Supplier requirements
The supplier ensure to provide information and forms as requiered under Res. MEPC
269(68) of IMO.
Download forms here: http://forms.metizoft.com/
Eart fault that appears when it is over 40*C in Engine room to be found and rectified. Could be Moisture
in gas!
U1 C2, U2, C1 & C2. has appeared with intermittent earth fault summer -22.
At the same time, drain the system, open up buffer tank for inspection, also open up the filter before the
pumps.
Need also to change some armaflex in engine room.
New glycole solution to be added after system has been flushed with commision cleaner. 10%