OPERATION & MAINTENANCE MANUAL

SUBMITTAL
FOR
FIRE RATED GLASS PARTITION AND DOORS

NBKA Mercedes Benz Service Centre Refurbishment


Client: Nasser Bin Khaled Automobiles.

Consultant: GHD Global Pty. Ltd.

Contractor: National Industrial Contracting Company.

MEP Contractor: Nabina Aluminum and Glass Factory.


Table of Contents

1. Introduction
2. How to Use the Manual
3. System Details and Description, Sequence of Operation
4. Supplier/Manufacturer /Contractor/Company Information and
Details
5. Equipment List & Schedule
6. Product Data & Technical Catalogue
7. Manufacturer's OMM Manual
8. Preventive Maintenance Schedule and Troubleshooting Guide
9. Health, Safety and Emergency Procedure
10. Spare Parts List & Manufacturer's Recommended Spare Parts
11. As-built Drawings and Reference List
12. Testing and commissioning Reports/Data
13. Guarantees, Warranties, and Certificates
14. Training Logs of End-User
1.1 Introduction:
List of Materials
S/n Description Manufacturer Country of Origin Remarks
1 Fire Rated Glass Vetrotech India
2 905065 ATHMER STADI L-24/20 TS L 1050mm, 150mm cut Forster Switzerland
3 907350 DOOR HANDLE INOX nut spindle 9mm Forster Switzerland
4 Door weatherstripping Forster Switzerland
5 Locking pin Forster Switzerland
6 Automatic drop seal Forster Switzerland
7 Weld-on hinge Forster Switzerland
8 Door Handle Forster Switzerland
9 Door keep Forster Switzerland
10 Single mortise lock Forster Switzerland
11 Intumescent strips Forster Switzerland
12 Fire resistant glazing tape Forster Switzerland
13 Glazing beads Forster Switzerland
14 Profiles Steel Forster Switzerland
15 Door Closer Dormakaba Switzerland/ China
17 Silicon sealant Nullifire UK
18 Rockwool Qatar Rockwool Qatar
19 Fasteners Fischer German
20 Coating Jotun Oman
21 Door Cylinder Consort UK
r
I! �V\I 1 uYgL...o.JJ�Wbg..Juj-11
NATIONAl INOUITRIAl CONTRACTING COMIANY
<..:ilJ� �L....:, 0--IJ-----l=>L.J
NASSER BIN KHA LED AUTOMOBILES
wt AlUMl�IUM
& GlASS rAC o��

4.1 Supplier/ Contractor/ Manufacturer Details


4.1.1 Profile Manufacture/Supplier's Details

Supplier Name Forster Profile Systems


Address P.O. Box 341484
Telephone No +971 450 159 33
Fax No +9714 3724 060
Email david.mills@forster.ch
Contact Person David Mills
Contract No +97155 7569 385

4.1.2 Glass Manufacture/Supplier's Details

Supplier Name Vetrotech Saint Gobain


Address 18, Rukmani Lakshmipathi Rd, Egmore Channai 600008
Telephone No +91 44 459 36 075
Fax No +974-4455 3260
Email india(@vetrotech.com
Contact Person Vetrotech Saint Gobain
Contract No +91 44 459 36 075

4.1.3 Main Contractor Details

Contractor Name National Industrial Contracting Company W.L.L.


Address PO Box 3713
Telephone No +974-4467 8972
Fax No +974-4455 3260
Email niccdh@qatar.net.qa
Contact Person Engr. Arnaldo Paradero
Contract No +974-6671 1866

4.1.4 Fabricator and Installer

Manufacturer Name Nabina Aluminum and Glass Factory


Address Zone 47, Street 310 Bldg 396
Telephone No +974-44654659
Fax No +974-44652786
Email nagf@nabina.com
Contact Person Ramy Hussien
Contract No +974-30595388
FORSTER
VETROTECH SAINT GOBAIN
FORSTER
VETROTECH SAINT GOBAIN
Maintenance Schedule for Fixed Windows/Partitions

S/n Description Frequency Performing Party Remarks


1 Clean accessible vision glass. Monthly Owner/Occupants
2 Clean all exterior surfaces of windows, 3 months Owner/Occupants
including frames
3 Lubricate and adjust operable vent Annually Owner/Occupants
hardware.
4 Replace or repair gaskets and Assessment FR contractor Within warranty
weatherstripping as required period if there any
Damage
5 Metal windows: check for signs or rust Assessment Owner/Occupants
or oxidization.
6 Operability: check for dislodged Assessment Owner/Occupants
gaskets or misaligned frames where
the gaskets are not in full contact upon
closing

Maintenance Schedule for Doors

S/n Description Frequency Performing Party Remark


1 Clean all exterior surfaces of doors, 3 months Owner/Occupants
including frames, flashing and
threshold tracks
2 Lubricate and adjust door hardware as Annually Owner/Occupants
required. Check rollers, hinges,
locksets, strike plates and closing
devices for loose attaching screws,
wear or other notable defects. The
door should swing freely without
obstruction and latch without requiring
additional force.
3 Review interior sealant. Repair as Assessment Owner/Occupants/FR
required. Contractor
4 Repair swing doors and associated With FR Contactor With warranty
components as required. warranty Period
period
5 Replace or repair gasket and Assessment FR Contractor With Warranty
weatherstripping as required. Period
6 Re-paint steel door finish for steel Assessment Owner/Occupants/FR Repaired within
frame doors Contractor warranty period
GENERAL HEALTH AND SAFETY POLICY FOR
SUPPLY & INSTALLATION OF

Project: NBKA Mercedes Benz Service Centre Refurbishment

Location: Doha; Qatar

Document No: 001 Revision No. : 00

Prepared by: Reviewed by: Reviewed by: Approved by:

Name Ramy Hussain


Project Manager
Job Title

Signature

Date 12.03.2024

1
1 General Health and Safety Policy

All worker involved in the project should be inducted on the Safety,


Health and Environmental Issues before they are allowed to work at the
site.
Ensure the working area is in safe conditions and maintain good
housekeeping.
Ensure to carry out the first aid and emergency response according to
Hazard Risk Assessment.
Equipment and machineries use for transportation and on-site mortar
mixing shall be in good condition and shall have a valid certificate (Third
Party Certificate).
Ensure that proper PPE equipment is provided to all personnel before
entering the site.
Tool-box talks over hazards and risks involved shall be conducted to all
personnel employed in the works prior to starting the activities.
The equipment shall be left in clean condition and free from debris.
Employees shall not be allowed to work above or in positions exposed to
protruding reinforcing steel without proper protection. Protruding steel,
on to and into which employees could fall shall be guarded to eliminate
the hazard of emplacement.
Dangerous exposed protruding steel that can be susceptible of creating
an accident must be covered with a Cap / Cover.

2 Risks
Hazard identification and risk assessment shall be carried out within 2
weeks of mobilization of the project.
Projects shall establish, implement and maintain the on-going
identification of hazards, assessment of their risk and determining the
necessary controls. Keep the records up-to-date and shall be reviewed
periodically.
Job safety analysis shall be done to integrate accepted safety and health
principles and practices into a particular job or task. Each job or task will
be analyzed by breaking them down into distinct steps to identify the
hazards and precautions and implemented with the aim of ensuring a
safe job execution.

3 Health
a. Sanitary Facilities
o All basic sanitary facilities will be available on site.
b. Health Care Facilities
o QU shall provide the number of First aid boxes furnished with the
medicines, tools and equipment. The First Aid box shall be
available in offices of Clients, QU, Satellite and res shelters
depending on number of employees.
o A first aider shall be provided for every 25 workers.
2
o QU shall appoint a full-time medical nurse at site in addition to the
first-aid box.

4 Safety
a. Induction
o QU will provide sustainability awareness thru induction & Training
of all personnel prior to discharging them of their duties and
responsibilities in the site.
b. Anticipated Risks
o Movement of vehicles & heavy equipment
o Dust accumulation
o Working near excavation and sea
c. Permits and Certification
The following work permits and certificates shall be available in the work
area as
required.
o Lifting permit;
o Working permit for confines space;
o Valid registration, 3rd Party certificates & insurance for heavy
equipment
o Valid licenses and insurances for operators.
d. Inspections
o Heavy equipment shall have third party certifications and shall be
regularly inspected with the approved required daily checklist to
ensure high quality standards and efficient equipment are being
used.

e. Personal Protective Equipment (PPE)

MANDATORY PERSONAL PROTECTIVE EQUIPMENT

Safety Shoes Hard Hi- Vest Coverall Safety Glass Safety gloves
hat/Safety (Cotton
Helmet Gloves/
Leather
Gloves)

3
Appropriate PPE shall be worn as per the work required but not limited to the
mandatory PPE.
f. Traffic Plan and regulation
o QU shall submit a Traffic Diversion Plan detailing the required
number of equipment, planning of the works, layout of the access
road, required road signage and to strictly adhere as such;
g. Information dissemination
Health and safety knowledge shall be disseminated and cascaded from top
management to the ordinary workers through:
o Site Induction
o Safety Toolbox
o Bulletin Boards
o Training Courses
o Group Discussions
o Site Instructions
o Engineers, Supervisors & Foreman
h. Site Night Works
o Working in the night shift will be arranged with all the necessary
Safety and Health facilities. Site Representative for supervision
will be available and Client approval will be secured for working
at night.
o QU shall provide lighting to avoid visual fatigue and prevent glare

o During night operations only clear or amber colored safety glasses


shall be worn. Contact lenses are allowed to be worn with eye
protection except while using a respirator.
o In every part of the area under which QU has control and where
persons are working or passing, QU shall ensure lighting, whether
natural or artificial. This measure shall also prevent the
formation of shadows. In particular access & escape routes to be
lighted properly.
o Any general lighting source shall be mounted at a height sufficient
to keep it well above the line of normal vision.
o Any local lighting source shall be mounted and arranged so as to
confine the light to the immediate area to be illuminated.
o Barricade the Hazardous area and use flashing lights.
o Keep combustible materials away from lights.
o Personnel to wear high visibility reflective vest.

4
5 COVID-19 (Corona virus)

Construction sites operating during the Coronavirus Covid-19 pandemic MUST ensure the
workforce is protected and the risk of spread of infection is minimized. The guidance
contained within this document is intended to introduce consistent measures on
sites of all sizes in line with -MoPH)
recommendations on social distancing. The health and safety requirements of any
construction activity MUST also not be compromised at this time. If an activity
cannot be undertaken safely due to a lack of suitably qualified personnel
being available or social distancing being implemented, it should not take place.

a) Site Access point:

1) Stop all non-essential visitors


2) Introduce staggered start and finish times to reduce congestion and contact at all
times
3) Monitor site access points to enable social distancing you may need to change
the number of access points, either increase to reduce congestion or decrease to
enable monitoring
4) Remove or disable entry systems that require skin contact i.e. fingerprint
scanners
5) Require all workers to wash or clean their hands before entering or leaving the
site
6) Allow plenty of space (two meter) between people waiting to enter site
7) Regularly clean common contact surfaces in reception, office, access control and
delivery areas i.e. scanners, turnstiles, screens, telephone handsets, desks,
particularly during peak flow times
8) Reduce the number of people in attendance at site inductions and consider
holding them outdoors wherever possible
9) Drivers should remain in their vehicles if the load will allow it and MUST wash or
clean their hands before unloading goods and materials.
10) Reminding workers not to come to site if they have symptoms of Coronavirus
and to follow recommended guidance.

b) Hand Washing

11) Allow regular breaks for keeping clean and washing hands.
12) Provide additional hand washing facilities to the usual welfare facilities if a large
spread out site or significant numbers of personnel on site.
13) Ensure soap and fresh water is readily available and kept topped up at all times
14) Provide hand sanitizer (minimum 60% alcohol content) where hand washing
facilities are unavailable.
15) Regularly clean the hand washing facilities and check soap and sanitizer levels.
16) Provide suitable and sufficient rubbish bins for hand towels with regular removal
and disposal.
5
17) Sites will need extra supplies of soap, hand sanitizer and paper towels and these
should be securely stored.

c) Additional PPE requirements (COVID-19)

1) Due to the current situation with Covid-19, all personnel require additional PPE
to be used at all times to prevent spread and to reduce human contact, all
operatives are required to utilise the following PPE alongside their standard kit
(the only exception being that machine operators may remove their masks and
goggles (only all other PPE to remain in use) whilst within the cab and
operating the machine.
2) The additions to the required PPE will act as an additional protective measure
against the potential spread of the disease. The additional PPE detailed within
this section should also be
3) upheld where possible during breaks and resting times. This is mandatory and
enforcement will be paramount.

Additional PPE:
Glasses / goggles.
Latex Gloves (to be worn under protective working gloves).
PPE or Half Mask with Filter.

6 First Aid and Emergency Service Response

The primary responsibility is to preserve life and first aid should be administered if
required and until the emergency services attend.

1) Emergency Response Plans (ERP) including contact details should be kept up to


date.
2) Consideration must also be given to potential delays in emergency services
response, due to the current pressure on resources.
3) Consider preventing or rescheduling high-risk work or providing additional
competent first aider.

We shall notify management of the said fire or accident/incident, either directly in


person or by radio or telephone communication on Emergency Telephone Number:

6
Emergency
Authority Name Area of Responsibility Contact
Number
Emergency and
Ambulance, Police &
Emergency Service Regulatory 999
Fire Department
Department
Water and Electricity
Emergency Service KHARAMAA 991
Emergency
Accidents &
(+974) 4439
Emergency Service HAMAD Hospital Emergency Hamad
2111
Hospital
Operation Ratheesh Panicker Operation Manager +974 66685249
Manager
Project Manager Ramy Hussein Project Manager +974

Site HSE

7
SECTION O7

AS-BUILT DRAWING
1 2 3 4 5 6 7 8 9 10 11 12

07
-
03
P
U
A A
-

33 FI RE HARDSTANDING

3
KEY PLAN
LEGEND:-
FIRERATED GLASS - EW90 & EW120
02
- G-1.1 20MM THK. CONTRAFLAM LITE WITH EW120 FOR FIX PARTITION
B EW120 14MM THK. CONTRAFLAM LITE WITH EW90 FOR DOOR PANELS B

FIRERATED PROFILE

FIRE RATED PROFILE FROM FORSTER


06
- WET PAINT SYSTEM: RAL 9011/BLACK

FFL+0.00
FFL

SSL -0.100

C C

01 ELEVATION VIEW FROM OUTSIDE 03 TYPICAL SECTION


- SCALE 1: 20 - SCALE 1:20

KEY PLAN
Scale : nts

D D

04 05 75-11179-A1106
- - 75-11179-A9111
75-11179-A9112
ZEN-NBKA MBSCR-IADQ-FFL-01-02

NICC-J220-SDW-ARCH-FR-015-016
NICC-J220-SDW-ARCH-FR-016-016
NICC-J220-SDW-ARCH-001 (3 of 6)
NICC-J220-SDW-ARCH-059
E E

NICC-J220-ASB-ARCH-1103
NICC-J220-ASB-ARCH-9185
NICC-J220-ASB-ARCH-1452

02 PARTIAL PLAN VIEW


- SCALE 1:20

04 DETAILS - 04 05 DETAILS - 05 CLIENT


02 SCALE 1: 3 02 SCALE 1: 3
F F

G-1.1- EW120 HINGED DOORSYSTEM FROM SUPERVISION CONSULTANT


FORSTER PRESTO SERIES GHD Level 23 Al Asmakh Tower West Bay
PO Box 14352 Doha, Qatar
T 974 4428 9444 F 974 4444 6127
E dohmail@ghd.com W www.ghd.com

CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY

P.O.Box : 3713
TEL : 44678972
Doha- Qatar
G G
HARDWARE LIST
PROJECT NAME
ITEM & DESCRIPTION
NBKA MERCEDES-BENZ SERVICE
CENTRE REFURBISHMENT
DWG Type :- AS-BUILT DRAWING
DRAWING TITLE

250 G-1.1 EW120 HINGED DOOR


H H
Drawn: Mazoon Approved: A.L. Paradero
Checked: Refai Scale: as-shown on A1
Date:
06 DETAILS - 06 07 DETAILS - 07
13-Aug2023
Drawing number: REV.:
03 SCALE 1: 3
03 SCALE 1: 2
NICC-J220-ASB-ARCH-6156 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

M-1.1- EW60 HINGED DOORSYSTEM FROM


FORSTER PRESTO SERIES 07 OUT OF SCOPE NEI GHB OUR BUI LDI NG

- T P
O + 1 5. 0

T P
O
+ 1 5. 0
M E TA L R O F N
I G T P
O
+ 1 5. 0

M E TA L G TU T E
R

S S
L + 5 4. 6
+ 6.8 0
T P
O T P
O + 86. 0

3
A - A

HARDWARE LIST
ITEM & DESCRIPTION
KEY PLAN
LEGEND:-
FIRERATED GLASS - EW90 & EW120
01
19

18

17
M-1.01
EW60
02 16
03 15
04 14
05 13
06 12

20MM THK. CONTRAFLAM LITE WITH EW120 FOR FIX PARTITION


07 11
08 10

09

B 02 14MM THK. CONTRAFLAM LITE WITH EW90 FOR DOOR PANELS


B
-
FIRERATED PROFILE

FIRE RATED PROFILE FROM FORSTER

WET PAINT SYSTEM: RAL 9011/BLACK

06
-

C C

04
05
-
-

01 ELEVATION VIEW FROM OUTSIDE


- SCALE 1: 16 03 TYPICAL SECTION KEY PLAN
- SCALE 1: 16 Scale : nts

D D

75-11179-A1206
75-11179-A9111
75-11179-A9113

02 PLAN VIEW 75-11179-A9102

- SCALE 1: 16
NICC-J220-SDW-ARCH-FR-017-018
NICC-J220-SDW-ARCH-FR-018-018
NICC-J220-SDW-ARCH-002 (3 of 5)
NICC-J220-SDW-ARCH-072 (4 of 5)
E E
NICC-J220-SDW-RF-007

NICC-J220-ASB-ARCH-1203
NICC-J220-ASB-ARCH-9185
NICC-J220-ASB-ARCH-9202
NICC-J220-ASB-ARCH-1209

06 DETAILS - 06
03 SCALE 1: 3 CLIENT

F F

SUPERVISION CONSULTANT

GHD Level 23 Al Asmakh Tower West Bay


PO Box 14352 Doha, Qatar
T 974 4428 9444 F 974 4444 6127
E dohmail@ghd.com W www.ghd.com

CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY

P.O.Box : 3713
TEL : 44678972
Doha- Qatar
G G

PROJECT NAME

NBKA MERCEDES-BENZ SERVICE


CENTRE REFURBISHMENT
DWG Type :- AS-BUILT DRAWING

04 DETAILS - 04 05 DETAILS - 05 DRAWING TITLE


02 SCALE 1: 2
02 SCALE 1: 2 M-1.01 EW60 HINGED DOOR

H H
Drawn: Mazoon Approved: A.L. Paradero
Checked: Refai Scale: as-shown on A1
Date: 13-Aug2023
07 DETAILS - 07 Drawing number: REV.:
03 SCALE 1: 2 NICC-J220-ASB-ARCH-6157 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

M-1.2- EW60 HINGED DOOR SYSTEM FROM OUT OF SCOPE

FORSTER PRESTO SERIES


NEI GHB OUR BUI LDI NG

FIRE CLASSIFICATION &


DOOR
T P
O + 1 5. 0

RATING 14MM THK. CONTRAFLAM LITE WITH EW60 T P


O
+ 1 5. 0
M E TA L R O F N
I G T P
O
+ 1 5. 0

M E TA L G TU T E
R

S S
L + 5 4. 6
+ 6.8 0
T P
O T P
O + 86. 0

FRAME WET PAINT SYSTEM (RAL 9011/BLACK)


A A
QUANTITY 1 NOS.

LOCATION EXTERNAL

HARDWARE LIST
ITEM & DESCRIPTION

07 KEY PLAN
6159 LEGEND:-
03 FIRERATED GLASS - EW90 & EW120
- 01
19

18

17
M-1.02
EW60
02 16
03 15
04 14
05 13
06 12

20MM THK. CONTRAFLAM LITE WITH EW120 FOR FIX PARTITION


07 11
08 10

09

B B
14MM THK. CONTRAFLAM LITE WITH EW90 FOR DOOR PANELS

FIRERATED PROFILE

FIRE RATED PROFILE FROM FORSTER

WET PAINT SYSTEM: RAL 9011/BLACK

02
C C
-
04 05 6
- - - PASSIVE ACTIVE
LEAF LEAF

08
W4 W4
6159

KEY PLAN
Scale : nts

D D

02 PLAN VIEW 75-11179-A1206


75-11179-A9111

- SCALE 1: 16 03 TYPICAL SECTION


01 ELEVATION VIEW FROM OUTSIDE
75-11179-A9113
75-11179-A9102

- SCAL 1: 16 - SCALE 1:16


NICC-J220-SDW-ARCH-FR-013-014
NICC-J220-SDW-ARCH-FR-014-014
NICC-J220-SDW-ARCH-002 (3 of 5)
NICC-J220-SDW-ARCH-072 (4 of 5)
E E
NICC-J220-SDW-RF-007

NICC-J220-ASB-ARCH-1203
NICC-J220-ASB-ARCH-9185
NICC-J220-ASB-ARCH-9202
NICC-J220-ASB-ARCH-1209

CLIENT

F F

SUPERVISION CONSULTANT

GHD Level 23 Al Asmakh Tower West Bay


PO Box 14352 Doha, Qatar
T 974 4428 9444 F 974 4444 6127
E dohmail@ghd.com W www.ghd.com

CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY

P.O.Box : 3713
TEL : 44678972
Doha- Qatar
G G

PROJECT NAME

NBKA MERCEDES-BENZ SERVICE


05 DETAILS - 05 CENTRE REFURBISHMENT
04 DETAILS - 04 02 SCALE 1: 2 06 DETAILS - 06
02 SCALE 1: 2
DWG Type :- AS-BUILT DRAWING
02 SCALE 1: 2
DRAWING TITLE

M-1.02 EW60 HINGED DOOR


SHEET 1 OF 2
H H
Drawn: Mazoon Approved: A.L. Paradero
Checked: Refai Scale: as-shown on A1
Date: 13-Aug2023
Drawing number: REV.:
NICC-J220-ASB-ARCH-6158 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

OUT OF SCOPE NEI GHB OUR BUI LDI NG

T P
O + 1 5. 0

T P
O
+ 1 5. 0
M E TA L R O F N
I G T P
O
+ 1 5. 0

M E TA L G TU T E
R

S S
L + 5 4. 6
+ 6.8 0
T P
O T P
O + 86. 0

A A

KEY PLAN
LEGEND:-

B B

C C

08 DETAILS - 08
07 DETAILS - 07
6158 SCALE 1: 2 6158 SCALE 1: 2
D D

75-11179-A1206
75-11179-A9111
75-11179-A9113
75-11179-A9102

NICC-J220-SDW-ARCH-FR-013-014
NICC-J220-SDW-ARCH-FR-014-014
NICC-J220-SDW-ARCH-002 (3 of 5)
NICC-J220-SDW-ARCH-072 (4 of 5)
E E
NICC-J220-SDW-RF-007

NICC-J220-ASB-ARCH-1203
NICC-J220-ASB-ARCH-9185
NICC-J220-ASB-ARCH-9202
NICC-J220-ASB-ARCH-1209

CLIENT

F F

SUPERVISION CONSULTANT

GHD Level 23 Al Asmakh Tower West Bay


PO Box 14352 Doha, Qatar
T 974 4428 9444 F 974 4444 6127
E dohmail@ghd.com W www.ghd.com

CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY

P.O.Box : 3713
TEL : 44678972
Doha- Qatar
G G

PROJECT NAME

NBKA MERCEDES-BENZ SERVICE


CENTRE REFURBISHMENT
DWG Type :- AS-BUILT DRAWING
DRAWING TITLE

M-1.02 EW60 HINGED DOOR


SHEET 2 OF 2
H H
Drawn: Mazoon Approved: A.L. Paradero
Checked: Refai Scale: as-shown on A1
Date: 13-Aug2023
Drawing number: REV.:
NICC-J220-ASB-ARCH-6159 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

OUT OF SCOPE NEI GHB OUR BUI LDI NG

T P
O + 1 5. 0

T P
O
+ 1 5. 0
M E TA L R O F N
I G T P
O
+ 1 5. 0

M E TA L G TU T E
R

S S
L + 5 4. 6
+ 6.8 0
T P
O T P
O + 86. 0

A A

3
-

2 KEY PLAN
-
F F LEGEND:-
FIRERATED GLASS - EW90 & EW120
01
19

18

17
HR-1.1
EW60
02 16
03 15
04 14
05 13
06 12

20MM THK. CONTRAFLAM LITE WITH EW120 FOR FIX PARTITION


07 11
08 10

09

B B
14MM THK. CONTRAFLAM LITE WITH EW90 FOR DOOR PANELS

FIRERATED PROFILE

FIRE RATED PROFILE FROM FORSTER


1 ELEVATION
- SCALE 1: 12 WET PAINT SYSTEM: RAL 9011/BLACK

04 05 06
- - -
C C

07 DETAILS - 07
2 SCALE 1: 2

KEY PLAN
Scale : nts

D D
2 PLAN FOR HR-1.1
- SCALE 1: 12
75-11179-A1206
75-11179-A9111
75-11179-A9121
75-11179-A9131
75-11179-A9132

NICC-J220-SDW-ARCH-FR-011-012

07 NICC-J220-SDW-ARCH-FR-012-012
NICC-J220-SDW-ARCH-002 (3 of 5)
- NICC-J220-SDW-ARCH-SC-002 (3 of 5)
E E

HR-1.1- EW60FIXED WINDOW SYSTEM NICC-J220-ASB-ARCH-1203

FROM FORSTER PRESTO SERIES NICC-J220-ASB-ARCH-1462


NICC-J220-ASB-ARCH-9193
NICC-J220-ASB-ARCH-1209
08
-
CONTRAFLAM LITE 60, 14MM

08 DETAILS - 08 CLIENT

F 2 SCALE 1: 2 F

SUPERVISION CONSULTANT

GHD Level 23 Al Asmakh Tower West Bay


PO Box 14352 Doha, Qatar
3 TYPICAL SECTION T 974 4428 9444 F 974 4444 6127
E dohmail@ghd.com W www.ghd.com
- SCALE 1:12
CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY

P.O.Box : 3713
TEL : 44678972
Doha- Qatar
G G

PROJECT NAME

NBKA MERCEDES-BENZ SERVICE


CENTRE REFURBISHMENT
DWG Type :- AS-BUILT DRAWING
DRAWING TITLE

HR-1.01 EW60
FIXED WINDOW
H H
Drawn: Mazoon Approved: A.L. Paradero
Checked: Refai Scale: as-shown on A1
Date: 14-Aug2023
04 DETAILS - 04 05 DETAILS - 05 06 DETAILS - 06 Drawing number: REV.:
2 SCALE 1: 2 2 SCALE 1: 2 2 SCALE 1: 2 NICC-J220-ASB-ARCH-6201 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

E OUT OF SCOPE NEI GHB OUR BUI LDI NG

- T P
O + 1 5. 0

T P
O
+ 1 5. 0
M E TA L R O F N
I G T P
O
+ 1 5. 0

M E TA L G TU T E
R

S S
L + 5 4. 6
+ 6.8 0
T P
O T P
O + 86. 0

03
A - A

F F F F KEY PLAN
01
- LEGEND:-
4 FIRERATED GLASS - EW120
GP31

14MM THK. CONTRAFLAM LITE WITH EW120


B 01
19
18
17
GP31
5 3 GP31

B
02 16
03 15
04 14
05 13
06 12
07 11
08 10

09

FIRERATED PROFILE
D
GP31
6 2 GP31

FIRE RATED PROFILE FROM FORSTER


-
02 PARTIAL ELEVATION FOR (GP-29 & GP31)
- SCALE 1: 16
GP31
7 1 GP31

03 TYPICAL SECTION FOR (GP-29 & GP31)


- SCALE 1: 16
A B C
- - - 7 GP31

GP31
8

C GP31
C
GP31
9 6

GP31
10 GP31

GP31
11 GP31

01 PARTIAL PLAN FOR (GP-29 & GP31)


- SCALE 1: 16 GP31
12 GP31

D D

GP31
13
GP31
75-11179-A1206 & A1209
GP29
75-11179-A9121

18 75-11179-A9131
75-11179-A9132
GP31
14 GP31

GP31

15 NICC-J220-SDW-ARCH-FR-009-010
NICC-J220-SDW-ARCH-FR-010-010
NICC-J220-SDW-ARCH-FR-011-011
NICC-J220-SDW-ARCH-002 (1 of 5)
GP29
16 17 NICC-J220-SDW-ARCH-014 (3 of 5)
NICC-J220-SDW-ARCH-SC-002 (1 of 5)
E GP29 E

NICC-J220-ASB-ARCH-1200
NICC-J220-ASB-ARCH-1209
NICC-J220-ASB-ARCH-1460
18 Nos. Fixed Window without NICC-J220-ASB-ARCH-9191
Aluminum Flashing
Scale : nts

DETAIL - A DETAIL - B DETAIL - C


CLIENT
A B C
F F
01 SCALE 1: 2 01 SCALE 1: 2 01 SCALE 1: 2

SUPERVISION CONSULTANT

GHD Level 23 Al Asmakh Tower West Bay


PO Box 14352 Doha, Qatar
T 974 4428 9444 F 974 4444 6127
E dohmail@ghd.com W www.ghd.com

CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY

P.O.Box : 3713
TEL : 44678972
Doha- Qatar
G G

PROJECT NAME

GP-29 & GP-31- EW120 FIXED WINDOW FROM NBKA MERCEDES-BENZ SERVICE
FORSTER PRESTO SERIES CENTRE REFURBISHMENT
DWG Type :- AS-BUILT DRAWING
DRAWING TITLE
GP-29 & GP-31
CONTRAFLAM LITE120, 14MM 18 Nos. FIXED WINDOW
WITHOUT ALUMINUM FLASHING
SHEET - 1 of 2
H H
Drawn: Mazoon Approved: A.L. Paradero
Checked: Refai Scale: as-shown on A1

D DETAIL - D E DETAIL - E Date: 15-Aug2023


Drawing number: REV.:
03 SCALE 1: 2 03 SCALE 1: 2 NICC-J220-ASB-ARCH-6203 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

E
OUT OF SCOPE NEI GHB OUR BUI LDI NG

6203 T P
O + 1 5. 0

T P
O
+ 1 5. 0
M E TA L R O F N
I G T P
O
+ 1 5. 0

M E TA L G TU T E
R

S S
L + 5 4. 6
+ 6.8 0
T P
O T P
O + 86. 0

3A
A - A

F F F F KEY PLAN
1A LEGEND:-
-
GP31 FIRERATED GLASS - EW120
3
14MM THK. CONTRAFLAM LITE WITH EW120
GP31
GP31
19

18
01 17

B B
02 16
03 15
04 14
05 13
06 12
07 11
08 10

09

GP31 2 GP31 FIRERATED PROFILE

D FIRE RATED PROFILE FROM FORSTER


6203
1
GP31 GP31

2A PARTIAL ELEVATION FOR GP-31 3A TYPICAL SECTION FOR GP31


- SCALE 1: 16 - SCALE 1: 16
GP31
7 GP31

C 6 C
GP31

GP31

1A
-

A B 5
F G
W9 GP31 GP31

6203 6203
- -

GP31 4 GP31

GP31 3 GP31

D D
C
6203 GP31
2 GP31

GP29
75-11179-A1206 & A1209
75-11179-A9121
75-11179-A9131

1 75-11179-A9132
GP31
GP31

GP31

1A PARTIAL PLAN FOR GP-31


NICC-J220-SDW-ARCH-FR-009-010
NICC-J220-SDW-ARCH-FR-010-010

- SCALE 1: 16 GP29
NICC-J220-SDW-ARCH-FR-011-011
NICC-J220-SDW-ARCH-002 (1 of 5)
NICC-J220-SDW-ARCH-014 (3 of 5)
GP29
NICC-J220-SDW-ARCH-SC-002 (1 of 5)
E E

NICC-J220-ASB-ARCH-1200
NICC-J220-ASB-ARCH-1209
NICC-J220-ASB-ARCH-1460
07 Nos. Fixed Window with NICC-J220-ASB-ARCH-9191
Aluminum Flashing
Scale : nts

CLIENT

F F

SUPERVISION CONSULTANT

GHD Level 23 Al Asmakh Tower West Bay


PO Box 14352 Doha, Qatar
T 974 4428 9444 F 974 4444 6127
E dohmail@ghd.com W www.ghd.com

CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY

P.O.Box : 3713
TEL : 44678972
Doha- Qatar
G GP-31- EW120 FIXED WINDOW FROM FORSTER G

PRESTO SERIES PROJECT NAME

NBKA MERCEDES-BENZ SERVICE


CENTRE REFURBISHMENT

CONTRAFLAM LITE120, 14MM DWG Type :- AS-BUILT DRAWING


DRAWING TITLE
GP-31
G DETAIL - E 07 Nos. FIXED WINDOW
WITH ALUMINUM FLASHING

F DETAIL - F 1A SCALE 1: 2 SHEET - 2 of 2


H H
Drawn: Mazoon Approved: A.L. Paradero
1A SCALE 1: 2 Checked: Refai Scale: as-shown on A1
Date: 15-Aug2023
Drawing number: REV.:
NICC-J220-ASB-ARCH-6204 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
N0 NA' NA NM

N1

OUT OF SCOPE
N10
NEI GHBOUR BUILDING

T P
O + 1 .1 05

T P
O

+ 1 5. 0 ME
T A LR O FO IN G T P
O

+ 1 5. 0

N9 T P
O + 86. 0
ME
T A LG U T E
R

S S
L + 4.5 6
T P
O + 8 06.

A A

N37

KEY PLAN
LEGEND:-

B C A B C
003 003 003 003 003

B B

ELEVATION - 1 ELEVATION - 2
SCALE 1: 60 SCALE 1: 60

C C

FHC
75-11179-A1106
75-11179-A1109
75-11179-A9111
75-11179-A9112
01 05 ZEN-NBKA MBSCR-IADQ-SPCA-01-00
6301 6301
ZEN-NBKA MBSCR-IADQ-FFL-01-02
D D

NICC-J220-SDW-ARCH-GWC-001 1
NICC-J220-SDW-ARCH-GWC-002 1
NICC-J220-SDW-ARCH-001 (2 of 6) 1
NICC-J220-SDW-ARCH-001 (3 of 6) 1
NICC-J220-SDW-ARCH-GWC-003 & 004 0
NICC-J220-SDW-ARCH-SC-001 ( 2 & 3) 3
NICC-J220-SDW-ARCH-013 (2 of 5) 1
NICC-J220-SDW-ARCH-079 (1 of 2) 0

NICC-J220-ASB-ARCH-1101 1
NICC-J220-ASB-ARCH-1102 1
NICC-J220-ASB-ARCH-1107 1
NICC-J220-ASB-ARCH-1108 1
E NICC-J220-ASB-ARCH-1451 2 E
NICC-J220-ASB-ARCH-1452 2
NICC-J220-ASB-ARCH-9180 0
NICC-J220-ABD-FA-016, 019 0
NICC-J220-ABD-FF-016, 019 0
NICC-J220-ABD-AC-016, 019 1
NICC-J220-ABD-PW-016, 019 1

5.5T 3.5T 5.5T 3.5T 3.5T 3.5T 3.5T

CLIENT

F F

SUPERVISION CONSULTANT

GHD Level 23 Al Asmakh Tower West Bay


PO Box 14352 Doha, Qatar
T 974 4428 9444 F 974 4444 6127
E dohmail@ghd.com W www.ghd.com

CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY

P.O.Box : 3713
TEL : 44678972
Doha- Qatar
G G

PROJECT NAME
PLAN VIEW PLAN VIEW NBKA MERCEDES-BENZ SERVICE
SCALE 1: 60 SCALE 1: 60 CENTRE REFURBISHMENT
DWG Type :- AS-BUILT DRAWING
DRAWING TITLE
SERVICE ADVISORS TEMPERED GLASS
CLADDING WITH DOOR
SHEET 1 OF 2
H H
Drawn: Mazoon Approved: A.L. Paradero
Checked: Refai Scale: as sown on A1
Date: 23-Jul-2023
Drawing number: REV.:
NICC-J220-ASB-ARCH-6300 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
N0 NA' NA NM

N1

OUT OF SCOPE
N10
NEI GHBOUR BUILDING

T P
O + 1 .1 05

T P
O

+ 1 5. 0 ME
T A LR O FO IN G T P
O

+ 1 5. 0

N9 T P
O + 86. 0
ME
T A LG U T E
R

S S
L + 4.5 6
T P
O + 8 06.

A A

FCL +2175
N37

03
-

8mm UV PRINTED KEY PLAN


EXCEPT TV AREA
LEGEND:-
02
8mm CLEAR TEMPERED -
SWING GLASS DOOR
B B

8mm CLEAR TEMPERED


GLASS WITH BLACK
UV PRINTED

C C
04 04
- -

SECTION A SECTION B SECTION C 75-11179-A1106


75-11179-A1109
SCALE 1: 16 SCALE 1: 16 SCALE 1: 16
75-11179-A9111
75-11179-A9112
ZEN-NBKA MBSCR-IADQ-SPCA-01-00
ZEN-NBKA MBSCR-IADQ-FFL-01-02
D D

8mm CLEAR TEMPERED GLASS NICC-J220-SDW-ARCH-GWC-001 1


NICC-J220-SDW-ARCH-GWC-002 1
WITH BLACK UV PRINTED NICC-J220-SWD-ARCH-001 (2 of 6) 1
STEEL TUBE NICC-J220-SDW-ARCH-001 (3 of 6) 1
73mm METAL STUD SILICONE FIXING NICC-J220-SDW-ARCH-GWC-003 & 004 0

WITH SELF TAPPING 12.5mm THICK REGULAR NICC-J220-SDW-ARCH-SC-001 ( 2 & 3) 3

SCREW GYPSUM BOART NICC-J220-SDW-ARCH-013 (2 of 5) 1

16mm THK.MOISTURE NICC-J220-SDW-ARCH-079 (1 of 2) 0

GYPSUM BOARD SS SCREW WITH RAWL PLUG


16mm THK.MOISTURE 1 LAYER ONE SIDE 8mm CLEAR TEMPERED GLASS NICC-J220-ASB-ARCH-1101 1
GYPSUM BOARD 1
1 LAYER ONE SIDE WITH BLACK UV PRINTED NICC-J220-ASB-ARCH-1102
NICC-J220-ASB-ARCH-1107 1

E
3M TAPE NICC-J220-ASB-ARCH-1108 1
E
NICC-J220-ASB-ARCH-1451 2
SILICONE FIXING 10 PIVOT TOP HINGE NICC-J220-ASB-ARCH-1452 2

WALL ATTACHED TV NICC-J220-ASB-ARCH-9180 0


NICC-J220-ABD-FA-016, 019 0
NICC-J220-ABD-FF-016, 019 0
8mm CLEAR TEMPERED 8mm UV PRINTED NICC-J220-ABD-AC-016, 019 1

GLASS WITH BLACK EXCEPT TV AREA ALUMINUM FRAME NICC-J220-ABD-PW-016, 019 1

UV PRINTED

01 DETAIL 02 DETAIL 03 DETAIL


6300 SCALE 1 : 25 - SCALE 1 : 50
- SCALE 1 : 10
CLIENT

F F

MAGNETIC LOCK FIXED ON THE FLOOR


SUPERVISION CONSULTANT
8mm CLEAR TEMPERED GLASS
WITH BLACK UV PRINTED ALUMINUM FRAME TO BE SUGGESTED GHD Level 23 Al Asmakh Tower West Bay
PO Box 14352 Doha, Qatar
SILICONE FIXING CONCEALED HINGES FIXED TO T 974 4428 9444 F 974 4444 6127
ALUMINUM FRAME E dohmail@ghd.com W www.ghd.com
16mm THK.MOISTURE 12.5mm THK.FIRE SHIELD MOISTURE
GYPSUM BOARD1 LAYER ONE SIDE GYPSUM BOARD1 LAYER
2 LAYER BOTH SIDE CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY
FLOOR TRIM PROFILE (ALUM.) P.O.Box : 3713
TEL : 44678972
FFL +0.00
Doha- Qatar
G G
16mm THK.MOISTURE
GYPSUM BOARD1 LAYER
ONE SIDE PROJECT NAME
VINYL FLOOR FINISH
NBKA MERCEDES-BENZ SERVICE
CENTRE REFURBISHMENT
SUPPORT FRAME
SCREED DWG Type :- AS-BUILT DRAWING
DRAWING TITLE

SERVICE ADVISORS TEMPERED GLASS


CLADDING WITH DOOR
SILICONE FIXING SHEET 2 OF 2
H H
8mm CLEAR TEMPERED GLASS Drawn: Mazoon Approved: A.L. Paradero
04 DETAIL WITH BLACK UV PRINTED 05 DETAIL Checked: Refai Scale: as sown on A1
6300 SCALE 1 : 8 Date: 23-Jul-2023
- SCALE 1 : 2
Drawing number: REV.:
NICC-J220-ASB-ARCH-6301 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
N0 NA' NA NM

N1

OUT OF SCOPE
N10
NEI GHBOUR BUILDING

5A 4A N9
T P
O

+ 1 5. 0
T P
O + 1 .1 05

ME
T A LR O FO IN G T P
O

+ 1 5. 0

- -
ME
T A LG U T E
R

S S
L + 4.5 6
T P
O + 86. 0 T P
O + 8 06.

A A

07 07
6309 6309 N37

KEY PLAN
LEGEND:-
3A 08 FIRERATED GLASS - EW90 & EW120

- 02 08 6309
20MM THK. CONTRAFLAM LITE WITH EW120 FOR FIX PARTITION

B
3A 4A 14MM THK. CONTRAFLAM LITE WITH EW90 FOR DOOR PANELS B

FIRERATED PROFILE

FIRE RATED PROFILE FROM FORSTER

WET PAINT SYSTEM: RAL 9011/BLACK

2A
- 06
04 05
2A 2A 2A

C
01 PASSIVE ACTIVE C

2A LEAF LEAF 03
2A

09 10
6309 6309

D 10 09 D
5A 4A
4A SECTION 5A SECTION
1A ELEVATION VIEW FROM - SCALE 1:20 - SCALE 1:20
75-11179-A1106
75-11179-A9111

- SCALE
75-11179-A9112
1:20 ZEN-NBKA MBSCR-IADQ-FFL-01-02

NICC-J220-SDW-ARCH-001 (4 of 6)
NICC-J220-SDW-ARCH-FR-001-003
NICC-J220-SDW-ARCH-FR-002-003
NICC-J220-SDW-ARCH-FR-003-003
NICC-J220-SDW-ARCH-SC-001 (2 of 3)
NICC-J220-SDW-ARCH-079 (1 of 2)
E E
01
6309 04 05 06 03
6309 6309 6309 6309
NICC-J220-ASB-ARCH-1103
NICC-J220-ASB-ARCH-1453
NICC-J220-ASB-ARCH-9184

AD01
UP

HARDWARE LIST CLIENT


ITEM & DESCRIPTION
F F

2A PARTIAL PLAN VIEW SUPERVISION CONSULTANT


- SCALE 1:20
GHD Level 23 Al Asmakh Tower West Bay
PO Box 14352 Doha, Qatar
T 974 4428 9444 F 974 4444 6127
01 E dohmail@ghd.com W www.ghd.com

6309 02 03
CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY
6309 6309
P.O.Box : 3713
TEL : 44678972
Doha- Qatar
G G
GF. KEY PLAN
Scale : nts PROJECT NAME

NBKA MERCEDES-BENZ SERVICE


CENTRE REFURBISHMENT
DWG Type :- AS-BUILT DRAWING
DRAWING TITLE
AD01- EW120 HINGED DOOR & FIXED PARTITION SYSTEM FROM
FORSTER PRESTO SERIES AD01 - EW120 Hinged Door &
3A PARTIAL PLAN VIEW Fixed Partition System (Sheet 1of2)
H
- SCALE 1:20
H
CONTRAFLAM LITE 120, 14MM CONTRAFLAM LITE 120, 20MM Drawn: Mazoon Approved: A.L. Paradero
Checked: Refai Scale: as sown on A1
Date: 20-Jul-2023
Drawing number: REV.:
NICC-J220-ASB-ARCH-6308 00
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
N0 NA' NA NM

N1

OUT OF SCOPE
N10
NEI GHBOUR BUILDING

T P
O + 1 .1 05

T P
O

+ 1 5. 0 ME
T A LR O FO IN G T P
O

+ 1 5. 0

N9 T P
O + 86. 0
ME
T A LG U T E
R

S S
L + 4.5 6
T P
O + 8 06.

A A

N37

KEY PLAN
LEGEND:-
FIRERATED GLASS - EW90 & EW120

20MM THK. CONTRAFLAM LITE WITH EW120 FOR FIX PARTITION

B 14MM THK. CONTRAFLAM LITE WITH EW90 FOR DOOR PANELS B

FIRERATED PROFILE

FIRE RATED PROFILE FROM FORSTER

WET PAINT SYSTEM: RAL 9011/BLACK

01 HORIZONTAL DETAILS 02 HORIZONTAL DETAILS


6308 SCALE 1:2 6308 SCALE 1:2 03 HORIZONTAL DETAILS
6308 SCALE 1:2

C C

D D

75-11179-A1106
75-11179-A9111
75-11179-A9112
ZEN-NBKA MBSCR-IADQ-FFL-01-02

04 HORIZONTAL DETAILS NICC-J220-SDW-ARCH-001 (4 of 6)

05 HORIZONTAL DETAILS
NICC-J220-SDW-ARCH-FR-001-003
6308 SCALE 1:2
06 HORIZONTAL DETAILS
NICC-J220-SDW-ARCH-FR-002-003

6308 SCALE 1:2 NICC-J220-SDW-ARCH-FR-003-003

6308 SCALE 1:2 NICC-J220-SDW-ARCH-SC-001 (2 of 3)


NICC-J220-SDW-ARCH-079 (1 of 2)
E E

NICC-J220-ASB-ARCH-1103
NICC-J220-ASB-ARCH-1453
NICC-J220-ASB-ARCH-9184

CLIENT

F F

SUPERVISION CONSULTANT

GHD Level 23 Al Asmakh Tower West Bay


PO Box 14352 Doha, Qatar
T 974 4428 9444 F 974 4444 6127
E dohmail@ghd.com W www.ghd.com

CONTRACTOR NATIONAL INDUSTRIAL CONTRACTING COMPANY

P.O.Box : 3713
TEL : 44678972
Doha- Qatar
G G

PROJECT NAME

NBKA MERCEDES-BENZ SERVICE


CENTRE REFURBISHMENT
DWG Type :- AS-BUILT DRAWING
08 VERTICAL DETAILS DRAWING TITLE
6308 SCALE 1:2
09 VERTICAL DETAILS 10 VERTICAL DETAILS AD01 - EW120 Hinged Door &
6308 SCALE 1:2
6308 SCALE 1:2
Fixed Partition System (Sheet 2of2)
H H
Drawn: Mazoon Approved: A.L. Paradero
Checked: Refai Scale: as sown on A1
07 VERTICAL DETAILS Date: 20-Jul-2023
6308 SCALE 1:2 Drawing number: REV.:
NICC-J220-ASB-ARCH-6309 00
1 2 3 4 5 6 7 8 9 10 11 12
t �
� uyµ,.]��Ll)-11
NATIONAl INOUITRIAl CONTRACTING COMIANY

<..:ilJ� �L....:, 0--IJ-----l=>L.J
NASSER BIN KHA LED AUTOMOBILES
ta :1 $ t r
lliiiiiiiill w
AlUMl�IUM
& GlASS rAC o��

SECTION-12

TESTING AND COMMISSIONING REPORTS/DATA


N/A

+.,. +
r
NABINAALUMINIUM
& GLASS FACTORY
.J.H.)¥-l... 'l..i.u... u
01/04/2023.

Ref: AK/NBKA/MB/1423.

CERTIFICATE OF WARRANTY.

Contract No AK/NBKA/MB/1423.

Project Name NBKA Mercedes -Benz Service Refurbishment.

Scope of works Supply & Installation of Fire Rated Doors, Fixed Partition and fixed window.

Main Contractor National Industrial Contracting Company.

Client: Nasser Bin Khaled Automobile /National Industrial Contracting. Nabina

FR Contractor Aluminum & Glass Factory.

And whereas by careful examination of the said Fire rated Doors, Fixed Partitions and
fixed windows, it has been determined that the required quantities and specifications of

elements have been used and that elements have been applied in conformance with the
requirements of the contract. Nabina Aluminum & Glass Factory hereby warrants the Fire
rated Doors, Fixed Partitions and fixed windows, against defects in performance,

workmanship, materials and manufacture. Now therefore, Nabina Aluminum & Glass
Factory warrantees to the above mentioned Client that as set forth below, during a period

of time of 10 years, from the date of March 21, 2024, Nabina Aluminum & Glass Factory
will at his own expense make or cause to be made, any repairs to its, elements that may be
necessary, as arise out of defects in performance, workmanship and/or materials, including
cracking, tearing and/or puncture. and shall maintain the Fire rated Doors, Fixed Partitions
and fixed Windows condition free from all arising from such causes, for the duration of the

warranty period.

For various moveable parts in the fire rated system Such as door closer, doorhandle etc.,
the warranty period shall be 2 years as per the manufacturer themselves.

For the purpose of this warranty, damages to the Fire rated doors, Fixed partitions and
fixed windows caused by unusual local natural phenomena shall not be deemed be
"Normal Wear and Tear' by the elements.

·971. .',1.2 9999 ·- 1,v,.v....v.n;:ibin.1hold1ng.con1


·974 446S 2786 upor St. /IL Wakra Road. � c n No ,.9321
P.O. Box 130. Dot,a - Q;nar
� NABINAALUMINIUM
� & GLASS FACTORY
Exclusions:

This warranty does not cover, and Nabina Aluminum & Glass Factory shall not be liable for:
• Damage to the installed Fire rated doors, Fixed partitions and fixed windows, caused
by any other party, other than its own personnel.

• Damages to the installed Fire rated doors, Fixed partitions and windows, caused by
repairs or penetrations or modifications to the Fire rated doors, Fixed partitions and
fixed windows by any other party, other than its own personnel.

• Damages caused by fire, failure of the structure (including non-designed/excessive


movement), or misuse of the Fire rated doors , Fixed partitions and fixed windows.

Inspection and Repair:


Upon written notice to his registered office requesting any investigation, inspection or
repairs, Nabina Aluminum & Glass Factory shall inspect the site and start the repair works
following such inspection:
1. Nabina Aluminum & Glass Factory, at its own expense, make such repairs as required by
this Warranty.
2. In case the requested repairs are not covered by this warranty such as, but not limited to,
damages caused by any other parties, Nabina Aluminum & Glass Factory shall make, or
cause to be made, such repairs at the Client expenses in accordance with the specifications
and this warranty shall, thereupon, remain in effect for the unexpired period of its original
terms.
3. If repairs are made by any other party than Nabina Aluminum & Glass Factory designee,
this warranty shall be automatically terminated.

There are no warranties which extend beyond the terms and conditions stated herein.

On Behalf of Nabina Aluminum and Glass Factory,

Name : Hazem Al Ajo.

Position Deputy General Manager.

Signature.

-97!; 1,/,29 999 · v. v\v.nabinJholcllng.com


' .,974 4465 2786 Airport St. AL W�kril Aoad. r � C P 110 1.9321
:·: n;,gf@·n�b,n;,.com P.O. Box 130. Dot1a - Qutar