The Values of Constants Used For Rate Analysis of Civil Work

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

The values of constants used for rate analysis of civil work can vary widely depending

on factors such as location, project specifications, market conditions, and the type of
construction activity being analyzed. However, I can provide some general ranges or
typical values for certain constants based on industry standards and common
practices:

1. Labour Constant: This can vary significantly depending on factors such as the
skill level of workers, prevailing wage rates in the region, and the complexity
of the task. As an example, labor constants may range from $10 to $30 per
hour for unskilled labor and can go higher for skilled tradespeople.
2. Material Constants: Material constants depend on the type of material being
used, quality standards, transportation costs, and market prices. As an
example, the cost of cement may range from $100 to $150 per ton, while the
cost of steel reinforcement may range from $500 to $1000 per ton.
3. Equipment Constants: Equipment constants depend on factors such as
equipment type, size, rental rates, fuel costs, and depreciation. For example,
equipment rental rates may range from $50 to $200 per hour, depending on
the type of equipment.
4. Overhead and Contingency Constants: Overhead and contingency constants
are typically expressed as a percentage of direct costs. Overhead costs may
range from 5% to 15% of direct costs, while contingency allowances may
range from 5% to 10% of the total project cost.
5. Profit Margin: Profit margins for construction projects can vary widely
depending on factors such as project size, complexity, and competition. Profit
margins may range from 10% to 30% of the total project cost.
6. Taxes and Duties: The value of taxes and duties can vary depending on the
jurisdiction and applicable tax rates. Taxes and duties may range from 5% to
15% of the total project cost, depending on local regulations.
7. Transportation Costs: Transportation costs depend on factors such as
distance, mode of transport, and the type of material being transported.
Transportation costs may range from $0.50 to $2.00 per mile for trucking, for
example.

It's important to note that these values are general estimates, and actual values may
vary based on specific project requirements and local conditions. Additionally, it's
essential to update these values regularly to reflect changes in market conditions,
regulations, and other factors that may affect construction costs. Professional
estimators and contractors often use historical data, market surveys, and industry
benchmarks to determine appropriate values for constants in rate analysis.