Professional Documents
Culture Documents
MEP Mas Suite2
MEP Mas Suite2
007 CLEAN, AND HOT WATER SYSTEM INSTALLATION FIRST FLOOR PLAN
01
1 : 200
ARCHITECT CONSULTANT : CLIENT : PROJECT TITLE : DRAWING TITLE : NO REVISION DATE SIGN ARCHITECT
- -
I WAYAN MUSTIKA
MAHAMERU STUDIO MAS SUITE CLEAN, AND HOT WATER - -
BAPAK I MADE SUDIANA SYSTEM INSTALLATION - - NO. DRAWING SCALE DATE DRAWN CHECKED APPROVED
- -
A3