My OEE Sheet, Pivot Table
My OEE Sheet, Pivot Table
ChipsCleaning Time
Part Start Time Part End Time
Planned
Programming Changeover Time Unplanned Good Total Rejected
No Power Downtime
Time (min) (min) Downtime (min) Count Qty
(min)
10 10 20 20 5 1
45 10 10 5
D2: Batch Start Time (Cell containing the start time of the batch in hh:mm format).
E2: Batch End Time (Cell containing the end time of the batch in hh:mm format).
H2: Planned Downtime (Cell containing the planned downtime in minutes).
P2: Target Qty (Cell containing the target quantity).
Q2: Cycle Time (Cell containing the cycle time in minutes).
G2: Good Count (Cell containing the count of good parts).
F2: Total Rejected Qty (Cell containing the total rejected quantity).
S2: Availability % (The cell where you calculated Availability %).
U2: Performance % (The cell where you calculated Performance %).
V2: Quality % (The cell where you calculated Quality %).
G2 represents the cell containing the count of good parts.
F2 represents the cell containing the total rejected quantity.
Machinig
Angement
%
ase replace these references in the formulas with the corresponding cell references in your Excel sheet. These formulas use basic Excel fun
Actual
Plan production
UPPH UPH Rejection % production Plan Achieve %
time
time
17%
33%
formulas use basic Excel functions and should work correctly once you have the appropriate data in these cells.
Availability % Performance % Quality % OEE % Shift duration
IF(ISNUMBER(H2), ((TIME(HOUR(E2),MINUTE(E2),0)-TIME(HOUR(D2),MINUTE(D2),0))*24*60-H2)/((TIME(HOUR(E2),MINUTE(E
in these cells.
Actual Production Time
01:50
00:50
TE(D2),0))*24*60-H2)/((TIME(HOUR(E2),MINUTE(E2),0)-TIME(HOUR(D2),MINUTE(D2),0))*24*60)*100, "")
Tool Setting
Date Shift Article Number Customer Name Machine/Equipment
Time (min)
10 10 40 1 5 1
45 10 10 5
25.00%
IF(ISNUMBER(L2), TEXT((L2 / (L2 + M2)), "0.00%"), "")
D2: Batch Start Time (Cell containing the start time of the batch in hh:mm format).
E2: Batch End Time (Cell containing the end time of the batch in hh:mm format).
H2: Planned Downtime (Cell containing the planned downtime in minutes).
P2: Target Qty (Cell containing the target quantity).
Q2: Cycle Time (Cell containing the cycle time in minutes).
G2: Good Count (Cell containing the count of good parts).
F2: Total Rejected Qty (Cell containing the total rejected quantity).
S2: Availability % (The cell where you calculated Availability %).
U2: Performance % (The cell where you calculated Performance %).
V2: Quality % (The cell where you calculated Quality %).
G2 represents the cell containing the count of good parts.
F2 represents the cell containing the total rejected quantity.
ase replace these references in the formulas with the corresponding cell references in your Excel sheet. These formulas use basic Excel fun
Actual
Plan production
UPH Rejection % production Plan Achieve % Availability %
time
time
17% 73.33%
33% 57.14%
IF(ISNUMBER(H2), ((TIME(HOUR(E2),
hese formulas use basic Excel functions and should work correctly once you have the appropriate data in these cells.
Performance % Quality % OEE % S
MBER(H2), ((TIME(HOUR(E2),MINUTE(E2),0)-TIME(HOUR(D2),MINUTE(D2),0))*24*60-H2)/((TIME(HOUR(E2),MINUTE(E2),0)-TIME(HOUR(D
UR(E2),MINUTE(E2),0)-TIME(HOUR(D2),MINUTE(D2),0))*24*60)*100, "")
20 1 5 1 6 9:00 11:30
Availability % - all -
Performance % - all -
Actual production- all -
Plan Achieve % - all -
12
10