Professional Documents
Culture Documents
Attachment Checklists
Attachment Checklists
During the survey of the designated area, complete the checklist below. Check N/A if the item does not Main Subcontractor: Area for relevant subcontractor logo
apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
Signature:
Inspection No Name:
Company:
Date: Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Onsite Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Main inspection Type:
12 Other if any ?
I. Lifting (includes loading/unloading) and forklift operations
Are lifting operations (in particulat heavy
1 equipement liftings) been permitted,
planned and documented prior to start ?
Signature:
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Main Facilities Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: MAIN FACILITIES Type:
C. Emergency
Emergency doors and push button free of
1 damage and obstructions from inside and
outside?
Emergency exit signs in good conditions,
2
free of damage, illuninated and visible?
Corridors leading to the emergency exits
3 free of hazards, obstructions and kept
clean?
Emergency alarm proprly working and
4 adequately sounding, all office staff can
hear it?
Emergency evacuation plan and contact list
5 developped and posted in visible and
accessible areas (Walls)?
Master point installed in a proper area
(Nearby the main access to outside) proper
6
height (Visible from all office corners)
routes to it marked or indicated?
D. First Aid Provisions
First aid room inspection checklist in place
1
and inspection proprly done?
2 General hygenic conditions satisfactory?
Are the general conditions of medications
3
and medical tools and stuff satisfactory?
List of paramedics and their qualifications
4
available and posted?
Up to date general site layout available and
5
posted?
All medical activities being performed have
6 been recorded and record up to date and
available?
Is signage related to health printed out and
7
posted?
Is the ambulance inspection checklist in
8
place and inspection proprly done?
Are the general hygenic conditions of the
9
ambulance satisfactory?
Are first aid boxes available, mounted or
10 proprly placed, inspection checklist in
place and proprly filled?
E. Sanitation
1 Housekeeping is in good order?
Hand towels/tissue are provided at
2
washbasins?
Hygiene advisory is posted for washing
3
hands after toilet?
Plumbing system of gray water and toilets
4
is adequate and adapted. No leak?
5 Showers are in good condition?
All flushes are in good working condition.
6
Toilets are clean?
7 Hand bassins are clean.
A non-skid flooring is provided. Mats are
8
provided in the showers.
A sharps container for shaver blades is
9
available.
Ventilation exhaust is working well and
10
efficient?
All lights in the bathroom and toilet areas
11
are in good working condition?
12 A cleaning record is available and posted?
Are MSDSs of the different detergents used
13 for cleaning available, posted with COSHH
assessment form?
Are toilets for desabled people designated
14
and signage in place ?
F. Dinning Room
1 Tables and chairs are clean and orderly?
2 Floor is vacuumed, swept and cleaned?
"No smoking" signs are displayed in eating
3
areas?
The staff uses "Wet Floor" sign each time it
4
mops the floor?
5 Floor and walls are clean?
6 The sneeze guard is clean?
7 Fly killer is installed and functional?
Signature:
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Onsite Welfare Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: WELFARE FACILITY Type:
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Report
A. General
For the dispersed workers e.g. SF areas, does the
Sub-Contractor provide sufficient and conveniently
1
accessible welfare facility/areas for all workers on
site?
For the dispersed workers e.g. SF areas, does the
Sub-Contractor provide sufficient and conveniently
2
accessible welfare facility/areas for all workers on
site?
Are they provided with an adequate and sufficient
3
supervision ?
Are they provided with the necessary and adequate
4
first aid provisions?
Are they provided with a specific emergency plan
5 included in the PTW pack or in the JSA including the
emergency contact list?
Is those remote areas were well identified and
6
communicated to the site emergency team ?
Are the area layout' for facilities and working areas
been developed and posted in the main areas for
7
emergency purposes including master points and
escape routes ?
Is safety board (s) installed and provided with the
8 required signage for notes, changes in the
organization or other system purposes ?
Has Covid-19 control measures put in place and
12
proprly implemented ?
9 Other if any ?
A. Dining Hall
Has this checklist been delivred to the relevant
1 subcontractor and is been fully implemented as per
SEGC Inspection Program ?
Enough number of tables, seats, plastic garbage bags
2 and metal garbage containers for plastic garbage
bags, are Available?
The waste containers are properly Covered & Waste
3
is transporting from the site regularly?
4 Floors are properly cleaned?
5 AC are available and working properly?
Refrigerator & Oven are available for food
6
Preservation?
7 Safety Signages are available properly?
B. Drinking Water
A supply of potable water shall be provided in
1
accordance with the quality standards
Approved for drinking purposes by the local
2
authority having jurisdiction is available?
3 Cold potable Water is available in Hot Weather?
Disposable cups & waste receptacle for disposing of
4
the used cups is available?
C. Sanitation
Adequate sanitation facilities, sanitary sewage and
water source shall be provided in the workplace in
accordance with the following for 20 or less 1 toilet
1
seat + urinal + lavatory
From 21 to 200 (1 toilet seat + urinal + lavatory) per
Are toilets separated with partitions and lockable
2 40 employees’ sequence.
doors for privacy purposes.
3 Are toiltes for females been designated ?
Sanitation facilities shall be maintained and kept
permanently clean. The sanitation and washing
4
facilities shall be daily cleaned up by water and soap
and sterilized twice a week at least?
Sanitation facilities shall be provided with adequate
5
lighting and ventilation
6 The Sewage Is Transported Regularly From the site?
7 Are sepctic tanks installed according standards ?
Are chemical toilets (If any) provided with tissue,
8 soap, water, daily maintenance checklist and
accessible to all workers?
Are all sanitation facilities free of leakage of water
9
or sewage ?
D. House Keeping
All the Walkways and Passages are Cleared from the
1
material or any other obstruction?
All the Hazardous Material stored in the proper
2 Storage area and provided with the inspection
checklist regulary ?
All the waste is managed in the proper skips and
3
designated area?
All the Emergency Exits are cleared from any
4
Blockage?
E. Ventilation
Appropriate ventilation in confined or enclosed
spaces such as vaults, basements and water tanks to
1
discharge dusts, fumes, mists, vapors, or gases
produced during the work is Available?
F. Smoking
Flammable Combustible material is not kept near to
1
the Facility?
2 Fire Extinguisher is Available?
3 Ash tray for separate bud is Available?
The designated area is available & Cover from the 3
4
sides & Top?
5 Cleaning is maintained all the time?
G. Prayer Room Only for prayer?
Designated
1
No material is allowed to store inside the Prayer
2 Room?
Inspected by:
Reveiwed by:
This field is not mandatory but it is to encourage management and others to care about
Position: safety by reviewing and helpinng
Signature:
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Water Dispenser Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Signature:
Inspection No Name:
Company:
Date: Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Onsite First Aid Inspection Checklist Template
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Signature :
Inspection No. Name:
Company:
Date: Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Fire Extinguisher Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: FIRE EXTINGUISHER Type: Unit No.
During the survey of the designated area, complete the checklist below. Check N/A if the item does Main Subcontractor: Area for relevant subcontractor logo
not apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
Is the extinguisher located in its
designated location, signage over
1
it and numbering system is
available ?
Is it clear of obstructions to
2
access or visibility?
Are operating instructions on the
3 name plate legible and facing
outward?
4 Is the extinguisher full?
Pressure gauge (or indicator) in
5 the operable range?
Signature
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Spill Kits Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: SPILL KIT Type:
During the survey of the designated area, complete the checklist below. Check N/A if the item does Main Subcontractor: Area for relevant subcontractor logo
not apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
A. Clean-up Items
1 Paper towels
2 Spill pads
3 Spill socks
Disposal bags with tape or twist
4
ties
Proprly placed, accessible and
5
free of damage ?
6 Container for waste ?
B. PPE
1 Goggels
2 Rated chemical gloves
Are portable shovel with bruch
3
available ?
C. Administrative
1 Spill kit signage ?
2 Emergency contact numbers ?
Inspection No.
Signature:
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC E&S Inspection CHecklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Area/Facility: Date:
During the survey of the designated area, complete the checklist below. Check N/A if the item does not apply.
A. SITE CONDITIONS
1 Site is free of litter and debris?
2 Any general site complaints?
D. HAZARDOUS WASTES
Hazardous wastes are collected in clearly labelled and leak
18
proof receptacles of 110% the volume of the contents?
M. CONCRETE OPERATIONS
Concrete operations are carried out within the site
41
boundaries?
Concrete mixer operators are supervised during wash out
42
of the concrete chute?
Ensure concrete mixer wheels are not tracking wet
43
concrete on the soil after wash out?
Drip trays or plastic is placed under the conjunction
44
between the concrete pump and the concrete mixer?
Spillage of wet concrete or contaminated water on soil or
45
close to water bodies is prohibited?
Concrete wash out area is inspected to ensure it is in good
46
condition and free of spills?
All personnel involved in concrete operations are trained
47
on contamination prevention and control?
Concrete testing is conducted in the designated testing
48
area where spill control devices are available?
A simple concrete bund is installed underneath diesel
49
operated cement mixers to contain spills?
N. ENVIRONMENTAL INCIDENTS & EMERGENCIES
Emergency contact numbers are posted in strategic
1
locations around site?
All employees are trained on environmental incident and
2
emergency control procedures?
All precautions and control devices are made available to
3
prevent incidents from occurring?
During the survey of the designated area, complete the checklist below. Check N/A if the item Main Subcontractor: Area for relevant subcontractor logo
does not apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
3 Violations of rules?
5 Any trespassers?
10 Traffic violations?
11 Animals observed?
Inspected by:
Reveiwed by:
This field is not mandatory but it is to encourage management and others to care about
Position: safety by reviewing and helpinng
Signature
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Water Wells Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: WATER WELLS Type:
During the survey of the designated area, complete the checklist below. Check N/A if the item does not Main Subcontractor: Area for relevant subcontractor logo
apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
Signature :
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Labour Camp Inspection CHecklist
Noor Energy 1 -DEWA CSP Phase IV
Area/Facility: Date
Availability of housing
Has there been a comprehensive assessment of the different
6 type of housing available in the surrounding communities
prior to building any workers’ accommodation?
For a larger project: is that assessment included in the
7
Environmental and Social Impact Assessment?
Has there been an assessment of the impact on the
8
communities of using existing housing opportunities?
Have measures to mitigate adverse impacts on the local housing
9 market been identified and included in the Environmental and Social
Action Plan (ESAP) or other relevant action plan?
Are the living facilities built using adequate materials, kept in good
36
repair and kept clean and free from rubbish and other refuse?
E4 Smoking Areas(DM)
Is the smoking area away and free from flammable / combustible
43
materials ?
44 Is there ash tray or other suitable means for extinguishing cigarettes ?
E5 Drainage
45 Is the site adequately drained?
E7 Water
Do workers have easy access to a supply of clean/
47
potable water in adequate quantities?
Does the quality of the water comply with national/local requirements
48
or WHO standards?
Is the smoking area away and free from flammable / combustible
49
materials ?
Are tanks used for the storage of drinking water constructed and
50 covered to prevent water stored therein from becoming polluted or
contaminated?
51 Is the quality of the drinking water regularly monitored?
88 Are there adequate basins for hand washing (1 basin per 5 men) ?
107 Are places for food preparation adequately ventilated and equipped?
Are kitchen floor, ceiling and wall surfaces adjacent to or above food
108 preparation and cooking areas built in non-absorbent, durable, non-
toxic, easily cleanable materials?
118 Is there safe, separate, correctly identified area for chemical storage ?
119 Are there proper drainage, screening and cleaning arrangements?
EPC-SEGC Labour Camp Inspection CHecklist
Noor Energy 1 -DEWA CSP Phase IV
Area/Facility: Date
137 Are workers provided with dedicated places for religious observance?
146 Have the staff received basic health and safety training?
EPC-SEGC Labour Camp Inspection CHecklist
Noor Energy 1 -DEWA CSP Phase IV
Area/Facility: Date
160 Have emergency plans on health and fire safety been prepared?
Has a security plan including clear provisions on the use of force been
165
designed and implemented?
Have the backgrounds of security staff been checked for previous
166
crimes or abuses?
Has the recruitment of security staff from both genders been
167
considered?
Have security staff received clear instruction about their duty and
168
responsibility?
Signature
Date:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining record. NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Lifting Accessories Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Type: Ref No:
During the survey of the designated area, complete the checklist below. Check N/A if the item does Main Subcontractor: Area for relevant subcontractor logo
not apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
This includes all lifting accessories, please tick N/A where the item doesn't apply.
Is a valid 3rd party certificate
1
available ?
2 Is the SWL clearly marked ?
Signature :
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC DG Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Type: Ref No:
During the survey of the designated area, complete the checklist below. Check N/A if the item Main Subcontractor: Area for relevant subcontractor logo
does not apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
A. DOCUMENTATION
1 User manual ?
2 Maintenance register ?
B. ENGINE
1 Is exhaust in good conditions ?
Inspection No.
Reveiwed by:
This field is not mandatory but it is to encourage management and others to care about
safety by reviewing and helpinng
Signature:
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Inspection CHecklist Template
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Type: Ref No:
During the survey of the designated area, complete the checklist below. Check N/A if the Main Subcontractor: Area for relevant subcontractor logo
item does not apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
A. DOCUMENTATION
1 User manual ?
2 Maintenance register ?
B. ENGINE
Exhaust in good
1
conditions ?
Engine cover / guard in
2
place ?
Battery & Hold downs in
3
good conditions ?
Hydraulic hoses in good
4
conditions ?
Engine coolant, oil and
5 hydraulic oil level in good
conditions ?
Signature
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Welding Machine Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Type: Ref No:
During the survey of the designated area, complete the Main Subcontractor: Area for relevant subcontractor logo
Utilizing:
checklist below. Check N/A if the item does not apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
Power line (AC single phase) in
0
good conditions ?
Power input cables in good
1
conditions ?
2 Grounding ?
Welding cables in good conditions
3
?
Signature:
Inspection No.
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Gas Cylinders Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Type: Ref No:
During the survey of the designated area/item, complete the checklist below. Check N/A if the item does Main Subcontractor: Area for relevant subcontractor logo
not apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
A. Cylinder
-1 Suitable cap available and used ?
Cylinder' color code and size according
0
local technical guidelines ?
1 Cylinder free of all kind of damages ?
Printed code over the cylinder clear
2
and readable ?
Tagging system from the
vender/manifacturer is vailable over
the cylinder ?
Did the relevant subcontractor get the
3 facts of the bottle testing and expiry
date ?
A. Regulator
1 Guage glass sealed and intact ?
Pressure indication needles clear and
2
secure ?
3 Guage markings clear and legible ?
4 Guages firmly attached to regulator ?
5 Guage free from damge ?
Pressure adjusting screw complete
6
and undamaged ?
7 Gland nut undamaged
Cylinder pressure sealing surface
8
undamaged
9 Anti-flashback connection attached
10 Anti-Flashback connection undamaged
Signature
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC DB Panels Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Type: Ref No:
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
1 General view of the Panel acceptable ?
2 LOTO applied ?
Emergency contact number (electrician)
3
posted ?
4 Is the Panel IP 65 rated ?
Incoming and all outgoing cables are connected
5
through the right size cable gland ?
Outlet Sockets are in good condition and leads
6
are properly secured (no protruding wires) ?
7 Is the panel proplry earthed ?
Is the panel proprly fixed, isolated from
8 conductors and proprly protected from being
collided ?
Inspection No.
Reveiwed by:
This field is not mandatory but it is to encourage management and others to care about
Position: safety by reviewing and helpinng
Signature :
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Power Tools Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Type: Ref No:
During the survey of the designated area, complete the checklist below. Check N/A if the item does Main Subcontractor: Area for relevant subcontractor logo
not apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
A. Equipment/Tools
1 Appearance
2 Motor
3 Safe Guards
4 Earth for Movable Equipment
5 Frame (body) Earth
6 Installation/Fixing
7 Abrasive Disk/Blade
8 Hand Switch / Dead Man’s swich
9 Pilot Lamp
B. Cable/Connector
1 Cable/Insulation
2 Cable Connectors
3 Cable Terminals/Clamp
4 Laying (Not to be damaged)
C. Miscellaneous
Earth (Grounding Continuity Test
1
for metal cased tools)
C. Desk power tools
Inspection No.
Reveiwed by:
This field is not mandatory but it is to encourage management and others to care about
safety by reviewing and helpinng
Signature:
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC FBH Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Type: Ref No:
During the survey of the designated area, complete the checklist below. Check N/A if the item does not Main Subcontractor: Area for relevant subcontractor logo
apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
Is the shelf life given by
1
manifacturer and been respected ?
Signature
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Restractable Sys Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Type: Ref No:
During the survey of the designated area, complete the checklist below. Check N/A if the item does not Main Subcontractor: Area for relevant subcontractor logo
apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
Is the manifacturer or approved 3rd
1
party certificate availble ?
Signature :
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Life Line Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: Type: Ref No:
SN Item YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
A. Wire rope (Diameter up to 12mm)
1 Diameter up to 13mm
B. Turnbuckies
1 Provide at end of structure
2 SWL up to 2.0 tons
C. Load test
Drop tested using 150kg minimium
1
weight
D. Wire connection to turnbuckle
1 Looped round eye of Turnbuckle.
2 Held by minimium of 2 bulldog clips.
Clips space approximately 6 x rope
3
diameter
E. Anchorage points
Not more than 30 feet apart Of suitable
1
strength
F. Cables sag
1 Not more than 3-inches
Result Allowed to use Yes/No: Yes No
Inspected by:
Reveiwed by:
This field is not mandatory but it is to encourage management and others to care about
Position: safety by reviewing and helpinng
Signature
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Ladders Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Unite: Area/Facility: LADDER Type:
During the survey of the designated area, complete the checklist below. Check N/A if the item does not Main Subcontractor: Area for relevant subcontractor logo
apply. Subcontractor: (if it is used by the subcontractor, if not leave it)
SN Items YES NO N/A Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Comments if any
Is ladder free of missing or loose
1
steps or rungs ?
Is the ladder free of damage or worn
2
non-sleep feet ?
Is the ladder free of loose nails,
3
screws, bolts or nuts ?
Is the ladder free of loose or faulty
4 spreaders, locks, and other metal
parts in poor repair ?
Is the ladder free of cracked, split,
5 worn or broken rails, braces, steps or
rungs ?
Is the ladder free of sharp edges on
6
rails and rungs ?
Is the ladder free of rough or
7
splintered surfaces ?
Is the ladder free of corrosion, rust,
8 oxidization and excessive wear,
especially on treads ?
Is the ladder free of twisted or
9
distorted rails ?
10 Is the identification label in place ?
11 Other if any ?
Result Allowed to use Yes/No: Yes No
Inspected by:
Reveiwed by:
This field is not mandatory but it is to encourage management and others to care about
safety by reviewing and helpinng
Inspection No.
Reveiwed by:
This field is not mandatory but it is to encourage management and others to care about
Position: safety by reviewing and helpinng
Signature :
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
After a Safety Fire Risk Assessmnet is developed
t is developed
EPC-SEGC Elevator Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Signature :
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02
EPC-SEGC Man-Basket Inspection Checklist
700MW CSP+250MW PV Hybrid IPP - DEWA Phase IV
Signature :
Inspection No.
Name:
Date: Company:
Position:
Shanghai Electric LTD.Co. Dubai Branch, NE Project Inspection System for Maintaining NE1-00-HS-SEC-PRO-OOO(G)-00013 - Rev02