Professional Documents
Culture Documents
MEP Mas Suite5
MEP Mas Suite5
N S
010 ROOM DETAIL (CLEAN, AND HOT WATER SYSTEM INSTALLATION PLAN ROOM B)
01
1 : 50
ARCHITECT CONSULTANT : CLIENT : PROJECT TITLE : DRAWING TITLE : NO REVISION DATE SIGN ARCHITECT
- -
I WAYAN MUSTIKA
MAHAMERU STUDIO MAS SUITE ROOM DETAIL - -
BAPAK I MADE SUDIANA (CLEAN, AND HOT WATER SYSTEM - - NO. DRAWING SCALE DATE DRAWN CHECKED APPROVED
- -
A4