Retail Supply Tariff of BESCOM FY 12 With Proposed 2012

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Retail Supply Tariff approved by K.E.R.C. in Tariff Order 2011 dated: 28 th Oct.

2011 For BESCOM


Sl.No. Tariff Category Category Description Particulars Existing Tariff as per Tariff Order-2010 Proposed by BESCOM

Approved as per Tariff Order2011

Remarks

L.T. Supply
Fully subsidized by GOK

Free

Free

Free

Fully subsidized by GOK

LT-1

BJ/KJ

Monthly Min. per Installation per Month. CDT(Commission Determined Tariff) EC per KWH

Rs 30/-

Rs 30/-

Rs 30/-

Cost of Supply: 475 Ps. / unit

443 Ps.

443 Ps.

475 Ps. Change in CDT 32 Ps Increased

Sanctioned Load Fixed Charge (FC) FC For Ist KW FC For addl. KW Consumption Rs.20/Rs.30/Rs.20/Rs.30/FC For 1st KW FC For addl. KW Rs.25/Rs.35/Rs 5 Increased Rs 5 Increased

LT-2 (a)(i)

Domestic - Applicable Energy Charges (EC) to Areas under Bruhat Bangalore Mahangara 0 to 30 KWH Palike (BBMP), Municipal 31 to 100 KWH Corporations and all 101 to 200 KWH Urban Local Bodies
Above 200 KWH

210 Ps 320 Ps 420 Ps 500Ps

298Ps. 0 to 30 KWH 408 Ps 508 Ps 588 Ps 31 to 100 KWH 101 to 200 KWH Above 200 KWH

220 Ps 340 Ps 450 Ps 550 Ps

10 Ps Increased 20 Ps Increased 30 Ps Increased 50 Ps Increased

Sanctioned Load Fixed Charge (FC) FC For Ist KW FC For addl. KW Rs.10/Rs.20/Rs.10/Rs.20/FC For 1st KW FC For addl. KW Rs.15/Rs.25/Rs 5 Increased Rs 5 Increased

LT-2 (a)(ii)

Domestic Areas under Village Panchayats

Consumption Energy Charges (EC) 0 to 30 KWH 31 to 100 KWH 101 to 200 KWH Above 200 KWH 200 Ps 300 Ps 400 Ps 450Ps 288 Ps. 388 Ps 488 Ps 538 Ps 0 to 30 KWH 31 to 100 KWH 101 to 200 KWH Above 200 KWH 210 Ps 310 Ps 420 Ps 500 Ps 10 Ps Increased 10 Ps Increased 20 Ps Increased 50 Ps Increased

LT-2(b)(i)

Pvt. Educational Fixed Charge (FC) Institutions: FC per KW Applicable to Areas under Bruhat FC Minimum per Month Bangalore Mahangara Palike (BBMP) , Municipal Consumption Corporations and all Energy Charges (EC) areas coming under 0 to 100 KWH Urban Local Bodies. 101 to 200 KWH
201 to 400 KWH Above 400 KWH Sanctioned Load Fixed Charge (FC) FC per KW FC Minimum per Month

Sanctioned Load

Rs.30/Rs.60/-

Rs.30/Rs.60/-

FC per KW FC Minimum per month

Rs.35/Rs.65/-

Rs 5 Increased Rs 5 Increased

495 Ps 555 Ps 590 Ps 635 Ps

583 Ps 643 Ps 678 Ps 723 Ps

0 to 100 KWH 101 to 200 KWH 201 to 400 KWH Above 400 KWH

550 Ps 550 Ps 650 Ps 650 Ps

55 Ps Increased 5 Ps Reduced 60 Ps Increased 15 Ps Increased

Rs.20/Rs.40/-

Rs.20/Rs.40/-

FC per KW FC Min. per month

Rs.25/Rs.50/-

Rs 5 Increased Rs 10 Increased

LT-2(b)(ii)

Pvt. Educational Institutions Applicable to Areas coming under Village Panchayats

Consumption Energy Charges (EC) 0 to 100 KWH 101 to 200 KWH 201 to 400 KWH Above 400 KWH 440 Ps 490 Ps 545 Ps 600 Ps 528 Ps 578 Ps 633 Ps 688 Ps 0 to 100 KWH 101 to 200 KWH 201 to 400 KWH Above 400 KWH 500 Ps 500 Ps 600 Ps 600 Ps 60 Ps Increased 10 Ps Increased 55 Ps Increased No Change

LT-3(i)

Sanctioned Load Commercial: Applicable to areas Fixed Charge (FC) per KW coming under Bruhat Consumption Bangalore Mahangara Energy Charges (EC) Palike (BBMP) , Municipal 0 to 50 KWH Corporations and all

Rs.35/-

Rs.35/-

FC per KW

Rs.40/-

Rs 5 Increased

560 Ps

648 Ps

0 to 50 KWH

600 Ps

40 Ps Increased

Retail supply Tariff of BESCOM for FY 12 Existing, Proposed & Approved

Urban Local Bodies


Above 50 KWH 680 Ps 768 Ps Above 50 KWH 700 Ps 20 Ps Increased

Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW Fixed Charge (FC) per KW Consumption Energy Charges (EC) Sanctioned Load Fixed Charge (FC)/KW Consumption Energy Charges (EC) Rs.25/Rs.25/Rs 50/Rs 50/FC per KW Rs 55/Rs 5 Increased

Same as above FC per KW Rs.30/Rs 5 Increased

LT-3(ii)

Commercial Applicable to Areas coming under Village Panchayats

0 to 50 KWH Above 50 KWH

540 Ps 640 Ps

628 Ps 728 Ps

0 to 50 KWH Above 50 KWH

550 Ps 650 Ps

10 Ps Increased 10 Ps Increased

Demand Based Tariff (Optional) where sanctioned load is above 5 kW but below 50 kW Fixed Charge (FC) per KW Consumption Energy Charges (EC) CDT (Commission Determined Tariff) 141 Ps per KWH Rs 40/Rs 40/FC per KW Rs 45/Rs 5 Increased

Same as above FC per HP 141 ps per Kwh Nil 141 ps per kwh FC per HP Nil

LT-4(a)

IP Sets 10 HP & below

CDT (Commission Determined Tariff)

121 Ps per KWH

Free as per GoK order. (In case, GOK do not release the subsidy, CDT shall be collected from the Consumers)
Change in CDT 20 Ps reduced

LT-4(b)

IP Sets Above 10 HP IP Sets Hor. Nur., Coffee & Tea: 10 HP & below IP Sets Hor. Nur. Coffee & Tea: Above 10 HP

FC per HP EC per KWH FC per HP EC per KWH

Rs.30/125 Ps Rs.20/125 Ps

Rs.30/213 Ps Rs.20/213 Ps

FC per HP EC per KWH FC per HP EC per KWH

Rs.30/140 Ps

No Change 15 Ps Increased No Change 15 Ps Increased No Change 15 Ps Increased

Rs.20/140 Ps Rs.30/140 Ps

10

LT-4(c)(i)

FC per HP EC per KWH Sanctioned Load Fixed Charge (FC)/HP 5 HP & below

Rs.30/125 Ps

Rs.30/213 Ps

FC per HP EC per KWH

11

LT-4(c)(ii)

Rs.25/Rs.30/Rs.40/Rs.110/-

Rs.25/Rs.30/Rs.40/Rs.110/-

5 HP & below Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above

Rs.30/Rs.30/Rs.40/Rs.110/Rs.50/Rs.70/Rs.160/-

Rs 5 Increased No Change No Change No Change

12

LT-5 (a)

Heating and Motive Power: Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations.

Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above

Demand Based Tariff (Optional) Above 5 HP but Rs.50/Rs.50/below 40 HP 40 HP & above but Rs.70/Rs.70/below 67 HP 67 HP & above Rs.160/Rs.160/Consumption Energy Charges (EC) 0 to 500 KWH 501 to 1000 KWH Above 1000 KWH 360 Ps 450 Ps 470 Ps 448 Ps 538 Ps 558 Ps

No Change

0 to 500 KWH 501 to 1000 KWH Above 1000 KWH

400 Ps 500 Ps 500 Ps

40 Ps Increased 50 Ps Increased 30 Ps Increased

Sanctioned Load Fixed Charge (FC)/HP 5 HP & below Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Rs.20/Rs.25/Rs.35/Rs.100/Rs.20/Rs.25/Rs.35/Rs.100/5 HP & below Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Rs.25/Rs.30/Rs.35/Rs.100/Rs 5 Increased Rs 5 Increased No Change No Change

13

LT-5(b)

Heating and Motive Power Applicable all Areas other than those covered under LT-5(a).

Demand Based Tariff (Optional Above 5 HP but below 40 HP 40 HP & above but below 67 HP 67 HP & above Consumption Energy Charges (EC) 0 to 500 KWH 501 to 1000 KWH Above 1000 KWH Rs.40/Rs.60/Rs.150/Rs.40/Rs.60/Rs.150/Rs.45/Rs.60/Rs.150/Rs 5 Increased No Change No Change

360 Ps 420 Ps 460 Ps

448 Ps 508 Ps 548 Ps

0 to 500 KWH 501 to 1000 KWH Above 1000 KWH

380 Ps 450 Ps 480 Ps

20 Ps Increased 30 Ps Increased

20 Ps Increased

14

LT-6 (a)

Water Supply

FC per HP EC per KWH FC per HP

Rs.35/370 Ps Rs.50/380 Ps

Rs.35/458 Ps Rs.50/468 Ps

FC per HP EC per KWH FC per HP EC per KWH

Rs.35/370 Ps Rs.50/400 Ps

No Change No Change No Change 20 Ps Increased

15

LT-6 (b)

Public Lighting

EC per KWH

Retail supply Tariff of BESCOM for FY 12 Existing, Proposed & Approved

Less than 67 HP Weekly Min. per KW

Rs.150/-

Rs.150/-

Weekly Min. per KW

Rs.160/Weekly Min: Rs 10 Increased 800 Ps E.C: 50 Ps Increased

EC per KWH

750 Ps

838 Ps

EC per KWH

16

LT-7

Temporary Supply
67 HP and above FC/HP/Month Rs. 200/Rs. 200/FC HP/Month Rs. 210/F.C: Rs 10 Increased E.C: 50 Ps Increased EC per KWH 750 Ps 838 Ps EC per KWH 800 Ps

H.T. Supply
Rs.180/DC per KVA HT-1 17 Rs.180/DC per KVA Rs.180/No Change

HT Water Supply

380 Ps EC per KWH

468 Ps

EC per KWH

380 Ps

No Change

18

HT-2(a)(i)

HT Industrial: Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations.

Demand Charges (DC) per KVA Consumption Energy Charges (EC 0 to 1 Lakh KWH Above 1 Lakh KWH Demand Charges (DC)

Rs.180/-

Rs.180/-

DC per KVA

Rs.180/-

No Change

460 Ps 500 Ps Rs.180

548 Ps 588 Ps Rs.180

0 to 1 Lakh KWH Above 1 Lakh KWH DC per KVA

490 Ps 530 Ps Rs.180/-

30 Ps Increased 30 Ps Increased No Change

19

HT-2(a)(i)

Applicable to per KVA Bangalore Consumption Metropolitan Railway Energy Charges (EC) Corporation Ltd. (BMRCL). HT Industrial: Applicable to Areas other than those covered under HT-2(a)(i)

407 Ps

495 Ps

EC per KWH

440 Ps

33 Ps Increased

20

HT-2(a)(ii)

Demand Charges (DC) per KVA Consumption Energy Charges (EC 0 to 1 Lakh KWH Above 1 Lakh KWH Demand Charges (DC) per KVA Consumption Energy Charges (EC) Per KWH

Rs.170/-

Rs.170/-

DC per KVA

Rs.170/-

No Change

460 Ps 490 Ps Rs.180

548 Ps 578 Ps Rs.180

0 to 1 Lakh KWH Above 1 Lakh KWH DC per KVA

490 Ps 520 Ps Rs.180/-

30 Ps Increased 30 Ps Increased No Change

21

HT-2(a)(i) and HT-2(a)(ii)

Railway Traction and Effluent Treatment Plants

460 Ps

548 Ps

EC per KWH

460 Ps

No Change

22

HT-2(b)(i)

HT Commercial Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations.

Demand Charges (DC) per KVA Consumption Energy Charges (EC) 0 to 2 Lakhs KWH Above 2 Lakhs KWH

Rs.200/-

Rs.200/-

DC per KVA

Rs.200/-

No Change

600 Ps 630 Ps

688 Ps 718 Ps

0 to 2 Lakhs KWH Above 2 Lakhs KWH

650 Ps 680 Ps

50 Ps Increased 50 Ps Increased

23

HT-2(b)(ii)

HT Commercial Applicable to Areas other than those covered under HT-2(b)(i) HT Lift Irrigation Schemes under Government Depts./Corporations.

Rs.190/Demand Charges (DC) per KVA Consumption 0 to 2 Lakhs KWH Above 2 Lakhs KWH EC per KWH and Annual Minimum 600 Ps 630 Ps

Rs.190/-

DC per KVA

Rs.190/-

No Change

688 Ps 718 Ps

0 to 2 Lakhs KWH Above 2 Lakhs KWH EC per KWH and Annual Minimum

630 Ps 660 Ps

30 Ps Increased 30 Ps Increased No Change in Annual Min

24

HT-3 (a)(i)

105 Ps 193 Ps subject to Min. subject to Min. of of Rs. 1000/- per Rs. 1000 per HP HP per annum per annum

105 Ps subject to annual Min. of Rs. 1000/- per HP per annum

No Change .

25

HT-3 (a)(ii)

HT Private Lift Irrigation Schemes /Societies : Connected to Urban / Express feeders

Rs.20/-

Rs.20/-

FC per HP/PM

Rs.30/Rs 10 Increased

F.C. per HP /PM

EC 65 Ps

EC 153 Ps

EC per KWH

No Change

Retail supply Tariff of BESCOM for FY 12 Existing, Proposed & Approved

E.C. per KWH

65 Ps

F.C. per HP/PM

Rs.10/-

Rs.10/-

FC per HP/PM

Rs.10/-

No Change

26

HT-3 (a)(iii)

HT Private Lift Irrigation Schemes /Societies other than those covered under HT-3 (a)(ii) (Not Connected to Urban / Express feeders)

E.C. per KWH

65 Ps

153 Ps

EC per KWH

65 Ps

No Change

27

HT-3 (b)

HT supply to Agriculture/ Horticulture Farms

EC per KWH and Annual Minimum

275 Ps subject to Min. of Rs. 1000 per HP per annum

363 Ps subject to Min. of Rs. 1000 per HP per annum Rs 100/-

EC per KWH and Annual Minimum

275 Ps subject to Min. of Rs. 1000 per HP per annum

No Change in Annual Min E.C: No Change

HT-4 (a)

28

HT Res. Apartments Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations HT Res. Apartments /Colonies Applicable to all areas other than those under HT4 (a) above

DC per KVA

Rs 100/-

DC per KVA

Rs 100/-

No Change

EC per KWH

450 Ps 430 Ps 518 Ps EC per KWH 20 Ps Increased

DC per KVA EC per KWH

Rs.100/400 Ps

Rs.100/488 Ps

DC per KVA EC per KWH

Rs.100/450 Ps

No Change 50 Ps Increased

29

HT-4(b)

Retail supply Tariff of BESCOM for FY 12 Existing, Proposed & Approved