ATTACHMENT-4 ATTACHMENT-4

ESTIMATED UTILITIES CONSUMPTION ESTIMATED UTILITIES CONSUMPTION

CONTRACT MONTH MAX.


DESCRIPTION UNIT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 DAILY RATE

1. POTABLE WATER

WORKSITE M3/MONTH

TEMPORARY AREA M3/MONTH

2. INDUSTRIAL WATER

WORKSITE M3/MONTH 5.2 6.3 7 7.3 18.4 18.4 17.3 16.3 11.1 11.3 13.3 17.8 22.4 22.4 22.4 17.8 17.8 11.1 11.1 11.1

TEMPORARY AREA M3/MONTH

3. ELECTRIC POWER

WORKSITE KWH/MONTH 475 475 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500

TEMPORARY AREA KWH/MONTH

4. FUEL FOR CONST. EQUIPMENT LT/MONTH


SUPPLIED BY JGC

5. FUEL FOR CONST. EQUIPMENT LT/MONTH


OF CONTRACTOR

6. GAS

6.1 ACETYLEN KG/MONTH

6.2 OXYGEN M3/MONTH

6.3 ARGON M3/MONTH

6.4 NITROGEN M3/MONTH

6.5 PROPANE KG/MONTH

Remarks : The Bidder shall also quote Maximum Daily Rates estimated to be consumed at the peak.