L.T. Supply
Fully subsidized by GOK
Free
Free
Free
LT-1
BJ/KJ
Monthly Min. per Installation per Month. CDT(Commission Determined Tariff) EC per KWH
Rs 30/-
Rs 30/-
Rs 30/-
443 Ps.
443 Ps.
Sanctioned Load Fixed Charge (FC) FC For Ist KW FC For addl. KW Consumption Rs.20/Rs.30/Rs.20/Rs.30/FC For 1st KW FC For addl. KW Rs.25/Rs.35/Rs 5 Increased Rs 5 Increased
LT-2 (a)(i)
Domestic - Applicable Energy Charges (EC) to Areas under Bruhat Bangalore Mahangara 0 to 30 KWH Palike (BBMP), Municipal 31 to 100 KWH Corporations and all 101 to 200 KWH Urban Local Bodies
Above 200 KWH
298Ps. 0 to 30 KWH 408 Ps 508 Ps 588 Ps 31 to 100 KWH 101 to 200 KWH Above 200 KWH
Sanctioned Load Fixed Charge (FC) FC For Ist KW FC For addl. KW Rs.10/Rs.20/Rs.10/Rs.20/FC For 1st KW FC For addl. KW Rs.15/Rs.25/Rs 5 Increased Rs 5 Increased
LT-2 (a)(ii)
Consumption Energy Charges (EC) 0 to 30 KWH 31 to 100 KWH 101 to 200 KWH Above 200 KWH 200 Ps 300 Ps 400 Ps 450Ps 288 Ps. 388 Ps 488 Ps 538 Ps 0 to 30 KWH 31 to 100 KWH 101 to 200 KWH Above 200 KWH 210 Ps 310 Ps 420 Ps 500 Ps 10 Ps Increased 10 Ps Increased 20 Ps Increased 50 Ps Increased
LT-2(b)(i)
Pvt. Educational Fixed Charge (FC) Institutions: FC per KW Applicable to Areas under Bruhat FC Minimum per Month Bangalore Mahangara Palike (BBMP) , Municipal Consumption Corporations and all Energy Charges (EC) areas coming under 0 to 100 KWH Urban Local Bodies. 101 to 200 KWH
201 to 400 KWH Above 400 KWH Sanctioned Load Fixed Charge (FC) FC per KW FC Minimum per Month
Sanctioned Load
Rs.30/Rs.60/-
Rs.30/Rs.60/-
Rs.35/Rs.65/-
Rs 5 Increased Rs 5 Increased
0 to 100 KWH 101 to 200 KWH 201 to 400 KWH Above 400 KWH
Rs.20/Rs.40/-
Rs.20/Rs.40/-
Rs.25/Rs.50/-
Rs 5 Increased Rs 10 Increased
LT-2(b)(ii)
Consumption Energy Charges (EC) 0 to 100 KWH 101 to 200 KWH 201 to 400 KWH Above 400 KWH 440 Ps 490 Ps 545 Ps 600 Ps 528 Ps 578 Ps 633 Ps 688 Ps 0 to 100 KWH 101 to 200 KWH 201 to 400 KWH Above 400 KWH 500 Ps 500 Ps 600 Ps 600 Ps 60 Ps Increased 10 Ps Increased 55 Ps Increased No Change
LT-3(i)
Sanctioned Load Commercial: Applicable to areas Fixed Charge (FC) per KW coming under Bruhat Consumption Bangalore Mahangara Energy Charges (EC) Palike (BBMP) , Municipal 0 to 50 KWH Corporations and all
Rs.35/-
Rs.35/-
FC per KW
Rs.40/-
Rs 5 Increased
560 Ps
648 Ps
0 to 50 KWH
600 Ps
40 Ps Increased
Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW Fixed Charge (FC) per KW Consumption Energy Charges (EC) Sanctioned Load Fixed Charge (FC)/KW Consumption Energy Charges (EC) Rs.25/Rs.25/Rs 50/Rs 50/FC per KW Rs 55/Rs 5 Increased
LT-3(ii)
540 Ps 640 Ps
628 Ps 728 Ps
550 Ps 650 Ps
10 Ps Increased 10 Ps Increased
Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW Fixed Charge (FC) per KW Consumption Energy Charges (EC) CDT (Commission Determined Tariff) 141 Ps per KWH Rs 40/Rs 40/FC per KW Rs 45/Rs 5 Increased
Same as above FC per HP 141 ps per Kwh Nil 141 ps per kwh FC per HP Nil
LT-4(a)
Free as per GoK order. (In case, GOK do not release the subsidy, CDT shall be collected from the Consumers)
Change in CDT 20 Ps reduced
LT-4(b)
IP Sets Above 10 HP IP Sets Hor. Nur., Coffee & Tea: 10 HP & below IP Sets Hor. Nur. Coffee & Tea: Above 10 HP
Rs.30/125 Ps Rs.20/125 Ps
Rs.30/213 Ps Rs.20/213 Ps
Rs.30/140 Ps
Rs.20/140 Ps Rs.30/140 Ps
10
LT-4(c)(i)
FC per HP EC per KWH Sanctioned Load Fixed Charge (FC)/HP 5 HP & below
Rs.30/125 Ps
Rs.30/213 Ps
11
LT-4(c)(ii)
Rs.25/Rs.30/Rs.40/Rs.110/-
Rs.25/Rs.30/Rs.40/Rs.110/-
5 HP & below Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above
Rs.30/Rs.30/Rs.40/Rs.110/Rs.50/Rs.70/Rs.160/-
12
LT-5 (a)
Heating and Motive Power: Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations.
Demand Based Tariff (Optional) Above 5 HP but Rs.50/Rs.50/below 40 HP 40 HP & above but Rs.70/Rs.70/below 67 HP 67 HP & above Rs.160/Rs.160/Consumption Energy Charges (EC) 0 to 500 KWH 501 to 1000 KWH Above 1000 KWH 360 Ps 450 Ps 470 Ps 448 Ps 538 Ps 558 Ps
No Change
Sanctioned Load Fixed Charge (FC)/HP 5 HP & below Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Rs.20/Rs.25/Rs.35/Rs.100/Rs.20/Rs.25/Rs.35/Rs.100/5 HP & below Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Rs.25/Rs.30/Rs.35/Rs.100/Rs 5 Increased Rs 5 Increased No Change No Change
13
LT-5(b)
Heating and Motive Power Applicable all Areas other than those covered under LT-5(a).
Demand Based Tariff (Optional Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Consumption Energy Charges (EC) 0 to 500 KWH 501 to 1000 KWH Above 1000 KWH Rs.40/Rs.60/Rs.150/Rs.40/Rs.60/Rs.150/Rs.45/Rs.60/Rs.150/Rs 5 Increased No Change No Change
20 Ps Increased 30 Ps Increased
20 Ps Increased
14
LT-6 (a)
Water Supply
Rs.35/370 Ps Rs.50/380 Ps
Rs.35/458 Ps Rs.50/468 Ps
Rs.35/370 Ps Rs.50/400 Ps
15
LT-6 (b)
Public Lighting
EC per KWH
Rs.150/-
Rs.150/-
EC per KWH
750 Ps
838 Ps
EC per KWH
16
LT-7
Temporary Supply
67 HP and above FC/HP/Month Rs. 200/Rs. 200/FC HP/Month Rs. 210/F.C: Rs 10 Increased E.C: 50 Ps Increased EC per KWH 750 Ps 838 Ps EC per KWH 800 Ps
H.T. Supply
Rs.180/DC per KVA HT-1 17 Rs.180/DC per KVA Rs.180/No Change
HT Water Supply
468 Ps
EC per KWH
380 Ps
No Change
18
HT-2(a)(i)
HT Industrial: Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations.
Demand Charges (DC) per KVA Consumption Energy Charges (EC 0 to 1 Lakh KWH Above 1 Lakh KWH Demand Charges (DC)
Rs.180/-
Rs.180/-
DC per KVA
Rs.180/-
No Change
19
HT-2(a)(i)
Applicable to per KVA Bangalore Consumption Metropolitan Railway Energy Charges (EC) Corporation Ltd. (BMRCL). HT Industrial: Applicable to Areas other than those covered under HT-2(a)(i)
407 Ps
495 Ps
EC per KWH
440 Ps
33 Ps Increased
20
HT-2(a)(ii)
Demand Charges (DC) per KVA Consumption Energy Charges (EC 0 to 1 Lakh KWH Above 1 Lakh KWH Demand Charges (DC) per KVA Consumption Energy Charges (EC) Per KWH
Rs.170/-
Rs.170/-
DC per KVA
Rs.170/-
No Change
21
460 Ps
548 Ps
EC per KWH
460 Ps
No Change
22
HT-2(b)(i)
HT Commercial Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations.
Demand Charges (DC) per KVA Consumption Energy Charges (EC) 0 to 2 Lakhs KWH Above 2 Lakhs KWH
Rs.200/-
Rs.200/-
DC per KVA
Rs.200/-
No Change
600 Ps 630 Ps
688 Ps 718 Ps
650 Ps 680 Ps
50 Ps Increased 50 Ps Increased
23
HT-2(b)(ii)
HT Commercial Applicable to Areas other than those covered under HT-2(b)(i) HT Lift Irrigation Schemes under Government Depts./Corporations.
Rs.190/Demand Charges (DC) per KVA Consumption 0 to 2 Lakhs KWH Above 2 Lakhs KWH EC per KWH and Annual Minimum 600 Ps 630 Ps
Rs.190/-
DC per KVA
Rs.190/-
No Change
688 Ps 718 Ps
0 to 2 Lakhs KWH Above 2 Lakhs KWH EC per KWH and Annual Minimum
630 Ps 660 Ps
24
HT-3 (a)(i)
105 Ps 193 Ps subject to Min. subject to Min. of of Rs. 1000/- per Rs. 1000 per HP HP per annum per annum
No Change .
25
HT-3 (a)(ii)
Rs.20/-
Rs.20/-
FC per HP/PM
Rs.30/Rs 10 Increased
EC 65 Ps
EC 153 Ps
EC per KWH
No Change
65 Ps
Rs.10/-
Rs.10/-
FC per HP/PM
Rs.10/-
No Change
26
HT-3 (a)(iii)
HT Private Lift Irrigation Schemes /Societies other than those covered under HT-3 (a)(ii) (Not Connected to Urban / Express feeders)
65 Ps
153 Ps
EC per KWH
65 Ps
No Change
27
HT-3 (b)
HT-4 (a)
28
HT Res. Apartments Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations HT Res. Apartments /Colonies Applicable to all areas other than those under HT4 (a) above
DC per KVA
Rs 100/-
DC per KVA
Rs 100/-
No Change
EC per KWH
Rs.100/400 Ps
Rs.100/488 Ps
Rs.100/450 Ps
No Change 50 Ps Increased
29
HT-4(b)