Q29) The main purpose of providing pour strip in post tensioning slab in Dubai is ____
A: to stress tendons easily B: to separate slabs C: water flow D: control elastic shortening
Q32) As the column height in RCC building increase, the reinforcement _______
Q33) In a 3 storey building, the live load of upper floors is taken by _______
A: beams and column of first floor B: beams only C: first slabs D: column only
Q36) As per ACI code, what is the maximum deflection for horizontal member due to live load is ___
Q38) The effective length K factor for column with both ends fixed is _____
Q39) When the mixture is mixed in the plant the time should not be less than ____
Q40) For heavily reinforced concrete members the nominal maximum size of aggregate shall be ____