Client

Sl no Type of test Origin of Steel Grade of Steel Steel Ø Test date

Conares
1 T8 Initial test Alam steel B 500B 8 14.3.2016

T8 1st Frequent
Alam steel B 500B 8
Test

T10 Initial test Alam steel B 500B 10 14.3.2016

T10 1st Frequent


Alam steel B 500B 10
Test

T12 Initial Test Alam steel B 500B 12 14.3.2016

T12 1st Frequent


Alam steel B 500B 12
Test

T16 Initial Test Alam steel B 500B 16 14.3.2016

T16 1st Frequent


Alam steel B 500B 16
Test

T20 Initial Test Alam steel B 500B 20 14.3.2016

T20 1st Frequent


Alam steel B 500B 20
Test

T25 Initial Test Alam steel B 500B 25 14.3.2016

T25 1st Frequent


Alam steel B 500B 25
Test

T32 Initial Test Alam steel B 500B 32 14.3.2016

T32 1st Frequent


Alam steel B 500B 32
Test

T40 Initial Test Alam steel B 500B 40 14.3.2016


T40 1st Frequent
Alam steel B 500B 40
Test

Turkey

1 T8 Initial test Alam steel B 500B 8 14.3.2016

T8 1st Frequent
Alam steel B 500B 8
Test

T10 Initial test Alam steel B 500B 10 14.3.2016

T10 1st Frequent


Alam steel B 500B 10
Test

T12 Initial Test Alam steel B 500B 12 14.3.2016

T12 1st Frequent


Alam steel B 500B 12
Test

T16 Initial Test Alam steel B 500B 16 14.3.2016

T16 1st Frequent


Alam steel B 500B 16
Test

T20 Initial Test Alam steel B 500B 20 14.3.2016

T20 1st Frequent


Alam steel B 500B 20
Test

T25 Initial Test Alam steel B 500B 25 14.3.2016

T25 1st Frequent


Alam steel B 500B 25
Test

T32 Initial Test Alam steel B 500B 32 14.3.2016

T32 1st Frequent


Alam steel B 500B 32
Test

T40 Initial Test Alam steel B 500B 40 14.3.2016

T40 1st Frequent


Alam steel B 500B 40
Test
The Project Manager

Mechanical (Tensile Test)

Tensile strength - Min 8% more than


Yeild strength - Min 500N/mm2
Report no actual yield strength

S1 S2 S3 S1 S2

482107 630 555 597 729 671

482108 586 556 514 689 695

482109 488 537 492 593 648

482110 614 593 563 677 652

482111 550 549 550 639 647

482112 537 553 543 642 663

482113 563 559 552 687 710

482114 639 631 639 745 735


482115 533 528 525 659 647

482116 615 589 485 734 764

482117 619 524 610 705 677

482118 626 555 610 711 684

482119 579 552 614 691 684

482120 587 585 583 695 704

482121 547 550 550 658 662

482122 632 630 619 706 709


PROJECT: DUBAI CREEK HARBOUR DEVELOPMENT

h - Min 8% more than


Total Elongation at Max force( 4% min) stress ratio 1.06 min
ield strength

S3 S1 S2 S3 S1 S2

704 5.4 5.3 5.4 1.16 1.21

635 9.3 6..3 6.3 1.18 1.25

601 8.3 7.3 8.3 1.22 1.21

657 5.3 5.3 7.3 1.10 1.10

641 13.3 13.3 7.3 1.16 1.18

648 10.3 8.3 9.3 1.20 1.20

681 8.3 8.4 8.3 1.22 1.27

745 7.4 7.4 7.4 1.17 1.16


644 7.3 6.3 7.3 1.24 1.23

568 8.4 8.4 8.3 1.19 1.30

683 5.4 5.3 5.3 1.14 1.29

718 7.4 8.3 8.4 1.14 1.23

713 7.3 8.3 8.4 1.19 1.24

696 10.3 8.4 8.3 1.18 1.20

676 9.3 9.3 10.3 1.20 1.20

697 8.4 9.4 9.3 1.12 1.13


The Engineer

RBOUR DEVELOPMENT – DUBAI CREEK RESIDENCES


Bend Test ReBend Test
Carbon
Test Sulphur
atio 1.06 min Report No Comment Report No Comment Report No (Max %- (Max % -
0.24+0.03 0.055)
)
S3

1.18 482107 OK 482107 OK 482115 0.24 0.016

1.24 482108 OK 482108 OK 482116 0.22 0.022

1.22 482109 OK 482109 OK 482117 0.22 0.016

1.17 482110 OK 482110 OK 482118 0.25 0.019

1.17 482111 OK 482111 OK 482119 0.24 0.029

1.19 482112 OK 482112 OK 482120 0.26 0.02

1.23 482113 OK 482113 OK 482121 0.24 0.022

1.17 482114 OK 482114 OK 482122 0.26 0.003


1.23 482115 OK 482115 OK 482107 0.23 0.021

1.17 482116 OK 482116 OK 482108 0.19 0.021

1.12 482117 OK 482117 OK 482109 0.25 0.021

1.18 482118 OK 482118 OK 482110 0.25 0.028

1.16 482119 OK 482119 OK 482111 0.26 0.022

1.19 482120 OK 482120 OK 482112 0.26 0.022

1.23 482121 OK 482121 OK 482113 0.27 0.021

1.13 482122 OK 482122 OK 482114 0.24 0.023


Engineer

Chemical Test Analysis (%)

Phosphor Nitrogen copper


us (Max (Max % - (Max % - Chromium Manganese Molybdenum
% - 0.055) 0.014) 0.85)

0.03 0.009 0.435 0.146 0.63 0.018

0.026 0.009 0.5 0.117 0.61 0.018

0.02 0.008 0.014 0.003 0.75 0.001

0.023 0.01 0.01 0.003 0.74 0.001

0.031 0.009 0.327 0.008 0.61 0.011

0.024 0.009 0.035 0.004 0.67 0.001

0.025 0.008 0.217 0.008 0.65 0.007

0.031 0..09 0.004 0.003 0.69 0.001


0.024 0.01 0.165 0.006 0.6 0.004

0.022 0.008 0.026 0.002 0.67 0.001

0.032 0.01 0.006 0.003 0.71 0.001

0.029 0.01 0.352 0.007 0.6 0.05

0.022 0.01 0.002 0.003 0.62 0.001

0.025 0.009 0.003 0.003 0.63 0.001

0.026 0.009 0.002 0.003 0.64 0.001

0.024 0.01 0.331 0.123 0.76 0.011


The Contractor

Submittal Details
Carbon
Equivalent
Nickel Vanadium Value Submittal
Submittal No
Date
(Max % -
0.52)

0.204 0.002 0.42 TS/ABM/CIV/TR/0067 29.03.2016

0.22 0.001 0.4 TS/ABM/CIV/TR/0067 29.03.2016

0.096 0.002 0.36 TS/ABM/CIV/TR/0067 29.03.2016

0.098 0.002 0.38 TS/ABM/CIV/TR/0067 29.03.2016

0.174 0.001 0.38 TS/ABM/CIV/TR/0067 29.03.2016

0.104 0.001 0.38 TS/ABM/CIV/TR/0067 29.03.2016

0.183 0.001 0.37 TS/ABM/CIV/TR/0067 29.03.2016

0.081 0.001 0.38 TS/ABM/CIV/TR/0067 29.03.2016


0.123 0.002 0.36 TS/ABM/CIV/TR/0067 29.03.2016

0.121 0.005 0.32 TS/ABM/CIV/TR/0067 29.03.2016

0.091 0.001 0.38 TS/ABM/CIV/TR/0067 29.03.2016

0.201 0.001 0.39 TS/ABM/CIV/TR/0067 29.03.2016

0.079 0.001 0.37 TS/ABM/CIV/TR/0067 29.03.2016

0.083 0.001 0.37 TS/ABM/CIV/TR/0067 29.03.2016

0.087 0.001 0.38 TS/ABM/CIV/TR/0067 29.03.2016

0.19 0.001 0.43 TS/ABM/CIV/TR/0067 29.03.2016


l Details

Remarks
Client

Sl no Type of test Origin of Steel Grade of Steel Steel Ø Test date

Emirates
1 T8 Initial test utmost steel B 500B 8 21.03.2016

T8 1st Frequent
utmost steel B 500B 8
Test

T10 Initial test utmost steel B 500B 10 21.03.2016

T10 1st Frequent


utmost steel B 500B 10
Test

T12 Initial Test utmost steel B 500B 12 21.03.2016

T12 1st Frequent


utmost steel B 500B 12
Test

T16 Initial Test utmost steel B 500B 16 21.03.2016

T16 1st Frequent


utmost steel B 500B 16
Test

T20 Initial Test utmost steel B 500B 20 21.03.2016

T20 1st Frequent


utmost steel B 500B 20
Test

T25 Initial Test utmost steel B 500B 25 21.03.2016

T25 1st Frequent


utmost steel B 500B 25
Test

T32 Initial Test utmost steel B 500B 32 21.03.2016

T32 1st Frequent


utmost steel B 500B 32
Test

T40 Initial Test utmost steel B 500B 40 21.03.2016


T40 1st Frequent
utmost steel B 500B 40
Test

Habas
1 T8 Initial test utmost steel B 500B 8 21.03.2016

T8 1st Frequent
utmost steel B 500B 8
Test

T10 Initial test utmost steel B 500B 10 21.03.2016

T10 1st Frequent


utmost steel B 500B 10
Test

T12 Initial Test utmost steel B 500B 12 21.03.2016

T12 1st Frequent


utmost steel B 500B 12
Test

T16 Initial Test utmost steel B 500B 16 21.03.2016

T16 1st Frequent


utmost steel B 500B 16
Test

T20 Initial Test utmost steel B 500B 20 21.03.2016

T20 1st Frequent


utmost steel B 500B 20
Test

T25 Initial Test utmost steel B 500B 25 21.03.2016

T25 1st Frequent


utmost steel B 500B 25
Test

T32 Initial Test utmost steel B 500B 32 21.03.2016

T32 1st Frequent


utmost steel B 500B 32
Test

T40 Initial Test utmost steel B 500B 40 21.03.2016

T40 1st Frequent


utmost steel B 500B 40
Test

kroman
1 T8 Initial test utmost steel B 500B 8 21.03.2016

T8 1st Frequent
utmost steel B 500B 8
Test

T10 Initial test utmost steel B 500B 10 21.03.2016

T10 1st Frequent


utmost steel B 500B 10
Test
T12 Initial Test utmost steel B 500B 12 21.03.2016

T12 1st Frequent


utmost steel B 500B 12
Test

T16 Initial Test utmost steel B 500B 16 21.03.2016

T16 1st Frequent


utmost steel B 500B 16
Test

T20 Initial Test utmost steel B 500B 20 21.03.2016

T20 1st Frequent


utmost steel B 500B 20
Test
T25 Initial Test utmost steel B 500B 25 21.03.2016
T25 1st Frequent
utmost steel B 500B 25
Test
T32 Initial Test utmost steel B 500B 32 21.03.2016
T32 1st Frequent
utmost steel B 500B 32
Test
T40 Initial Test utmost steel B 500B 40 21.03.2016
T40 1st Frequent
utmost steel B 500B 40
Test
The Project Manager

Mechanical (Tensile Test)

Tensile strength - Min 8% more than


Yeild strength - Min 500N/mm2
Report no actual yield strength

S1 S2 S3 S1 S2

486282 513 564 496 617 657

486283 546 580 573 654 689

486284 552 545 556 623 626

486285 555 545 518 656 649

486286 553 553 557 650 652

486287 525 526 529 628 630

486288 530 528 533 647 646

486289 562 565 562 665 668


486274 617 534 557 729 623

486275 576 586 543 672 664

486276 551 561 568 631 656

486277 587 564 571 695 662

486278 577 580 560 679 667

486279 573 580 579 676 693

486280 556 557 551 670 671

486281 570 566 575 680 678

486297 516 525 514 638 662

486290 515 541 528 622 657


486291 557 556 553 657 646

486292 520 524 535 629 625

486293 509 539 535 613 640

486294 550 546 547 655 649

486295 540 567 573 653 696

486296 564 565 560 695 694


PROJECT: DUBAI CREEK HARBOUR DEVELOPMENT – D

h - Min 8% more than


Total Elongation at Max force( 4% min) stress ratio 1.06 min
ield strength

S3 S1 S2 S3 S1 S2

591 7.3 7.3 6.3 1.20 1.16

678 8.3 8.3 7.3 1.20 1.19

628 7.3 7.3 7.3 1.13 1.15

620 9.3 9.3 9.3 1.18 1.19

654 7.3 8.3 8.3 1.18 1.18

635 8.3 9.3 9.3 1.20 1.20

653 9.3 9.3 10.3 1.22 1.22

666 10.3 10.3 11.3 1.18 1.18


645 6.4 5.3 5.3 1.18 1.17

630 8.3 8.3 7.3 1.17 1.13

665 8.3 8.3 8.3 1.15 1.17

686 10.3 9.3 10.3 1.18 1.17

645 8.3 8.3 10.3 1.18 1.15

688 9.3 9.3 9.3 1.18 1.19

665 10.3 10.3 11.3 1.21 1.20

707 10.3 10.3 10.4 1.19 1.20

632 5.3 5.3 5.3 1.24 1.26

640 6.3 6.3 6.3 1.21 1.21


657 7.3 9.3 8.3 1.18 1.16

631 7.3 9.3 8.3 1.21 1.19

635 9.3 10.3 10.3 1.20 1.19

653 10.3 11.3 10.3 1.19 1.19

701 9.3 9.3 10.4 1.21 1.23

669 9.3 10.3 10.3 1.23 1.23


The Engineer

OUR DEVELOPMENT – DUBAI CREEK RESIDENCES


Bend Test ReBend Test
Carbon
Test Sulphur Phosphor
atio 1.06 min Comment Comment Report No (Max %- (Max % - us (Max
0.24+0.03 0.055) % - 0.055)
)
S3

1.19 Ok Ok 486282 0.25 0.023 0.026

1.18 Ok Ok 486283 0.26 0.018 0.025

1.13 Ok Ok 486284 0.25 0.024 0.026

1.20 Ok Ok 486285 0.26 0.019 0.026

1.17 Ok Ok 486286 0.25 0.022 0.027

1.20 Ok Ok 486287 0.23 0.021 0.024

1.23 Ok Ok 486288 0.24 0.019 0.027

1.19 Ok Ok 486289 0.23 0.024 0.027


1.16 Ok Ok 486274 0.23 0.022 0.033

1.16 Ok Ok 486275 0.22 0.023 0.027

1.17 Ok Ok 486276 0.22 0.022 0.026

1.20 Ok Ok 486277 0.23 0.027 0.03

1.15 Ok Ok 486278 0.25 0.023 0.025

1.19 Ok Ok 486279 0.25 0.02 0.022

1.21 Ok Ok 486280 0.21 0.019 0.025

1.23 Ok Ok 486281 0.25 0.021 0.026

1.23 Ok Ok 486297 0.25 0.023 0.028

1.21 Ok Ok 486290 0.26 0.023 0.023


1.19 Ok Ok 486291 0.25 0.024 0.027

1.18 Ok Ok 486292 0.246 0.025 0.026

1.19 Ok Ok 486293 0.24 0.025 0.025

1.19 Ok Ok 486294 0.23 0.022 0.027

1.22 Ok Ok 486295 0.25 0.023 0.03

1.19 Ok Ok 486296 0.27 1.018 0.022


ineer T

Chemical Test Analysis (%)

Nitrogen copper
(Max % - (Max % - Chromium Manganese Molybdenum Nickel
0.014) 0.85)

0.012 0.041 0.004 0.61 0.001 0.088

0.01 0.003 0.002 0.6 0.001 0.087

0.01 0.01 0.002 0.66 0.001 0.087

0.009 0.002 0.003 0.67 0.001 0.094

0.009 0.029 0.003 0.57 0.001 0.091

0.092 0.023 0.004 0.64 0.001 0.092

0.009 0.018 0.004 0.6 0.001 0.092

0.009 0.415 0.105 0.71 0.013 0.19


0.183 0.495 0.144 0.63 0.013 0.183

0.009 0.416 0.109 0.65 0.01 0.188

0.01 0.459 0.106 0.59 0.016 0.203

0.01 0.51 0.112 0.63 0.018 0.222

0.009 0.029 0.006 0.7 0.001 0.091

0.01 0.043 0.005 0.69 0.002 0.099

0.008 0.42 0.054 0.69 0.015 0.204

0.009 0.439 0.112 0.76 0.012 0.191

0.01 0.255 0.055 0.69 0.012 0.17

0.009 0.235 0.007 0.64 0.01 0.163


0.008 0.197 0.008 0.63 0.008 0.142

0.01 0.243 0.007 0.64 0.008 0.144

0.01 0.211 0.006 0.64 0.01 0.146

0.01 0.226 0.008 1 0.009 0.166

0.01 0.333 0.154 1.02 0.017 0.0178

1.01 0.043 0.004 0.62 0.001 0.103


.
The Contractor

Submittal Details
Carbon
Equivalent
Vanadium Value Submittal
Submittal No Remarks
Date
(Max % -
0.52)

0.002 0.36 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.002 0.36 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.37 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.38 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.002 0.36 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.34 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.35 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.42 TS/ABM/CIV/TR/0077 R1 12.04.2016


0.003 0.42 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.39 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.39 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.002 0.41 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.37 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.38 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.38 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.44 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.41 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 TS/ABM/CIV/TR/0077 R1 12.04.2016


0.005 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.38 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.37 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.43 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.49 TS/ABM/CIV/TR/0077 R1 12.04.2016

0.001 0.38 TS/ABM/CIV/TR/0077 R1 12.04.2016


Concrete Trial Mixes S

1 Batching plant Ready Mix Gulf Ltd Ready Mix Gulf Ltd
2 Concrete grade C50/20(Sub-structure) C70/20(Tower columns and walls

3 Trial Mix Date 3/14/2016 15 March 2016


4 Tial mix number Trial mix 1 Trial mix 2 Trial mix 3 Trial mix 1
5 Batching time 11.12 a.m 11.32 a.m 11.52 a.m 10.55 a.m
6 Density (Kg/m3) 2440 2450 2440 2500
7 Ambient temperature(*C) 34 34 34 36
8 Concrete avg. temperature (*C) 26 25 25 26
9 Air content(%) 1.3 1.2 1.2 0.6
10 Bleeding Nil Nil Nil Nil
11 Segregation Nil Nil Nil Nil
12 No. of cubes per trial mix 25 25 25 25
13 Slump variation
a.) Initial 235 240 235 230
b.) 30 Min 230 220 220 225
c.) 1 Hr 200 200 210 220
d.) 1 Hr 30 Min 195 190 200 210
e.) 2 Hrs 165 170 185 200
14 Temperature variation (*C)
a.) Initial 24 24 24 25
b.) 30 Min 25 25 25 26
c.) 1 Hr 26 25 25 28
d.) 1 Hr 30 Min 27 26 26 29
e.) 2 Hrs 28 27 27 30
15 7 days cube test results
Test date 3/21/2016 3/21/2016 3/21/2016 3/22/2016
Cube 1 - Com. Stren. (N/mm2) 53.50 50.00 51.50 69.50
Cube 2 - Com. Stren. (N/mm2) 55.00 50.00 47.00 68.50
Cube 3 - Com. Stren. (N/mm2) 54.00 51.00 49.00 71.00
Avg. Com. Strength (N/mm2) 54.17 50.33 49.17 69.67
% of expected 28 days value 88.08% 81.84% 79.95% 85.48%
16 28 days cube test results
Test date 4/11/2016 4/11/2016 4/11/2016 12 April 2016
Cube 1 - Com. Strength(N/mm2) 67.5 59.5 61.5 90.5
Cube 2 - Com. Strength(N/mm2) 66 63.5 62.5 86
Cube 3 - Com. Strength(N/mm2) 66 64.5 63 92.5
Avg. Com. Strength (N/mm2) 66.5 62.5 62.3 89.7
% of expected 28 days value 108.13% 101.63% 101.36%
Concrete Trial Mixes Summery

Ready Mix Gulf Ltd Ready Mix Gulf Ltd Ready Mix Gulf Ltd
C50/20(Superstructure - Towers from level
C70/20(Tower columns and walls up to L18) 18 and above, Podium columns and slabs, C30/20 (Slabs on grade)
Tower slabs)
15 March 2016 16 March 2016 3/17/2016
Trial mix 2 Trial mix 3 Trial mix 1 Trial mix 2 Trial mix 3 Trial mix 1
11.39 a.m 12.01 p.m 10.14 a.m 10.43 a.m 11.02 a.m 10.42 a.m
2500 2490 2460 2450 2460 2470
36 36 32 32 32 28
27 27 25 24 24 24
0.9 0.7 1.3 1.3 1.4 1.5
Nil Nil Nil Nil Nil Nil
Nil Nil Nil Nil Nil Nil
25 25 25 25 25 25

240 240 230 240 230 230


225 230 225 230 220 220
205 220 210 215 200 185
205 215 200 200 195 180
200 195 190 185 185 160

26 25 22 21 22 22
27 27 23 23 23 23
28 28 25 24 24 24
29 29 25.5 24 24 24
30 30 26 25 25 25

3/22/2016 3/22/2016 3/23/2016 3/23/2016 3/23/2016 3/24/2016


73.00 68.30 48.50 50.50 51.50 49.00
77.50 72.30 49.00 50.00 50.50 47.00
77.00 74.00 50.00 50.50 54.00 49.50
75.83 71.53 49.17 50.33 52.00 48.50
93.05% 87.77% 79.95% 81.84% 84.55% 116.87%

12 April 2016 12 April 2016 4/13/2016 13 April 2016 13 April 2016 4/14/2016
94 97 62.5 63.5 60 57.5
85 98 62 61.5 62.5 59
95 63.5 60.5 65.5 60.5
89.5 96.7 62.7 61.8 62.7 59
Ready Mix Gulf Ltd RMG Ltd
C15/10
C30/20 (Slabs on grade)
(Blinding)
3/17/2016 3/17/2016
Trial mix 2 Trial mix 3 Trial mix 1
11.02 a.m 11.24 a.m 01.03 p.m
2450 2460 2410
28 28 29
24 22 25
1.3 1.4 1.9
Nil Nil Nil
Nil Nil Nil
25 25 14

230 225 180


210 195 160
200 190 150
190 185 130
165 160 110

23 21 23
23 22 24
24 22 25
24 22.5 26
24.5 23 27

3/24/2016 3/24/2016 3/24/2016


48.50 43.50 32.50
47.50 41.00 33.50
49.50 42.50 33.00
48.50 42.33 33.00
116.87% 102.01% 124.53%

4/14/2016 4/14/2016 4/14/2016


59 54 44.5
58.5 57 43.5
58 55 43
58.5 55.3 43.7
Concrete Trial Mixes Su

1 Batching plant Golden Ready Mix Golden Ready Mix

2 Concrete grade C50/20(Sub-structure) C70/20(Tower columns and walls u

3 Trial Mix Date 3/22/2016 3/27/2016


4 Tial mix number Trial mix 1 Trial mix 2 Trial mix 3 Trial mix 1
5 Batching time 11.36 a.m 12.29 p.m 01.17 p.m 10.14 a.m
6 Density (Kg/m3) 2410 2420 2420 2460
7 Ambient temperature(*C) 26 27 27 31
8 Concrete avg. temperature (*C) 22 22 22 25
9 Air content(%) 1.3 1 1.1 0.8
10 Bleeding Nil Nil Nil Nil
11 Segregation Nil Nil Nil Nil
12 No. of cubes per trial mix 37 25 25 37
13 Slump variation
a.) Initial 230 230 230 250
b.) 30 Min 210 210 220 230
c.) 1 Hr 180 190 190 220
d.) 1 Hr 30 Min 160 170 160 185
e.) 2 Hrs 140 150 140 175
14 Temperature variation (*C)
a.) Initial 21.0 21.0 21.0 23.0
b.) 30 Min 21.5 22.0 22.0 24.0
c.) 1 Hr 22.0 22.3 23.0 24.5
d.) 1 Hr 30 Min 23.0 23.0 23.0 25.0
e.) 2 Hrs 23.0 24.0 24.0 26.0
15 7 days cube test results
Test date 3/29/2016 3/29/2016 3/29/2016 4/3/2016
Cube 1 - Com. Stren. (N/mm2) 46.00 48.00 47.50 70.50
Cube 2 - Com. Stren. (N/mm2) 46.50 50.00 46.00 69.50
Cube 3 - Com. Stren. (N/mm2) 47.50 50.50 49.50 69.50
Avg. Com. Strength (N/mm2) 46.67 49.50 47.67 69.83
% of expected 28 days value 75.88% 80.49% 77.51% 85.69%
16 28 days cube test results
Test date 4/19/2016 4/19/2016 4/19/2016 4/24/2016
Cube 1 - Com. Strength(N/mm2) 59 66 62 85
Cube 2 - Com. Strength(N/mm2) 62.5 71 61.5 83.5
Cube 3 - Com. Strength(N/mm2) 61.5 61.5 61.5 80.5
Avg. Com. Strength (N/mm2) 61.0 66.2 61.7 83.0
% of expected 28 days value
Concrete Trial Mixes Summery

Golden Ready Mix Golden Ready Mix Golden Ready Mix


C50/20(Superstructure - Towers from level
0/20(Tower columns and walls up to L18) 18 and above, Podium columns and slabs, C30/20 (Slabs on grade)
Tower slabs)
3/27/2016 3/30/2016 4/4/2016
Trial mix 2 Trial mix 3 Trial mix 1 Trial mix 2 Trial mix 3 Trial mix 1 Trial mix 2
12.15 p.m 13.54 p.m 11.02 p.m 13.18 p.m 14.45 p.m 9.52 a.m 11.13 a.m
2440 2450 2440 2430 2440 2390 2410
33 34 34 35 38 25 25
28 25.0 27 28 29 22 22
0.9 0.8 1.3 1.2 1.6 1.1 1
Nil Nil Nil Nil Nil Nil Nil
Nil Nil Nil Nil Nil Nil Nil
25 25 37 25 25 9 9

250 240 225 220 220 210 210


230 230 210 190 180 190 190
210 200 170 170 165 175 170
185 185 150 150 145 150 150
175 175 130 130 125 125 130

27.0 21.7 25.0 27.0 27.5 20.0 21.0


29.0 23.0 26.0 27.6 29.0 21.0 22.0
29.0 26.0 27.0 28.2 29.5 22.0 22.0
27.0 27.0 27.0 29.5 30.0 22.0 23.0
28.0 27.5 28.0 30.0 30.5 22.5 23.5

4/3/2016 4/3/2016 6/4/2016 6/4/2016 6/4/2016 4/11/2016 4/11/2016


71.00 65.50 53.00 54.50 52.50 43.50 38.00
69.50 64.50 51.50 54.00 53.50 42.00 39.00
68.50 66.50 52.00 53.00 53.00 40.50 38.50
69.67 65.50 52.17 53.83 53.00 42.00 38.50
85.48% 80.37% 84.82% 87.53% 86.18% 101.20% 92.77%

4/24/2016 4/24/2016 4/27/2016 4/27/2016 4/27/2016 5/2/2016 5/2/2016


88 84.5 72 69 72.5 57.5 57
88.5 79.5 75 73.5 71 57 59
90.5 78.5 70 73 73.5 56 55
89.0 80.8 72.3 71.8 72.3 56.8 57.0
en Ready Mix GRM

C15/10
Slabs on grade)
(Blinding)

4/4/2016 3/22/2016
Trial mix 3 Trial mix 1
12.14 p.m 02.08 p.m
2400 2370
25 27
23 23
1 1.5
Nil Nil
Nil Nil
9 12

210 200
190 150
170 130
150 110
125 90

21.5 22.0
23.0 22.0
23.0 23.0
23.0 23.0
24.0 23.5

4/11/2016 3/29/2016
38.50 30.50
38.50 29.00
37.50 29.50
38.17 29.67
91.97% 111.95%

5/2/2016 4/19/2016
57 36
54.5 37
54 35.5
55.2 36.2
Client The Project Manager

PROJECT: DUBAI CREEK HA


Grade of
S.No Supplier Source Type of coupler dia (mm) Date of test report No.
steel

1 Utmost Bautech Threaded coupler 16 500B 12.04.2016 491192

2 Utmost Bautech Threaded coupler 20 500B 12.04.2016 491193

3 Utmost Bautech Threaded coupler 25 500B 12.04.2016 491194

4 Utmost Bautech Threaded coupler 32 500B 12.04.2016 491195

5 Utmost Bautech Threaded coupler 40 500B 12.04.2016 491196

6 Utmost Bautech Reduced coupler 32 to 40 500B 12.04.2016 491197

Grade of
S.No Supplier Source Type of coupler dia (mm) Date of test report No.
steel

1 Alam Lenton Threaded 16 500B 05.04.2016 489667

16(Retesting) 500B 24.04.2016 493289

2 Alam Lenton Threaded 20 500B 05.04.2016 489668

3 Alam Lenton Threaded 25 500B 05.04.2016 489669

4 Alam Lenton Threaded 32 500B 05.04.2016 489670

5 Alam Lenton Threaded 40 500B 05.04.2016 489671


ct Manager The Engineer Co

ECT: DUBAI CREEK HARBOUR DEVELOPMENT – DUBAI CREEK RESIDENCES


Permanent elongation at 0.6fy
Original length of coupler Cross sectional area mm2
mm
Sample 1 Sample 2 Sample 3 Sample 1 Sample 2 Sample 3 Sample 1 Sample 2 Sample 3

40 40 40 0.04 0.06 0.05 201 201 201

48 48 48 0.03 0.05 0.03 314 314 314

38 38 38 0.06 0.06 0.06 491 491 491

72 72 72 0.05 0.05 0.07 804 804 804

89.5 89.66 89.64 0.03 0.05 0.05 1257 1257 1257

80.54 80.35 81 0.02 0.03 0.03 804 804 804

Permanent elongation at 0.6fy


Original length of coupler Cross sectional area mm2
mm
Sample 1 Sample 2 Sample 3 Sample 1 Sample 2 Sample 3 Sample 1 Sample 2 Sample 3

56 56 56 0.03 0.02 0.05 201 201 201

55.92 55.91 55.96 0.02 0.03 0.03 201 201 201

72 72 72 0.04 0.06 0.07 314 314 314

85 86 85 0.03 0.06 0.06 491 491 491

97 97 97 0.03 0.05 0.05 804 804 804

127 127 127 0.04 0.05 0.05 1257 1257 1257


Contractor

CES
Ultimate tensile stress(N/mm2) Failure mode Submittal Details
Sample 1 Sample 2 Sample 3 Sample 1 Sample 2 Sample 3 Submittal No
steel bar steel bar steel bar
693 659 680 TS/ABM/CIV/TR/0095
broken broken broken
steel bar steel bar steel bar
662 658 654 TS/ABM/CIV/TR/0095
broken broken broken
steel bar steel bar steel bar
628 626 623 TS/ABM/CIV/TR/0095
broken broken broken
steel bar steel bar steel bar
639 640 645 TS/ABM/CIV/TR/0095
broken broken broken
steel bar steel bar steel bar
667 662 659 TS/ABM/CIV/TR/0095
broken broken broken
steel bar steel bar steel bar
633 641 646 TS/ABM/CIV/TR/0095
broken broken broken

Ultimate tensile stress(N/mm2) Failure mode Submittal Details


Sample 1 Sample 2 Sample 3 Sample 1 Sample 2 Sample 3 Submittal No
steel bar steel bar steel slipped
675 666 487 TS/ABM/CIV/TR/0083
broken broken from coupler
steel bar steel bar steel bar
669 683 684 TS/ABM/CIV/TR/0083
broken broken broken
steel bar steel bar steel bar
653 653 658 TS/ABM/CIV/TR/0083
broken broken broken
steel slipped steel slipped steel slipped
644 645 658 TS/ABM/CIV/TR/0083
from coupler from coupler from coupler
steel bar steel bar steel bar
650 648 651 TS/ABM/CIV/TR/0083
broken broken broken
steel slipped steel bar steel bar
729 712 715 TS/ABM/CIV/TR/0083
from coupler broken broken
Submittal Details
Submittal Date Remarks

18.04.2016

18.04.2016

18.04.2016

18.04.2016

18.04.2016

18.04.2016

Submittal Details
Submittal Date Remarks

12.04.2016

12.04.2016

12.04.2016

12.04.2016

12.04.2016

12.04.2016
Client The Project Manager

Concrete Cube Compressiv

Cube Compressive
Mix Design & 7 Days Crushing
Cube Date of Tower/
Strength Supplier
Ref. No. Casting Podium Cube No
(N/mm²) Date of Strength
testing (N/mm²)

A 67.5
N1 28/03/2016 C70 Gulf NW3 04/04/2016
B 64.0

A 35.0
N2 08/04/2016 C50 Golden NE2 15/04/2016
B 40.0

N3 08/04/2016 C50 Golden NE2 durab

A 33.5
N4 08/04/2016 C50 Golden NE2 15/04/2016
B 34.5

A 39.5
N5 08/04/2016 C50 Golden NE2 15/04/2016
B 41.0

N6 08/04/2016 C50 Golden NE2 durab

A 37.5
N7 08/04/2016 C50 Golden NE2 15/04/2016
B 37.0

A 39.0
N8 08/04/2016 C50 Golden NE2 15/04/2016
B 39.0

A 33.5
N9 08/04/2016 C50 Golden NE2 15/04/2016
B 36.5
N10 08/04/2016 C50 Golden NE2 durab

A 41.0
N11 08/04/2016 C50 Golden NE2 15/04/2016
B 41.0

A 31.0
N12 08/04/2016 C50 Golden NE2 15/04/2016
B 33.0

N13 08/04/2016 C50 Golden NE2 durab

A 37.5
N14 08/04/2016 C50 Golden NE2 15/04/2016
B 36.5

A 32.5
N15 08/04/2016 C50 Golden NE2 15/04/2016
B 32.5

A 32.0
N16 08/04/2016 C50 Golden NE2 15/04/2016
B 40.5

N17 15/04/2016 C50 Golden NE2 durab

A 36.00
N18 15/04/2016 C50 Golden NE3 22/04/2016
B 38.00

A 35.50
N19 15/04/2016 C50 Golden NE3 22/04/2016
B 38.00

N20 15/04/2016 C50 Golden NE3 durab

A 41.50
N21 15/04/2016 C50 Golden NE3 22/04/2016
B 40.00

A 40.50
N22 15/04/2016 C50 Golden NE3 22/04/2016
B 40.50
N23 15/04/2016 C50 Golden NE3 durab

A 38.00
N24 15/04/2016 C50 Golden NE3 22/04/2016
B 39.50

A 40.50
N25 15/04/2016 C50 Golden NE3 22/04/2016
B 40.00

N26 15/04/2016 C50 Golden NE3 durab

A 37.00
N27 15/04/2016 C50 Golden NE3 22/04/2016
B 35.00

A 36.00
N28 15/04/2016 C50 Golden NE3 22/04/2016
B 36.50

N29 15/04/2016 C50 Golden NE3 durab

A 37.00
N30 15/04/2016 C50 Golden NE3 22/04/2016
B 39.00

A 41.00
N31 15/04/2016 C50 Golden NE3 22/04/2016
B 39.00

A 37.50
N32 15/04/2016 C50 Golden NE3 22/04/2016
B 38.00

A 39.00
N33 15/04/2016 C50 Golden NE3 22/04/2016
B 39.50

N34 15/04/2016 C50 Golden NE3 durab

A 39.50
N35 15/04/2016 C50 Golden NE3 22/04/2016
B 38.00
A 58.00
N36 16/04/2016 C70 Golden NW3 23/04/2016
B 57.50

A 54.50
N37 16/04/2016 C70 Golden SW3 23/04/2016
B 53.00

A 55.50
N38 18/04/2016 C70 Golden NW3 25/04/2016
B 53.00

A 55.50
N39 23/04/2016 C70 Golden NE3 30/04/2016
B 57.00

A 59.50
N40 23/04/2016 C70 Golden NE3 30/04/2016
B 54.00

A 40.00
N41 25/04/2016 C50 Golden NW3 02/05/2016
B 37.50

A 40.50
N42 25/04/2016 C50 Golden NW3 02/05/2016
B 38.00

A 43.50
N43 25/04/2016 C50 Golden NW3 02/05/2016
B 41.50

A 40.50
N44 25/04/2016 C50 Golden NW3 02/05/2016
B 39.50

A 57.00
N45 26/04/2016 C70 Golden NE2 03/05/2016
B 58.50

A 56.50
N46 27/04/2016 C70 Golden NE3 04/05/2016
B 58.50

A 47.00
N47 27/04/2016 C70 Golden NE3 04/05/2016
B 46.00

A 45.0
N48 28/04/2016 C50 Golden NE2 05/05/2016
N48 28/04/2016 C50 Golden NE2 05/05/2016
B 44.5

A 47.0
N49 28/04/2016 C50 Golden NE2 05/05/2016
B 45.5

A 37.5
N50 28/04/2016 C50 Golden NE2 05/05/2016
B 36.5

A 54.0
N51 30/04/2016 C70 Golden NE3 07/05/2016
B 57.5

A 65.50
N52 02/05/2016 C70 Golden NW3 09/05/2016
B 54.00

A 64.50
N53 02/05/2016 C70 Golden NW3 09/05/2016
B 64.50

A 64.50
N54 02/05/2016 C70 Golden NW3 09/05/2016
B 67.00

A 63.50
N55 02/05/2016 C70 Golden NW3 09/05/2016
B 58.00

A 64.50
N56 02/05/2016 C70 Golden NW3 09/05/2016
B 59.50

A
N57 08/05/2016 C50 Golden NE2 15/05/2016
B

A
N58 10/05/2016 C70 Golden NW3 17/05/2016
B

A
N59 11/05/2016 C70 Golden NE3 18/05/2016
B

A
N60 11/05/2016 C70 Golden NE3 18/05/2016
B
A
N61 11/05/2016 C70 Golden NE3 18/05/2016
B

A
N62 11/05/2016 C70 Golden NE3 18/05/2016
B

A
N63 11/05/2016 C70 Golden NE3 18/05/2016
B

A
N64 14/05/2016 C70 Golden NE2 21/05/2016
B

A
N65 14/05/2016 C70 Golden NE2 21/05/2016
B

A
N66 14/05/2016 C70 Golden NE2 21/05/2016
B

A
N67 06/01/1900
B

A
N68 06/01/1900
B

A
N69 06/01/1900
B

A
N70 06/01/1900
B

A
N71 06/01/1900
B

A
N72 06/01/1900
B

A
N73 06/01/1900
N73 06/01/1900
B

A
N74 06/01/1900
B

A
N75 06/01/1900
B

A
N76 06/01/1900
B

A
N77 06/01/1900
B

A
N78 06/01/1900
B

A
N79 06/01/1900
B

A
N80 06/01/1900
B

A
N81 06/01/1900
B

A
N82 06/01/1900
B

A
N83 06/01/1900
B

A
N84 06/01/1900
B

A
N85 06/01/1900
B
A
N86 06/01/1900
B

N87

N88

N89

N90

N91

N92

N93

N94

N95
The Engineer Contractor

be Compressive Strength Report


As of: 08.05.2016
Cube Compressive strength(N/mm²)
ays Crushing 28 Days Crushing Remarks
Description / LOCATION
7 Days
Average Cube Ref. # Strength Average
Date
(N/mm²) (N/mm²) (N/mm²)

C 76.5
Column C6,C4,C14 & WALL
65.8 25/04/2016 81.5
W9,W11 (B2-B1)
D 86.5

C 65.0
37.5 06/05/2016 66.8 Raft foundation
D 68.5

durability Raft foundation

C 69.0
34.0 06/05/2016 67.3 Raft foundation
D 65.5

C 65.0
40.3 06/05/2016 67.3 Raft foundation
D 69.5

durability Raft foundation

C 66.5
37.3 06/05/2016 64.0 Raft foundation
D 61.5

C 65.5
39.0 06/05/2016 65.8 Raft foundation
D 66.0

C 66.0
35.0 06/05/2016 66.3 Raft foundation
D 66.5
durability Raft foundation

C 69.5
41.0 06/05/2016 66.3 Raft foundation
D 63.0

C 64.0
32.0 06/05/2016 66.0 Raft foundation
D 68.0

durability Raft foundation

C 63.0
37.0 06/05/2016 63.8 Raft foundation
D 64.5

C 66.0
32.5 06/05/2016 66.3 Raft foundation
D 66.5

C 66.0
36.3 06/05/2016 66.8 Raft foundation
D 67.5

durability Raft foundation

C
37.00 13/05/2016 #DIV/0! Raft foundation
D

C
36.75 13/05/2016 #DIV/0! Raft foundation
D

durability Raft foundation

C
40.75 13/05/2016 #DIV/0! Raft foundation
D

C
40.50 13/05/2016 #DIV/0! Raft foundation
D
durability Raft foundation

C
38.75 13/05/2016 #DIV/0! Raft foundation
D

C
40.25 13/05/2016 #DIV/0! Raft foundation
D

durability Raft foundation

C
36.00 13/05/2016 #DIV/0! Raft foundation
D

C
36.25 13/05/2016 #DIV/0! Raft foundation
D

durability Raft foundation

C
38.00 13/05/2016 #DIV/0! Raft foundation
D

C
40.00 13/05/2016 #DIV/0! Raft foundation
D

C
37.75 13/05/2016 #DIV/0! Raft foundation
D

C
39.25 13/05/2016 #DIV/0! Raft foundation
D

durability Raft foundation

C
38.75 13/05/2016 #DIV/0! Raft foundation
D
C C5 (2NOS)
W3-
57.75 14/05/2016 #DIV/0!
C11,C12,C13,C16,C3,C9,C2,C5
D (B2-B1)

C
W3-W11 & W9 Opposite wall to
53.75 14/05/2016 #DIV/0!
W3-w9 (B2-B1)
D

C
C1, W3-C2,W3-C17,W3-C18,
54.25 16/05/2016 #DIV/0!
W3-W2 (B2-B1)
D

C
E3-C14,E3-C4,E3-C10,E3-C11,E3-
56.25 21/05/2016 #DIV/0!
C15 (B2-B1)
D

C
E3-C19,E3-C20,E3-C16,E3-
56.75 21/05/2016 #DIV/0!
C12,E3-C18 (B2-B1)
D

C
38.75 23/05/2016 #DIV/0! TC1 FOUNDATION
D

C
39.25 23/05/2016 #DIV/0! TC1 FOUNDATION
D

C
42.50 23/05/2016 #DIV/0! TC1 FOUNDATION
D

C
40.00 23/05/2016 #DIV/0! TC1 FOUNDATION
D

C
57.75 24/05/2016 #DIV/0! E2-C5 & E2-C4 (B2-B1)
D

C
57.50 25/05/2016 #DIV/0! E3-C9 & W3-W12 (B2-B1)
D

C
46.50 25/05/2016 #DIV/0! E3-C22 & E3-C29 (B2-B1)
D

C
44.8 26/05/2016 #DIV/0! TC2 FOUNDATION
44.8 26/05/2016 #DIV/0! TC2 FOUNDATION
D

C
46.3 26/05/2016 #DIV/0! TC2 FOUNDATION
D

C
37.0 26/05/2016 #DIV/0! TC2 FOUNDATION
D

C
55.8 28/05/2016 #DIV/0! E3-W5(2 SECTIONS)
D

C
COREWALL LEVEL +4.2 TO +7.5
59.75 30/05/2016 #DIV/0!
(B2-B1)
D

C
COREWALL LEVEL +4.2 TO +7.5
64.50 30/05/2016 #DIV/0!
(B2-B1)
D

C
COREWALL LEVEL +4.2 TO +7.5
65.75 30/05/2016 #DIV/0!
(B2-B1)
D

C
COREWALL LEVEL +4.2 TO +7.5
60.75 30/05/2016 #DIV/0!
(B2-B1)
D

C
COREWALL LEVEL +4.2 TO +7.5
62.00 30/05/2016 #DIV/0!
(B2-B1)
D

C
300mm thick Slab @ lift &
#DIV/0! 05/06/2016 #DIV/0!
staircase area +4.5m level
D

C
#DIV/0! 07/06/2016 #DIV/0!
D

C
#DIV/0! 08/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 08/06/2016 #DIV/0! COREWALL(B2-B1)
D
C
#DIV/0! 08/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 08/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 08/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 11/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 11/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 11/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D
C
#DIV/0! 27/01/1900 #DIV/0!
D
or

08.05.2016

Remarks
28 Days
Client The Project Manager

Concrete Cube Compress

Mix
Cube Compressive stren
Cube Design & Tower/
Date of Casting Supplier 7 Days Crushing
Ref. No. Strength Podium
(N/mm²) Cube No Date of Strength
testing (N/mm²)

A 50.5
S1 31/03/2016 C50 Gulf SE2 07/04/2016
B 52.5

S2 31/03/2016 C50 Gulf SE2 DURABILITY

A 52.5
S3 31/03/2016 C50 Gulf SE2 07/04/2016
B 49.5

A 51.0
S4 31/03/2016 C50 Gulf SE2 07/04/2016
B 51.5

A 54.5
S5 01/04/2016 C50 Gulf SE2 08/04/2016
B 49.5

S6 01/04/2016 C50 Gulf SE2 DURABILITY

A 52.0
S7 01/04/2016 C50 Gulf SE2 08/04/2016
B 52.0

A 50.5
S8 01/04/2016 C50 Gulf SE2 08/04/2016
B 49.5

S9 01/04/2016 C50 Gulf SE2 DURABILITY


S9 01/04/2016 C50 Gulf SE2 DURABILITY

A 53.0
S10 01/04/2016 C50 Gulf SE2 08/04/2016
B 51.0

A 55.0
S11 01/04/2016 C50 Gulf SE2 08/04/2016
B 51.5

A 50.0
S12 01/04/2016 C50 Gulf SE2 08/04/2016
B 51.0

A 50.5
S13 01/04/2016 C50 Gulf SE2 08/04/2016
B 51.0

S14 01/04/2016 C50 Gulf SE2 DURABILITY

A 53.5
S15 01/04/2016 C50 Gulf SE2 08/04/2016
B 52.0

S16 01/04/2016 C50 Gulf SE2 DURABILITY

A 49.5
S17 01/04/2016 C50 Gulf SE2 08/04/2016
B 51.0

A 58.0
S18 17/04/2016 C70 Gulf SE2 24/04/2016
B 60.0

A 65.5
S19 18/04/2016 C70 Gulf SW3 25/04/2016
B 69.0

A 64.0
S20 20/04/2016 C70 Gulf SE2 27/04/2016
B 50.0
A 59.5
S21 20/04/2016 C70 Gulf SW3 27/04/2016
B 63.0

A 49.0
S22 21/04/2016 C70 Golden NW3 28/04/2016
B 47.0

A 54.0
S23 21/04/2016 C70 Golden SE2 28/04/2016
B 49.0

A 67.5
S24 26/04/2016 C70 Gulf SE2 03/05/2016
B 64.0

A 64.0
S25 26/04/2016 C70 Gulf SE2 03/05/2016
B 61.0

A 55.0
S26 30/04/2016 C50 Gulf SE2 07/05/2016
B 57.0

A 47.0
S27 03/05/2016 C50 Gulf SE3 10/05/2016
B 41.0

A 40.0
S28 03/05/2016 C50 Gulf SE3 10/05/2016
B 43.0

A 44.5
S29 03/05/2016 C50 Gulf SE3 10/05/2016
B 43.0

S30 03/05/2016 C50 Gulf SE3 DURABILITY

A 45.0
S31 03/05/2016 C50 Gulf SE3 10/05/2016
B 46.5

S32 03/05/2016 C50 Gulf SE3 DURABILITY


S32 03/05/2016 C50 Gulf SE3 DURABILITY

A 50.5
S33 03/05/2016 C50 Gulf SE3 10/05/2016
B 53.0

A 49.5
S34 03/05/2016 C50 Gulf SE3 10/05/2016
B 51.5

A 47.5
S35 03/05/2016 C50 Gulf SE3 10/05/2016
B 48.5

S36 03/05/2016 C50 Gulf SE3 DURABILITY

A 47.0
S37 03/05/2016 C50 Gulf SE3 10/05/2016
B 50.0

A 45.0
S38 03/05/2016 C50 Gulf SE3 10/05/2016
B 44.5

S39 03/05/2016 C50 Gulf SE3 DURABILITY

A 48.5
S40 03/05/2016 C50 Gulf SE3 10/05/2016
B 48.5

A 47.0
S41 03/05/2016 C50 Gulf SE3 10/05/2016
B 42.0

A
S42 03/05/2016 C50 Gulf SE3 10/05/2016
B

S43 03/05/2016 C50 Gulf SE3 DURABILITY


A
S44 04/05/2016 C50 Gulf SE2 11/05/2016
B

A
S45 04/05/2016 C50 Gulf SE2 11/05/2016
B

A
S46 07/05/2016 C70 Gulf SW3 14/05/2016
B

A
S47 09/05/2016 C70 Gulf SE2 16/05/2016
B

A
S48 09/05/2016 C70 Gulf SE2 16/05/2016
B

A
S49 09/05/2016 C70 Gulf SE2 16/05/2016
B

A
S50 09/05/2016 C70 Gulf SE2 16/05/2016
B

A
S51 09/05/2016 C70 Gulf SE2 16/05/2016
B

A
S52 11/05/2016 C70 GULF SE2 18/05/2016
B

A
S53 11/05/2016 C70 GULF SE2 18/05/2016
B

A
S54 11/05/2016 C50 Golden SW3 18/05/2016
B
A
S55 11/05/2016 C50 Golden SW3 18/05/2016
B

A
S56 11/05/2016 C70 GULF SE2 18/05/2016
B

A
S57 11/05/2016 C70 GULF SE2 18/05/2016
B

A
S58 11/05/2016 C50 Golden SW3 18/05/2016
B

A
S59 11/05/2016 C50 Golden SW3 18/05/2016
B

A
S60 06/01/1900
B

A
S61 06/01/1900
B

A
S62 06/01/1900
B

A
S63 06/01/1900
B

A
S64 06/01/1900
B

A
S65 06/01/1900
B
A
S66 06/01/1900
B

A
S67 06/01/1900
B

A
S68 06/01/1900
B

A
S69 06/01/1900
B

A
S70 06/01/1900
B

A
S71 06/01/1900
B

A
S72 06/01/1900
B

A
S73 06/01/1900
B

A
S74 06/01/1900
B

A
S75 06/01/1900
B

A
S76 06/01/1900
B
A
S77 06/01/1900
B

A
S78 06/01/1900
B

A
S79 06/01/1900
B

A
S80 06/01/1900
B

A
S81 06/01/1900
B

A
S82 06/01/1900
B

A
S83 06/01/1900
B

A
S84 06/01/1900
B

A
S85 06/01/1900
B

A
S86 06/01/1900
B

A
S87 06/01/1900
B
A
S88 06/01/1900
B

A
S89 06/01/1900
B

A
S90 06/01/1900
B

A
S91 06/01/1900
B

A
S92 06/01/1900
B

A
S93 06/01/1900
B

A
S94 06/01/1900
B
The Engineer Contractor

e Cube Compressive Strength Report


As of: 08.05.20
Cube Compressive strength(N/mm²)
ays Crushing 28 Days Crushing Description / LOCATION
Cube
Average Ref. # Strength Average
Date
(N/mm²) (N/mm²) (N/mm²)

C 62.5
51.5 28/04/2016 62.5 RAFT FOUNDATION
D 62.5

DURABILITY RAFT FOUNDATION

C 63.0
51.0 28/04/2016 62.0 RAFT FOUNDATION
D 61.0

C 62.5
51.3 28/04/2016 62.8 RAFT FOUNDATION
D 63.0

C 63.0
52.0 29/04/2016 61.8 RAFT FOUNDATION
D 60.5

DURABILITY RAFT FOUNDATION

C 66.5
52.0 29/04/2016 66.8 RAFT FOUNDATION
D 67.0

C
50.0 29/04/2016 #DIV/0! RAFT FOUNDATION
D

DURABILITY RAFT FOUNDATION


DURABILITY RAFT FOUNDATION

C 63.5
52.0 29/04/2016 64.5 RAFT FOUNDATION
D 65.5

C 67.5
53.3 29/04/2016 66.8 RAFT FOUNDATION
D 66.0

C 64.0
50.5 29/04/2016 65.5 RAFT FOUNDATION
D 67.0

C 59.5
50.8 29/04/2016 58.8 RAFT FOUNDATION
D 58.0

DURABILITY RAFT FOUNDATION

C 61.5
52.8 29/04/2016 60.8 RAFT FOUNDATION
D 60.0

DURABILITY RAFT FOUNDATION

C 61.5
50.3 29/04/2016 61.8 RAFT FOUNDATION
D 62.0

C
E2-C8,C17,C22,C13(2A),E2-
59.0 15/05/2016 #DIV/0!
C20,C13(2B),C5,C3,E2-C11 & C12 (B2 TO B1)
D

C
Column W3-C9,W3-C4,W3-C1,W3-C6,W3-
67.3 16/05/2016 #DIV/0!
C15,W3-C18,W3-C13 (B2-B1)
D

C
E2-13(TYPE 2),E2-13(TYPE 2C),E2-C15 (B2-
57.0 18/05/2016 #DIV/0!
B1)
D
C
61.3 18/05/2016 #DIV/0! W3-C8,C6(TYPE 1),W3-C12 (B2-B1)
D

C
48.0 19/05/2016 #DIV/0! W3-C8,C1(2 NOS),W3-C15,C5 (B2-B1)
D

C (B2-B1)
51.5 19/05/2016 #DIV/0! E2-C1,E2-C2,E2-C9,E2-C10,C12,
D C13 (TYPE 2C)

C COREWALL E2-W5,E2-W7,E2-W9 & WALL


65.8 24/05/2016 #DIV/0! TERMINATING @ +4.2LEVEL FOR LIFT AREA
D & SHEAR WALL E2-W14

C COREWALL E2-W5,E2-W7,E2-W9 & WALL


62.5 24/05/2016 #DIV/0! TERMINATING @ +4.2LEVEL FOR LIFT AREA
D & SHEAR WALL E2-W14

C
56.0 28/05/2016 #DIV/0! CORRIDOR SLAB @ LEVEL +4.5LEVEL
D

C
44.0 31/05/2016 #DIV/0! RAFT FOUNDATION
D

C
41.5 31/05/2016 #DIV/0! RAFT FOUNDATION
D

C
43.8 31/05/2016 #DIV/0! RAFT FOUNDATION
D

DURABILITY RAFT FOUNDATION

C
45.8 31/05/2016 #DIV/0! RAFT FOUNDATION
D

DURABILITY RAFT FOUNDATION


DURABILITY RAFT FOUNDATION

C
51.8 31/05/2016 #DIV/0! RAFT FOUNDATION
D

C
50.5 31/05/2016 #DIV/0! RAFT FOUNDATION
D

C
48.0 31/05/2016 #DIV/0! RAFT FOUNDATION
D

DURABILITY RAFT FOUNDATION

C
48.5 31/05/2016 #DIV/0! RAFT FOUNDATION
D

C
44.8 31/05/2016 #DIV/0! RAFT FOUNDATION
D

DURABILITY RAFT FOUNDATION

C
48.5 31/05/2016 #DIV/0! RAFT FOUNDATION
D

C
44.5 31/05/2016 #DIV/0! RAFT FOUNDATION
D

C
#DIV/0! 31/05/2016 #DIV/0! RAFT FOUNDATION
D

DURABILITY RAFT FOUNDATION


C
#DIV/0! 01/06/2016 #DIV/0! TC07 FOOTING
D

C
#DIV/0! 01/06/2016 #DIV/0! TC07 FOOTING
D

C
#DIV/0! 04/06/2016 #DIV/0! W3-C10 & W3-W2 (B2-B1)
D

C
#DIV/0! 06/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 06/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 06/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 06/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 06/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 08/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 08/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 08/06/2016 #DIV/0! TC-06 RAFT
D
C
#DIV/0! 08/06/2016 #DIV/0! TC-06 RAFT
D

C
#DIV/0! 08/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 08/06/2016 #DIV/0! COREWALL(B2-B1)
D

C
#DIV/0! 08/06/2016 #DIV/0! TC-06 RAFT
D

C
#DIV/0! 08/06/2016 #DIV/0! TC-06 RAFT
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D
C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D
C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D
C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D

C
#DIV/0! 27/01/1900 #DIV/0!
D
ctor

As of: 08.05.2016

Remarks Remarks
7 Days 28 Days
Client The Project Manager

Linear
Liquid Limit Plastic Plasticity MDD
S.No Type of soil Shrinkag OMC % Sulphate%
% Limit% index% Mg/m3
e%

Could not Could not


Excavated Non
1 be be 0.9 1.82 13 0.39
soil plastic
obtained obtained
2 Road base - - - - 2.25 6.7 -
The Engineer Contractor

SOIL

Passing Submittal Details


Carbonate
Chloride Organic througth
content as
% matter% 0.063 mm
CO2%
sieve%
Submittal No Submittal Date Remarks

0.04 <0.1 22 17 TS/ABM/CIV/TR/0064 29.03.2016

- - - - TS/ABM/CIV/TR/0065 29.03.2016
Contractor

CBR Submittal Details

At 2.5mm penetration At 5mm penetration


Submittal No Submittal Date Remarks
Top base Top base

14 18 18 22 TS/ABM/CIV/TR/0075 06.04.2016

- - - -