AL KASHAF GENERAL CONTRACTING EST.

DUMAT AL JANDAL WIND FARM PROJECT

CONCRETE PUMP INSPECTION CHECKLIST

Vehicle no: DATE: 17/10/2023

Report any problems found to your supervisor

CONCRETE PUMP
ITEM YES NO N/A

Concrete pump is physically sound and in good condition


Tires are free from damage
Only competent person is operating concrete pump
All rotatory parts are covered with guards
Outriggers are in working condition and free from damage
Emergency stop button is in working condition
Panel is covered properly
Hopper is in good condition
Suitable mesh is available at hopper to avoid contact with moving parts
All pipe joints are tight with proper clamp
In case of electricity operated, electrical connection is taken properly and
machine is grounded
Operator is competent and authorized
All pipes to be used are free from damages and physically sound
Machine sound normal during operation