DAFTAR SURVEY HARGA SATUAN BAHAN DAN ALAT KERJA

KEGIATAN : REHABILITASI PERPUSTAKAAN


SATUAN PENDIDIKAN #NAME?
LOKASI #NAME?
SUMBER DANA #NAME?

No Jenis Bahan/Material Sat TOKO/UD/CV ……… TOKO/UD/CV ……… TOKO/UD/CV ………

BAHAN PASIR DAN BATU


1 sirtu m3 80,000.00 80,000.00 80,000.00
2 Pasir Pasang/Pasir Beton m3 137,000.00 137,000.00 137,000.00
3 Batu pecah 2/3 (Mesin) m3 176,000.00 176,000.00 176,000.00
4 Batu gunung atau Quari m3 108,000.00 108,000.00 108,000.00
5 Batu Kali 15/20 m3 128,000.00 128,000.00 128,000.00
6 Batu bata merah 5x12x25 bh 550.00 550.00 550.00
7 Tanah urug m3 67,000.00 67,000.00 67,000.00

PORTLAND CEMENT (PC)


8 Semen Warna kg 1,500.00 1,500.00 1,500.00
9 Portland Cement 40 Kg SNI kg 1,375.00 1,375.00 1,375.00
10 Kapur m3 3,300.00 3,300.00 3,300.00

BESI
11 Besi Strip kg 14,000.00 14,000.00 14,000.00
12 Rangka atap baja ringan (Galvalum) m2 250,000.00 250,000.00 250,000.00
13 Besi beton polos kg 10,000.00 10,000.00 10,000.00
14 Kawat Bendrat kg 17,000.00 17,000.00 17,000.00
15 Kawat kasa m2 18,700.00 18,700.00 18,700.00
16 Paku eternit kg 16,000.00 16,000.00 16,000.00
17 Paku reng kg 14,000.00 14,000.00 14,000.00
18 Paku Usuk kg 14,000.00 14,000.00 14,000.00
19 Paku triplek kg 16,000.00 16,000.00 16,000.00
20 Paku pancing kg 18,000.00 18,000.00 18,000.00
21 Paku sekrup bh 850.00 850.00 850.00
22 Pintu PVC unit 200,000.00 200,000.00 200,000.00
23 Buis Beton D 100 bh 165,000.00 165,000.00 165,000.00
24 Profil allminium m1 125,000.00 125,000.00 125,000.00
25 Skrup fixer bh 200.00 200.00 200.00
26 Sealant tube 45,000.00 45,000.00 45,000.00

LANTAI
27 Tegel abu-abu 20x20 Cm m2
28 Keramik 20x20 ( Lantai) motif m2 42,000.00 42,000.00 42,000.00
29 Keramik dinding ASIA TILE 20x25 (setara) m2 45,000.00 45,000.00 45,000.00
30 Keramik lantai ASIA TILE 30x30 - (setara) m2 37,000.00 37,000.00 37,000.00
31 Paving stone K-200 abu-abu m2 42,000.00 42,000.00 42,000.00

KAYU
32 Papan kamper 3/25 m3 8,250,000.00 8,250,000.00 8,250,000.00
33 Kayu kamper 6/15 m3 7,500,000.00 7,500,000.00 7,500,000.00
34 Kayu kruing 8/12, 6/12, 6/15 m3 5,500,000.00 5,500,000.00 5,500,000.00
35 Kayu meranti rangka langit-langit 4/6, 3/5 m3 4,500,000.00 4,500,000.00 4,500,000.00
36 Kayu meranti 8/12,6/12,6/15 m3 4,800,000.00 4,800,000.00 4,800,000.00
37 Kayu meranti 3/30 x 3m m3 5,000,000.00 5,000,000.00 5,000,000.00
38 Kayu terentang ( papan begisting ) m3 3,100,000.00 3,100,000.00 3,100,000.00
39 Kayu Bengkirai m3 5,000,000.00 5,000,000.00 5,000,000.00
40 Kayu Balau m3 7,500,000.00 7,500,000.00 7,500,000.00
No Jenis Bahan/Material Sat TOKO/UD/CV ……… TOKO/UD/CV ……… TOKO/UD/CV ………

41 List kayu polos 1/5 x 2m btg 6,500.00 6,500.00 6,500.00


42 Bambu Bongkotan btg 16,500.00 16,500.00 16,500.00
43 Multiplek 9 mm lbr
44 Triplek Lapis Almunium lbr 84,700.00 84,700.00 84,700.00
45 Woodplank 3000x300x4 lbr
No Jenis Bahan/Material Sat TOKO/UD/CV ……… TOKO/UD/CV ……… TOKO/UD/CV ………

PENUTUP ATAP DAN PLAFOND


46 Genteng Mantili - Nglayur bh 2,500.00 2,500.00 2,500.00
47 Genteng bubungan Mantili bh 8,500.00 8,500.00 8,500.00
48 Triplek tebal 3 mm (1.10x2,10) lbr 33,000.00 33,000.00 33,000.00
49 Eternit 100x100x0.4 setara Axcell lbr 14,000.00 14,000.00 14,000.00
50 List Gypsum tipe S 12 cm terpasang (lengkung 1 : 4) m 15,000.00 15,000.00 15,000.00
51 Asbes gelombang kecil lbr 62,000.00 62,000.00 62,000.00
52 Bubungan asbes gelombang kecil lbr 27,500.00 27,500.00 27,500.00

INTALASI
53 Pipa paralon 5/8" Panjang 4.00 m - Maspion ljr 7,250.00 7,250.00 7,250.00
54 Pipa PVC 3/4 AW Panjang 4 m - Maspion tipe D Ljr 24,000.00 24,000.00 24,000.00
55 Pipa PVC 2,5" AW Panjang 4.00 m - Maspin tipe D ljr 44,000.00 44,000.00 44,000.00
56 Pipa PVC 4" AW Panjang 4.00 m - Maspion tipe D ljr 55,000.00 55,000.00 55,000.00
57 Lem Paralon - Isarplass bh 6,000.00 6,000.00 6,000.00
58 Pipa galvanis 1,5" ljr 375,000.00 375,000.00 375,000.00

SANITASI
59 Closet jongkok porselin warna ( setara INA ) bh 122,000.00 122,000.00 122,000.00
60 Seal Tape bh 3,500.00 3,500.00 3,500.00
61 Kran air (Amico) 3/4" - swing bh 22,000.00 22,000.00 22,000.00
62 Floor drain bh 15,000.00 15,000.00 15,000.00

CAT
63 Cat (besi/kayu) Sejenis (EMCO) kg 49,500.00 49,500.00 49,500.00
64 Cat Meni (besi/kayu) cap pedang kg 16,500.00 16,500.00 16,500.00
65 Tiner A - setara Bintang lt 21,000.00 21,000.00 21,000.00
66 Tiner B - setara Bintang lt 9,000.00 9,000.00 9,000.00
67 Cat tembok setara Avitex kg 18,480.00 18,480.00 18,480.00
68 Cat tembok setara Avitex kg 18,480.00 18,480.00 18,480.00
69 Kertas gosok lbr 3,300.00 3,300.00 3,300.00
70 Plamur tembok - setara SUPER kg 15,400.00 15,400.00 15,400.00
71 Plamur kayu kg 16,000.00 16,000.00 16,000.00
72 Spiritus - setara Naga lt 17,500.00 17,500.00 17,500.00
73 Lem Kayu - setara Rajawali kg 12,500.00 12,500.00 12,500.00
74 Minyak Begisting/ Solar lt 6,000.00 6,000.00 6,000.00
75 Rol Cat bh 15,400.00 15,400.00 15,400.00

KACA
76 kaca bening 5mm - Asahi Mass m2 66,000.00 66,000.00 66,000.00
77 Kaca naco 15x7cm m2 27,500.00 27,500.00 27,500.00

ALAT PENGGANTUNG DAN KUNCI


78 Engsel Pintu setara Dolphin ps 22,000.00 22,000.00 22,000.00
79 Engsel Jendela setara Dolphin ps 16,500.00 16,500.00 16,500.00
80 Slot Pintu / Jendela setara Dolphin ps 7,700.00 7,700.00 7,700.00
81 Kunci Tanam besar setara Dolphin ps 104,500.00 104,500.00 104,500.00
82 Hak Angin setara SES ps 12,100.00 12,100.00 12,100.00
83 Pegangan pintu (termasuk pasang) setara Muller ps 99,000.00 99,000.00 99,000.00

INSTALASI LISTRIK
84 Lampu SL 20 W/220 V Philips Set 32,000.00 32,000.00 32,000.00
85 Lampu pijar 25 - 100Watt Philips bh 7,500.00 7,500.00 7,500.00
86 Saklar ganda " LG" bh 20,000.00 20,000.00 20,000.00
87 Saklar tunggal "LG" bh 20,000.00 20,000.00 20,000.00
No Jenis Bahan/Material Sat TOKO/UD/CV ……… TOKO/UD/CV ……… TOKO/UD/CV ………

88 Stop Kontak "LG" m' 23,000.00 23,000.00 23,000.00


89 NYA 1000 Vol 2 x 2,5 mm "Eterna m' 803,200.00 803,200.00 803,200.00
90 Pasang Plastik Titik
91 Isolator bh 1,500.00 1,500.00 1,500.00
92 Fitting plafond bh 7,500.00 7,500.00 7,500.00
93 T dos PVC bh 750.00 750.00 750.00

LEGALITAS TOKO
T I M E S C H E D U L L E
JADWAL PELAKSANAN

KEGIATAN : REHABILITASI PERPUSTAKAAN


SUMBER DANA : P APBD KABUPATEN JOMBANG TA. 2021
SEKOLAH : SDN BANJARDOWO I
LOKASI : KECAMATAN JOMBANG
KABUPATEN : JOMBANG

NO. URAIAN PEKERJAAN


BOBOT
(%)
BULAN I (...........)
Chart Title
BULAN II (.............) BULAN II (.............)
% KETERANGAN
1 2 3 4 5 6 7 8 5 6 7 8

A BIAYA KONSTRUKSI FISIK


I PEKERJAAN PERSIAPAN #NAME? #NAME? #NAME?
IV PEKERJAAN ATAP #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### PEKERJAAN PINTU & JENDELA #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
VI PEKERJAAN KERAMIK #NAME? #NAME? #NAME?
VII PEKERJAAN PLAFOND #NAME? #NAME? #NAME? #NAME?
III PEKERJAAN PENGECATAN #NAME? #NAME? #NAME?
IV PEKERJAAN INSTALASI LISTRIK #NAME? #NAME? #NAME?

B BIAYA PERENCANAAN & PENGAWASAN #NAME? #NAME? #NAME?


C BIAYA OPERASIONAL PELAKSANAAN #NAME? #NAME? #NAME? #NAME?

JUMLAH #NAME?
RENCANA KEMAJUAN FISIK 0 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? CATATAN :
KOMULATIF KEMAJUAN FISIK

Mengetahui : Menyetujui : Dibuat oleh :


- 0 #NAME?
- 0 #NAME?
-

0 0 0
- 0 0
ANALISA BAHAN DAN UPAH

PEKERJAAN TANAH
1 Menggali 1 m3 tanah biasa sedalam 1 m
Upah
0.750 Oh Pekerja @ Rp. 88,500.00 = Rp 66,375.00
0.075 Oh Mandor @ Rp. 130,000.00 = Rp 9,750.00
= Rp 76,125.00
Total Upah = Rp 76,125.00
Overhead + provit 10% = Rp 7,612.50
Harga satuan pekerjaan = Rp 83,737.50

2 1 m3 Urug tanah kembali


Upah
0.250 Oh Pekerja @ Rp. 88,500.00 = Rp 22,125.00
0.025 Oh Mandor @ Rp. 130,000.00 = Rp 3,250.00
= Rp 25,375.00
Total Upah = Rp 25,375.00
Overhead + provit 10% = Rp 2,537.50
Harga satuan pekerjaan = Rp 27,912.50

3 Mengurug 1 m3 tanah
Bahan
1.200 m3 Urug tanah @ Rp. 110,000.00 = Rp 132,000.00
= Rp 132,000.00
Upah
0.300 Oh Pekerja @ Rp. 88,500.00 = Rp 26,550.00
0.010 Oh Mandor @ Rp. 130,000.00 = Rp 1,300.00
= Rp 27,850.00
Total Upah dan Bahan = Rp 159,850.00
Overhead + provit 10% = Rp 15,985.00
Harga satuan pekerjaan = Rp 175,835.00

4 Mengurug 1 m3 pasir pasang


Bahan
1.200 m3 Pasir pasang @ Rp. 220,000.00 = Rp 264,000.00
= Rp 264,000.00
Upah
0.300 Oh Pekerja @ Rp. 88,500.00 = Rp 26,550.00
0.010 Oh Mandor @ Rp. 130,000.00 = Rp 1,300.00
= Rp 27,850.00
Total Upah dan Bahan = Rp 291,850.00
Overhead + provit 10% = Rp 29,185.00
Harga satuan pekerjaan = Rp 321,035.00

PEKERJAAN PONDASI
1 Memasang 1 m3 batu kosong (aanstamping)
Bahan
1.200 m3 Batu belah 15/20 @ Rp. 260,000.00 = Rp 312,000.00
0.432 m3 Pasir pasang @ Rp. 220,000.00 = Rp 95,040.00
= Rp 407,040.00
Upah
0.780 Oh Pekerja @ Rp. 88,500.00 = Rp 69,030.00
0.390 Oh Tukang @ Rp. 120,000.00 = Rp 46,800.00
0.039 Oh Kepala tukang @ Rp. 125,000.00 = Rp 4,875.00
0.039 Oh Mandor @ Rp. 130,000.00 = Rp 5,070.00
= Rp 125,775.00
Total Upah dan Bahan = Rp 532,815.00
Overhead + provit 10% = Rp 53,281.50
Harga satuan pekerjaan = Rp 586,096.50

2 Memasang 1 m3 pondasi batu kali, 1 Pc : 6 PP


Bahan
1.200 m3 Batu belah 15/20 @ Rp. 260,000.00 = Rp 312,000.00
117.000 m3 PC @ Rp. 1,275.00 = Rp 149,175.00
0.561 m3 Pasir pasang @ Rp. 220,000.00 = Rp 123,420.00
= Rp 584,595.00
Upah
1.500 Oh Pekerja @ Rp. 88,500.00= Rp 132,750.00
0.750 Oh Tukang @ Rp. 120,000.00= Rp 90,000.00
0.075 Oh Kepala tukang @ Rp. 125,000.00= Rp 9,375.00
0.075 Oh Mandor @ Rp. 130,000.00= Rp 9,750.00
= Rp 241,875.00
Total harga = Rp 826,470.00
Overhead + provit 10% = Rp 82,647.00
Harga satuan pekerjaan = Rp 909,117.00

PEKERJAAN BETON
1 1 m3 'Membuat 1 m³ beton mutu f’c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87
Bahan (Berat jenis pasir 1.400 kg/m3, batu pecah 2/3 1.350 kg/m3
247.000 kg Semen portland 40 Kg (SNI) @ Rp. 1,275.00 = Rp 314,925.00
0.621 m3 Pasir beton @ Rp. 220,000.00 = Rp 136,557.14
0.740 m3 Batu kali pecah 2/3 @ Rp. 250,000.00 = Rp 185,000.00
215.000 ltr Air @ Rp. 100.00 = Rp 21,500.00
= Rp 657,982.14
Upah
1.650 Oh Pekerja @ Rp. 88,500.00= Rp 146,025.00
0.275 Oh Tukang batu @ Rp. 120,000.00= Rp 33,000.00
0.028 Oh Kepala tukang @ Rp. 125,000.00= Rp 3,500.00
0.083 Oh Mandor @ Rp. 130,000.00= Rp 10,790.00
= Rp 193,315.00
Total harga = Rp 851,297.14
Overhead + provit 10% = Rp 85,129.71
Harga satuan pekerjaan = Rp 936,426.86

2 1 m3 'Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Bahan (Berat jenis pasir 1.400 kg/m3, batu pecah 2/3 1.350 kg/m3
326.000 kg Semen portland 40 Kg (SNI) @ Rp. 1,275.00 = Rp 415,650.00
0.543 m3 Pasir beton @ Rp. 220,000.00 = Rp 119,416.00
0.762 m3 Batu kali pecah 2/3 @ Rp. 250,000.00 = Rp 190,555.55
215.000 ltr Air @ Rp. 100.00 = Rp 21,500.00
= Rp 747,121.55
Upah
1.650 Oh Pekerja @ Rp. 88,500.00 = Rp 146,025.00
0.275 Oh Tukang batu @ Rp. 120,000.00 = Rp 33,000.00
0.028 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,500.00
0.083 Oh Mandor @ Rp. 130,000.00 = Rp 10,790.00
= Rp 193,315.00
Total harga = Rp 940,436.55
Overhead + provit 10% = Rp 94,043.66
Harga satuan pekerjaan = Rp 1,034,480.21

3 1 m3 Membuat 1 m³ beton mutu f’c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58
Bahan (Berat jenis pasir 1.400 kg/m3, batu pecah 2/3 1.350 kg/m3
371.000 kg Semen portland 40 Kg (SNI) @ Rp. 1,275.00 = Rp 473,025.00
0.499 m3 Pasir beton @ Rp. 220,000.00 = Rp 109,685.40
0.776 m3 Batu kali pecah 2/3 @ Rp. 250,000.00 = Rp 193,875.00
215.000 ltr Air @ Rp. 100.00 = Rp 21,500.00
= Rp 798,085.40
Upah
1.650 Oh Pekerja @ Rp. 88,500.00= Rp 146,025.00
0.275 Oh Tukang batu @ Rp. 120,000.00= Rp 33,000.00
0.028 Oh Kepala tukang @ Rp. 125,000.00= Rp 3,500.00
0.083 Oh Mandor @ Rp. 130,000.00= Rp 10,790.00
= Rp 193,315.00
Total harga = Rp 991,400.40
Overhead + provit 10% = Rp 99,140.04
Harga satuan pekerjaan = Rp 1,090,540.44

4 1 m3 Beton mutu F'c = 21.7 Mpa ( K 250 ), Slump ( 12 ± 2 ) Cm, w/c = 0.56
Bahan (Berat jenis pasir 1.400 kg/m3, batu pecah 2/3 1.350 kg/m3
384.000 kg Semen portland 40 Kg (SNI) @ Rp. 1,275.00 = Rp 489,600.00
0.494 m3 Pasir beton @ Rp. 220,000.00 = Rp 108,742.86
0.770 m3 Batu kali pecah 2/3 @ Rp. 250,000.00 = Rp 192,407.41
215.000 ltr Air @ Rp. 100.00 = Rp 21,500.00
= Rp 812,250.26
Upah
1.650 Oh Pekerja @ Rp. 88,500.00= Rp 146,025.00
0.275 Oh Tukang batu @ Rp. 120,000.00= Rp 33,000.00
0.028 Oh Kepala tukang @ Rp. 125,000.00= Rp 3,500.00
0.083 Oh Mandor @ Rp. 130,000.00= Rp 10,790.00
= Rp 193,315.00
Total harga = Rp 1,005,565.26
Overhead + provit 10% = Rp 100,556.53
Harga satuan pekerjaan = Rp 1,106,121.79

5 10 kg Pembesian 10 kg dengan besi polos atau besi ulir


Bahan
10.500 kg Besi beton (polos/ulir) @ Rp. 10,500.00 = Rp 110,250.00
0.150 kg Kawat beton @ Rp. 20,000.00 = Rp 3,000.00
= Rp 113,250.00
Upah
0.070 Oh Pekerja @ Rp. 88,500.00 = Rp 6,195.00
0.070 Oh Tukang besi @ Rp. 120,000.00 = Rp 8,400.00
0.007 Oh Kepala tukang @ Rp. 125,000.00 = Rp 875.00
0.004 Oh Mandor @ Rp. 130,000.00 = Rp 520.00
= Rp 15,990.00
Total harga = Rp 129,240.00
Total harga /kg = Rp 12,924.00
Overhead + provit 10% = Rp 1,292.40
Harga satuan pekerjaan = Rp 14,216.40

6 1 m2 Memasang bekisting untuk pondasi


Bahan
0.040 m3 Kayu begisting @ Rp. 5,500,000.00 = Rp 220,000.00
3.000 kg Paku 5 cm – 10 cm @ Rp. 10,000.00 = Rp 30,000.00
0.100 ltr Minyak bekisting @ Rp. 8,500.00 = Rp 850.00
= Rp 250,850.00
Upah
0.520 Oh Pekerja @ Rp. 88,500.00 = Rp 46,020.00
0.260 Oh Tukang kayu @ Rp. 120,000.00 = Rp 31,200.00
0.026 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,250.00
0.026 Oh Mandor @ Rp. 130,000.00 = Rp 3,380.00
= Rp 83,850.00
Total harga = Rp 334,700.00

7 1 m2 Memasang bekisting untuk sloof 3x pakai


Bahan
0.045 m3 Kayu Begisting @ Rp. 5,500,000.00 = Rp 247,500.00
0.300 kg Paku 5 cm – 10 cm @ Rp. 10,000.00 = Rp 3,000.00
0.100 ltr Minyak bekisting @ Rp. 8,500.00 = Rp 850.00
Untuk 1x pakai = Rp 251,350.00
Untuk 3x pakai = Rp 83,783.33
Upah
0.520 Oh Pekerja @ Rp. 88,500.00
= Rp 46,020.00
0.260 Oh Tukang kayu @ Rp. 120,000.00
= Rp 31,200.00
0.026 Oh Kepala tukang @ Rp. 125,000.00
= Rp 3,250.00
0.026 Oh Mandor @ Rp. 130,000.00
= Rp 3,380.00
= Rp 83,850.00
Total harga = Rp 167,633.33
Overhead + provit 10% = Rp 16,763.33
Harga satuan pekerjaan = Rp 184,396.67

8 1 m2 Memasang bekisting untuk kolom 3x pakai


Bahan
0.040 m3 Kayu Begisting @ Rp. 5,500,000.00 = Rp 220,000.00
0.400 kg Paku 5 cm – 10 cm @ Rp. 10,000.00 = Rp 4,000.00
0.200 ltr Minyak bekisting @ Rp. 8,500.00 = Rp 1,700.00
0.015 m3 Balok kayu kelas III @ Rp. 6,000,000.00 = Rp 90,000.00
0.350 lbr Plywood tebal 9 mm @ Rp. 175,000.00 = Rp 61,250.00
2.000 btg Dolken kayu galam, @ Rp. 25,000.00 = Rp 50,000.00
Untuk 1x pakai = Rp 201,250.00
Untuk 3x pakai = Rp 67,083.33
Upah
0.520 Oh Pekerja @ Rp. 88,500.00
= Rp 46,020.00
0.260 Oh Tukang kayu @ Rp. 120,000.00
= Rp 31,200.00
0.026 Oh Kepala tukang @ Rp. 125,000.00
= Rp 3,250.00
0.026 Oh Mandor @ Rp. 130,000.00
= Rp 3,380.00
= Rp 83,850.00
Total harga = Rp 150,933.33
Overhead + provit 10% = Rp 15,093.33
Harga satuan pekerjaan = Rp 166,026.67
9 1 m2 Memasang bekisting untuk balok 1x pakai
Bahan
0.040 m3 Kayu Begisting @ Rp. 5,500,000.00 = Rp 220,000.00
0.400 kg Paku 5 cm – 10 cm @ Rp. 10,000.00 = Rp 4,000.00
0.200 ltr Minyak bekisting @ Rp. 8,500.00 = Rp 1,700.00
0.018 m3 Balok kayu kelas III @ Rp. 6,000,000.00 = Rp 108,000.00
0.350 lbr Plywood tebal 9 mm @ Rp. 175,000.00 = Rp 61,250.00
2.000 btg Dolken kayu galam, @ Rp. 25,000.00 = Rp 50,000.00
Untuk 1x pakai = Rp 219,250.00
Untuk 3x pakai = Rp 73,083.33
Upah
0.660 Oh Pekerja @ Rp. 88,500.00 = Rp 58,410.00
0.330 Oh Tukang kayu @ Rp. 120,000.00 = Rp 39,600.00
0.033 Oh Kepala tukang @ Rp. 125,000.00 = Rp 4,125.00
0.033 Oh Mandor @ Rp. 130,000.00 = Rp 4,290.00
= Rp 106,425.00
Total harga = Rp 325,675.00
Overhead + provit 10% = Rp 32,567.50
Harga satuan pekerjaan = Rp 358,242.50

10 1 m2 Memasang bekisting untuk balok 3x pakai


Bahan
0.040 m3 Kayu Begisting @ Rp. 5,500,000.00 = Rp 220,000.00
0.400 kg Paku 5 cm – 10 cm @ Rp. 10,000.00 = Rp 4,000.00
0.200 ltr Minyak bekisting @ Rp. 8,500.00 = Rp 1,700.00
0.018 m3 Balok kayu kelas III @ Rp. 6,000,000.00 = Rp 108,000.00
0.350 lbr Plywood tebal 9 mm @ Rp. 175,000.00 = Rp 61,250.00
2.000 btg Dolken kayu galam, @ Rp. 25,000.00 = Rp 50,000.00
Untuk 1x pakai = Rp 219,250.00
Untuk 3x pakai = Rp 73,083.33
Upah
0.660 Oh Pekerja @ Rp. 88,500.00 = Rp 58,410.00
0.330 Oh Tukang kayu @ Rp. 120,000.00 = Rp 39,600.00
0.033 Oh Kepala tukang @ Rp. 125,000.00 = Rp 4,125.00
0.033 Oh Mandor @ Rp. 130,000.00 = Rp 4,290.00
= Rp 106,425.00
Total harga = Rp 179,508.33
Overhead + provit 10% = Rp 17,950.83
Harga satuan pekerjaan = Rp 197,459.17

11 1 m2 Memasang bekisting untuk lantai


Bahan
0.040 m3 Kayu Begisting @ Rp. 5,500,000.00 = Rp 220,000.00
0.400 kg Paku 5 cm – 10 cm @ Rp. 10,000.00 = Rp 4,000.00
0.200 ltr Minyak bekisting @ Rp. 8,500.00 = Rp 1,700.00
0.018 m3 Balok kayu kelas III @ Rp. 6,000,000.00 = Rp 108,000.00
0.350 lbr Plywood tebal 9 mm @ Rp. 175,000.00 = Rp 61,250.00
6.000 btg Dolken kayu galam, @ Rp. 25,000.00 = Rp 150,000.00
= Rp 544,950.00
Upah
0.660 Oh Pekerja @ Rp. 88,500.00 = Rp 58,410.00
0.330 Oh Tukang kayu @ Rp. 120,000.00 = Rp 39,600.00
0.033 Oh Kepala tukang @ Rp. 125,000.00 = Rp 4,125.00
0.033 Oh Mandor @ Rp. 130,000.00 = Rp 4,290.00
= Rp 106,425.00
Total harga = Rp 651,375.00
Overhead + provit 10% = Rp 65,137.50
Harga satuan pekerjaan = Rp 716,512.50

12 1 m2 Memasang bekisting untuk balok latay & ring balk 3x pakai


Bahan
0.045 m3 Kayu Begisting @ Rp. 5,500,000.00 = Rp 247,500.00
0.300 kg Paku 5 cm – 10 cm @ Rp. 10,000.00 = Rp 3,000.00
0.100 ltr Minyak bekisting @ Rp. 8,500.00 = Rp 850.00
Untuk 1x pakai = Rp 251,350.00
Untuk 3x pakai = Rp 83,783.33
Upah
0.520 Oh Pekerja @ Rp. 88,500.00 = Rp 46,020.00
0.260 Oh Tukang kayu @ Rp. 120,000.00 = Rp 31,200.00
0.026 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,250.00
0.026 Oh Mandor @ Rp. 130,000.00 = Rp 3,380.00
= Rp 83,850.00
Total harga = Rp 167,633.33
Overhead + provit 10% = Rp 16,763.33
Harga satuan pekerjaan = Rp 184,396.67

13 1 m3 Footplate 100x120x25cm K225


Bahan
3.850 m2 Begisting @ Rp. 111,566.67 = Rp 429,531.67
141.050 kg Pembesian @ Rp. 14,216.40 = Rp 2,005,223.22
1.000 m3 Cor Beton K.225 @ Rp. 1,090,540.44 = Rp 1,090,540.44
= Rp 3,525,295.33

14 1 m3 Sloof 15/25 K225


Bahan
17.250 m2 Begisting @ Rp. 184,396.67 = Rp 3,180,842.50
197.460 kg Pembesian @ Rp. 14,216.40 = Rp 2,807,170.34
1.000 m3 Cor Beton K.225 @ Rp. 1,090,540.44 = Rp 1,090,540.44
= Rp 7,078,553.28

15 1 m3 Kolom 20/35 K225


Bahan
16.000 m2 Begisting @ Rp. 166,026.67 = Rp 2,656,426.67
147.500 kg Pembesian @ Rp. 14,216.40 = Rp 2,096,919.00
1.000 m3 Cor Beton K.225 @ Rp. 1,090,540.44 = Rp 1,090,540.44
= Rp 5,843,886.11

16 1 m3 Kolom 15/30 K175


Bahan
20.700 m2 Begisting @ Rp. 166,026.67 = Rp 3,436,752.00
173.880 kg Pembesian @ Rp. 14,216.40 = Rp 2,471,947.63
1.000 m3 Cor Beton K.175 @ Rp. 1,034,480.21 = Rp 1,034,480.21
= Rp 6,943,179.84

17 1 m3 Kolom 15/15 K175


Bahan
27.000 m2 Begisting @ Rp. 166,026.67 = Rp 4,482,720.00
226.800 kg Pembesian @ Rp. 14,216.40 = Rp 3,224,279.52
1.000 m3 Cor Beton K.175 @ Rp. 1,034,480.21 = Rp 1,034,480.21
= Rp 8,741,479.73

18 1 m3 Balok Beton 15/25 K175


Bahan
18.200 m2 Begisting @ Rp. 358,242.50 = Rp 6,520,013.50
229.693 kg Pembesian @ Rp. 14,216.40 = Rp 3,265,412.30
1.000 m3 Cor Beton K.175 @ Rp. 1,034,480.21 = Rp 1,034,480.21
= Rp 10,819,906.01

19 1 m3 Balok latay 12/20 K175


Bahan
22.360 m2 Begisting @ Rp. 184,396.67 = Rp 4,123,109.47
220.963 kg Pembesian @ Rp. 14,216.40 = Rp 3,141,293.65
1.000 m3 Cor Beton K.175 @ Rp. 1,034,480.21 = Rp 1,034,480.21
= Rp 8,298,883.33

20 1 m3 Ring Balk 15/25 K175


Bahan
18.200 m2 Begisting @ Rp. 184,396.67 = Rp 3,356,019.33
229.693 kg Pembesian @ Rp. 14,216.40 = Rp 3,265,412.30
1.000 m3 Cor Beton K.175 @ Rp. 1,034,480.21 = Rp 1,034,480.21
= Rp 7,655,911.84

21 1 m3 Plat dek kanopi 10cm K175


Bahan
12.000 m2 Begisting @ Rp. 716,512.50 = Rp 8,598,150.00
68.820 kg Pembesian @ Rp. 14,216.40 = Rp 978,372.65
1.000 m3 Cor Beton K.175 @ Rp. 1,034,480.21 = Rp 1,034,480.21
= Rp 10,611,002.85

22 1 m3 Plat dek kanopi 8cm K175


Bahan
12.000 m2 Begisting @ Rp. 238,837.50 = Rp 2,866,050.00
68.820 kg Pembesian @ Rp. 14,216.40 = Rp 978,372.65
1.000 m3 Cor Beton K.175 @ Rp. 1,034,480.21 = Rp 1,034,480.21
= Rp 4,878,902.85

23 1 m3 Membuat lantai kerja beton tumbuk, 1 Pc : 4 Ps : 6 Kr


Bahan
173.000 Kg PC @ Rp. 1,275.00 = Rp 220,575.00
0.570 m3 Pasir beton @ Rp. 220,000.00 = Rp 125,400.00
0.870 m3 Koral beton @ Rp. 250,000.00 = Rp 217,500.00
= Rp 563,475.00
Upah
1.650 Oh Pekerja @ Rp. 88,500.00 = Rp 146,025.00
0.250 Oh Tukang batu @ Rp. 120,000.00 = Rp 30,000.00
0.025 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,125.00
0.080 Oh Mandor @ Rp. 130,000.00 = Rp 10,400.00
= Rp 189,550.00
Total harga = Rp 753,025.00
Overhead + provit 10% = Rp 75,302.50
Harga satuan pekerjaan = Rp 828,327.50

PEKERJAAN PASANGAN & PLESTERAN


1 1 m2 Memasang bata merah tebal 1 bata, 1 PC : 4 PP
Bahan
140.000 bh Bata merah @ Rp. 700.00 = Rp 98,000.00
26.550 kg PC @ Rp. 1,275.00 = Rp 33,851.25
0.093 m3 Pasir pasang @ Rp. 220,000.00 = Rp 20,460.00
= Rp 152,311.25
Upah
0.600 Oh Pekerja @ Rp. 88,500.00 = Rp 53,100.00
0.200 Oh Tukang batu @ Rp. 120,000.00 = Rp 24,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00 = Rp 2,500.00
0.030 Oh Mandor @ Rp. 130,000.00 = Rp 3,900.00
= Rp 83,500.00
Total harga = Rp 235,811.25
Overhead + provit 10% = Rp 23,581.13
Harga satuan pekerjaan = Rp 259,392.38

2 1 m2 Memasang bata merah tebal 1/2 bata, 1 PC : 3 PP


Bahan
70.000 bh Bata merah @ Rp. 700.00 = Rp 49,000.00
14.370 kg PC @ Rp. 1,275.00 = Rp 18,321.75
0.040 m3 Pasir pasang @ Rp. 220,000.00 = Rp 8,800.00
= Rp 76,121.75
Upah
0.300 Oh Pekerja @ Rp. 88,500.00 = Rp 26,550.00
0.100 Oh Tukang batu @ Rp. 120,000.00 = Rp 12,000.00
0.010 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,250.00
0.015 Oh Mandor @ Rp. 130,000.00 = Rp 1,950.00
= Rp 41,750.00
Total harga = Rp 117,871.75
Overhead + provit 10% = Rp 11,787.18
Harga satuan pekerjaan = Rp 129,658.93

3 1 m2 Memasang bata merah tebal 1/2 bata, 1 PC : 6 PS


Bahan
70.000 bh Bata merah @ Rp. 700.00 = Rp 49,000.00
8.320 kg PC @ Rp. 1,275.00 = Rp 10,608.00
0.049 m3 Pasir pasang @ Rp. 220,000.00 = Rp 10,780.00
= Rp 70,388.00
Upah
0.300 Oh Pekerja @ Rp. 88,500.00 = Rp 26,550.00
0.100 Oh Tukang batu @ Rp. 120,000.00 = Rp 12,000.00
0.010 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,250.00
0.015 Oh Mandor @ Rp. 130,000.00 = Rp 1,950.00
= Rp 41,750.00
Total harga = Rp 112,138.00
Overhead + provit 10% = Rp 11,213.80
Harga satuan pekerjaan = Rp 123,351.80

4 Membuat 1 m2 plesteran tebal 15mm, 1 PC : 3 PP


Bahan
7.776 kg PC @ Rp. 1,275.00 = Rp 9,914.40
0.023 m3 Pasir pasang @ Rp. 220,000.00 = Rp 5,060.00
= Rp 14,974.40
Upah
0.300 Oh Pekerja @ Rp. 88,500.00 = Rp 26,550.00
0.150 Oh Tukang batu @ Rp. 120,000.00 = Rp 18,000.00
0.015 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,875.00
0.015 Oh Mandor @ Rp. 130,000.00 = Rp 1,950.00
= Rp 48,375.00
Total harga = Rp 63,349.40
Overhead + provit 10% = Rp 6,334.94
Harga satuan pekerjaan = Rp 69,684.34

5 Membuat 1 m2 plesteran tebal 15mm, 1 PC : 6 PP


Bahan
3.680 kg PC @ Rp. 1,275.00 = Rp 4,692.00
0.023 m3 Pasir pasang @ Rp. 220,000.00 = Rp 5,060.00
= Rp 9,752.00
Upah
0.200 Oh Pekerja @ Rp. 88,500.00 = Rp 17,700.00
0.150 Oh Tukang batu @ Rp. 120,000.00 = Rp 18,000.00
0.015 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,875.00
0.015 Oh Mandor @ Rp. 130,000.00 = Rp 1,950.00
= Rp 39,525.00
Total harga = Rp 49,277.00
Overhead + provit 10% = Rp 4,927.70
Harga satuan pekerjaan = Rp 54,204.70

6 Membuat 1 m Benangan sudut, alur kusen, kol plint


Bahan
1.500 kg PC @ Rp. 1,275.00 = Rp 1,912.50
0.004 m3 Pasir pasang @ Rp. 220,000.00 = Rp 946.00
= Rp 2,858.50
Upah
0.200 Oh Pekerja @ Rp. 88,500.00 = Rp 17,700.00
0.100 Oh Tukang batu @ Rp. 120,000.00 = Rp 12,000.00
0.015 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,875.00
0.015 Oh Mandor @ Rp. 130,000.00 = Rp 1,950.00
= Rp 33,525.00
Total harga = Rp 36,383.50
Overhead + provit 10% = Rp 3,638.35
Harga satuan pekerjaan = Rp 40,021.85

PEKERJAAN ATAP
1 1 kg Ongkos kerja, pabrikasi dan pemasangan baja ( elektroda 20%)
Upah An. SNI ( Revisi )
0.060 Oh Pekerja @ Rp. 88,500.00 = Rp 5,310.00
0.060 Oh Tukang las @ Rp. 120,000.00 = Rp 7,200.00
0.006 Oh Kepala Tukang @ Rp. 125,000.00 = Rp 750.00
0.003 Oh Mandor @ Rp. 130,000.00 = Rp 390.00
= Rp 13,650.00
Peralatan An. SNI ( Revisi )
0.0700 Oh Sewa welding set @ Rp. 35,000.00 = Rp 2,450.00
. (minimal 5 jam) = Rp 2,450.00
Total Upah dan Bahan = 16,100.00

2 1 kg Pekerjaan Baja Profil


Bahan An. SNI ( Revisi )
1.150 Kg Baja profil @ Rp. 13,000.00 = 14,950.00
0.020 Kg Elektroda baja 20% @ Rp. 55,000.00 = Rp 1,100.00
= Rp 16,050.00
Upah Ongkos kerja, pabrikasi dan pemasangan 1 kg 16,100.00 = Rp 16,100.00
= Rp 16,100.00
Total Upah dan Bahan = 32,150.00
Overhead + provit 10% = Rp 3,215.00
Harga satuan pekerjaan = Rp 35,365.00

3 1 m' Pasang Reuter ukuran ( 3 x 20 ) cm, kayu kuat kelas 2


Bahan
0.011 m3 Kayu kuat kelas 2 3/20 papan @ Rp. 10,000,000.00 = Rp 108,000.00
0.100 Kg Paku biasa 2" - 5" @ Rp. 10,000.00 = Rp 1,000.00
= Rp 109,000.00
Upah
0.100 Oh Pekerja @ Rp. 88,500.00 = Rp 8,850.00
0.200 Oh Tukang kayu @ Rp. 120,000.00 = Rp 24,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00 = Rp 2,500.00
0.005 Oh Mandor @ Rp. 130,000.00 = Rp 650.00
= Rp 36,000.00
Total harga = Rp 145,000.00
Overhead + provit 10% = Rp 14,500.00
Harga satuan pekerjaan = Rp 159,500.00

4 1 m' woodplank 300.3000.4 mm


Bahan
1.050 m1 Woodplank 300.3000.4 @ Rp. 16,666.67 = Rp 17,500.00
5% Sambungan + penguat @ Rp. 833.33 = Rp 833.33
0.100 Kg Paku biasa 2" - 5" @ Rp. 10,000.00 = Rp 1,000.00
= Rp 19,333.33
Upah
0.100 Oh Pekerja @ Rp. 88,500.00 = Rp 8,850.00
0.200 Oh Tukang kayu @ Rp. 120,000.00 = Rp 24,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00 = Rp 2,500.00
0.005 Oh Mandor @ Rp. 130,000.00 = Rp 650.00
= Rp 36,000.00
Total harga = Rp 55,333.33
Overhead + provit 10% = Rp 5,533.33
Harga satuan pekerjaan = Rp 60,866.67

5 1 m2 Pasang genteng lokal


Bahan
18.000 bh Genteng lokal @ Rp. 2,500.00 = Rp 45,000.00
= Rp 45,000.00

Upah
0.150 Oh Pekerja @ Rp. 88,500.00 = Rp 13,275.00
0.075 Oh Tukang @ Rp. 120,000.00 = Rp 9,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00 = Rp 2,500.00
0.010 Oh Mandor @ Rp. 130,000.00 = Rp 1,300.00
= Rp 26,075.00
Total harga = Rp 71,075.00
Overhead + provit 10% = Rp 7,107.50
Harga satuan pekerjaan = Rp 78,182.50

6 1 m' Pasang bubungan genteng lokal


Bahan
3.500 bh bubungan genteng lokal @ Rp. 5,000.00 = Rp 17,500.00
8.000 kg PC @ Rp. 1,275.00 = Rp 10,200.00
0.032 m3 Pasir pasang @ Rp. 220,000.00 = Rp 7,040.00
= Rp 34,740.00
Upah
0.400 Oh Pekerja @ Rp. 88,500.00 = Rp 35,400.00
0.200 Oh Tukang @ Rp. 120,000.00 = Rp 24,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00 = Rp 2,500.00
0.002 Oh Mandor @ Rp. 130,000.00 = Rp 260.00
= Rp 62,160.00
Total harga = Rp 96,900.00
Overhead + provit 10% = Rp 9,690.00
Harga satuan pekerjaan = Rp 106,590.00

PEKERJAAN PINTU & JENDELA


1 Membuat & memasang 1 buah PJ-1
Bahan
Kusen
1.100 m1 Profile alluminium @ Rp. 105,000.00 = Rp 115,500.00
2.000 buah Skrup fixer @ Rp. 500.00 = Rp 1,000.00
0.060 tube Sealant @ Rp. 35,000.00 = Rp 2,100.00
= Rp 118,600.00
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp 357,410.00
Overhead + provit 10% = Rp 35,741.00
Harga satuan pekerjaan = Rp 393,151.00

1 Membuat & memasang 1 m2 daun pintu alluminium


Bahan
4.400 m1 Profile alluminium @ Rp. 105,000.00 = Rp 462,000.00
4.500 buah Profil kaca @ Rp. 25,000.00 = Rp 112,500.00
0.270 tube Sealant @ Rp. 35,000.00 = Rp 9,450.00
= Rp 583,950.00
Upah
0.085 Oh Pekerja @ Rp. 88,500.00 = Rp 7,522.50
0.085 Oh Tukang @ Rp. 120,000.00 = Rp 10,200.00
0.009 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,125.00
0.005 Oh Mandor @ Rp. 130,000.00 = Rp 650.00
= Rp 19,497.50
Total harga = Rp 603,447.50
Overhead + provit 10% = Rp 60,344.75
Harga satuan pekerjaan = Rp 663,792.25

2 Membuat & memasang 1 m2 daun jendela kaca alluminium


Bahan
4.400 m1 Profile alluminium @ Rp. 105,000.00 = Rp 462,000.00
4.500 buah Profil kaca @ Rp. 28,750.00 = Rp 129,375.00
0.270 tube Sealant @ Rp. 35,000.00 = Rp 9,450.00
= Rp 600,825.00
Upah
0.085 Oh Pekerja @ Rp. 88,500.00 = Rp 7,522.50
0.085 Oh Tukang @ Rp. 120,000.00 = Rp 10,200.00
0.009 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,125.00
0.005 Oh Mandor @ Rp. 130,000.00 = Rp 650.00
= Rp 19,497.50
Total harga = Rp 620,322.50
Overhead + provit 10% = Rp 62,032.25
Harga satuan pekerjaan = Rp 682,354.75

1 Membuat & memasang 1 buah PJ-1


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
38.000 buah Skrup fixer @ Rp. 500.00 = Rp 19,000.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Daun pintu
Err:509 m2 Profile alluminium + kaca @ Rp. 583,950.00 = Rp Err:509
Daun jendela
Err:509 m2 Profile alluminium + kaca @ Rp. 600,825.00 = Rp Err:509
Accecories
1.000 bh kunci tanam 2x putar @ Rp. 120,000.00 = Rp 120,000.00
6.000 bh Engsel pintu @ Rp. 35,000.00 = Rp 210,000.00
6.000 psg Engsel jendela @ Rp. 25,000.00 = Rp 150,000.00
6.000 psg Kait angin @ Rp. 20,000.00 = Rp 120,000.00
8.000 bh Kunci selot @ Rp. 14,000.00 = Rp 112,000.00
= Rp Err:509
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:509
Overhead + provit 10% = Rp Err:509
Harga satuan pekerjaan = Rp Err:509

2 Membuat & memasang 1 buah PJ-2


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
24.000 buah Skrup fixer @ Rp. 500.00 = Rp 12,000.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Daun pintu
Err:509 m2 Profile alluminium + kaca @ Rp. 583,950.00 = Rp Err:509
Daun jendela
Err:508 m2 Profile alluminium + kaca @ Rp. 600,825.00 = Rp Err:508
Accecories
1.000 bh kunci tanam 2x putar @ Rp. 120,000.00 = Rp 120,000.00
3.000 bh Engsel pintu @ Rp. 35,000.00 = Rp 105,000.00
3.000 psg Engsel jendela @ Rp. 25,000.00 = Rp 75,000.00
3.000 psg Kait angin @ Rp. 20,000.00 = Rp 60,000.00
4.000 bh Kunci selot @ Rp. 14,000.00 = Rp 56,000.00
= Rp Err:508
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:508
Overhead + provit 10% = Rp Err:508
Harga satuan pekerjaan = Rp Err:508

3 Membuat & memasang 1 buah P-1


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
18.000 buah Skrup fixer @ Rp. 500.00 = Rp 9,000.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Daun pintu
Err:509 m2 Profile alluminium + kaca @ Rp. 583,950.00 = Rp Err:509
Daun jendela
Err:509 m2 Profile alluminium + kaca @ Rp. 600,825.00 = Rp Err:509
Accecories
1.000 bh kunci tanam 2x putar @ Rp. 120,000.00 = Rp 120,000.00
6.000 bh Engsel pintu @ Rp. 35,000.00 = Rp 210,000.00
2.000 psg Engsel jendela @ Rp. 25,000.00 = Rp 50,000.00
2.000 psg Kait angin @ Rp. 20,000.00 = Rp 40,000.00
4.000 bh Kunci selot @ Rp. 14,000.00 = Rp 56,000.00
= Rp Err:509
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:509
Overhead + provit 10% = Rp Err:509
Harga satuan pekerjaan = Rp Err:509

4 Membuat & memasang 1 buah P-2


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
15.000 buah Skrup fixer @ Rp. 500.00 = Rp 7,500.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Daun pintu
Err:509 m2 Profile alluminium + kaca @ Rp. 583,950.00 = Rp Err:509
Daun jendela
Err:509 m2 Profile alluminium + kaca @ Rp. 600,825.00 = Rp Err:509
Accecories
1.000 bh kunci tanam 2x putar @ Rp. 120,000.00 = Rp 120,000.00
3.000 bh Engsel pintu @ Rp. 35,000.00 = Rp 105,000.00
1.000 psg Engsel jendela @ Rp. 25,000.00 = Rp 25,000.00
1.000 psg Kait angin @ Rp. 20,000.00 = Rp 20,000.00
2.000 bh Kunci selot @ Rp. 14,000.00 = Rp 28,000.00
= Rp Err:509
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:509
Overhead + provit 10% = Rp Err:509
Harga satuan pekerjaan = Rp Err:509

5 Membuat & memasang 1 buah J-1


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
20.000 buah Skrup fixer @ Rp. 500.00 = Rp 10,000.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Daun jendela
Err:508 m2 Profile alluminium + kaca @ Rp. 600,825.00 = Rp Err:508
Accecories
4.000 psg Engsel jendela @ Rp. 25,000.00 = Rp 100,000.00
4.000 psg Kait angin @ Rp. 20,000.00 = Rp 80,000.00
4.000 bh Kunci selot @ Rp. 14,000.00 = Rp 56,000.00
= Rp Err:508
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:508
Overhead + provit 10% = Rp Err:508
Harga satuan pekerjaan = Rp Err:508

6 Membuat & memasang 1 buah J-2


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
23.000 buah Skrup fixer @ Rp. 500.00 = Rp 11,500.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Daun jendela
Err:508 m2 Profile alluminium + kaca @ Rp. 600,825.00 = Rp Err:508
Accecories
4.000 psg Engsel jendela @ Rp. 25,000.00 = Rp 100,000.00
4.000 psg Kait angin @ Rp. 20,000.00 = Rp 80,000.00
4.000 bh Kunci selot @ Rp. 14,000.00 = Rp 56,000.00
= Rp Err:508
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:508
Overhead + provit 10% = Rp Err:508
Harga satuan pekerjaan = Rp Err:508

7 Membuat & memasang 1 buah J-3


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
50.000 buah Skrup fixer @ Rp. 500.00 = Rp 25,000.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Kaca polos
Err:509 m2 Kaca tebal 5 mm @ Rp. 121,000.00 = Rp Err:509
= Rp Err:509
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:509
Overhead + provit 10% = Rp Err:509
Harga satuan pekerjaan = Rp Err:509

8 Membuat & memasang 1 buah J-4


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
12.000 buah Skrup fixer @ Rp. 500.00 = Rp 6,000.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Kaca polos
Err:509 m2 Kaca tebal 5 mm @ Rp. 121,000.00 = Rp Err:509
= Rp Err:509
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:509
Overhead + provit 10% = Rp Err:509
Harga satuan pekerjaan = Rp Err:509

9 Membuat & memasang 1 buah V-1


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
8.000 buah Skrup fixer @ Rp. 500.00 = Rp 4,000.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Daun jendela
Err:509 m2 Profile alluminium + kaca @ Rp. 600,825.00 = Rp Err:509
Accecories
2.000 psg Engsel jendela @ Rp. 25,000.00 = Rp 50,000.00
2.000 psg Kait angin @ Rp. 20,000.00 = Rp 40,000.00
2.000 bh Kunci selot @ Rp. 14,000.00 = Rp 28,000.00
= Rp Err:509
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:509
Overhead + provit 10% = Rp Err:509
Harga satuan pekerjaan = Rp Err:509

10 Membuat & memasang 1 buah V-2


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
4.000 buah Skrup fixer @ Rp. 500.00 = Rp 2,000.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Daun jendela
Err:509 m2 Profile alluminium + kaca @ Rp. 600,825.00 = Rp Err:509
Accecories
1.000 psg Engsel jendela @ Rp. 25,000.00 = Rp 25,000.00
1.000 psg Kait angin @ Rp. 20,000.00 = Rp 20,000.00
1.000 bh Kunci selot @ Rp. 14,000.00 = Rp 14,000.00
= Rp Err:509
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:509
Overhead + provit 10% = Rp Err:509
Harga satuan pekerjaan = Rp Err:509

11 Membuat & memasang 1 buah V-3


Bahan
Kusen Err:509 m1
Err:509 m1 Profile alluminium @ Rp. 105,000.00 = Rp Err:509
4.000 buah Skrup fixer @ Rp. 500.00 = Rp 2,000.00
Err:509 tube Sealant @ Rp. 35,000.00 = Rp Err:509
Kaca polos
Err:509 m2 Kaca tebal 5 mm @ Rp. 121,000.00 = Rp Err:509
= Rp Err:509
Upah
1.050 Oh Pekerja @ Rp. 88,500.00 = Rp 92,925.00
1.050 Oh Tukang @ Rp. 120,000.00 = Rp 126,000.00
0.105 Oh Kepala tukang @ Rp. 125,000.00 = Rp 13,125.00
0.052 Oh Mandor @ Rp. 130,000.00 = Rp 6,760.00
= Rp 238,810.00
Total harga = Rp Err:509
Overhead + provit 10% = Rp Err:509
Harga satuan pekerjaan = Rp Err:509

11 1 m2 Pasang kaca tebal 5 mm


Bahan
1.100 m2 Kaca tebal 5 mm @ Rp. 110,000.00 = Rp 121,000.00
= Rp 121,000.00
Upah
0.150 Oh Pekerja @ Rp. 88,500.00 = Rp 13,275.00
0.150 Oh Tukang @ Rp. 120,000.00 = Rp 18,000.00
0.015 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,875.00
0.001 Oh Mandor @ Rp. 130,000.00 = Rp 97.50
= Rp 33,247.50
Total harga = Rp 154,247.50
Overhead + provit 10% = Rp 15,424.75
Harga satuan pekerjaan = Rp 169,672.25

12 1 buah pasang kunci tanam biasa


Bahan
1.000 bh kunci tanam 2x putar @ Rp. 120,000.00 = Rp 120,000.00
= Rp 120,000.00
Upah
0.010 Oh Pekerja @ Rp. 88,500.00 = Rp 885.00
0.500 Oh Tukang @ Rp. 120,000.00 = Rp 60,000.00
0.010 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,250.00
0.005 Oh Mandor @ Rp. 130,000.00 = Rp 650.00
= Rp 62,785.00
Total harga = Rp 182,785.00
Overhead + provit 10% = Rp 18,278.50
Harga satuan pekerjaan = Rp 201,063.50

13 1 buah pasang engsel pintu


Bahan
1.000 psg Engsel pintu @ Rp. 35,000.00 = Rp 35,000.00
= Rp 35,000.00
Upah
0.015 Oh Pekerja @ Rp. 88,500.00 = Rp 1,327.50
0.150 Oh Tukang @ Rp. 120,000.00 = Rp 18,000.00
0.015 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,875.00
0.001 Oh Mandor @ Rp. 130,000.00 = Rp 97.50
= Rp 21,300.00
Total harga = Rp 56,300.00
Overhead + provit 10% = Rp 5,630.00
Harga satuan pekerjaan = Rp 61,930.00

14 1 buah pasang engsel jendela


Bahan
1.000 psg Engsel jendela @ Rp. 25,000.00 = Rp 25,000.00
= Rp 25,000.00
Upah
0.015 Oh Pekerja @ Rp. 88,500.00 = Rp 1,327.50
0.150 Oh Tukang @ Rp. 120,000.00 = Rp 18,000.00
0.015 Oh Kepala tukang @ Rp. 125,000.00 = Rp 1,875.00
0.001 Oh Mandor @ Rp. 130,000.00 = Rp 97.50
= Rp 21,300.00
Total harga = Rp 46,300.00
Overhead + provit 10% = Rp 4,630.00
Harga satuan pekerjaan = Rp 50,930.00

15 1 buah pasang kunci selot


Bahan
1.000 bh Kunci selot @ Rp. 15,000.00 = Rp 15,000.00
= Rp 15,000.00
Upah
0.020 Oh Pekerja @ Rp. 88,500.00= Rp 1,770.00
0.200 Oh Tukang @ Rp. 120,000.00= Rp 24,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00= Rp 2,500.00
0.001 Oh Mandor @ Rp. 130,000.00= Rp 130.00
= Rp 28,400.00
Total harga = Rp 43,400.00
Overhead + provit 10% = Rp 4,340.00
Harga satuan pekerjaan = Rp 47,740.00

16 1 buah pasang kait angin


Bahan
1.000 Bh Kait angin @ Rp. 20,000.00 = Rp 20,000.00
= Rp 20,000.00
Upah
0.015 Oh Pekerja @ Rp. 88,500.00= Rp 1,327.50
0.150 Oh Tukang kayu @ Rp. 120,000.00= Rp 18,000.00
0.015 Oh Kepala tukang @ Rp. 125,000.00= Rp 1,875.00
0.001 Oh Mandor @ Rp. 130,000.00= Rp 97.50
= Rp 21,300.00
Total harga = Rp 41,300.00
Overhead + provit 10% = Rp 4,130.00
Harga satuan pekerjaan = Rp 45,430.00

PEKERJAAN KERAMIK
1 1 m2 Pasang lantai keramik 40 x 40 cm
Bahan
1.000 m2 Keramik lantai 40x40 @ Rp. 135,000.00 = Rp 135,000.00
10.000 Kg PC @ Rp. 1,275.00 = Rp 12,750.00
0.0450 m3 Pasir pasang @ Rp. 220,000.00 = Rp 9,900.00
0.500 Kg Semen warna @ Rp. 13,500.00 = Rp 6,750.00
= Rp 164,400.00
Upah
0.700 Oh Pekerja @ Rp. 88,500.00= Rp 61,950.00
0.350 Oh Tukang kayu @ Rp. 120,000.00= Rp 42,000.00
0.035 Oh Kepala tukang @ Rp. 125,000.00= Rp 4,375.00
0.035 Oh Mandor @ Rp. 130,000.00= Rp 4,550.00
= Rp 112,875.00
Total harga = Rp 277,275.00
Overhead + provit 10% = Rp 27,727.50
Harga satuan pekerjaan = Rp 305,002.50

2 1 m2 Pasang lantai keramik 20 x 20 cm motif


Bahan
1.000 m2 Keramik lantai 20x20 @ Rp. 51,000.00 = Rp 51,000.00
10.000 Kg PC @ Rp. 1,275.00 = Rp 12,750.00
0.0450 m3 Pasir pasang @ Rp. 220,000.00 = Rp 9,900.00
0.500 Kg Semen warna @ Rp. 13,500.00 = Rp 6,750.00
= Rp 80,400.00
Upah
0.700 Oh Pekerja @ Rp. 88,500.00 = Rp 61,950.00
0.350 Oh Tukang kayu @ Rp. 120,000.00 = Rp 42,000.00
0.035 Oh Kepala tukang @ Rp. 125,000.00 = Rp 4,375.00
0.035 Oh Mandor @ Rp. 130,000.00 = Rp 4,550.00
= Rp 112,875.00
Total harga = Rp 193,275.00
Overhead + provit 10% = Rp 19,327.50
Harga satuan pekerjaan = Rp 212,602.50

3 1 m2 Pasang dinding keramik 20 x 25 cm


Bahan
1.000 m2 Keramik 20x25 cm @ Rp. 65,000.00 = Rp 65,000.00
9.300 Kg Semen portland @ Rp. 1,275.00 = Rp 11,857.50
0.018 m3 Pasir pasang @ Rp. 220,000.00 = Rp 3,960.00
1.500 Kg Semen warna @ Rp. 13,500.00 = Rp 20,250.00
= Rp 101,067.50
Upah
0.600 Oh Pekerja @ Rp. 88,500.00 = Rp 53,100.00
0.100 Oh Tukang kayu @ Rp. 120,000.00 = Rp 12,000.00
0.045 Oh Kepala tukang @ Rp. 125,000.00 = Rp 5,625.00
0.030 Oh Mandor @ Rp. 130,000.00 = Rp 3,900.00
= Rp 74,625.00
Total harga = Rp 175,692.50
Overhead + provit 10% = Rp 17,569.25
Harga satuan pekerjaan = Rp 193,261.75

PEKERJAAN PENGECATAN
1 1 m2 Pengecatan tembok baru ( 1x cat dasar, 2 x cat penutup , 1 x plamir ) ANVITAC
Bahan
0.100 kg plamir @ Rp. 29,000.00 = Rp 2,900.00
0.100 kg cat dasar dinding @ Rp. 135,000.00 = Rp 13,500.00
0.260 kg cat penutup 2 x pengecatan @ Rp. 135,000.00 = Rp 35,100.00
51,500.00
Upah
0.020 Oh Pekerja @ Rp. 88,500.00 = Rp 1,770.000
0.063 Oh Tukang batu @ Rp. 120,000.00 = Rp 7,560.000
0.006 Oh Kepala Tukang @ Rp. 125,000.00 = Rp 787.500
0.003 Oh Mandor @ Rp. 130,000.00 = Rp 325.000
= Rp 10,442.50
Total harga = Rp 61,942.50
Overhead + provit 10% = Rp 6,194.25
Harga satuan pekerjaan = Rp 68,136.75

2 1 m2 Pengecatan bidang kayu baru ( 1 x plamir , 1 x cat dasar , 2 x cat penutup )


Bahan
0.200 kg cat meni @ Rp. 35,000.00 = Rp 7,000.00
0.150 kg plamir kayu @ Rp. 27,000.00 = Rp 4,050.00
0.170 kg cat Kayu @ Rp. 72,000.00 = Rp 12,240.00
0.260 kg cat penutup 2 x Pengecatan @ Rp. 72,000.00 = Rp 18,720.00
42,010.00
Upah
0.070 Oh Pekerja @ Rp. 88,500.00 = Rp 6,195.000
0.009 Oh Tukang batu @ Rp. 120,000.00 = Rp 1,080.000
0.006 Oh Kepala Tukang @ Rp. 125,000.00 = Rp 750.000
0.003 Oh Mandor @ Rp. 130,000.00 = Rp 325.000
= Rp 8,350.00
Total harga = Rp 50,360.00
Overhead + provit 10% = Rp 5,036.00
Harga satuan pekerjaan = Rp 55,396.00
PEKERJAAN SANITASI AIR
1 Memasang 1 buah kloset jongkok porselen
Bahan An. SNI ( Revisi ) 6.2.1
1.000 Bh Kloset jongkok porselen @ Rp. 125,000.00 Rp 125,000.00
2.000 Kg Semen portland @ Rp. 1,275.00 Rp 2,550.00
0.010 m3 Pasir pasang @ Rp. 220,000.00 Rp 2,200.00
Rp 129,750.00
Upah An. SNI ( Revisi ) 6.2.2
0.500 Oh Pekerja @ Rp. 88,500.00 Rp 44,250.00
0.200 Oh Tukang batu @ Rp. 120,000.00 Rp 24,000.00
0.150 Oh Kepala tukang @ Rp. 125,000.00 Rp 18,750.00
0.160 Oh Mandor @ Rp. 130,000.00 Rp 20,800.00
Rp 107,800.00
Total harga Rp 237,550.00
Overhead + provit 10% = Rp 23,755.00
Harga satuan pekerjaan = Rp 261,305.00

2 Memasang 1 m' pipa PVC klas D ø 2,5"


Bahan An. SNI ( Revisi ) 6.31.1
1.200 m' Pipa PVC @ Rp. 6,250.00 Rp 7,500.00
35% harga pipa = Perlengkapan @ Rp. 2,187.50 Rp 2,187.50
Rp 9,687.50
Upah An. SNI ( Revisi ) 6.31.2
0.081 Oh Pekerja @ Rp. 88,500.00 Rp 7,168.50
0.135 Oh Tukang batu @ Rp. 120,000.00 Rp 16,200.00
0.0135 Oh Kepala tukang @ Rp. 125,000.00 Rp 1,687.50
0.0041 Oh Mandor @ Rp. 130,000.00 Rp 533.00
Rp 25,589.00
Total harga Rp 35,276.50
Overhead + provit 10% = Rp 3,527.65
Harga satuan pekerjaan = Rp 38,804.15
3 Memasang 1 m' pipa PVC tipe AW ø 3/4"
Bahan An. SNI ( Revisi ) 6.26.1
1.200 m' Pipa PVC @ Rp. 6,625.00 Rp 7,950.00
35% harga pipa = Perlengkapan @ Rp. 2,318.75 Rp 2,318.75
Rp 10,268.75
Upah An. SNI ( Revisi ) 6.26.2
0.036 Oh Pekerja @ Rp. 88,500.00 Rp 3,186.00
0.060 Oh Tukang batu @ Rp. 120,000.00 Rp 7,200.00
0.006 Oh Kepala tukang @ Rp. 125,000.00 Rp 750.00
0.0018 Oh Mandor @ Rp. 130,000.00 Rp 234.00
Rp 11,370.00
Total harga Rp 21,638.75
Overhead + provit 10% = Rp 2,163.88
Harga satuan pekerjaan = Rp 23,802.63
4 Memasang 1 buah kran ø 3/4" atau 1/2"
Bahan An. SNI ( Revisi ) 6.35.1
1.000 Bh Kran air @ Rp. 25,000.00 Rp 25,000.00
0.025 Bh Seal tape @ Rp. 3,500.00 Rp 87.50
Rp 25,087.50
Upah An. SNI ( Revisi ) 6.35.2
0.010 Oh Pekerja @ Rp. 88,500.00 Rp 885.00
0.100 Oh Tukang batu @ Rp. 120,000.00 Rp 12,000.00
0.010 Oh Kepala tukang @ Rp. 125,000.00 Rp 1,250.00
0.005 Oh Mandor @ Rp. 130,000.00 Rp 650.00
Rp 14,785.00
Total harga Rp 39,872.50
Overhead + provit 10% = Rp 3,987.25
Harga satuan pekerjaan = Rp 43,859.75
REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)

KEGIATAN : REHABILITASI PERPUSTAKAAN


SUMBER DANA : P APBD KABUPATEN JOMBANG TA. 2021
SEKOLAH : SDN BANJARDOWO I
LOKASI : KECAMATAN JOMBANG
KABUPATEN : JOMBANG

No Uraian Pekerjaan Sub Total (Rp)

1 2 3

A BIAYA KONSTRUKSI FISIK

I PEKERJAAN PERSIAPAN 1,800,000.00000000

II PEKERJAAN ATAP 42,458,904.10242

III PEKERJAAN PINTU & JENDELA 13,425,259

IV PEKERJAAN KERAMIK 8,064,151.2

V PEKERJAAN PLAFOND 16,124,221.67175

VI PEKERJAAN PENGECATAN 8,311,019.612472

VII PEKERJAAN INSTALASI LISTRIK 726,500

JUMLAH BIAYA KONSTRUKSI FISIK (BKF) Rp 90,910,055.59


PPN 10% Rp 9,091,005.56
JUMLAH TOTAL Rp 100,001,061.15
DIBULATKAN Rp 100,000,000.00

TERBILANG : " Seratus Juta Rupiah"

Jombang, 2021
Dibuat Oleh,
Kepala Bidang Pembinaan SD
Dinas Pendidikan Dan Kebudayaan
Kabupaten Jombang
Selaku Pejabat Pembuat Komitmen

ENDRO WAHY
ENDRO WAHYUDI, S.STP.
NIP. 19800528 199912 1 001
PERHITUNGAN VOLUME RUANG KELAS

KEGIATAN : REHABILITASI PERPUSTAKAAN


SUMBER DANA : P APBD KABUPATEN JOMBANG TA. 2021
SEKOLAH : SDN BANJARDOWO I
LOKASI : KECAMATAN JOMBANG
KABUPATEN : JOMBANG

No. SKET GAMBAR DAN PERHITUNGAN VOLUME VOLUME SAT.


PEKERJAAN PERSIAPAN
1 Uitset / Pengukuran Ulang 1.00 ls
2 Bongkar Atap + Plafond 2.00 ls
3 Pembersihan lokasi 1.00 ls
4 Papan Nama Kegiatan 1.00 ls
5 Rencana MK3K 1.00 ls

PEKERJAAN ATAP
1 Pas. Kuda-kuda kayu 8/15 cm, kayu kuat kelas II
Kuda Kuda = 21.05 x 0.08 x 0.15 x 2.00 = 0.51 m3

Ikat Angin = 0.06 x 0.10 x 3.70 x 2.00 = 0.04 m3


= 0.55 m3 0.55 m3

2 Pas. Rangka Atap Usuk 5/7 cm dan Reng 2/3 cm Kayu Kelas I
= 11.00 x 10.17
= 111.87 m2 111.87 m2

3 Pas. Nok, Gording, Balok Tembok 8/12 kayu kuat kelas II


= 0.08 x 0.12 x 10.17 x 4.00 bh 0.3931
= 0.39 m3 0.39 m2

5 Pas. Penutup Atap genteng


= 11.00 x 10.17 111.87 m2
= 111.87 m2

6 Pas. Bubungan genteng lokal Baru


= 10.17 m' 10.17 m'

7 Pas. Kalsiplank Lebar = 30 cm


= 11.00 + 10.17 + 11.00 + 10.17
= 42.34 m' 42.34 m'

PEKERJAAN PINTU & JENDELA


1 Pas.Pintu P1 (1 buah)
Pas. Kusen Kayu Kelas II
= 2.00 + 2.00 + 1.32
= 5.32 x 0.06 x 0.15
= 0.05 x 1 Buah
= 0.05 m3 0.05 m3

Pas. Panil Kayu Kelas II


= 2.05 x 1.50 x 1 Buah
= 3.07 m2 3.07 m2

Pas. Slimar Kayu Kelas II


= 2.32 x 0.08 x 2 x 1
= 0.37 m2 0.37 m2

Pas. Kaca 5mm


= 0.46 x 0.54 x 2.00 x 1.00 = 0.50 m2
= 0.70 x 0.60 x 1.00 x 1.00 = 0.42 m2
0.92 m2 0.92 m2
Pas. Nako Tralis
= 0.71 x 0.50 x 2.00 x 1.00 Buah
= 0.71 m2 0.71 m2

2 Pas. Pintu P2 ( 1 Buah)


= 2.36 + 2.36 + 0.88 + 0.88
= 6.48 x 0.06 x 0.15
= 0.06 x 1.00 Buah
= 0.06 m3 0.06 m3

Pas. Panil Kayu Kelas II


= 2.00 x 0.88 x 1.00
= 1.76 m2 1.76 m2

Pas. Nako Tralis


= 0.88 x 0.35
= 0.31 x 1.00 Buah
= 0.31 m2 0.31 m2

3 Pas. Jendela J1 ( 2 Buah )


= 1.70 x 5.00 + 1.70 x 5.00
= 17.00 x 0.06 x 0.15
= 0.15 x 2.00
= 0.31 m3 0.31 m3

Pas. Slimar Kayu Kelas II


= 3.40 x 0.08 x 4.00 x 2.00
= 2.18 m2 2.18 m2

Pas. Kaca 5mm


No. SKET GAMBAR DAN PERHITUNGAN VOLUME VOLUME SAT.
= 1.04 x 0.37 x 4.00 x 1.00
= 1.54 m2 1.54 m2

PEKERJAAN KERAMIK
1 Pas. Keramik Lantai Polos 40x40 cm
= 6.90 x 8.00 = 55.20 m2
= 2.50 x 2.00 = 5.00 m2
60.20 m2 60.20 m2

PEKERJAAN PLAFOND
1 Pas. Plafond Rangka Hollow 40x40 dan 20x40 cm
Modul 600 x 1200 mm dan Penutup Kalsiboard 1200 x 2400 mm
Utama = 2.85 x 3.35 x 1.00 = 9.55 m2
= 4.85 x 6.85 x 1.00 = 33.22 m2
= 3.05 x 3.30 x 1.00 = 10.07 m2
Samping = 5.50 x 4.00 x 1.00 = 22.00 m2
Belakang = 8.15 x 1.00 x 1.00 = 8.15 m2
Depan = 8.15 x 1.00 x 1.00 = 8.15 m2
91.14 m2 91.14 m2

2 Pas. Gypsum Board


Dalam = 10.00 + 9.00 = 19.00 m' 19.00 m'

PEKERJAAN PENGECATAN
1 Pengecatan Kayu
P1
Luar = 2.15 + 2.15 + 1.32 + 1.42 + 1.42 + 0.5
+ 0.5
= 9.46 m'
= 0.27 x 9.46 x 2
= 5.11 m2

Panil = 1.32 x 2.10 x 2 x 2 Sisi


= 11.09 m2

P2
Luar = 2.15 + 2.24 + 1.1 + 1.32 + 1.05 + 2.24 +
2.24 + 0.50 + 0.5
= 13.34 m'
= 0.27 x 13.34 x 1
= 3.60 m2

Dalam = 1.00 + 1.00


= 2.00 m'
= 0.42 x 2.00 x 2
= 1.68 m2

Panil = 0.80 x 2.10 x 2


= 3.36 m2

J1
Luar = 2.54 + 2.54 + 0.83 + 0.83 + 2.54 + 2.54 +
0.54 + 0.54
= 12.90 x 0.27 x 4
= 13.93 m2

Dalam = 0.71 + 0.71 + 0.42 + 0.42


= 2.26 x 0.27 x 4
= 2.44 m2

BV
Luar = 1.58 + 1.58 + 0.54 + 0.54
= 4.24 x 0.27 x 1
= 1.14 m2

Dalam = 0.42 x 0.42 x 1


= 0.18 m2

Jumlah Pengecatan Kayu = 42.53 m2


42.53 m2
2 Pengecatan Dinding
Dalam = 3.50 x 6.85 x 4.00 = 95.90 m2
3.50 x 7.65 x 2.00 = 53.55 m2
3.50 x 7.45 x 2.00 = 52.15 m2
Depan = 5.50 x 3.00 = 16.50 m2
Samping = 7.00 x 4.00 x 2.00 Sisi = 56.00 m2
= 0.50 x 2.50 x 7.00 x 2.00 Sisi = 17.50 m2
291.60 m2

Pengurangan Kusen
P1 = 2.40 x 1.00 x 2.00 x 2.00 sisi = 9.60 m2
J1 = 2.40 x 1.15 x 4.00 x 2.00 sisi = 22.08 m2
J2 Harmonika = 0.72 x 2.22 x 3.00 x 2.00 sisi = 9.59 m2
J3 Kaca Talip = 0.72 x 2.18 x 2.00 x 2.00 sisi = 6.28 m2
Keramik = 1.30 x 5.50 = 7.15 m2
= 54.70 m2 236.90 m2
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -

Rp -

Rp -
Rp -
Rp -

Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Pas. 1/2 Bata
(Pengunci/cincin)
Ta nah Urug
Buis Beton Ø 30 Plesteran 1pc : 3ps
45

45

40 40
Pas. 1/2 Bata
(Pengunci/cincin)
Ta nah Urug
Buis Beton Ø 30 Plesteran 1pc : 3ps

45

45
Rp -
40 40
DAFTAR SURVEY HARGA SATUAN BAHAN DAN UPAH KERJA

KEGIATAN : REHABILITASI PERPUSTAKAAN


SUMBER DANA : P APBD KABUPATEN JOMBANG TA. 2021
SEKOLAH : SDN BANJARDOWO I
LOKASI : KECAMATAN JOMBANG
KABUPATEN : JOMBANG

No Jenis Bahan/Material Sat Harga Bahan

BAHAN PASIR DAN BATU


1 Pasir Pasang/Pasir Beton m3 220,000.00
2 Air ltr 2.30

PORTLAND CEMENT (PC)


1 Portland Cement 40 Kg SNI kg 1,275.00

BESI
1 Paku Usuk & Reng kg 10,000.00
2 Besi hollow 40x40 mm m' 27,000.00
3 Besi hollow 20x20 mm m' 20,000.00
4 Paku sekrup bh 300.00

LANTAI
1 Keramik Lantai Polos 40X40 cm m2 135,000.00

KAYU
1 Papan meranti 3/30-300 m3 6,200,000.00
2 Kayu meranti 6/15 m3 6,000,000.00
3 Kayu kuat kelas II 8/12, 6/12, 6/15 m3 5,500,000.00
4 Kayu kuat kelas I 2/3, 5/7. m3 10,000,000.00

PENUTUP ATAP DAN PLAFOND


1 Genteng Lokal bh 2,500.00
2 Genteng bubungan bh 5,000.00
3 Gypsum Board m' 65,000.00

CAT
1 Cat tembok setara Catylac (5kg) Galon 130,000.00
2 Plamir tembok setara SUPER Kg 29,000.00

KACA
1 Kaca bening 5mm- Asahi Mass m2 110,000.00
2 Kaca naco 15x7cm m2 28,000.00

ALAT PENGGANTUNG DAN KUNCI


1 Engsel Pintu ps 35,000.00
2 Engsel Jendela ps 25,000.00
3 Slot Pintu/ Jendela ps 15,000.00
No Jenis Bahan/Material Sat Harga Bahan

4 Kunci Tanam Besar ps 120,000.00


5 Hak Angin ps 20,000.00
6 Pegangan Pintu (termasuk pasang) setara Muller ps 120,000.00

INTALASI
1 Titik Lampu Ttk 30,000.00
2 Pas. Lampu LED 8 watt Set 26,500.00
3 Saklar Ganda ''LG'' bh 25,000.00
4 Saklar Tunggal ''LG'' bh 25,000.00
5 Stop Kontak ''LG'' bh 22,000.00
6 Biaya Penyambungan ls 30,000.00

UPAH TENAGA KERJA


1 Pekerja Oh 88,500.00
2 Tukang Oh 120,000.00
3 Kepala Tukang Oh 125,000.00
4 Mandor Oh 130,000.00
No Jenis Bahan/Material Sat Harga Bahan

CATATAN :
1. Lembar survey harga bahan bisa dibuat terpisah untuk masing - masing Toko/Liveransir;
2. Harga Dasar yang dipakai adalah analisis hasil survey masing-masing satuan material bahan;
3. Diupayakan harga yang dipakai mencerminkan kondisi harga di sekitar lokasi kegiatan, dengan
mempertimbangkan jarak tempuh dan kondisi medan;
4. Daftar harga SK Bupati Nomor: 188.4.45/30A/415.10.10/2010 adalah harga tertinggi maksimum tahun anggaran
2010 yang didalamnya sudah mengandung keuntungan sebesar 10% bagi Penyedia Jasa Pemborongan;

5. Apabila harga survey pasar yang diperoleh melebihi dari harga yang ditetapkan pada SK Bupati Tahun 2010
karena terjadi kenaikan harga pasar, maka harga dasar yang dipakai adalah harga survey pasar;

6. Harga (EE/HPS) yang dipakai dan masuk keanalisa SNI Satuan Pekerjaan diambil dari harga dasar yang harus
dinaikkan maksimal 10%;
7. Akibat pengalian 10% dari harga dasar, apabila terdapat pecahan atau angka dibelakang koma, maka pembulatan
harga adalah ke bawah, sehingga hasilnya tidak melebihi 10%;
8. Disampaikan kepada seluruh Penyedia Jasa Konsultansi Perencanaan, bahwa harga dasar dan harga yang dipakai
dan masuk keanalisa SNI satuan Pekerjaan (HPS/EE), adalah dasar akuntabilitas dan objektivitas yang akan
dijadikan dasar awal pemeriksaan Badan Pemeriksa Keuangan (BPK) dan Inspektorat Daerah;

9. Hasil akhir penyusunan EE adalah mutlak tanggungjawab Penyedia Jasa Konsultansi Perencanaan;

10. Harga Upah Pekerja mengikuti harga upah pekerja yang tercantum dalam SK Bupati Jombang Tahun 2010;

11. Daftar harga ini dilampirkan dan dijilid menjadi satu dengan EE/Laporan Pendahuluan.
#NAME?
#NAME?
kg #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
19,285.71 #NAME?
#NAME?
#NAME?
#NAME?
6.25 #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
2,272.73 227.27 #NAME?
90.91 #NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
HARGA PERKIRAAN SENDIRI (HPS)

KEGIATAN : REHABILITASI PERPUSTAKAAN


SUMBER DANA : P APBD KABUPATEN JOMBANG TA. 2021
SEKOLAH : SDN BANJARDOWO I
LOKASI : KECAMATAN JOMBANG
KABUPATEN : JOMBANG

Harga Satuan
No Uraian Pekerjaan Sat Volume Jumlah Harga (Rp) Total Biaya (Rp)
Pekerjaan (Rp)
1 2 3 4.00 5 6 = 4*5 7

A. BIAYA KONSTRUKSI FISIK


I PEKERJAAN PERSIAPAN
1 Uitset / Pengukuran Ulang ls 1.00 500,000.00 500,000.00
3 Pembersihan lokasi ls 1.00 500,000.00 500,000.00
4 Papan Nama Kegiatan ls 1.00 300,000.00 300,000.00
5 Rencana MK3K ls 1.00 500,000.00 500,000.00
sub total 1,800,000.00
II PEKERJAAN ATAP
1 Pas. Kuda-kuda kayu 8/15 cm, kayu kuat kelas II m3 0.55 8,436,420.00 4,636,656.43
2 Pas. Rangka Atap Usuk 5/7 cm dan Reng 2/3 cm Kayu Kelas I m2 111.87 205,275.00 22,964,114.25
3 Pas. Nok, Gording, Balok Tembok 8/12 kayu kuat kelas II m3 0.39 7,606,140.00 2,970,410.64
4 Pas. Penutup Atap genteng m2 111.87 75,737.55 8,472,759.72
5 Pas. Bubungan genteng lokal Baru m1 10.17 93,738.00 953,315.46
6 Pas. Kalsiplank Lebar = 30 cm m1 42.34 58,140.00 2,461,647.60
sub total 42,458,904.10
III PEKERJAAN PINTU & JENDELA
1 Pas. Pintu P1 ( 1 Buah )
Pas. Kusen Kayu Kelas II m3 0.05 10,383,090.00 506,487.00
Pas. Panil Kayu Kelas II m2 3.07 753,965.00 2,318,442.38
Pas. Slimar Kayu Kelas II m2 0.37 551,864.00 204,851.92
Pas. Kaca 5mm m2 0.92 142,306.50 130,466.60
Pas. Kunci Tanam bh 8.00 187,785.00 1,502,280.00
Pas. Engsel Pintu bh 6.00 56,306.50 337,839.00
Pas. Nako Tralis m2 0.71 900,000.00 639,000.00
Pas. Selo Pintu bh 1.00 43,400.00 43,400.00

2 Pas. Pintu P2 ( 1 Buah )


Pas. Kusen Kayu Kelas II m3 0.06 10,383,090.00 605,541.81
Pas. Panil Kayu Kelas II m2 1.76 753,965.00 1,326,978.40
Pas. Engsel Pintu bh 6.00 56,306.50 337,839.00
Pas. Pegangan Pintu bh 1.00 120,000.00 120,000.00
Pas. Nako Tralis m2 0.31 900,000.00 277,200.00
Pas. Selot Pintu bh 1.00 43,400.00 43,400.00

3 Pas. Jendela J1 ( 2 Buah )


Pas. Kusen Kayu Kelas II m3 0.31 10,383,090.00 3,177,225.54
Pas Slimar Kayu Kelas II m2 2.18 551,864.00 1,200,856.06
Pas. Kaca 5mm m2 1.54 142,306.50 219,038.16
Pas. Engsel Jendela bh 2.00 39,200.00 78,400.00
Pas. Kait Angin bh 4.00 42,242.50 168,970.00
Pas. Selot Jendela bh 4.00 43,400.00 173,600.00

sub total 13,425,259.00


IV PEKERJAAN KERAMIK
1 Pas. Keramik Lantai Polos 40x40cm m2 60.20 133,956.00 8,064,151.20

sub total 8,064,151.20


V PEKERJAAN PLAFOND
1 Pas. Plafond Rangka Hollow 40x40 dan 20x40 mm m2 91.14 81,679.05 7,443,820.22
Modul 600 x 1200 mm dan Penutup Kalsiboard 1200 x 2000 mm
2 Pas. Gypsum Board m2 91.14 95,242.50 8,680,401.45

sub total 16,124,221.67


VI PEKERJAAN PENGECATAN
1 Cat dinding m2 236.90 16,557.66 3,922,529.52
2 Cat Plafond m2 91.14 23,222.85 2,116,530.55
3 Cat Kayu m2 42.53 53,417.40 2,271,959.54

sub total 8,311,019.61


VII PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu titik 5.00 30,000.00 150,000.00
2 Pas. Lampu LED 8 watt bh 5.00 26,500.00 132,500.00
3 Saklar Ganda ''LG'' bh 2.00 25,000.00 50,000.00
4 Saklar Tunggal ''LG'' bh 1.00 25,000.00 25,000.00
5 Stop Kontak ''LG'' bh 2.00 22,000.00 44,000.00
6 Biaya Penyambungan ls 5.00 30,000.00 150,000.00

sub total 726,500.00


-

90,910,055.59
0.55
0.55 -
0.33 -
0.55
1.98 -
90,910,055.59 #REF!
5.10 #REF!
25.26 #REF!
3.27 7.38 33.09 13.65 451.64 75.27 #REF!
9.32 #REF!
1.05 #REF!
2.71 #REF!
46.75 #REF!

90,910,055.59
0.56
2.55
0.23
0.14
1.65
0.37
0.70
0.05

90,910,055.59
0.67
1.46
0.37
0.13
0.30
0.05

90,910,055.59
3.49
1.32
0.24
0.09
0.19
0.19

14.75
90,910,055.59
8.87

8.99
90,910,055.59
8.19

9.55

17.75
90,910,055.59 #REF!
4.31 #REF!
2.33
2.50

9.15
90,910,055.59
0.16
0.15
0.05
0.03
0.05
0.16

0.63
REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)

KEGIATAN : REHABILITASI PERPUSTAKAAN


SUMBER DANA : P APBD KABUPATEN JOMBANG TA. 2021
SEKOLAH : SDN BANJARDOWO I
LOKASI : KECAMATAN JOMBANG
KABUPATEN : JOMBANG

No Uraian Pekerjaan Sub Total (Rp)

1 2 3

A BIAYA KONSTRUKSI FISIK

I PEKERJAAN PERSIAPAN 1,800,000.00000

II PEKERJAAN ATAP 42,458,904.102

III PEKERJAAN PINTU & JENDELA 13,425,259

IV PEKERJAAN KERAMIK 8,064,151.2

V PEKERJAAN PLAFOND 16,124,221.672

VI PEKERJAAN PENGECATAN 8,311,019.612

VII PEKERJAAN INSTALASI LISTRIK 726,500

JUMLAH BIAYA KONSTRUKSI FISIK (BKF) 90,910,055.587


PPN 10% 9,091,005.559
JUMLAH TOTAL 100,001,061.145
DIBULATKAN Rp 100,000,000.000

TERBILANG : " Seratus Juta Rupiah"

Jombang, 2021
Mengetahui / Menyetujui,
Kepala Bidang Pembinaan SD
Dinas Pendidikan Dan Kebudayaan
Kabupaten Jombang
Selaku Pejabat Pembuat Komitmen

ENDRO WAHYUDI, S.STP.


NIP. 19800528 199912 1 001
REKAPITULASI ANALISA HARGA SATUAN (AHS)

KEGIATAN : PEMBANGUNAN GEDUNG AULA & MUSHOLA


SUMBER DANA : DINAS PERUMAHAN DAN PERMUKIMAN
### : JOGOROTO
SEKOLAH : APBD TA. 2017

Harga Sat
No Uraian Pekerjaan Keterangan Sat
Pekerjaan (Rp)
1 2 4 4 6

I. PEKERJAAN PERSIAPAN
1 Uitzet / Pengukuran ls
2 Papan nama kegiatan ls
3 Pembersihan lokasi & pas. Bowplank ls

II. PEKERJAAN TANAH


1 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m m3 69,625.00
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m 3
50,750.00
3 A.2.3.1.15. Pengurugan 1 m3 Tanah Urug m3 157,375.00
4 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 195,850.00

III. PEKERJAAN PONDASI


1 A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping) m3 498,255.00
2 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP m 3
876,100.00

IV. PEKERJAAN STRUKTUR/BETON


MUTU BETON m3 -
1 A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (K.100) K100 m3 784,041.64
2 A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, K175 m3 717,177.46
w/c = 0,87 (K.175)

3 A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K.225) K225 m3 921,936.88
4 A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K.250) K250 m3 936,457.91

BESI
5 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir /10kg kg 12,924.00

BEGESTING
6 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 1x pakai m2 153,850.00
7 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 3x pakai m 2 167,600.00
8 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 3x pakai m 2 85,770.83
9 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok 3x pakai m2 264,437.50
10 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 1x pakai m 2 633,375.00
11 (An.2008) Memasang 1 m2 bekisting untuk balok latay & ring balk 3x pakai 3x pakai m 2 167,633.33

ITEM PEKERJAAN BETON


12 Footplate 100x120x25cm K225 /m3 m3 2,040,547.06
13 Sloof 15/25 K225 /m 3
m 3
3,313,872.26
14 Kolom 20/35 K225 /m3 m3 2,212,495.58
15 Kolom 15/15 K175 /m 3
m 3
3,326,106.28
16 Kolom 15/30 K175 /m 3
m 3
2,250,940.17
17 Rabat lantai tebal 5cm /m3 m3 784,041.64
Harga Sat
No Uraian Pekerjaan Keterangan Sat
Pekerjaan (Rp)
1 2 4 4 6

18 Balok latey 12/20 K175 /m 3


m 3
3,962,597.65
19 Balok beton 15/25 K175 /m 3
m 3
5,826,795.62
20 Ring Balk 15/25 K175 /m3 m3 3,229,295.39
21 Plat atap dek t=10cm K175 (polos 10 - 200) /m 3
m 3
6,061,809.36
22 Plat kanopi t=8cm K175 (polos 10 - 200) /m 3
m 3
6,061,809.36

V. PEKERJAAN PASANGAN
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu
1 campuran 1SP : 4PP m2 235,811.25

A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu


2 campuran 1SP : 3PP m2 117,871.75

3 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm m2 63,349.40


A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu
4 campuran 1SP : 6PP m2 112,138.00

5 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm m2 59,945.40


6 Pas. Roster batu bata 40x40cm harga survey bh 25,000.00

VI. PEKERJAAN ATAP


1 A.4.2.1.1. Pemasangan 1 kg besi profil kg 28,600.00
4 Bracing Ø16 + turn buckle M16 harga survey kg 15,000.00
5 Anchor (bolt nut) ASTM 307 @ 4xdia.14 mm L=400 mm harga survey bh 30,000.00
6 Bout Mur HTB Ø14 mm harga survey bh 4,000.00
7 Base plat/Stiff plat/rip/plat flans (±1%) harga survey kg 15,000.00
9 Trekstang ∅6mm harga survey kg 15,000.00
10 Pas. Usuk & reng rangka galvalume harga survey m2 105,000.00
11 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok Lokal m2 76,480.08
12 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok Lokal m1 94,657.00
13 A.4.6.1.22.a Pemasangan 1 m’ Kalsiplank lebar = 30 cm m1 58,710.00

VII. PEKERJAAN PINTU & JENDELA


PEKERJAAN ALLUMUNIUM
1 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium m1 128,376.00
2 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm m2 722,231.00
3 A.4.2.1.13. Pemasangan 1m2 pintu kaca rangka alluminium m2 603,447.50

PEKERJAAN KUNCI & PENGGANTUNG


1 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa bh 187,785.00
2 A.4.6.2.5. Pemasangan 1 buah engsel pintu bh 56,306.50
3 A.4.6.2.6. Pemasangan 1 buah engsel jendela psg 39,200.00
4 A.4.6.2.9. Pemasangan 1 buah kait angin psg 42,242.50
5 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 43,400.00

PEKERJAAN KUNCI & PENGGANTUNG


6 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm m2 142,306.50

ITEM PEKERJAAN PINTU & JENDELA ALLUMUNIUM


1 Pas. PJ-1 harga /unit bh Err:509
2 Pas. PJ-2 harga /unit bh Err:509
Harga Sat
No Uraian Pekerjaan Keterangan Sat
Pekerjaan (Rp)
1 2 4 4 6

3 Pas. P-1 harga /unit bh Err:509


4 Pas. P-2 harga /unit bh Err:509
5 Pas. J-1 harga /unit bh Err:509
6 Pas. J-2 harga /unit bh Err:509
7 Pas. J-3 harga /unit bh Err:509
8 Pas. J-4 harga /unit bh Err:509
9 Pas. V-1 harga /unit bh Err:509
10 Pas. V-2 harga /unit bh Err:509
11 Pas. V-3 harga /unit bh Err:509
12 Pas. Pintu PVC lengkap harga survey bh 550,000.00

VIII. PEKERJAAN KERAMIK


1 Analisa harga satuan SNI 7395:2008 No.6.4 1m2 Pas. Keramik Lantai 40 x 40 cm m2 200,920.71
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm m 2
196,335.00
3 A.4.4.3.54.a. Pemasangan 1 m2 dinding keramik 20 cm x 25 cm m2 255,382.50

IX. PEKERJAAN PLAFOND


1 Pas. Eternit kalsiboard + rangka hollow harga survey m2 100,000.00
2 List gypsum 12 cm harga survey m1 16,000.00

X. PEKERJAAN PENGECATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2
1 lapis cat penutup) m2 23,821.33

XI. PEKERJAAN INSTALASI LISTRIK


1 Pas. Titik Lampu ls titik 125,000.00
2 Saklar Ganda harga survey bh 28,750.00
3 Saklar tunggal harga survey bh 23,000.00
4 Stop Kontak harga survey bh 26,450.00
5 Pas. Down light 18 watt harga survey bh 55,000.00
6 Pas. Lampu SL 13 watt harga survey bh 20,000.00
7 Penyambungan instalasi listrik ls ls 300,000.00

XII. PEKERJAAN SANITASI AIR


1 A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen bh 442,900.00
2 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ” bh 79,622.50
3 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” m1 22,128.50
4 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” m1 35,701.00
5 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m 1
35,701.00
6 Floor drain - bahan kuningan harga survey bh 22,000.00
7 Septicktank ls bh 3,500,000.00
8 Pas. Bak kontol 60x60x60cm (cor beton) ls bh 250,000.00
9 Timba bak harga survey bh 50,000.00
10 Penyambungan pipa saluran air bersih ls bh 300,000.00

XIII. PEKERJAAN LAIN-LAIN


1 Finishing batu alam harga survey m2 230,000.00

###
Harga Sat
No Uraian Pekerjaan Keterangan Sat
Pekerjaan (Rp)
1 2 4 4 6

Diperiksa oleh :
###
###
###

###
###
ANALISIS HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM
NOMOR : 28/PRT/M/2016
1 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok Lokal
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 88,500.00 13,275.00
2 Tukang Kayu L.02 OH 0.075 120,000.00 9,000.00
3 Kepala Tukang L.03 OH 0.008 125,000.00 937.50
4 Mandor L.04 OH 0.008 130,000.00 1,040.00
Jumlah Harga Tenaga Kerja 24,252.50
B BAHAN
1 Genteng bh 20.000 2,500.00 50,000.00
Jumlah Harga Bahan 50,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 74,252.50


E Overhead & Profit 3% 2,227.58
F Harga Satuan Pekerjaan (D+E) 76,480.08

2 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok Lokal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 88,500.00 35,400.00
2 Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
4 Mandor L.04 OH 0.002 130,000.00 260.00
Jumlah Harga Tenaga Kerja 62,160.00
B BAHAN
1 Bubungan Genteng Kodok bh 2.500 5,000.00 12,500.00
2 Semen Portland kg 8.000 1,275.00 10,200.00
3 Pasir Pasang m3 0.032 220,000.00 7,040.00
Jumlah Harga Bahan 29,740.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 91,900.00


E Overhead & Profit 3% 2,757.00
F Harga Satuan Pekerjaan (D+E) 94,657.00

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


1 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 4.00 88,500.00 354,000.00
2 Tukang Las Kontruksi L.02 OH 12.00 120,000.00 1,440,000.00
3 Kepala Tukang L.03 OH 1.20 125,000.00 150,000.00
4 Mandor L.04 OH 0.20 130,000.00 26,000.00
Jumlah Harga Tenaga Kerja 1,970,000.00
B BAHAN
1 Balok kayu m3 1.10 5,500,000.00 6,050,000.00
2 Besi strip tebal 5 mm kg 15.00 13,000.00 195,000.00
3 Paku 12 cm kg 5.60 10,000.00 56,000.00
Jumlah Harga Bahan 6,301,000.00
C PERALATAN

Jumlah Harga Alat -


D Jumlah (A+B+C) 8,271,000.00
E Overhead & Profit 3% 248,130.00
F Harga Satuan Pekerjaan (D+E) 8,519,130.00

2 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, nok, balok tembok kayu kelas II


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 2.40 88,500.00 212,400.00
2 Tukang Kayu L.02 OH 7.20 120,000.00 864,000.00
3 Kepala Tukang L.03 OH 0.72 125,000.00 90,000.00
4 Mandor L.04 OH 0.12 130,000.00 15,600.00
Jumlah Harga Tenaga Kerja 1,182,000.00
B BAHAN
1 Balok kayu m3 1.10 5,500,000.00 6,050,000.00
2 Besi strip tebal 5 mm kg 15.00 13,000.00 195,000.00
3 Paku 12 cm kg 3.00 10,000.00 30,000.00
Jumlah Harga Bahan 6,275,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 7,457,000.00


E Overhead & Profit 3% 223,710.00
F Harga Satuan Pekerjaan (D+E) 7,680,710.00

3 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng , kayu kelas I


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.1000 88,500.00 8,850.00
2 Tukang Las Kontruksi L.02 OH 0.1000 120,000.00 12,000.00
3 Kepala Tukang L.03 OH 0.0100 125,000.00 1,250.00
4 Mandor L.04 OH 0.0050 130,000.00 650.00
Jumlah Harga Tenaga Kerja 22,750.00
B BAHAN
1 Kaso-kaso 5 x 7cm m3 0.0140 10,000,000.00 140,000.00
2 Reng 2 x 3 cm m3 0.0036 10,000,000.00 36,000.00
3 Paku 5 dan 10 cm kg 0.2500 10,000.00 2,500.00
Jumlah Harga Bahan 178,500.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 201,250.00


E Overhead & Profit 3% 6,037.50
F Harga Satuan Pekerjaan (D+E) 207,287.50

4 A.4.6.1.22.a Pemasangan 1 m’ Kalsiplank lebar = 30 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 88,500.00 8,850.00
2 Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
4 Mandor L.04 OH 0.005 130,000.00 650.00
Jumlah Harga Tenaga Kerja 36,000.00
B BAHAN
1 Kalsiplank 30 cm lbr 0.350 50,000.00 17,500.00
2 Sambungan + penguat 5% 50,000.00 2,500.00
3 Paku biasa 2" - 5" kg 0.100 10,000.00 1,000.00
Jumlah Harga Bahan 21,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 57,000.00


E Overhead & Profit 3% 1,710.00
F Harga Satuan Pekerjaan (D+E) 58,710.00

5 An. 2008 1 m' Pasang Reuter ukuran ( 3 x 20 ) cm, kayu kuat kelas 2
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 88,500.00 8,850.00
2 Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.020 - -
4 Mandor L.04 OH 0.005 125,000.00 625.00
Jumlah Harga Tenaga Kerja 33,475.00
B BAHAN
1 Kayu kuat kelas 2 3/20 papan m3 0.011 10,000,000.00 108,000.00
2 Paku biasa 2" - 5" Kg 0.100 10,000.00 1,000.00
Jumlah Harga Bahan 109,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 142,475.00


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 142,475.00

PEKERJAAN PINTU & JENDELA


A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
1 A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 6.000 88,500.00 531,000.00
2 Tukang kayu L.02 OH 18.000 120,000.00 2,160,000.00
3 Kepala tukang L.03 OH 1.800 125,000.00 225,000.00
4 Mandor L.04 OH 0.300 130,000.00 39,000.00
Jumlah Harga Tenaga Kerja 2,955,000.00
B BAHAN
1 Balok kayu m3 1.200 6,000,000.00 7,200,000.00
2 Paku 10 cm Kg 1.250 10,000.00 12,500.00
3 Lem kayu Kg 1.000 12,000.00 12,000.00
Jumlah Harga Bahan 7,224,500.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 10,179,500.00


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 10,179,500.00

2 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 88,500.00 88,500.00
2 Tukang kayu L.02 OH 3.000 120,000.00 360,000.00
3 Kepala tukang L.03 OH 0.300 125,000.00 37,500.00
4 Mandor L.04 OH 0.050 130,000.00 6,500.00
Jumlah Harga Tenaga Kerja 492,500.00
B BAHAN
1 Papan kayu m3 0.040 6,200,000.00 248,000.00
2 Lem kayu Kg 0.500 12,000.00 6,000.00
Jumlah Harga Bahan 254,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 746,500.00


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 746,500.00

3 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.800 88,500.00 70,800.00
2 Tukang kayu L.02 OH 2.400 120,000.00 288,000.00
3 Kepala tukang L.03 OH 0.240 125,000.00 30,000.00
4 Mandor L.04 OH 0.040 130,000.00 5,200.00
Jumlah Harga Tenaga Kerja 394,000.00
B BAHAN
1 Papan kayu m3 0.024 6,200,000.00 148,800.00
2 Lem kayu Kg 0.300 12,000.00 3,600.00
Jumlah Harga Bahan 152,400.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 546,400.00


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 546,400.00

4 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela Jalusi, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 88,500.00 88,500.00
2 Tukang kayu L.02 OH 3.000 120,000.00 360,000.00
3 Kepala tukang L.03 OH 0.300 125,000.00 37,500.00
4 Mandor L.04 OH 0.050 130,000.00 6,500.00
Jumlah Harga Tenaga Kerja 492,500.00
B BAHAN
1 Papan kayu m3 0.064 6,200,000.00 396,800.00
2 Lem kayu Kg 0.500 12,000.00 6,000.00
Jumlah Harga Bahan 402,800.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 895,300.00


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 895,300.00

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 88,500.00 885.00
2 Tukang kayu L.02 OH 0.500 120,000.00 60,000.00
3 Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
4 Mandor L.04 OH 0.005 130,000.00 650.00
Jumlah Harga Tenaga Kerja 67,785.00
B BAHAN
1 Kunci tanam biasa bh 1.000 120,000.00 120,000.00
Jumlah Harga Bahan 120,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 187,785.00


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 187,785.00

2 A.4.6.2.5. Pemasangan 1 buah engsel pintu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.015 88,500.00 1,327.50
2 Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
3 Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
4 Mandor L.04 OH 0.001 130,000.00 104.00
Jumlah Harga Tenaga Kerja 21,306.50
B BAHAN
1 Engsel pintu bh 1.000 35,000.00 35,000.00
Jumlah Harga Bahan 35,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 56,306.50


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 56,306.50

3 A.4.6.2.6. Pemasangan 1 buah engsel jendela


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 88,500.00 885.00
2 Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
3 Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
4 Mandor L.04 OH 0.001 130,000.00 65.00
Jumlah Harga Tenaga Kerja 14,200.00
B BAHAN
1 Engsel kupu-kupu set 1.000 25,000.00 25,000.00
Jumlah Harga Bahan 25,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 39,200.00


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 39,200.00

4 A.4.6.2.9. Pemasangan 1 buah kait angin


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.015 88,500.00 1,327.50
2 Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
3 Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
4 Mandor L.04 OH 0.008 130,000.00 1,040.00
Jumlah Harga Tenaga Kerja 22,242.50
B BAHAN
1 Kait angin set 1.000 20,000.00 20,000.00
Jumlah Harga Bahan 20,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 42,242.50


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 42,242.50

5 A.4.6.2.11. Pemasangan 1 buah kunci slot


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.020 88,500.00 1,770.00
2 Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
3 Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
4 Mandor L.04 OH 0.001 130,000.00 130.00
Jumlah Harga Tenaga Kerja 28,400.00
B BAHAN
1 Kunci slot bh 1.000 15,000.00 15,000.00
Jumlah Harga Bahan 15,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 43,400.00


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 43,400.00

6 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.015 88,500.00 1,327.50
2 Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
3 Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
4 Mandor L.04 OH 0.001 130,000.00 104.00
Jumlah Harga Tenaga Kerja 21,306.50
B BAHAN
1 Kaca tebal 5 mm m2 1.100 110,000.00 121,000.00
2 Sealant tube 0.050 35,000.00 1,750.00
Jumlah Harga Bahan 121,000.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 142,306.50


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 142,306.50

PEKERJAAN KERAMIK LANTAI & DINDING


A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Analisa harga satuan SNI 7395:2008 No.6.4 1m2 Pas. Keramik Lantai 40 x 40 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 88,500.00 22,125.00
2 Tukang batu L.02 OH 0.125 120,000.00 15,000.00
3 Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
4 Mandor L.04 OH 0.013 130,000.00 1,690.00
Jumlah Harga Tenaga Kerja 40,440.00
B BAHAN
1 Keramik 40 x 40 cm bh 6.250 19,285.71 120,535.71
2 Semen Portland kg 9.800 1,275.00 12,495.00
3 Pasir pasang m3 0.045 220,000.00 9,900.00
4 Semen warna kg 1.300 13,500.00 17,550.00
Jumlah Harga Bahan 160,480.71
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 200,920.71


E Overhead & Profit (10 %) -
F Harga Satuan Pekerjaan (D+E) 200,920.71

PEKERJAAN PLAFOND
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
Pas. Plafond Rangka Hollow 40 x 40 dan 20 x 40 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 88,500.00000 13,275.000000
2 Tukang batu L.02 OH 0.250 120,000.00000 30,000.000000
3 Kepala tukang L.03 OH 0.025 125,000.00000 3,125.000000
4 Mandor L.04 OH 0.008 130,000.00000 1,040.000000
Jumlah Harga Tenaga Kerja 47,440.000000000
B BAHAN
1 Besi hollow 40x40 mm m' 1.650 6,750.00000 11,137.500000
2 Besi hollow 20x20 mm m' 2.500 5,000.00000 12,500.000000
3 Paku skrup bh 30.000 300.00000 9,000.000000

Jumlah Harga Bahan 32,637.500000000


C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 80,077.50000


E Overhead & Profit 2% 1,601.55
F Harga Satuan Pekerjaan (D+E) 81,679.05000000

Memasang 1 m2 langit-langit GRC board ukuran (1200x2400x9) mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 88,500.00000 8,850.000000
2 Tukang batu L.02 OH 0.050 120,000.00000 6,000.000000
3 Kepala tukang L.03 OH 0.005 125,000.00000 625.000000
4 Mandor L.04 OH 0.005 130,000.00000 650.000000
Jumlah Harga Tenaga Kerja 16,125.000000000
B BAHAN
1 Gypsum board m' 1.050 65,000.00000 68,250.000000
3 Paku skrup bh 30.000 300.00000 9,000.000000

Jumlah Harga Bahan 77,250.000000000


C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 93,375.00000


E Overhead & Profit 2% 1,867.50
F Harga Satuan Pekerjaan (D+E) 95,242.50000000

PEKERJAAN PENGECATAN
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
1 A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.020 88,500.00 1,770.00
2 Tukang cat L.02 OH 0.063 120,000.00 7,560.00
3 Kepala tukang L.03 OH 0.006 125,000.00 787.50
4 Mandor L.04 OH 0.003 130,000.00 390.00
Jumlah Harga Tenaga Kerja 10,507.50
B BAHAN
1 Plamur kg 0.100 29,000.00 2,900.00
2 Cat dasar kg 0.100 27,000.00 2,700.00
3 Cat penutup kg 0.260 27,000.00 7,020.00
Jumlah Harga Bahan 12,620.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 23,127.50


E Overhead & Profit 3% 693.82
F Harga Satuan Pekerjaan (D+E) 23,821.33

3 A.4.7.1.4. 1 m2 Pengecatan bidang kayu (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.070 88,500.00 6,195.00
2 Tukang cat L.02 OH 0.009 120,000.00 1,080.00
3 Kepala tukang L.03 OH 0.006 125,000.00 750.00
4 Mandor L.04 OH 0.003 130,000.00 390.00
Jumlah Harga Tenaga Kerja 8,415.00
B BAHAN
1 Cat menie Kg 0.200 35,000.00 7,000.00
2 Plamuur Kg 0.150 27,000.00 4,050.00
3 Cat dasar Kg 0.170 72,000.00 12,240.00
4 Cat penutup Kg 0.260 72,000.00 18,720.00
5 Kuas buah 0.010 17,000.00 170.00
6 Pengencer Kg 0.030 32,500.00 975.00
7 Ampelas Lbr 0.200 4,000.00 800.00
Jumlah Harga Bahan 43,955.00
C PERALATAN

Jumlah Harga Alat -

D Jumlah (A+B+C) 52,370.00


E Overhead & Profit (10 %) 5,237.00
F Harga Satuan Pekerjaan (D+E) 57,607.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! 1650
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! 0.01400
#REF! 0.00360
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! 1.12
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! 1.12
#REF!
#REF!
#REF! 1.12
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

109090.909091
10909.0909091
4363.63636364
15272.7272727
T I M E S C H E D U L L E
JADWAL PELAKSANAN

### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!

BOBOT BULAN I BULAN II BULAN I


NO. URAIAN PEKERJAAN
(%) 1 2 3 4 5 6 7 8 9

A BIAYA KONSTRUKSI FISIK


I #REF! #REF! #REF!
II #REF! #REF! #REF!
III #REF! #REF! #REF! #REF! #REF! #REF!
IV #REF! #REF! #REF! #REF! #REF!
V #REF! #REF! #REF! #REF!
VI #REF! #REF! #REF!
VII #REF! #REF!
VIII #REF! #REF!
IX #REF! #REF! #REF!
X #REF! #REF!
XI #REF! #REF!

B BIAYA MANJEMEN KONSTRUKSI


I BIAYA PERENCANAAN TEKNIS #REF! #REF!
II BIAYA OPERASIONAL PELAKSANAAN #REF! #REF! #REF!
III BIAYA PENGAWASAN TEKNIS #REF!
JUMLAH #REF!
RENCANA KEMAJUAN FISIK 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
KOMULATIF KEMAJUAN FISIK 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
E

BULAN III BULAN IV


% KETERANGAN
10 11 12 13 14 15 16

#REF!

#REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

#REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF! #REF!

Jombang, / / 2019
Dibuat oleh :
Panitia Pembangunan sekolah (P2S)
#REF!

#REF!
Fasilitator
T I M E S C H E D U L L E
JADWAL PELAKSANAN

KEGIATAN : REHABILITASI PERPUSTAKAAN


SUMBER DANA : P APBD KABUPATEN JOMBANG TA. 2021
SEKOLAH : SDN BANJARDOWO I
LOKASI : KECAMATAN JOMBANG
KABUPATEN : JOMBANG

BOBOT MINGGU KE
NO. URAIAN PEKERJAAN % KET
(%) I II III IV V VI VII

A BIAYA KONSTRUKSI FISIK

I PEKERJAAN PERSIAPAN 1.98 1.39 0.59

II PEKERJAAN ATAP 46.75 14.03 18.70 14.03

III PEKERJAAN PINTU & JENDELA 14.75 1.48 4.43 8.85

IV PEKERJAAN KERAMIK 8.99 4.50 4.50

V PEKERJAAN PLAFOND 17.75 5.33 5.33 7.10

VI PEKERJAAN PENGECATAN 9.15 0.92 1.83 6.41

VII PEKERJAAN INSTALASI LISTRIK 0.63 0.32 0.32

JUMLAH 100.00
RENCANA KEMAJUAN FISIK - 15.41 18.70 15.50 9.75 15.41 13.43 11.81
KOMULATIF RENCANA KEMAJUAN FISI - 15.41 34.11 49.61 59.36 74.77 88.19 100.00

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?

-
MANAGEMEN KESELAMATAN DAN KESEHATAN KERJA KONTRUKSI (MK3K)

Sat. Kuantitas Biaya Satuan Jumlah Keterangan


No. Uraian
(Rp) (Rp)

A Alat Pelindung Diri terdiri atas:


1 Topi Pelindung (Safety Helmet) ; Bh 2.00 50,000.00 100,000.00
4 Sepatu Keselamatan (Safety Shoes); Psg 2.00 100,000.00 200,000.00
5 Rompi Keselamatan (Safety Vest); Bh 2.00 100,000.00 200,000.00

Jumlah 500,000.00