Rab SDN Banjardowo
Rab SDN Banjardowo
BESI
11 Besi Strip kg 14,000.00 14,000.00 14,000.00
12 Rangka atap baja ringan (Galvalum) m2 250,000.00 250,000.00 250,000.00
13 Besi beton polos kg 10,000.00 10,000.00 10,000.00
14 Kawat Bendrat kg 17,000.00 17,000.00 17,000.00
15 Kawat kasa m2 18,700.00 18,700.00 18,700.00
16 Paku eternit kg 16,000.00 16,000.00 16,000.00
17 Paku reng kg 14,000.00 14,000.00 14,000.00
18 Paku Usuk kg 14,000.00 14,000.00 14,000.00
19 Paku triplek kg 16,000.00 16,000.00 16,000.00
20 Paku pancing kg 18,000.00 18,000.00 18,000.00
21 Paku sekrup bh 850.00 850.00 850.00
22 Pintu PVC unit 200,000.00 200,000.00 200,000.00
23 Buis Beton D 100 bh 165,000.00 165,000.00 165,000.00
24 Profil allminium m1 125,000.00 125,000.00 125,000.00
25 Skrup fixer bh 200.00 200.00 200.00
26 Sealant tube 45,000.00 45,000.00 45,000.00
LANTAI
27 Tegel abu-abu 20x20 Cm m2
28 Keramik 20x20 ( Lantai) motif m2 42,000.00 42,000.00 42,000.00
29 Keramik dinding ASIA TILE 20x25 (setara) m2 45,000.00 45,000.00 45,000.00
30 Keramik lantai ASIA TILE 30x30 - (setara) m2 37,000.00 37,000.00 37,000.00
31 Paving stone K-200 abu-abu m2 42,000.00 42,000.00 42,000.00
KAYU
32 Papan kamper 3/25 m3 8,250,000.00 8,250,000.00 8,250,000.00
33 Kayu kamper 6/15 m3 7,500,000.00 7,500,000.00 7,500,000.00
34 Kayu kruing 8/12, 6/12, 6/15 m3 5,500,000.00 5,500,000.00 5,500,000.00
35 Kayu meranti rangka langit-langit 4/6, 3/5 m3 4,500,000.00 4,500,000.00 4,500,000.00
36 Kayu meranti 8/12,6/12,6/15 m3 4,800,000.00 4,800,000.00 4,800,000.00
37 Kayu meranti 3/30 x 3m m3 5,000,000.00 5,000,000.00 5,000,000.00
38 Kayu terentang ( papan begisting ) m3 3,100,000.00 3,100,000.00 3,100,000.00
39 Kayu Bengkirai m3 5,000,000.00 5,000,000.00 5,000,000.00
40 Kayu Balau m3 7,500,000.00 7,500,000.00 7,500,000.00
No Jenis Bahan/Material Sat TOKO/UD/CV ……… TOKO/UD/CV ……… TOKO/UD/CV ………
INTALASI
53 Pipa paralon 5/8" Panjang 4.00 m - Maspion ljr 7,250.00 7,250.00 7,250.00
54 Pipa PVC 3/4 AW Panjang 4 m - Maspion tipe D Ljr 24,000.00 24,000.00 24,000.00
55 Pipa PVC 2,5" AW Panjang 4.00 m - Maspin tipe D ljr 44,000.00 44,000.00 44,000.00
56 Pipa PVC 4" AW Panjang 4.00 m - Maspion tipe D ljr 55,000.00 55,000.00 55,000.00
57 Lem Paralon - Isarplass bh 6,000.00 6,000.00 6,000.00
58 Pipa galvanis 1,5" ljr 375,000.00 375,000.00 375,000.00
SANITASI
59 Closet jongkok porselin warna ( setara INA ) bh 122,000.00 122,000.00 122,000.00
60 Seal Tape bh 3,500.00 3,500.00 3,500.00
61 Kran air (Amico) 3/4" - swing bh 22,000.00 22,000.00 22,000.00
62 Floor drain bh 15,000.00 15,000.00 15,000.00
CAT
63 Cat (besi/kayu) Sejenis (EMCO) kg 49,500.00 49,500.00 49,500.00
64 Cat Meni (besi/kayu) cap pedang kg 16,500.00 16,500.00 16,500.00
65 Tiner A - setara Bintang lt 21,000.00 21,000.00 21,000.00
66 Tiner B - setara Bintang lt 9,000.00 9,000.00 9,000.00
67 Cat tembok setara Avitex kg 18,480.00 18,480.00 18,480.00
68 Cat tembok setara Avitex kg 18,480.00 18,480.00 18,480.00
69 Kertas gosok lbr 3,300.00 3,300.00 3,300.00
70 Plamur tembok - setara SUPER kg 15,400.00 15,400.00 15,400.00
71 Plamur kayu kg 16,000.00 16,000.00 16,000.00
72 Spiritus - setara Naga lt 17,500.00 17,500.00 17,500.00
73 Lem Kayu - setara Rajawali kg 12,500.00 12,500.00 12,500.00
74 Minyak Begisting/ Solar lt 6,000.00 6,000.00 6,000.00
75 Rol Cat bh 15,400.00 15,400.00 15,400.00
KACA
76 kaca bening 5mm - Asahi Mass m2 66,000.00 66,000.00 66,000.00
77 Kaca naco 15x7cm m2 27,500.00 27,500.00 27,500.00
INSTALASI LISTRIK
84 Lampu SL 20 W/220 V Philips Set 32,000.00 32,000.00 32,000.00
85 Lampu pijar 25 - 100Watt Philips bh 7,500.00 7,500.00 7,500.00
86 Saklar ganda " LG" bh 20,000.00 20,000.00 20,000.00
87 Saklar tunggal "LG" bh 20,000.00 20,000.00 20,000.00
No Jenis Bahan/Material Sat TOKO/UD/CV ……… TOKO/UD/CV ……… TOKO/UD/CV ………
LEGALITAS TOKO
T I M E S C H E D U L L E
JADWAL PELAKSANAN
JUMLAH #NAME?
RENCANA KEMAJUAN FISIK 0 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? CATATAN :
KOMULATIF KEMAJUAN FISIK
0 0 Direktur
- 0 0
ANALISA BAHAN DAN UPAH
PEKERJAAN TANAH
1 Menggali 1 m3 tanah biasa sedalam 1 m
Upah
0.750 Oh Pekerja @ Rp. 88,500.00 = Rp 66,375.00
0.075 Oh Mandor @ Rp. 130,000.00 = Rp 9,750.00
= Rp 76,125.00
Total Upah = Rp 76,125.00
Overhead + provit 10% = Rp 7,612.50
Harga satuan pekerjaan = Rp 83,737.50
3 Mengurug 1 m3 tanah
Bahan
1.200 m3 Urug tanah @ Rp. 110,000.00 = Rp 132,000.00
= Rp 132,000.00
Upah
0.300 Oh Pekerja @ Rp. 88,500.00 = Rp 26,550.00
0.010 Oh Mandor @ Rp. 130,000.00 = Rp 1,300.00
= Rp 27,850.00
Total Upah dan Bahan = Rp 159,850.00
Overhead + provit 10% = Rp 15,985.00
Harga satuan pekerjaan = Rp 175,835.00
PEKERJAAN PONDASI
1 Memasang 1 m3 batu kosong (aanstamping)
Bahan
1.200 m3 Batu belah 15/20 @ Rp. 260,000.00 = Rp 312,000.00
0.432 m3 Pasir pasang @ Rp. 220,000.00 = Rp 95,040.00
= Rp 407,040.00
Upah
0.780 Oh Pekerja @ Rp. 88,500.00 = Rp 69,030.00
0.390 Oh Tukang @ Rp. 120,000.00 = Rp 46,800.00
0.039 Oh Kepala tukang @ Rp. 125,000.00 = Rp 4,875.00
0.039 Oh Mandor @ Rp. 130,000.00 = Rp 5,070.00
= Rp 125,775.00
Total Upah dan Bahan = Rp 532,815.00
Overhead + provit 10% = Rp 53,281.50
Harga satuan pekerjaan = Rp 586,096.50
PEKERJAAN BETON
1 1 m3 'Membuat 1 m³ beton mutu f’c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87
Bahan (Berat jenis pasir 1.400 kg/m3, batu pecah 2/3 1.350 kg/m3
247.000 kg Semen portland 40 Kg (SNI) @ Rp. 1,275.00 = Rp 314,925.00
0.621 m3 Pasir beton @ Rp. 220,000.00 = Rp 136,557.14
0.740 m3 Batu kali pecah 2/3 @ Rp. 250,000.00 = Rp 185,000.00
215.000 ltr Air @ Rp. 100.00 = Rp 21,500.00
= Rp 657,982.14
Upah
1.650 Oh Pekerja @ Rp. 88,500.00= Rp 146,025.00
0.275 Oh Tukang batu @ Rp. 120,000.00= Rp 33,000.00
0.028 Oh Kepala tukang @ Rp. 125,000.00= Rp 3,500.00
0.083 Oh Mandor @ Rp. 130,000.00= Rp 10,790.00
= Rp 193,315.00
Total harga = Rp 851,297.14
Overhead + provit 10% = Rp 85,129.71
Harga satuan pekerjaan = Rp 936,426.86
2 1 m3 'Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Bahan (Berat jenis pasir 1.400 kg/m3, batu pecah 2/3 1.350 kg/m3
326.000 kg Semen portland 40 Kg (SNI) @ Rp. 1,275.00 = Rp 415,650.00
0.543 m3 Pasir beton @ Rp. 220,000.00 = Rp 119,416.00
0.762 m3 Batu kali pecah 2/3 @ Rp. 250,000.00 = Rp 190,555.55
215.000 ltr Air @ Rp. 100.00 = Rp 21,500.00
= Rp 747,121.55
Upah
1.650 Oh Pekerja @ Rp. 88,500.00 = Rp 146,025.00
0.275 Oh Tukang batu @ Rp. 120,000.00 = Rp 33,000.00
0.028 Oh Kepala tukang @ Rp. 125,000.00 = Rp 3,500.00
0.083 Oh Mandor @ Rp. 130,000.00 = Rp 10,790.00
= Rp 193,315.00
Total harga = Rp 940,436.55
Overhead + provit 10% = Rp 94,043.66
Harga satuan pekerjaan = Rp 1,034,480.21
3 1 m3 Membuat 1 m³ beton mutu f’c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58
Bahan (Berat jenis pasir 1.400 kg/m3, batu pecah 2/3 1.350 kg/m3
371.000 kg Semen portland 40 Kg (SNI) @ Rp. 1,275.00 = Rp 473,025.00
0.499 m3 Pasir beton @ Rp. 220,000.00 = Rp 109,685.40
0.776 m3 Batu kali pecah 2/3 @ Rp. 250,000.00 = Rp 193,875.00
215.000 ltr Air @ Rp. 100.00 = Rp 21,500.00
= Rp 798,085.40
Upah
1.650 Oh Pekerja @ Rp. 88,500.00= Rp 146,025.00
0.275 Oh Tukang batu @ Rp. 120,000.00= Rp 33,000.00
0.028 Oh Kepala tukang @ Rp. 125,000.00= Rp 3,500.00
0.083 Oh Mandor @ Rp. 130,000.00= Rp 10,790.00
= Rp 193,315.00
Total harga = Rp 991,400.40
Overhead + provit 10% = Rp 99,140.04
Harga satuan pekerjaan = Rp 1,090,540.44
4 1 m3 Beton mutu F'c = 21.7 Mpa ( K 250 ), Slump ( 12 ± 2 ) Cm, w/c = 0.56
Bahan (Berat jenis pasir 1.400 kg/m3, batu pecah 2/3 1.350 kg/m3
384.000 kg Semen portland 40 Kg (SNI) @ Rp. 1,275.00 = Rp 489,600.00
0.494 m3 Pasir beton @ Rp. 220,000.00 = Rp 108,742.86
0.770 m3 Batu kali pecah 2/3 @ Rp. 250,000.00 = Rp 192,407.41
215.000 ltr Air @ Rp. 100.00 = Rp 21,500.00
= Rp 812,250.26
Upah
1.650 Oh Pekerja @ Rp. 88,500.00= Rp 146,025.00
0.275 Oh Tukang batu @ Rp. 120,000.00= Rp 33,000.00
0.028 Oh Kepala tukang @ Rp. 125,000.00= Rp 3,500.00
0.083 Oh Mandor @ Rp. 130,000.00= Rp 10,790.00
= Rp 193,315.00
Total harga = Rp 1,005,565.26
Overhead + provit 10% = Rp 100,556.53
Harga satuan pekerjaan = Rp 1,106,121.79
PEKERJAAN ATAP
1 1 kg Ongkos kerja, pabrikasi dan pemasangan baja ( elektroda 20%)
Upah An. SNI ( Revisi )
0.060 Oh Pekerja @ Rp. 88,500.00 = Rp 5,310.00
0.060 Oh Tukang las @ Rp. 120,000.00 = Rp 7,200.00
0.006 Oh Kepala Tukang @ Rp. 125,000.00 = Rp 750.00
0.003 Oh Mandor @ Rp. 130,000.00 = Rp 390.00
= Rp 13,650.00
Peralatan An. SNI ( Revisi )
0.0700 Oh Sewa welding set @ Rp. 35,000.00 = Rp 2,450.00
. (minimal 5 jam) = Rp 2,450.00
Total Upah dan Bahan = 16,100.00
Upah
0.150 Oh Pekerja @ Rp. 88,500.00 = Rp 13,275.00
0.075 Oh Tukang @ Rp. 120,000.00 = Rp 9,000.00
0.020 Oh Kepala tukang @ Rp. 125,000.00 = Rp 2,500.00
0.010 Oh Mandor @ Rp. 130,000.00 = Rp 1,300.00
= Rp 26,075.00
Total harga = Rp 71,075.00
Overhead + provit 10% = Rp 7,107.50
Harga satuan pekerjaan = Rp 78,182.50
PEKERJAAN KERAMIK
1 1 m2 Pasang lantai keramik 40 x 40 cm
Bahan
1.000 m2 Keramik lantai 40x40 @ Rp. 135,000.00 = Rp 135,000.00
10.000 Kg PC @ Rp. 1,275.00 = Rp 12,750.00
0.0450 m3 Pasir pasang @ Rp. 220,000.00 = Rp 9,900.00
0.500 Kg Semen warna @ Rp. 13,500.00 = Rp 6,750.00
= Rp 164,400.00
Upah
0.700 Oh Pekerja @ Rp. 88,500.00= Rp 61,950.00
0.350 Oh Tukang kayu @ Rp. 120,000.00= Rp 42,000.00
0.035 Oh Kepala tukang @ Rp. 125,000.00= Rp 4,375.00
0.035 Oh Mandor @ Rp. 130,000.00= Rp 4,550.00
= Rp 112,875.00
Total harga = Rp 277,275.00
Overhead + provit 10% = Rp 27,727.50
Harga satuan pekerjaan = Rp 305,002.50
PEKERJAAN PENGECATAN
1 1 m2 Pengecatan tembok baru ( 1x cat dasar, 2 x cat penutup , 1 x plamir ) ANVITAC
Bahan
0.100 kg plamir @ Rp. 29,000.00 = Rp 2,900.00
0.100 kg cat dasar dinding @ Rp. 135,000.00 = Rp 13,500.00
0.260 kg cat penutup 2 x pengecatan @ Rp. 135,000.00 = Rp 35,100.00
51,500.00
Upah
0.020 Oh Pekerja @ Rp. 88,500.00 = Rp 1,770.000
0.063 Oh Tukang batu @ Rp. 120,000.00 = Rp 7,560.000
0.006 Oh Kepala Tukang @ Rp. 125,000.00 = Rp 787.500
0.003 Oh Mandor @ Rp. 130,000.00 = Rp 325.000
= Rp 10,442.50
Total harga = Rp 61,942.50
Overhead + provit 10% = Rp 6,194.25
Harga satuan pekerjaan = Rp 68,136.75
1 2 3
Jombang, 2021
Dibuat Oleh,
Kepala Bidang Pembinaan SD
Dinas Pendidikan Dan Kebudayaan
Kabupaten Jombang
Selaku Pejabat Pembuat Komitmen
ENDRO WAHY
ENDRO WAHYUDI, S.STP.
NIP. 19800528 199912 1 001
PERHITUNGAN VOLUME RUANG KELAS
PEKERJAAN ATAP
1 Pas. Kuda-kuda kayu 8/15 cm, kayu kuat kelas II
Kuda Kuda = 21.05 x 0.08 x 0.15 x 2.00 = 0.51 m3
2 Pas. Rangka Atap Usuk 5/7 cm dan Reng 2/3 cm Kayu Kelas I
= 11.00 x 10.17
= 111.87 m2 111.87 m2
PEKERJAAN PLAFOND
1 Pas. Plafond Rangka Hollow 40x40 dan 20x40 cm
Modul 600 x 1200 mm dan Penutup Kalsiboard 1200 x 2400 mm
Utama = 2.85 x 3.35 x 1.00 = 9.55 m2
= 4.85 x 6.85 x 1.00 = 33.22 m2
= 3.05 x 3.30 x 1.00 = 10.07 m2
Samping = 5.50 x 4.00 x 1.00 = 22.00 m2
Belakang = 8.15 x 1.00 x 1.00 = 8.15 m2
Depan = 8.15 x 1.00 x 1.00 = 8.15 m2
91.14 m2 91.14 m2
PEKERJAAN PENGECATAN
1 Pengecatan Kayu
P1
Luar = 2.15 + 2.15 + 1.32 + 1.42 + 1.42 + 0.5
+ 0.5
= 9.46 m'
= 0.27 x 9.46 x 2
= 5.11 m2
P2
Luar = 2.15 + 2.24 + 1.1 + 1.32 + 1.05 + 2.24 +
2.24 + 0.50 + 0.5
= 13.34 m'
= 0.27 x 13.34 x 1
= 3.60 m2
J1
Luar = 2.54 + 2.54 + 0.83 + 0.83 + 2.54 + 2.54 +
0.54 + 0.54
= 12.90 x 0.27 x 4
= 13.93 m2
BV
Luar = 1.58 + 1.58 + 0.54 + 0.54
= 4.24 x 0.27 x 1
= 1.14 m2
Pengurangan Kusen
P1 = 2.40 x 1.00 x 2.00 x 2.00 sisi = 9.60 m2
J1 = 2.40 x 1.15 x 4.00 x 2.00 sisi = 22.08 m2
J2 Harmonika = 0.72 x 2.22 x 3.00 x 2.00 sisi = 9.59 m2
J3 Kaca Talip = 0.72 x 2.18 x 2.00 x 2.00 sisi = 6.28 m2
Keramik = 1.30 x 5.50 = 7.15 m2
= 54.70 m2 236.90 m2
RENCANA ANGGARAN BIAYA (RAB)
Harga Satuan
No Uraian Pekerjaan Sat Volume Jumlah Harga (Rp) Total Biaya (Rp)
Pekerjaan (Rp)
1 2 3 4.00 5 6 = 4*5 7
Disusun oleh,
Harga Satuan
No Uraian Pekerjaan Sat Volume Jumlah Harga (Rp) Total Biaya (Rp)
Pekerjaan (Rp)
1 2 3 4.00 5 6 = 4*5 7
Perencana Teknis
CV. MIRTHA UTAMA
90,910,055.59
0.55
0.55 -
0.33 -
0.55
1.98 -
90,910,055.59 #REF!
5.10 #REF!
25.26 #REF!
3.27 7.38 33.09 13.65 451.64 75.27 #REF!
9.32 #REF!
1.05 #REF!
2.71 #REF!
46.75 #REF!
90,910,055.59
0.56
2.55
0.23
0.14
1.65
0.37
0.70
0.05
90,910,055.59
0.67
1.46
0.37
0.13
0.30
0.05
90,910,055.59
3.49
1.32
0.24
0.09
0.19
0.19
14.75
90,910,055.59
8.87
8.99
90,910,055.59
8.19
9.55
17.75
90,910,055.59 #REF!
4.31 #REF!
2.33
2.50
9.15
90,910,055.59
0.16
0.15
0.05
0.03
0.05
0.16
0.63
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
1 2 3
Mengetahui
Kepala Dinas Pendidikan Dan Kebudayaan
Kabupaten Jombang
Selaku Pengguna Anggaran
90,910,055.5866420
100,000,000.00 -
PAGU 54,000,000
SELISIH (46,001,061)
Harga Sat
No Uraian Pekerjaan Keterangan Sat
Pekerjaan (Rp)
1 2 4 4 6
I. PEKERJAAN PERSIAPAN
1 Uitzet / Pengukuran ls
2 Papan nama kegiatan ls
3 Pembersihan lokasi & pas. Bowplank ls
3 A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K.225) K225 m3 921,936.88
4 A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K.250) K250 m3 936,457.91
BESI
5 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir /10kg kg 12,924.00
BEGESTING
6 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 1x pakai m2 153,850.00
7 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 3x pakai m 2 167,600.00
8 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 3x pakai m 2 85,770.83
9 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok 3x pakai m2 264,437.50
10 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 1x pakai m 2 633,375.00
11 (An.2008) Memasang 1 m2 bekisting untuk balok latay & ring balk 3x pakai 3x pakai m 2 167,633.33
V. PEKERJAAN PASANGAN
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu
1 campuran 1SP : 4PP m2 235,811.25
X. PEKERJAAN PENGECATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2
1 lapis cat penutup) m2 23,821.33
###
Harga Sat
No Uraian Pekerjaan Keterangan Sat
Pekerjaan (Rp)
1 2 4 4 6
Diperiksa oleh :
###
###
###
###
###
DAFTAR SURVEY HARGA SATUAN BAHAN DAN UPAH KERJA
BESI
1 Baja profil kg 13,000.00
11 Rangka atap baja ringan (Galvalum) "usuk & reng" m2 105,000.00
2 Besi beton polos kg 10,500.00
3 Kawat Bendrat kg 20,000.00
15 Kawat kasa m2 18,700.00
13 Paku eternit kg 18,000.00
14 Paku reng kg 14,000.00
1 Paku Usuk & Reng kg 10,000.00
3 Paku Asbes kg 40,000.00
4 Paku pancing kg 18,000.00
5 Paku sekrup bh 850.00
6 Pintu PVC unit 200,000.00
7 Buis Beton D 100 bh 165,000.00
8 Profil allminium m1 105,000.00
9 Profil kaca m1 25,000.00
10 Allminium Strip m1 16,500.00
11 Skrup fixer bh 500.00
12 Sealant tube 35,000.00
13 Pipa galvanis 2" 3.6mm 6m/batang btg 500,000.00
14 Pipa galvanis 1 1/2" 3.2mm 6m/batang btg 600,000.00
15 Pipa galvanis 1" 3.2mm 6m/batang btg 230,000.00
2 Besi hollow 40x40 mm m' 27,000.00
3 Besi hollow 20x20 mm m' 20,000.00
No Jenis Bahan/Material Sat Harga Bahan
LANTAI
27 Tegel abu-abu 20x20 Cm m2
25 Keramik 20x20 (Lantai) motif m2 51,000.00
1 Keramik dinding 20x25 cm m2 65,000.00
1 Keramik Lantai Polos 40X40 cm m2 135,000.00
31 Paving stone K-200 abu-abu m2 42,000.00
KAYU
1 Papan meranti 3/30-300 m3 6,200,000.00
2 Kayu meranti 6/15 m3 6,000,000.00
3 Kayu kuat kelas II 8/12, 6/12, 6/15 m3 5,500,000.00
4 Kayu kuat kelas I 2/3, 5/7. m3 10,000,000.00
5 Kayu meranti rangka langit-langit 5/7, 4/6, 3/5, 2/3 m3 4,750,000.00
32 Kayu meranti 8/12,6/12,6/15 m3 6,000,000.00
33 Kayu meranti 3/30 x 3m m3 3,000,000.00
6 Kayu terentang ( papan begisting ) m3 5,500,000.00
35 Kayu Bengkirai m3 5,500,000.00
36 Kayu Balau m3 6,100,000.00
37 List kayu polos 1/5 x 2m btg 6,500.00
7 Bambu Bongkotan btg 25,000.00
8 Multiplek 9 mm lbr 175,000.00
40 Triplek Lapis Almunium lbr 84,700.00
3 Lisplank L = 30 cm lbr 50,000.00
CAT
1 Cat tembok setara Catylac (5kg) Galon 130,000.00
2 Plamir tembok setara SUPER Kg 29,000.00
KACA
1 Kaca bening 5mm- Asahi Mass m2 110,000.00
2 Kaca naco 15x7cm m2 28,000.00
INTALASI
1 Titik Lampu Ttk 30,000.00
2 Pas. Lampu LED 8 watt Set 26,500.00
3 Saklar Ganda ''LG'' bh 25,000.00
4 Saklar Tunggal ''LG'' bh 25,000.00
5 Stop Kontak ''LG'' bh 22,000.00
6 Biaya Penyambungan ls 30,000.00
SANITASI
56 Closet jongkok porselin warna ( setara INA ) bh 125,000.00
57 Seal Tape bh 3,500.00
58 Kran air (Amico) 3/4" - swing bh 25,000.00
59 Floor drain bh 20,000.00
CAT
1 Cat (besi/kayu) Sejenis (EMCO) kg 72,000.00
2 Cat Meni (besi/kayu) cap pedang kg 35,000.00
3 Tiner A - setara Bintang lt 32,500.00
4 Tiner B - setara Bintang lt 20,000.00
1 Cat tembok setara Catylac (5kg) Galon 135,000.00
6 Cat tembok setara Avitex kg 135,000.00
5 Cat genteng gln 160,000.00
5 Kertas gosok lbr 4,000.00
2 Plamur tembok - setara SUPER kg 29,000.00
7 Plamur kayu kg 27,000.00
69 Spiritus - setara Naga lt 17,500.00
9 Lem Kayu - setara Rajawali kg 12,000.00
10 Minyak Begisting/ Solar lt 8,500.00
72 Rol Cat bh 15,400.00
8 Kuas 4'' bh 17,000.00
KACA
1 kaca bening 5mm - Asahi Mass m2 110,000.00
74 Kaca naco 15x7cm m2 27,500.00
INSTALASI LISTRIK
1 Titik Lampu Ttk 100,000.00
2 Pas. Lampu SL 18 watt Set 35,000.00
3 Pas. Lampu SL 13 watt bh 35,000.00
3 Saklar ganda " LG" bh 28,750.00
4 Saklar tunggal "LG" bh 23,000.00
5 Stop Kontak "LG" bh 26,450.00
86 NYA 1000 Vol 2 x 2,5 mm "Eterna m' 700,000.00
6 Pasang Plastik Titik 100,000.00
88 Isolator bh 1,500.00
89 Fitting plafond bh 7,500.00
90 T dos PVC bh 1,500.00
6 Biaya Penyambungan ls 50,000.00
CATATAN :
1. Lembar survey harga bahan bisa dibuat terpisah untuk masing - masing Toko/Liveransir;
2. Harga Dasar yang dipakai adalah analisis hasil survey masing-masing satuan material bahan;
3. Diupayakan harga yang dipakai mencerminkan kondisi harga di sekitar lokasi kegiatan, dengan
mempertimbangkan jarak tempuh dan kondisi medan;
4. Daftar harga SK Bupati Nomor: 188.4.45/30A/415.10.10/2010 adalah harga tertinggi maksimum tahun anggaran
2010 yang didalamnya sudah mengandung keuntungan sebesar 10% bagi Penyedia Jasa Pemborongan;
5. Apabila harga survey pasar yang diperoleh melebihi dari harga yang ditetapkan pada SK Bupati Tahun 2010
karena terjadi kenaikan harga pasar, maka harga dasar yang dipakai adalah harga survey pasar;
6. Harga (EE/HPS) yang dipakai dan masuk keanalisa SNI Satuan Pekerjaan diambil dari harga dasar yang harus
dinaikkan maksimal 10%;
7. Akibat pengalian 10% dari harga dasar, apabila terdapat pecahan atau angka dibelakang koma, maka pembulatan
harga adalah ke bawah, sehingga hasilnya tidak melebihi 10%;
8. Disampaikan kepada seluruh Penyedia Jasa Konsultansi Perencanaan, bahwa harga dasar dan harga yang dipakai
dan masuk keanalisa SNI satuan Pekerjaan (HPS/EE), adalah dasar akuntabilitas dan objektivitas yang akan
dijadikan dasar awal pemeriksaan Badan Pemeriksa Keuangan (BPK) dan Inspektorat Daerah;
9. Hasil akhir penyusunan EE adalah mutlak tanggungjawab Penyedia Jasa Konsultansi Perencanaan;
10. Harga Upah Pekerja mengikuti harga upah pekerja yang tercantum dalam SK Bupati Jombang Tahun 2010;
11. Daftar harga ini dilampirkan dan dijilid menjadi satu dengan EE/Laporan Pendahuluan.
#NAME?
#NAME?
#NAME?
kg #NAME?
kg #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
19,285.71 #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
6.25 #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
0.008 #NAME?
#NAME?
#NAME?
#NAME?
125 #NAME?
1125000 #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
2,272.73 227.27 #NAME?
90.91 #NAME?
318.18 #NAME?
318.18 #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
40,000.00
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ANALISIS HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM
NOMOR : 28/PRT/M/2016
PEKERJAAN TANAH
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
1 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.750 88,500.00 66,375.00
2 Mandor L.04 OH 0.025 130,000.00 3,250.00
Jumlah Harga Tenaga Kerja 69,625.00
B BAHAN
PEKERJAAN BETON
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
1 A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (K.100)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.650 88,500.00 146,025.00
2 Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
3 Kepala Tukang L.03 OH 0.028 125,000.00 3,500.00
4 Mandor L.04 OH 0.083 130,000.00 10,790.00
Jumlah Harga Tenaga Kerja 193,315.00
B BAHAN
1 Semen Portland kg 247.000 1,275.00 314,925.00
2 Pasir Beton kg 869.000 157.14 136,557.14
3 Kerikil (Maks 30mm) kg 999.000 138.89 138,750.00
4 Air ltr 215.000 2.30 494.50
Jumlah Harga Bahan 590,726.64
C PERALATAN
2 A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K.175)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.200 88,500.00 106,200.00
2 Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.020 125,000.00 2,500.00
4 Mandor L.04 OH 0.060 130,000.00 7,800.00
Jumlah Harga Tenaga Kerja 140,500.00
B BAHAN
1 Semen Portland kg 230.000 1,275.00 293,250.00
2 Pasir Beton kg 893.000 157.14 140,328.57
3 Kerikil (Maks 30mm) kg 1,027.000 138.89 142,638.89
4 Air ltr 200.000 2.30 460.00
Jumlah Harga Bahan 576,677.46
C PERALATAN
C PERALATAN
C PERALATAN
11 (An.2008) Memasang 1 m2 bekisting untuk balok latay & ring balk 3x pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.520 88,500.00 46,020.00
2 Tukang Kayu L.02 OH 0.260 120,000.00 31,200.00
3 Kepala Tukang L.03 OH 0.026 125,000.00 3,250.00
4 Mandor L.04 OH 0.026 130,000.00 3,380.00
Jumlah Harga Tenaga Kerja 83,850.00
B BAHAN
1 Kayu kelas III m3 0.045 5,500,000.00 247,500.00
2 Paku 5-10 cm kg 0.300 10,000.00 3,000.00
3 Minyak begesting ltr 0.100 8,500.00 850.00
Jumlah Harga Bahan 251,350.00
Jumlah Harga Bahan 3x pemakaian 83,783.33
C PERALATAN
2 A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 88,500.00 26,550.00
2 Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
3 Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
4 Mandor L.04 OH 0.015 130,000.00 1,950.00
Jumlah Harga Tenaga Kerja 41,750.00
B BAHAN
1 Bata merah bh 70.000 700.00 49,000.00
2 Semen Portland kg 14.370 1,275.00 18,321.75
3 Pasir pasang m3 0.040 220,000.00 8,800.00
Jumlah Harga Bahan 76,121.75
C PERALATAN
2 A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 88,500.00 26,550.00
2 Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
3 Kepala Tukang L.03 OH 0.010 125,000.00 1,250.00
4 Mandor L.04 OH 0.015 130,000.00 1,950.00
Jumlah Harga Tenaga Kerja 41,750.00
B BAHAN
1 Bata merah bh 70.000 700.00 49,000.00
2 Semen Portland kg 8.320 1,275.00 10,608.00
3 Pasir pasang m3 0.049 220,000.00 10,780.00
Jumlah Harga Bahan 70,388.00
C PERALATAN
PEKERJAAN ATAP
1 A.4.2.1.1. Pemasangan 1 kg besi profil
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.060 88,500.00 5,310.00
2 Tukang Las Kontruksi L.02 OH 0.060 120,000.00 7,200.00
3 Kepala Tukang L.03 OH 0.006 125,000.00 750.00
4 Mandor L.04 OH 0.003 130,000.00 390.00
Jumlah Harga Tenaga Kerja 13,650.00
B BAHAN
1 Besi Profil kg 1.150 13,000.00 14,950.00
Jumlah Harga Bahan 14,950.00
C PERALATAN
5 An. 2008 1 m' Pasang Reuter ukuran ( 3 x 20 ) cm, kayu kuat kelas 2
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 88,500.00 8,850.00
2 Tukang Kayu L.02 OH 0.200 120,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.020 - -
4 Mandor L.04 OH 0.005 125,000.00 625.00
Jumlah Harga Tenaga Kerja 33,475.00
B BAHAN
1 Kayu kuat kelas 2 3/20 papan m3 0.011 10,000,000.00 108,000.00
2 Paku biasa 2" - 5" Kg 0.100 10,000.00 1,000.00
Jumlah Harga Bahan 109,000.00
C PERALATAN
2 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 88,500.00 88,500.00
2 Tukang kayu L.02 OH 3.000 120,000.00 360,000.00
3 Kepala tukang L.03 OH 0.300 125,000.00 37,500.00
4 Mandor L.04 OH 0.050 130,000.00 6,500.00
Jumlah Harga Tenaga Kerja 492,500.00
B BAHAN
1 Papan kayu m3 0.040 6,200,000.00 248,000.00
2 Lem kayu Kg 0.500 12,000.00 6,000.00
Jumlah Harga Bahan 254,000.00
C PERALATAN
3 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.800 88,500.00 70,800.00
2 Tukang kayu L.02 OH 2.400 120,000.00 288,000.00
3 Kepala tukang L.03 OH 0.240 125,000.00 30,000.00
4 Mandor L.04 OH 0.040 130,000.00 5,200.00
Jumlah Harga Tenaga Kerja 394,000.00
B BAHAN
1 Papan kayu m3 0.024 6,200,000.00 148,800.00
2 Lem kayu Kg 0.300 12,000.00 3,600.00
Jumlah Harga Bahan 152,400.00
C PERALATAN
4 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela Jalusi, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 88,500.00 88,500.00
2 Tukang kayu L.02 OH 3.000 120,000.00 360,000.00
3 Kepala tukang L.03 OH 0.300 125,000.00 37,500.00
4 Mandor L.04 OH 0.050 130,000.00 6,500.00
Jumlah Harga Tenaga Kerja 492,500.00
B BAHAN
1 Papan kayu m3 0.064 6,200,000.00 396,800.00
2 Lem kayu Kg 0.500 12,000.00 6,000.00
Jumlah Harga Bahan 402,800.00
C PERALATAN
PEKERJAAN PLAFOND
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
1 A.4.6.1.19. Pemasangan 1 m2 Rangka Langit - Langit (50x100) cm Kayu Kelas II dan III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 88,500.00 13,275.00
2 Tukang batu L.02 OH 0.300 120,000.00 36,000.00
3 Kepala tukang L.03 OH 0.030 125,000.00 3,750.00
4 Mandor L.04 OH 0.075 130,000.00 9,750.00
Jumlah Harga Tenaga Kerja 62,775.00
B BAHAN
1 Kaso-kaso 5 x 7cm m3 0.015 4,750,000.00 73,150.00
2 Paku 7 cm – 10 cm kg 0.200 10,000.00 2,000.00
Jumlah Harga Bahan 75,150.00
C PERALATAN
1 A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.028 88,500.00 2,478.00
2 Tukang cat L.02 OH 0.042 120,000.00 5,040.00
3 Kepala tukang L.03 OH 0.004 125,000.00 525.00
4 Mandor L.04 OH 0.003 130,000.00 390.00
Jumlah Harga Tenaga Kerja 8,433.00
B BAHAN
2 Cat dasar kg 0.120 27,000.00 3,240.00
3 Cat penutup kg 0.180 27,000.00 4,860.00
Jumlah Harga Bahan 8,100.00
C PERALATAN
3 A.4.7.1.4. 1 m2 Pengecatan bidang kayu (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.070 88,500.00 6,195.00
2 Tukang cat L.02 OH 0.009 120,000.00 1,080.00
3 Kepala tukang L.03 OH 0.006 125,000.00 750.00
4 Mandor L.04 OH 0.003 130,000.00 390.00
Jumlah Harga Tenaga Kerja 8,415.00
B BAHAN
1 Cat menie Kg 0.200 35,000.00 7,000.00
2 Plamuur Kg 0.150 27,000.00 4,050.00
3 Cat dasar Kg 0.170 72,000.00 12,240.00
4 Cat penutup Kg 0.260 72,000.00 18,720.00
5 Kuas buah 0.010 17,000.00 170.00
6 Pengencer Kg 0.030 32,500.00 975.00
7 Ampelas Lbr 0.200 4,000.00 800.00
Jumlah Harga Bahan 43,955.00
C PERALATAN
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
### #REF!
#REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
Jombang, / / 2019
Dibuat oleh :
Panitia Pembangunan sekolah (P2S)
#REF!
#REF!
Fasilitator
T I M E S C H E D U L L E
JADWAL PELAKSANAN
BOBOT MINGGU KE
NO. URAIAN PEKERJAAN % KET
(%) I II III IV V VI VII
JUMLAH 100.00
RENCANA KEMAJUAN FISIK - 15.41 18.70 15.50 9.75 15.41 13.43 11.81
KOMULATIF RENCANA KEMAJUAN FISI - 15.41 34.11 49.61 59.36 74.77 88.19 100.00
Dibuat Oleh,
Perencana Teknis
CV. MIRTHA UTAMA
-
MANAGEMEN KESELAMATAN DAN KESEHATAN KERJA KONTRUKSI (MK3K)
Jumlah 500,000.00