Upper Ganga Canal:-

Construction Period 1840-1854 by- Sir Proby Gautley


Total Length-9575 including all branches
S. No. Description Length
1 Main Canal 910.00
2 Branches 582.36
3 Distributries 3299.95
4 Minors 2427.95
Total 7220.26
Route:-
Bhimguada Header Haridwar-Roorkee-Saharanpur-Muzaffarnagar-Meerut –
Ghaziabad-Bulandshahar-G.B.Nagar-Aligarh-Hathras-Mathura- Agra-Etawa-Firozabad
Branches:-
1) Deoband Branch-35km L
2) Anupshahar Branch-80km L
3) Mat Branch-177km R
a) Stumps:- Bifurcate from Nanaoo
i) Kanpur Stump
ii) Etawah Stump
Route in Aligarh Distt.:-
Barauli- Bajgarhi-Oriha→Jawan-Kasimpur PH- Barautha-Machhua- Machhua Sikander-

Sumera –Jawa bypass- Kasimpur –Satha-Bhim garhi, Gonda-Changeri

Pur-Shekha-Nanaoo→ Rudayan(Hathras-Bahdurpur Khedia



Nagla Sartaj-
Madya Ganga Canal:-
Completion -1994

Total Length-1128 including all branches


S. No. Description Length
1 Main Canal 115
2 Branches 73
3 Distributries 438
4 Minors 521
Total 1128

Route:-
Phase 1
Rawli Barrage Bijnor-Ghaziabad-Bulandshahar-Aligarh-Hathras- Mathura-Firozabad.

Phase 2
Start-2007-08 Completion-2022-23
Total Length-66.20km
S. No. Description Length
1 Main Canal 60.00
2 Branches (2) 110.80
3 Distributries (25) 433.00
4 Minors (142) 613.50
Total 1217.30

Madhya ganga Barrage Bijnaur-Dingarpur, Muaradabad- Amroha –Dhanaura-


Gajraula Amroha-Chandausi Branch Sambhal- Bahjoi Branch Sambhal
Lower Ganga Canal:-
Construction Period 1872-1879
Total Length-8148.11km including all branches
S. No. Description Length
1 Main Canal 99.80
2 Branches (8) 1014.06
3 Distributries (175) 3616.83
4 Minors (805) 3417.42
Total 8148.11

Route:-
Naraura Barrage Bulandshahar-Aligarh-Kasganj-Etah-Mainpuri- Etawa-Farrukhabad-
Etawah-Kanpur-Fatehpur- Allahabad

Route in Aligarh Distt.:-


Naraura-Ramghat- Uncha gaon(Bulandshahar)- Khediya Sujanpur-Sankra-
Mohkampur(Dadon)-Bada gaon(Barauli)-Nagala Beech(Kasganj)

Parallel Lower Ganga Canal(PLGC):- 1974-1982


Total Length-88.858km main line
After construction of Ramganga Dam in 1974, water supply in Lower Ganga Canal System was
increased, after which parallel lower ganga canal was constructed and extra water was made available
for the cultivation of Khairf and western Prayagraj Water branch was constructed in 1974 to provide
irrigation facility in other areas of Kanpur and Prayagraj districts.

Naraura Barrage Bulandshahar- Aligarh-Etah- Firozabad - Mainpuri- Etawah -Auraiya-


Kannauj-Unnao- Kanpur Dehat - Kanpur Nagar-Fatehpur -Jalaun-Hamirpur-Kaushambi
-Rae Bareli-Prayagraj