Professional Documents
Culture Documents
Subbarao Cherukuri - Original
Subbarao Cherukuri - Original
Subbarao Cherukuri
Wats App No.: +91 8154975268 E-mail:subbarao.cheruku@gmail.com
M: +211 910163966 (South Sudan)
CAREER OBJECTIVE
Electrical Engineer having excellence in Oil and Gas Sector, Pipeline Project
construction, Commissioning, CGD and maintenance seeking a challenging position to
utilize my skills and abilities to work with committed & dedicated people, who will help
to explore myself, realize my potential, and contribute in the growth of company.
Educational Details:
Responsibility:
A. Previous Employer:
Responsibility:
1. As a Pipeline Engineer:
Internal Corrosion/Integrity of Pipeline.
Carrying out pigging by launching / retrieval of scrapper in Scrapper barrels at
all stations, pig tracking along pipeline including assembly of Scrapper.
Assistance providing during Intelligence Pigging.
Above ground piping UT measurement checked on yearly basis.
External Corrosion/Cathodic Protection of Pipeline
Taking care of Permanent Cathodic Protection system of cross-country pipeline
which includes CPPSM Stations and CPTR Stations.
Preparation of Operation & Maintenance SOPs for carrying out maintenance
activities as per schedule maintenance planner.
Planning & implementation of preventive maintenance Plan for Equipment
Reliability and safety.
Carrying out periodic ON/OFF PSP survey to check/ensure the healthiness of
CP system.
Monthly reading/monitoring of corrosion coupons.
Inspection & maintenance of TRU/CPPSM Panels
Maintenance of AJB, IJ, Anode beds. The efficacy of anode beds & others
grounding cells like zinc anodes, magnesium anodes is being carried out, to
ensure the proper functioning of the same & about its consumption.
Maintaining of Circuit resistance & any other CP parameters within permissible
limits as per standard guidelines.
Ensure proper working of Interrupters with synchronization with all CP
stations.
Coordinate with clients for review and approve CP documents / drawings.
Rectification of short casing locations has been done.
Mitigation work for various problems comprises Interference, Very High
Potential, HVDC/HT Crossing, and Presence of nearby Metallic Structure,
failure of Reference Cell etc.
To present various technical aspects & proposals of cathodic protection system
to enhance Protection and efficiency level of existing CP system.
Mitigation of High Potential, High Grounding Anode Resistance, and High
Induced AC Voltage.
Application of Coating Work (Cold Tape) on Pipeline section if Coating found
damage or if it required.
Checking / Inspection of Pipeline by Bell Hole method.
2. As a Maintenance Incharge:
Preparation of Operation & Maintenance SOPs for carrying out maintenance
activities as per schedule maintenance planner.
Planning & implementation of preventive maintenance Plan for Equipment
Reliability and safety.
Pre-Commission& Commission of gas metering skids and shutdown activities
on running customer skids.
PCV/SDV checking and Maintenance job at customer skids.
Pre-monsoon & Post monsoon activities were carried out for electrical system.
Prepare the Check list of Electrical, Mechanical and Instrumentation
equipment’s.
Shutdown Maintenance activities was carried out like Cleaning / tightening of
MV/LV busbar, Transformer Oil filtration etc.
Trouble shooting of various electrical equipment was also carried out like
repair of APFC panel, SMPS in Chabbi battery chargers & Air cooled SVRs.
Load test of battery banks and also to identify the weak cells from the bank &
get it replaced with healthy cell to upkeep, enhance the battery bank back up.
Maintenance of earth pits
Ensuring proper rating of MCB/ELCB/fuses etc. for effective protection of
system
RCA preparation and implementation of suggestions to protect the equipment.
Maintenance of DG set by carrying out periodic checks like B check/C check/D
check.
Project planning, scheduling and monitoring the progress by making scheduled
v/s actual progress reports.
Accomplishments:
Handling erection & commissioning of system & field instruments.
Organized Off site and Mock Drill for Emergency Operation 3 times.
Proficiently managing Company Assets and undertaking responsibility.
Handling the Emergency situation/ rectification like pilferage, leakage by leak
clamp & Pipeline / Piping burst by replacing with pipes/ fitting.
B. Previous Employer
Liasoning with Local / Govt. Authorities and ROU clearing & grading.
3) Designation : QC Engineer
Company : JSIW Infrastructure Pvt.Ltd.
Project : Botad Project.
Client : GSPL.
Duration : 3rd June-2010 to 26th November-2010.
4) Designation : QC Engineer
Company : Tolani ProjectsPvt.Ltd.
Project : KJ#3 – Ramnad Gas pipeline Project.
Client : ONGC.
EPC : Jai Hind Projects Ltd.
Duration : 09th December-2008 to 29th May-2010.
Role / Responsibilities:
Personnel Details:
Name: SUBBARAO CHERUKURI
Father: RAMESH BABU
Date of Birth: 15/07/1985
Marital Status: Married
Languages: Telugu, Hindi, Tamil & English.
PASSPORT DETAILS:
I here declare that all the information stated above is true and complete to the best of
my knowledge and belief and nothing has been concealed /distorted.