Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

PSPCL

(pgBillPay.aspx) (pgBillPay.aspx)

 Print Bill

PUNJAB STATE POWER CORPORATION LIMITED


Billing Category
(Regd. Office P.S.E.B. Head Office, The Mall Patiala-147001,Ph. 1912), CIN: U40109PB2010SGC033813
E-mail: 1912@pspcl.in, Website: www.pspcl.in, GSTIN NO: 03AAFCP5120Q1ZC
DS-GEN
Original for Recipient Duplicate for Supplier, Taxable Invoice, Invoice-cum-Bill of Supply

Sub Division Division Circle Bill Cycle Bill Date Bill No.

ZIRAKPUR SUB ZIRAKPUR DIVISION MOHALI 12-2024 01-MAR-2024 500282201695


DIVISION(4133)

A/C No.: 3007199805 Load Contract Tariff Type Bill Status Due Date Bill Amount
Consumer Name: SURINDER PAL BANSAL Demand Cash/Online DD/Cheque
Address: | #8117 BL-I AERO CITY | AERO CITY |
9.98 0.00 DS-GEN O 11-Mar- 11-Mar- Rs.990/-
#Z74AC010558Y
2024 2024

GST No.: 0 Voltage Details of Meter Meter CT CT No.


Connection Date: 29-03-2019 Supply Meter Number Make Capacity Digit Status Make
Mobile No.: 95XXXXX778
LT 100017865614 HPL ELECTRIC 0 6 O
& POWER

Feeder Code Date of New Reading Date of Old Reading Bill Period Meter Securit Cons. Security cons/Meter
Security Security Interest

01-MAR-2024 03-FEB-2024 27 1530.00 2590.00

Meter Reading

Details Old New Current Meter Line CT Ratio Meter CT Overall MMTS Old Meter Unit Consumed
Reading Reading Units Multiplier Ratio Multiplier Correction Cons.

KWH 1.00 1.00 0.00 0


KVAH 23060.00 1.00 1.00 0.00 0

MDI 1.00 1.00

(A) Fixed Charges

Contract Demand (L) Actual Demand KVA 80% of (L) KVA (B) A or B Rate per Billing Days (D) A: Fixed Charges Amount
KVA (A) whichever KVA per =CxRxDx12/365
greater KVA month (R)
(C)
0.00 7.984 7.984 110.00 27 777.00

(B) Energy Charges

Units Rate/kWh Amount B: Total Energy Charges

0-100 KWH 0.00 5.34 480.6

100-300 KWH 0.00 7.15 1287.00 0.00


300-ABOVE KWH 0.00 7.75 682.00

(C) Fuel Cost Adjustment Charges *Additional Surcharges

Total Energy Charges KVAH Consumption Rate of C: Amount Unit Rate Amount C: FCA + Addl Surcharges
FCS/KVAH

0.00 0 0 358.00 0 0.00 0

(D) Rental Charges GST

Meter Rent MCB, CT/PT Unit Rent for Total Rent HSN Code SGST CGST Total GST D: Total Rent with Tax
for PSPCL Rental any other
Meter equipment

40.00 18.00 0.00 58.00 5.22 5.22 10.44 68.44

(E) Surcharges

Voltage Surcharge Demand Surcharge ToD Surcharge

Supply Catered Surcharge Voltage Demand in Rate of Amount of Peak Rate Amount E: Total Surcharge (Rs.)
Voltage Voltage Rate Surcharge excess Demand Demand Hours
Amount Surcharge Surcharge KVAH

LT LT 0 0 0 0

(F) Rebates

Voltage Rebates ToD Rebates

Units HT/EHT Rebate Amount Non-Peak Hours KVAH Rate Amount F: Total Rebates (Rs.)

(G) Previous Adjustment Amount Notice No.: and Date:


Units Fixed Energy FCA Rentals Surcharges(+) Rebates(-) Taxes Subsidy Total G: Net Previous Adjustment
Charges Charges (Rs.)

0.00 0.00/ 0.00 / 0.00/ 0.00/-9. 0.00/-9.

(H) Sundry Charges/Allowances Notice No.: 0 - 0 and Date: JAN 1 1900 12:00AM - JAN 1 1900 12:00AM
Late Units Fixed Energy FCA Rentals Surcharges(+) Rebates(-) Taxes Subsidy Total H: Net Sundry
Payment Charges Charges Charges/Allowances
Interest (Rs.)

/ 0.00 / 0. 0.00 / 0. 0.00 / 0. /0 / /0 /0 / 0 0

(I) Subsidy

Subsidised KVAH Rate for Subsidy Amount I: Net Subsidy (Rs.)

(J) Taxation
Electricity Duty Municipal IDF Cow Cess Total Tax Net Energy TCS/TDS Curr/Prev Rounding NET BILL AMOUNT
Tax Charges Amount
Rs.990/-
101.00 16.00 39.00 0.00 156.00 / Nine Hundred Ninety
Rupees Only
(K) Total Billed Amount

Due Date by Due Date Net Amount Payable Simple interest on delayed payment Amount Payable within 1 month
Cash/Online by by due date @1.5%p.m. after due date
DD/Cheque

11-Mar- 11-Mar- 990 15 1005


2024 2024

(L) Previous Cycle's Consumption

MONTH:- - - - - - - - - - - -
MDI:- - - - - - - - - - - -
KWH:- - - - - - - - - - - -
KVAH:- - - - - - - - - - - -
Payment History:
Last Payment Amount:Rs. 3730, Dated: 03-02-2024

Message:
1. Payments exceeding Rs.20,000/- shall be accepted in digital mode only w.e.f. 01-07-2021.
2. In case the payment of billed amount is not made by the due date,the power supply shall be liable for disconnection after expiry of 15 days of the due
date and this may be taken as notice under section 56 of the Electricity Act 2003 read with regulation 32 of the Supply Code, 2014.
3.
4.
5.
6.
7.
8.
9.

Description (HSN Code) Quantily UQC Non- Taxable CGST 9% SGST 9% Total
Taxable Amount
Amount

Meter Rent (997319) 1 - 0 40 3.6 3.6 47.2

MCB Rent (997319) 1 - 0 18 1.62 1.62 21.24

Electrical Energy 0 UNT-Units 0 0 0 0 0


(271600)

PUNJAB STATE POWER CORPORATION LIMITED


website:www.pspcl.in form RO 3-B
Meter Reading Overall Consumption

New Status Old Status Multiplier

Bi-Directional Import KWH 23060.00 22702.00 1.00 358


Meter (From PSPCL) KVAH 23269.00 22908.00 1.00 361

KVA 4.16 1.00 0

Export KWH 13287 12873 1.00 414


(To PSPCL) KVAH 13371 12957 1.00 414

KVA 0 0 1.00 0

Net KWH 9773 0 1.00 0


KVAH 9898 0 1.00 0

KVA 0 0 1.00 0

Solar Solar KWH 7216 6744 1.00 472


Meter KVAH 7392 0 1.00 7392

KVA 0 0 1.00 0

Previous Net Consumption: 0.00 Net Cons. for Billing: 0.00 Total Consumption: 416 Current Carry Forward: 56
Carry
Forward: 0

Solar Installation Date: 0 Solar Capacity: 0.00 Import Amount (at retail tariff): 0.00 Export Amount (at feed-in tariff): 416

Print Date: 03-03-2024 06:49


Powered by O/o CE(IT) PSPCL
AM

You might also like