Templates: Levelling operations

Template 1: Plan and prepare for levelling operations.

Plan and prepare for levelling operations.

Client Name: Student to fill Job Details:

Address: Student to fill Plan and prepare for levelling operations.

Phone Number: Student to fill Worker signature:

Date(dd/mm/yyyy) Student to fill

Worker name:

Work instructions
and operational
details

Sequence of work

Safety requirements
based on WHS laws
and regulations.

Australian
standards for
Levelling operations

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 1 of 14
Environmental
requirements
according to site
environmental plan.

Communication,
Signage and
barricade
requirements

PPE required

Tools and equipment selected

Tools and equipment Checked for serviceability Any faults (if any)

Faults reported to:

Material quantity requirements

Materials Quantity

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 2 of 14
Position of material on site:

Safe material handling procedures followed

Team roles

Verbal and non-verbal


communication signals to
be used during the
levelling operations. (Any
five)

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 3 of 14
Sign off:

Date:

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 4 of 14
Template 2: Setting up levelling instrument

Setting up and testing levelling instrument

Procedures to set up levelling instrument. (50-100 words)

Procedures to test levelling instrument. (50-100 words)

Location of datum point.

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 5 of 14
Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 6 of 14
Template 3: Rise and fall calculations

Rise and fall method

Station Backsigh Intermediat Foresigh Ris Fal Reduce Distanc Remark


numbe t e sight t e l d e s
r level

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 7 of 14
Template 4: Three-wire readings

Three-wire readings

Stations Readings Calculations

Station number: To stadia line Cross-hair accurate:


___
Cross-hair  Yes

Bottom stadia line  No

Station number: To stadia line Cross-hair accurate:


___
Cross-hair  Yes

Bottom stadia line  No

Station number: To stadia line Cross-hair accurate:


___
Cross-hair  Yes

Bottom stadia line  No

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 8 of 14
Template 5: Two-Peg test

Two-Peg test

Instructions:

1. Use pegs to mark the area on the worksite.


2. The points should be set up at a distance of 30m apart.
3. Depending on the exercise area, use pegs or a spray can to mark two points.
4. Set up the level instrument midway between the points.
5. Perform adjustment tests to ensure that the instrument is level.
6. Take and record the staff reading at each peg and record the level
measurements in the table provided below.
7. Calculate the difference between the two readings and record it in the table.
8. Move the optical level so that it is 5 m outside one of the pegs.
9. Take the staff another reading and record them in the table.
10. Again calculate the difference between the two readings and record it in the
table.
11. Check whether the readings are the same or not.

Calculations

Two peg test Station A Station B

Peg A

Peg B

Calculations

Results

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 9 of 14
Template 6: Setting up levelling instrument

Setting up and testing levelling instrument

Procedures to set up levelling instrument. (50-100 words)

Procedures to test levelling instrument for operational effectiveness and


accuracy. (50-100 words)

Procedures to check tolerances. (50-100 words)

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 10 of 14
Location of datum point.

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 11 of 14
Template 7: Height of collimation method

Height of collimation method

Station Backsight Intermediate Foresight Height of Distance Remarks


number sight collimation

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 12 of 14
Template 8: Three-wire readings

Three-wire readings

Stations Readings Calculations

Station number: To stadia line Cross-hair accurate:


___
Cross-hair  Yes

Bottom stadia line  No

Station number: To stadia line Cross-hair accurate:


___
Cross-hair  Yes

Bottom stadia line  No

Station number: To stadia line Cross-hair accurate:


___
Cross-hair  Yes

Bottom stadia line  No

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 13 of 14
Template 9: Two-Peg test

Two-Peg test

Instructions:

1. Use pegs to mark the area on the worksite.


2. The points should be set up at a distance of 30m apart.
3. Depending on the exercise area, use pegs or a spray can to mark two points.
4. Set up the level instrument midway between the points.
5. Perform adjustment tests to ensure that the instrument is level.
6. Take and record the staff reading at each peg and record the level
measurements in the table provided below.
7. Calculate the difference between the two readings and record it in the table.
8. Move the optical level so that it is 5 m outside one of the pegs.
9. Take the staff another reading and record them in the table.
10. Again calculate the difference between the two readings and record it in the
table.
11. Check whether the readings are the same or not.

Calculations

Two peg test Station A Station B

Peg A

Peg B

Calculations

Results

Version Number: 1.0 (Review date: 26/08/2023) Unit Code: CPCCOM3006

Page 14 of 14