DETAILED CONSTRUCTION SCHEDULE

Pipe Fabrication Works


Tangguh UCC Onshore Project
PT. JGC Indonesia

MONTH
NO. 2025 2026 Remarks
DESCRIPTION

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

1 Project Award
1,1 Contract Award

2 Preparation Work
2,1 Temparary site facility (Site office, workshop, etc)
2,2 Equipment, tools preparation & mobilization
2,3 Manpower mobilization
2,4 Purchase material consumable
2,5 Engineering

3 Steel Strucure Fabrication


3,1 Area A100
3,2 Area A200
3,3 Area A300
3,4 Area B000

4 Piping Shop Fabrication


4,1 Area A100
4,2 Area A200
4,3 Area A300
4,4 Area B000