Back Up Stock Pile Material LPB ( February )

LPB
123
NO TANGGAL SEC
ABU BATU 2-3 3-5 5-7
BUC. REET VOL. BUC. REET. VOL. BUC. REET. VOL. BUC. REET. VOL.
1 30 January 2023 1 0 0 7.6 3 22.8 0
2 01 February 2023 1 0 0 0 0
3 02 February 2023 1 0 0 7.6 2 15.2 0
4 03 February 2023 1 0 0 0 0
5 04 February 2023 1 0 0 0 0
6 05 February 2023 1 0 0 7.6 2 15.2 0
7 06 February 2023 1 0 0 0 0
8 07 February 2023 1 0 0 0 0
9 08 February 2023 1 0 0 0 0
10 09 February 2023 1 0 0 0 0
11 10 February 2023 1 0 0 0 0
12 11 February 2023 1 0 0 0 0
13 12 February 2023 1 0 0 0 0
14 13 February 2023 1 0 0 0 0
15 14 February 2023 1 0 0 0 0
16 15 February 2023 1 0 0 0 0
17 16 February 2023 1 0 0 0 0
18 17 February 2023 1 0 11.4 2 22.8 0 0
19 18 February 2023 1 0 0 7.6 3 22.8 0
20 19 February 2023 1 0 0 7.6 5 38 7.6 2 15.2
21 20 February 2023 1 0 0 7.6 4 30.4 0
22 21 February 2023 1 0 0 7.6 4 30.4 0
23 22 February 2023 1 0 0 0 0
24 23 February 2023 1 0 0 0 0
25 24 February 2023 1 0 0 7.6 8 60.8 0
26 25 February 2023 1 0 0 7.6 1 7.6 0
27 26 February 2023 1 0 0 7.6 3 22.8 0
28 27 February 2023 1 0 0 0 0
29 28 February 2023 1 0 0 0 0

Jumlah 0 0 2 22.8 35 266 2 15.2


Total Reetase 39 Reet
Total Volume 304 m³

Page 1 of 4
Back Up Stock Pile Change Material ( February )
Change Material
KM 128
NO TANGGAL SEC.
ABU BATU 2-3 3-5 5-7
BUC. REET. VOL. BUC. REET. VOL. BUC. REET. VOL. BUC. REET. VOL.
1 08 January 2023 1 0 0 11.4 3 34.2
2 23 January 2023 1 0 0 0 7.6 3 22.8
3 25 January 2023 1 0 0 7.6 2 15.2 0
4 28 January 2023 1 0 0 7.6 3 22.8 0
5 29 January 2023 1 0 0 0 7.6 2 15.2
6 30 January 2023 1 0 0 7.6 6 45.6 0
7 31 January 2023 1 0 0 0 0
8 01 February 2023 1 0 0 0 0
9 02 February 2023 1 0 0 0 7.6 3 22.8
10 03 February 2023 1 0 0 0 0
11 04 February 2023 1 0 0 0 0
12 05 February 2023 1 0 0 0 0
13 06 February 2023 1 0 0 0 0
14 07 February 2023 1 0 0 0 0
15 08 February 2023 1 0 0 0 0
16 09 February 2023 1 0 0 0 0
17 10 February 2023 1 0 0 0 0
18 11 February 2023 1 0 0 0 0
19 12 February 2023 1 0 0 0 0
20 13 February 2023 1 0 0 0 0
21 14 February 2023 1 0 0 0 0
22 15 February 2023 1 0 0 0 0
23 16 February 2023 1 0 0 0 0
24 17 February 2023 1 0 0 0 0
25 18 February 2023 1 0 0 0 0
26 19 February 2023 1 0 0 0 0
27 20 February 2023 1 0 0 0 0
28 21 February 2023 1 0 0 0 0
29 22 February 2023 1 0 0 0 0
30 23 February 2023 1 0 0 0 0

Page 2 of 4
31 24 February 2023 1 0 0 0 0
32 25 February 2023 1 0 0 0 0
33 26 February 2023 1 0 0 0 0
34 27 February 2023 1 0 0 0 0
35 28 February 2023 1 0 0 0 0

Jumlah 0 0 0 0 14 117.8 8 60.8


Total Reetase 22 Reet
Total Volume 178.6 m³

KETERANGAN
1 REET
1) DT HINO INFRAS 11.4 m³
2) DT TATA HAULING 7.6 m³

TOTAL REETASE DT
1) DT HINO INFRAS 5 reet
2) DT TATA HAULING 46 reet

Page 3 of 4
Back Up Hamparan Material Split Section 1 & 2.A ( Januari - Februari )

RITASE KUBIKASI
NO TANGGAL KM SEC KETERANGAN
Abu Batu (1/2) 2-3 3-5 5-7 Keteterangan Abu Batu (1/2) 2-3 3-5 5-7 Keteterangan
1 27 January 2023 128 1 1 7.6 Dumping Lokasi SUDAH DIHAMPAR
2 30 January 2023 126 1 1 7.6 Dumping Lokasi SUDAH DIHAMPAR
3 30 January 2023 131 1 1 7.6 Dumping Lokasi SUDAH DIHAMPAR
4 30 January 2023 133 1 2 15.2 Dumping Lokasi SUDAH DIHAMPAR
5 30 January 2023 136 1 2 15.2 Dumping Lokasi SUDAH DIHAMPAR
6 30 January 2023 137 1 2 15.2 Dumping Lokasi SUDAH DIHAMPAR
126 1 4 Blending 45.6 Stock Pile KM 128 SUDAH DIHAMPAR
127 1 2 Blending 22.8 Stock Pile KM 128 SUDAH DIHAMPAR
130 1 3 Blending 34.2 Stock Pile KM 128 SUDAH DIHAMPAR
7 07 February 2023
135 1 4 Blending 45.6 Stock Pile KM 128 SUDAH DIHAMPAR
136 1 5 Blending 57 Stock Pile KM 128 SUDAH DIHAMPAR
137 1 4 Blending 45.6 Stock Pile KM 128 SUDAH DIHAMPAR
8 10 February 2023 138 1 6 45.6 Stock Pile KM 123 SUDAH DIHAMPAR
9 11 February 2023 120 2.A 1 7.6 Stock Pile KM 123 SUDAH DIHAMPAR
140 1 2 22.8 Dumping Lokasi SUDAH DIHAMPAR
10 13 February 2023
106 2.A 2 22.8 Dumping Lokasi SUDAH DIHAMPAR
11 17 February 2023 130 1 2 22.8 Dumping Lokasi SUDAH DIHAMPAR
12 21 February 2023 125 1 2 15.2 Dumping Lokasi SUDAH DIHAMPAR
13 22 February 2023 130 1 1 7.6 Dumping Lokasi SUDAH DIHAMPAR
14 24 February 2023 112 2.A 4 45.6 Dumping Lokasi SUDAH DIHAMPAR
133 S.1 1 7.6 Dumping Lokasi SUDAH DIHAMPAR
15 25 February 2023
112 2.A 3 34.2 Dumping Lokasi SUDAH DIHAMPAR
131 S.1 2 15.2 Stock Pile KM 123 SUDAH DIHAMPAR
16 26 February 2023
112 S.2A 5 57 Dumping Lokasi SUDAH DIHAMPAR
Total Blending Loading Stock Pile
Total Keseluruhan
0 0 19 21 22 0 0 144.4 228 250.8
Total Reetase 62 Reet
Total Kubikasi 623.2 m³

Page 4 of 4