Pressure (Design) and pipe
weight

Expansion Load Case 16 - at Thermal


16 (EXP) L16=L6-L15
Temperature Design

Occasional Load Case 17 – Taken load seismic


17 (OCC) L17=L7-L6
acceleration along (+) X axis. (Code compliance)

Occasional Load Case 18 – Taken load seismic


18 (OCC) L18=L8-L6
acceleration along (-) X axis. (Code compliance)

Occasional Load Case 19 – Taken load seismic


19 (OCC) L19=L9-L6
acceleration along (+) Y axis. (Code compliance)

Occasional Load Case 20 - Taken load seismic


20 (OCC) L20=L10-L6
acceleration along (-) Y axis. (Code compliance)

Page 9 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Numbe
Load Combination Description
r
Occasional Load Case 21 – Taken load Wind
21 (OCC) L21=L11-L6 acceleration of Wind X direction. (Code
compliance)

Occasional Load Case 22 – Taken load Wind


22 (OCC) L22=L12-L6 acceleration of Wind –X direction. (Code
compliance)

Occasional Load Case 23 – Taken load Wind


23 (OCC) L23=L13-L6 acceleration of Wind Load +Y direction. (Code
compliance)

Occasional Load Case 24 – Taken load Wind


24 (OCC) L24=L14-L6 acceleration of Wind Load –Y direction. (Code
compliance)

Occasional Load Case 25 – Sustain + Seismic


25 (OCC) L25=L17+L15
acceleration along (+) X axis. (Code compliance)

Occasional Load Case 26 – Sustain + Seismic


26 (OCC) L26=L18+L15
acceleration along (-) X axis. (Code compliance)

Occasional Load Case 27 – Sustain + Seismic


27 (OCC) L27=L19+L15
acceleration along (+) Y axis. (Code compliance)

Occasional Load Case 28 – Sustain + Seismic


28 (OCC) L28=L20+L15
acceleration along (-) Y axis. (Code compliance)

Occasional Load Case 29 – Sustain + Wind


29 (OCC) L29=L21+L15
acceleration along (+) X axis. (Code compliance)

Occasional Load Case 30 – Sustain + Wind


30 (OCC) L30=L22+L15
acceleration along (-) X axis. (Code compliance)

31 Occasional Load Case 31 – Sustain + Wind


(OCC) L31=L23+L15
acceleration along (+) Y axis. (Code compliance)

32 Occasional Load Case 32 – Sustain + Wind


(OCC) L32=L24+L15
acceleration along (-) Y axis. (Code compliance)

33 (OCC) Occasional Load Case 33– Max seismic


L33=L25.L26,L27,L28 acceleration + Sustain

34 (OCC) Occasional Load Case 34 – Max Wind


L34=L29,L30,L31,L32 acceleration + Sustain

Page 10 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

5. SRESS ANALYSIS RESULTS

5.1. Code Compliance


The Steam LMB-A to Steam Vessel design of Lumut Balai Geothermal FCRS

Project described above was found to be code compliant to ASME B31.1.

Power Piping. The pipe stress and flexibility analysis results are provided in

Appendix F.

5.2. Maximum Stress Summary


Table 5.1 – Maximum Stress Summary

Code
Numbe Allowable Ratio
Load Combination Node Stress Remarks
r (lb/in2) (%)
(lb/in2)

1 (SUS) W+P1 550 4888.9 17100.0 43.3 PASS

2 (EXP) L16=L6-L15 610 40522.0 46216.8 87.0 PASS

3 (OCC) L33=L25.L26,L27,L28 589 8447.1 19665.0 43.0 PASS

4 (OCC) L34=L29,L30,L31,L32 568 7621.4 19665.0 38.8 PASS


Note :
1. For All Case Ratio = (Calculated stress/Allowable Stress) Must Less than 100%
2. For ASME B 31.1, the operating case has no allowable stress value

40522.0 lb/in2
(Node = 160)

Figure 5.1 Maximum Stress

Page 11 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

5.3. Maximum Displacement Summary


Table 5.2 - Maximum Displacement Summary

Displacement - X Displacement - Y Displacement Z


No Load Case
Value Value Value
Node Node Node
(mm) (mm) (mm)

1 (EXP) L15=L5-L14 1329 -86.258 588 -122.817 610 59.620

-86.258 mm
(Node = 1329)

Figure 5.2 Maximum Axial Displacement (X Direction)

-122.817 mm
(Node = 588)

Figure 5.3 Maximum Axial Displacement (Y Direction)

Page 12 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

59.620 mm
(Node = 610)

Figure 5.4 Maximum Vertical Displacement at (Z Direction)

5.4. Maximum Pipe Support Load and Moment Summary


From Table 5.3 - 5.4 are shown the summary load restraint for non-anchor pipe

support. The results are provided in Attachment K.


Table 5.3 - Maximum Pipe Support Load Summary Operating Case

No.
Maximum Force Load Case Node Force (N)
Support

Maximum X (OPE) W+D1+T1+P1 170 220256.8 SP-325

Maximum Y (OPE) W+D1+T1+P1 30 308227.8 SP-330

Maximum Z (OPE) W+D1+T1+P1 1990 -1672823 SP-265

Table 5.4 - Maximum Pipe Support Load Summary Occasional Load Case

Maximum Nod No.


Load Case Force (N)
Force e Support

(OCC) PS-750-
Maximum X 5077 84547.2
L33=L25.L26,L27,L28 025

(OCC)
Maximum Y 1990 -91728.32 SP-265
L33=L25.L26,L27,L28

(OCC)
Maximum Z 1990 -1030360 SP-265
L33=L25.L26,L27,L28

Page 13 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

From Table 5.5 - 5.8 are shown the summary load and moment restraint for

anchor pipe support. The results are provided in Attachment.


Table 5.5 - Maximum Anchor Load Summary Operating Case

No.
Maximum Force Load Case Node Force (N)
Support
Maximum X (OPE) W+D1+T1+P1 1130 278359.9 SP-294

Maximum Y (OPE) W+D1+T1+P1 1130 73054.5 SP-294

Maximum Z (OPE) W+D1+T1+P1 1130 5373.2 SP-294

Table 5.6 - Maximum Anchor Moment Summary Operating Case

Maximum Moment No.


Load Case Node
Moment (N.m) Support
Maximum X (OPE) W+D1+T1+P1 1130 290014.2 SP-294

Maximum Y (OPE) W+D1+T1+P1 1510 -68655.2 SP-281

Maximum Z (OPE) W+D1+T1+P1 1510 65738.7 SP-281

Table 5.7 - Maximum Anchor Load Summary Occasional Case

No.
Maximum Force Load Case Node Force (N)
Support
(OCC)
Maximum X 5096 -80045.6 PS-750-
L33=L25.L26,L27,L28
024

(OCC)
Maximum Y 1190 -91728.3 SP-265
L33=L25.L26,L27,L28

(OCC)
Maximum Z 1990 -1030360 SP-265
L33=L25.L26,L27,L28

Page 14 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Table 5.8 - Maximum Anchor Moment Summary Occasional Case


Maximum Moment No.
Load Case Node
Moment (N.m) Support
(OCC)
Maximum X 1130 -71189.6 SP-294
L33=L25.L26,L27,L28

(OCC)
Maximum Y 1130 -195774.9 SP-294
L33=L25.L26,L27,L28

(OCC)
Maximum Z 1510 -197072.7 SP-281
L33=L25.L26,L27,L28

5.5 Flange Check (NC-3658.3 Method)

Table 5.7 - Flange Check NC-3658.3

Bendin Allowabl
Torsion Flange
g G/C e Ratio
Node Momen AB (mm²) Stress
Moment (mm) Pressure %
t (N.m.) (psig)
(N.m.) /Stress
1000.0 16772.00
5092 7776 85452 8513.1 36000.0 23.65
0 0
1000.0 16772.00
5089 7776 82638 8232.7 36000.0 22.87
0 0
1000.0 16772.00
5086 7776 69892 6963.0 36000.0 19.34
0 0
1000.0 16772.00
5083 7776 70940 7067.4 36000.0 19.63
0 0
1000.0 16772.00
5082 7776 75824 7553.9 36000.0 20.98
0 0
1000.0 16772.00
5085 7776 68094 6783.8 36000.0 18.84
0 0

5.6 Nozzle Check

Table 5.8 – Nozzle Check at Separator LMB-A

Nod Ma Mb Mc Remark
Condition Fa N. Fb N. Fc N.
e N.m. N.m. N.m.
(OPE)
N2 -198205 338877 1126 7491 -19887 741402 Note 1
W+D1+T1+P1

Page 15 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Thermal Displacement
Vertical = 2.388 mm
Horizontal = 5.328 mm

Figure 5.5 Nozzle N2 Separator LMB-A

Table 5.8 – Nozzle Check at Steam Vessel

Nod Ma Mb Mc Remark
Condition Fa N. Fb N. Fc N.
e N.m. N.m. N.m.
(OPE)
N4 44362 -9022 -6987 98386 7156 -3961 Note 1
W+D1+T1+P1

Thermal Displacement
Vertical = 5.128 mm
Horizontal = 11.034 mm

Figure 5.6 Nozzle N4 Steam Vessel

Page 16 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Notes :
1. Summary for separator (N2) & steam vessel (N4) nozzle analysis have been
evaluated and the result are acceptable as per WRC 107 from recommendarion
ASME VIII Section 2 in para 4.5.15. The results as presented in Attachment L.
2. The nozzle allowable will be increased by mechanical to accomocate the load from
piping.
3. Piping recommended for the thickness and diameter of reinforcing pad at Nozzle (N1)
of separator shall be follow as per WRC calculation in attachment L.

6. SUMMARY AND RECOMMENDATION

6.1. Conclusion

Summary from Pipeline Stress Analysis for Steam LMB-A to Steam Vessel

design of Lumut Balai Geothermal FCRS showing that maximum pipeline stress

still less than Allowable Stress based on ASME B31.1.

6.2. Recommendation

Based on the result summary presented it is recommended:

 Using design pressure and temperature as the input for the analysis.

 Caused of thermal expansion, looping shall be provided.

 Pipe support shall be followed the detailed input types and locations of the

pipe support.

 The nozzle strength shall be increased to accommodate the load from piping.

7. ATTACHMENT

Attachment A – Line Stress Analysis


Attachment B – P&ID Markup
Attachment C – Alignment Sheet Drawing
Attachment D – Isometric Drawing
Attachment E – Isometric Extract Drawing
Attachment F – General Arrangement Mechanical Equipment
Attachment G – Caesar Model and Data Input
Attachment H – Input Echo
Page 17 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment I – Stress Summary


Attachment J – Displacement
Attachment K – Restraint Summary
Attachment L – Flange Leakage
Attachment M – Nozzle Check

Page 18 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment A – Line Stress Analysis

Page 19 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment B – P&ID Markup

Page 20 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment C – Alignment Sheet Drawing

Page 21 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment D – Isometric Drawing

Page 22 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment E – General Arrangement Separator

Page 23 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment F – Caesar Model and Data Input

Page 24 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment G – Input Echo

Page 25 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment H – Stress Summary

Page 26 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment I – Displacement

Page 27 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment J – Restraint Summary

Page 28 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment K – Flange Leakage

Page 29 of 30
PIPE STRESS AND FLEXIBILITY ANALYSIS REPORT FOR STEAM FROM LMB-A TO
STEAM VESSEL
Document No. Rev No. Contract No.
LMB2-E-FC-PIP-OCS-MS1-0015 C 459/PGE000/2022-S0

Attachment L – Nozzle Check

Page 30 of 30