Dickson Project Instalation
Dickson Project Instalation
DATE: 12/03/2024
3
HOUSE LAYOUT.
4
LIGHT LAYOUT.
5
SOCKETS LAYOUT.
6
SWITCH LAYOUT.
7
MATERIALS QUATATION.
FUN 2 5000
COOKER 1 7000
COSTING
DESCRIPTION QUANTITY WATTAGE HOURS/DAY LOAD/DAY LOAD/MONTH
SMOKE DETECTOR 2 0.2W 24 9.6WH 0.288KWH
FUN 2 50W 6 600WH 1.8KWH
COOKER 1 4000W 3HRS 12000WH 360KWH
OVEN 1 3000W 30MIN 1500WH 4.5KWH
DISHWASHER 1 2000W 1 2000WH 60KWH
TELEVISION 1 60W 8 480WH 14.4KWH
SURFACE CEILEING 24 18W 6 2592WH 77.76KWH
LIGHTS
HOME THEATRE 2 60W 8 960WH 28.8KWH
VERANDOR LIGHTS 2 18W 12 432WH 22.96KWH
RECESSESSED LIGHTS 1 10W 6 60WH 1.8KWH
WATER HEATER 3 1000W 1 3000WH 90KWH
OUTDOOR LIGHTS 8 20W 12 1920WH 57.6KWH
LAUNDRY MACHINE 1 2000W 3/WK 570WH 17.1KWH