BERRY CREEK HIGHLANDS - PHASE 3

REVISIONS/CORRECTIONS
TOTAL NET
REVISE (R) CITY OF

CIVIL CONSTRUCTION PLANS


NO. TOTAL SITE
VOID (V) CHANGE AUSTIN DATE
NO. DESCRIPTION SHEETS IMP. COVER
ADD (A) IMP. COVER APPROVAL IMAGED
IN PLAN (SQ. FT.)/%
SHEET NO.'S (SQ. FT.) DATE
SET

PAVING, GRADING & UTILITIES


FOR
BERRY CREEK HIGHLANDS
PHASE 3
CITY OF GEORGETOWN, WILLIAMSON COUNTY, TEXAS

©
BERRY CREEK HIGHLANDS
MUNICIPAL UTILITY DISTRICT SHEET INDEX

KHA PROJECT NO. 069291006


GENERAL SITE DEVELOPMENT NOTES:
SHEET NO. DESCRIPTION
1. THESE PLANS WERE PREPARED, SEALED, SIGNED AND DATED BY A TEXAS LICENSED PROFESSIONAL ENGINEER. THEREFORE, BASED ON THE ENGINEER'S
CONCURRENCE OF COMPLIANCE, THE PLANS FOR CONSTRUCTION OF THE PROPOSED PROJECT ARE HEREBY APPROVED SUBJECT TO THE STANDARD C-01 COVER SHEET
CONSTRUCTION SPECIFICATIONS AND DETAILS MANUAL AND ALL OTHER APPLICABLE CITY, STATE AND FEDERAL REQUIREMENTS AND CODES. C-02 FINAL PLAT (SHEET 1 OF 2)
2. THE PROJECT IS SUBJECT TO ALL CITY STANDARD SPECIFICATIONS AND DETAILS IN EFFECT AT THE TIME OF SUBMITTAL OF THE PROJECT TO THE CITY. C-03 FINAL PLAT (SHEET 2 OF 2)
3. ALL ELECTRIC DISTRIBUTION LINES AND INDIVIDUAL SERVICE LINES SHALL BE INSTALLED UNDERGROUND. IF OVERHEAD LINES EXISTING PRIOR TO
C-04 GENERAL NOTES (SHEET 1 OF 2) 2/21/24
UNDERGROUND INSTALLATION, SUCH POLES, GUY WIRES, AND RELATED STRUCTURES SHALL BE REMOVED FOLLOWING CONSTRUCTION OF THE UNDERGROUD
INFRASTRUCTURE (ONLY APPLICABLE FOR RESIDENTIAL PROPERTY). C-05 GENERAL NOTES (SHEET 2 OF 2)
4. WHERE NO EXISTING OVERHEAD INFRASTRUCTURE EXISTS, UNDERGROUND ELECTRIC UTILITY LINES SHALL BE LOCATED ALONG THE STREET AND WITHIN THE C-06 EROSION CONTROL PLAN - PHASE 3
SITE. WHERE EXISTING OVERHEAD INFRASTRUCTURE IS TO BE RELOCATED, IT SHALL BE RE-INSTALLED UNDERGROUND AND THE EXISTIGN FACILITIES SHALL BE C-07 EROSION CONTROL PLAN - PHASE 5
REMOVED AT THE DISCRETION OF THE DEVELOPMENT ENGINEER (IONLY APPLICABLE FOR NON-RESIDENTIAL AND MULTI-FAMILY DEVELOPMENT). S.
H 3 C-08 TREE PRESERVATION PLAN (SHEET 1 OF 2)
CO 14
5. ALL ELECTRIC AND COMMUNICATION INFRASTRUCTURE SHALL COMPLY WITH UDC SECTION 13.06. W CR
BO C-09 TREE PRESERVATION PLAN (SHEET 2 OF 2)
6. THE PROPERTY SUBJECT TO THIS APPLICATION IS SUBJECT TO THE WATER QUALITY REGULATIONS OF THE CITY OF GEORGETOWN. Y
19
7. A GEOLOGIC ASSESSMENT, IN ACCORDANCE WITH THE CITY OF GEORGETOWN WATER QUALITY REGULATIONS, WAS COMPLETED ON MARCH 31, 2016. ANY 5 C-10 GRADING PLAN
SPRINGS AND STREAMS AS IDENTIFIED IN THE GEOLOGIC ASSESSMENT ARE SHOWN HEREIN. C-11 PAVING PLAN & PROFILE - NYX DRIVE
C-12 PAVING PLAN & PROFILE - REDDING WAY
LEGAL DESCRIPTION
C-13 PAVING PLAN & PROFILE - WILLOW BEAN DRIVE
BEING A 16.886 ACRE (735,554 SQUARE FEET) TRACT OF LAND SITUATED IN THE
BURRELL EAVES SURVEY, ABSTRACT NO. 216, CITY OF GEORGETOWN, C-14 PAVING PLAN & PROFILE - ZELDA DRIVE
WILLIAMSON COUNTY, TEXAS; AND BEING A PORTION OF THAT CERTAIN 314.54 C-15 EXISTING DRAINAGE AREA MAP
ACRE TRACT DESCRIBED IN QUIT CLAIM DEED TO BERRY CREEK (GEORGETOWN),
ASLI IX, LLC, AS RECORDED IN DOCUMENT NO. 2018106295 OF THE OFFICIAL C-16 PROPOSED DRAINAGE AREA MAP
PUBLIC RECORDS OF WILLIAMSON COUNTY
C-17 INLET DRAINAGE AREA MAP

RD

COVER SHEET
C-18 DRAINAGE CALCULATIONS
ENGINEER/APPLICANT

L
EL
C-19 OVERALL STORM PLAN

SH
C-20 STORM PLAN & PROFILE - SD-A (SHEET 1 OF 2)
C-21 STORM PLAN & PROFILE - SD-A (SHEET 2 OF 2)
PROJECT C-22 STORM PLAN & PROFILE - SD-B & SD-D
LOCATION
C-23 STORM PLAN & PROFILE - SD-C

SURVEYOR C-24
C-25
STORM LATERAL PROFILES (SHEET 1 OF 2)
STORM LATERAL PROFILES (SHEET 2 OF 2)
10814 JOLLYVILLE ROAD, AVALLON IV, SUITE 200 Tel. No. (512) 418-1771 C-26 OVERALL WATER PLAN (SHEET 1 OF 2)
AUSTIN, TEXAS 78759 Fax No. (512) 418-1791 KIMLEY-HORN
CERTIFICATE OF REGISTRATION #928 WEBSITE: http://www.kimley-horn.com/ C-27 OVERALL WATER PLAN (SHEET 2 OF 2)
601 NW LOOP 410, SUITE 350 C-28 WASTEWATER PLAN & PROFILE - WWL-A
CONTACT: JACOB KONDO, P.E.
SAN ANTONIO, TEXAS 78216 16.886 ACRES SITUATED IN THE BURRELL EAVES SURVEY ABSTRACT NO. 216
EMAIL: JACOB.KONDO@KIMLEY-HORN.COM C-29 WASTEWATER PLAN & PROFILE - WWL-B
TELEPHONE: (210) 541-9166 CITY OF GEORGETOWN, WILLIAMSON COUNTY, TEXAS C-30 WASTEWATER PLAN & PROFILE - WWL-C
TELEPHONE: 737-471-0326 CONTACT: JOHN G. MOSIER
EMAIL: greg.mosier@kimley-horn.com
VICINITY MAP C-31
C-32
WASTEWATER PLAN & PROFILE - WWL-D
STREET LIGHT & SIGN PLAN
SCALE: 1" = 1,000'
OWNER/DEVELOPER
C-33 EROSION CONTROL DETAILS

PROJECT INFORMATION
C-34 PAVING DETAILS
Know what'sbelow.
Call before you dig.
C-35 UTILITY DETAILS (SHEET 1 OF 3)
FR BERRY CREEK, LLC C-36 UTILITY DETAILS (SHEET 2 OF 3)
BRANDON JENKINS
SUITE 900
ACREAGE: 20.38 ACRES
ZONING: BERRY CREEK HIGHLANDS PUD
PLAN SUBMITTAL/REVIEW LOG C-37 UTILITY DETAILS (SHEET 3 OF 3)
WASHINGTON DC 20036
(ORDINANCE 2018-36)

BERRY CREEK
CONTACT: FRANK DEL CASTILLO

WILLIAMSON COUNTY, TEXAS


EMAIL: frank.delcastillo@ashtonwoods.com

HIGHLANDS
1ST SUBMITTAL TO CITY 09/15/2023
WATER SERVICE

CITY OF GEORGETOWN
TELEPHONE: 512-450-4916 WARNING: CONTRACTOR IS TO
WEBSITE: www.ashtonwoods.com 2ND SUBMITTAL TO CITY 11/06/2023 VERIFY PRESENCE AND EXACT
3RD SUBMITTAL TO CITY 12/04/2023 LOCATION OF ALL UTILITIES

GAS SERVICE

PHASE 3
4TH SUBMITTAL TO CITY 01/22/2024 PRIOR TO CONSTRUCTION.
CITY OF GEORGETOWN
GEORGETOWN UTILITY SYSTEMS

CIVIL CONSTRUCTION PLANS


ATMOS ENERGY CORPORATION 300-1 INDUSTRIAL AVENUE
3110 N INTERSTATE 35 GEORGETOWN, TEXAS 78626
ROUND ROCK, TEXAS 78681 TELEPHONE: (512)930-3555
TELEPHONE: (512) 310-3855 CONTACT: DAVID MUNK
CONTACT: ALIDA PAINE
WEBSITE: www.atmosenergy.com
WEBSITE: https://gus.georgetown.org/ BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT

ELECTRIC SERVICE WASTEWATER SERVICE LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)
RELEASE OF THIS APPLICATION DOES NOT CONSTITUTE A VERIFICATION OF ALL
DATA, INFORMATION AND CALCULATIONS SUPPLIED BY THE APPLICANT. THE
PEDERNALES ELECTRIC COOPERATIVE, INC. CITY OF GEORGETOWN ENGINEER OF RECORD IS SOLELY RESPONSIBLE FOR THE COMPLETENESS, TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED
10625 WEST HIGHWAY 29 GEORGETOWN UTILITY SYSTEMS ACCURACY AND ADEQUACY OF HIS/HER SUBMITTAL, WHETHER OR NOT THE 3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
LIBERTY HILL, TEXAS 78642 300-1 INDUSTRIAL AVENUE APPLICATION IS REVIEWED FOR CODE COMPLIANCE BY CITY ENGINEERS. 3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)
TELEPHONE: (512) 778-5470 GEORGETOWN, TEXAS 78626
CONTACT: JUSTIN BOWERMAN TELEPHONE: (512)930-3555
___________________________________________________ _____________ ALL RESPONSIBILITY FOR THE ADEQUACY OF THESE PLANS REMAINS WITH THE ENGINEER WHO PREPARED THEM.
DISTRICT ENGINEER DATE
WEBSITE: WWW.PEC.COOP CONTACT: DAVID MUNK IN REVIEWING THESE PLANS, THE CITY OF GEORGETOWN MUST RELY UPON THE ADEQUACY OF THE WORK OF
WEBSITE: https://gus.georgetown.org/ REVIEW OF THESE PLANS BY THE DISTRICT IS LIMITED TO WATER, THE DESIGN ENGINEER. REVIEW OF THE SUBMITTED MATERIALS DOES NOT CONSTITUTE A VERIFICATION OF ALL

C-01
WASTEWATER, AND DRAINAGE AND DOES NOT INDICATE A REVIEW OF THE
ADEQUACY OF THE DESIGN FOR THE FACILITIES. IN APPROVING THESE PLANS,
DATA, INFORMATION AND CALCULATIONS SUPPLIED BY THE APPLICANT. THE ENGINEER OF RECORD IS SOLELY
THE DISTRICT MUST RELY ON THE ADEQUACY OF THE WORK OF THE DESIGN RESPONSIBLE FOR THE COMPLETENESS, ACCURACY AND ADEQUACY OF HIS/HER SUBMITTAL, WHETHER OR NOT
ENGINEER. THE APPLICATION IS REVIEWED FOR ORDINANCE COMPLIANCE BY THE CITY ENGINEER.
OF C-37
2023-24-CON
2/21/24

BERRY CREEK
HIGHLANDS FINAL PLAT (SHEET 1 OF
©
C-02
OF C-37

PHASE 3 2)
CITY OF GEORGETOWN
2023-24-CON

WILLIAMSON COUNTY, TEXAS


CIVIL CONSTRUCTION PLANS KHA PROJECT NO. 069291006 BERRY CREEK HIGHLANDS - PHASE 3
2/21/24

BERRY CREEK
HIGHLANDS FINAL PLAT (SHEET 2 OF
©
C-03
OF C-37

PHASE 3 2)
CITY OF GEORGETOWN
2023-24-CON

WILLIAMSON COUNTY, TEXAS


CIVIL CONSTRUCTION PLANS KHA PROJECT NO. 069291006 BERRY CREEK HIGHLANDS - PHASE 3
GENERAL NOTES PAVING & STRIPING NOTES STORM SEWER NOTES CITY OF GEORGETOWN NOTES:
TCEQ-0592 (REV. JULY 15, 2015) PAGE 1 OF 2
1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF GEORGETOWN "UNIFIED DEVELOPMENT 1. ALL CONSTRUCTION SHALL BE IN GENERAL ACCORDANCE WITH THESE PLANS, CITY OF 1. THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
1. THE CONSTRUCTION PORTION OF THESE PLANS WERE PREPARED, SEALED, SIGNED AND DATED
CODE" AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. GEORGETOWN, TX STANDARD SPECIFICATIONS, THE FINAL GEOTECHNICAL REPORT AND LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION WATER POLLUTION ABATEMENT PLAN
BY A TEXAS LICENSED PROFESSIONAL ENGINEER. THEREFORE BASED ON THE ENGINEER'S
COMMONLY ACCEPTED CONSTRUCTION STANDARDS. AND SHALL NOTIFY THE CONSTRUCTION MANAGER AND ENGINEER OF ANY GENERAL CONSTRUCTION NOTES
CONCURRENCE OF COMPLIANCE, THE CONSTRUCTION PLANS FOR CONSTRUCTION OF THE
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL AND LABOR TO CONSTRUCT THE CONFLICTS DISCOVERED. CONTRACTOR IS RESPONSIBLE FOR PROTECTING
PROPOSED PROJECT ARE HEREBY APPROVED SUBJECT TO THE STANDARD CONSTRUCTION
FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE 2. TESTING OF MATERIALS REQUIRED FOR THE CONSTRUCTION OF THE PAVING IMPROVEMENTS EXISTING UTILITIES (SHOWN OR NOT SHOWN) WITHIN SCOPE OF EDWARDS AQUIFER PROTECTION PROGRAM CONSTRUCTION NOTES - LEGAL DISCLAIMER
SPECIFICATIONS AND DETAILS MANUAL AND ALL OTHER APPLICABLE CITY, STATE AND FEDERAL
APPROVING AUTHORITIES, SPECIFICATIONS AND REQUIREMENTS. SHALL BE PERFORMED BY AN APPROVED AGENCY FOR TESTING MATERIALS. THE NOMINATION OF CONSTRUCTION. IF ANY EXISTING UTILITIES ARE DAMAGED, THE
REQUIREMENTS AND CODES. THE FOLLOWING/LISTED “CONSTRUCTION NOTES” ARE INTENDED TO BE ADVISORY IN NATURE ONLY AND DO NOT CONSTITUTE AN APPROVAL
THE TESTING LABORATORY AND THE PAVEMENT OF SUCH TESTING SERVICES SHALL BE MADE BY CONTRACTOR SHALL REPLACE THEM AT HIS OWN EXPENSE.
OR CONDITIONAL APPROVAL BY THE EXECUTIVE DIRECTOR (ED), NOR DO THEY CONSTITUTE A COMPREHENSIVE LISTING OF RULES OR
3. CONTRACTOR SHALL CONTACT ALL FRANCHISE UTILITY COMPANIES TO HAVE THEM LOCATE EXISTING UTILITIES THE CONTRACTOR. THE OWNER SHALL APPROVE THE LABORATORY NOMINATED TO DO THE 2. THIS PROJECT IS SUBJECT TO ALL CITY STANDARD SPECIFICATIONS AND DETAILS IN EFFECT AT CONDITIONS TO BE FOLLOWED DURING CONSTRUCTION. FURTHER ACTIONS MAY BE REQUIRED TO ACHIEVE COMPLIANCE WITH TCEQ
PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE THE EXACT LOCATION AND DEPTH OF ALL TESTING OF MATERIALS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SHOW BY 2. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL DIMENSIONS SHOWN, THE TIME OF SUBMITTAL OF THE PROJECT TO THE CITY. REGULATIONS FOUND IN TITLE 30, TEXAS ADMINISTRATIVE CODE (TAC), CHAPTERS 213 AND 217, AS WELL AS LOCAL ORDINANCES AND
FRANCHISE UTILITY SERVICES AND ANY REQUIRED RELOCATION AND/OR EXTENSIONS. SERVICES SHOWN ON THE STANDARD TESTING PROCEDURES THAT THE WORK CONSTRUCTED DOES MEET THE INCLUDING THE HORIZONTAL AND VERTICAL LOCATION OF CURB INLETS AND REGULATIONS PROVIDING FOR THE PROTECTION OF WATER QUALITY. ADDITIONALLY, NOTHING CONTAINED IN THE FOLLOWING/LISTED
PLANS ARE CONCEPTUAL. REQUIREMENTS OF THE CITY'S SPECIFICATIONS AND THESE PLANS. GRATE INLETS AND ALL UTILITIES CROSSING THE STORM SEWER. 3. THE SITE CONSTRUCTION PLANS SHALL MEET ALL REQUIREMENTS OF THE APPROVED SITE PLAN. “CONSTRUCTION NOTES” RESTRICTS THE POWERS OF THE ED, THE COMMISSION OR ANY OTHER GOVERNMENTAL ENTITY TO PREVENT,
CORRECT, OR CURTAIL ACTIVITIES THAT RESULT OR MAY RESULT IN POLLUTION OF THE EDWARDS AQUIFER OR HYDROLOGICALLY
4. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING RELOCATION AND INSTALLATION OF FRANCHISE UTILITIES 3. BARRIER FREE RAMPS SHALL BE CONSTRUCTED AT ALL DRIVEWAY APPROACHES PER CITY 3. THE SITE UTILITY CONTRACTOR SHALL PROVIDE ALL MATERIALS AND 4. WASTEWATER MAINS AND SERVICE LINES SHALL BE SDR 26 PVC.
CONNECTED SURFACE WATERS. THE HOLDER OF ANY EDWARDS AQUIFER PROTECTION PLAN CONTAINING “CONSTRUCTION NOTES” IS STILL
NECESSARY FOR ON AND OFF SITE CONSTRUCTION. STANDARDS. APPURTENANCES NECESSARY FOR COMPLETE INSTALLATION OF THE STORM
5. WASTEWATER MAINS SHALL BE INSTALLED WITHOUT HORIZONTAL OR VERTICAL BENDS. RESPONSIBLE FOR COMPLIANCE WITH TITLE 30, TAC, CHAPTERS 213 OR ANY OTHER APPLICABLE TCEQ REGULATION, AS WELL AS ALL
SEWER. CONDITIONS OF AN EDWARDS AQUIFER PROTECTION PLAN THROUGH ALL PHASES OF PLAN IMPLEMENTATION. FAILURE TO COMPLY WITH
5. BRACING OF UTILITY POLES MAY BE REQUIRED BY UTILITY COMPANIES WHEN TRENCHING OR EXCAVATION IS IN 4. ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO 6. MAXIMUM DISTANCE BETWEEN WASTEWATER MANHOLES IS 500 FEET. ANY CONDITION OF THE ED'S APPROVAL, WHETHER OR NOT IN CONTRADICTION OF ANY “CONSTRUCTION NOTES,” IS A VIOLATION OF TCEQ
CLOSE PROXIMITY TO THE POLES. THE COST OF BRACING POLES WILL BE BORNE BY THE CONTRACTOR. THERE IS THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". 4. THE INSPECTOR SHALL INSPECT ALL "PUBLIC" CONSTRUCTION. THE REGULATIONS AND ANY VIOLATION IS SUBJECT TO ADMINISTRATIVE RULES, ORDERS, AND PENALTIES AS PROVIDED UNDER TITLE 30, TAC §
NO SEPARATE PAY ITEM FOR THIS WORK. THE COST IS INCIDENTAL TO THE VARIOUS PAY ITEMS FOR INSTALLATION CONTRACTOR'S BID PRICE SHALL INCLUDE ALL INSPECTION FEES. 7. WASTEWATER MAINS SHALL BE LOW PRESSURE AIR TESTED AND MANDREL TESTED BY THE 213.10 (RELATING TO ENFORCEMENT). SUCH VIOLATIONS MAY ALSO BE SUBJECT TO CIVIL PENALTIES AND INJUNCTION. THE
OF PIPE. 5. CONTRACTOR SHALL FURNISH AND INSTALL ALL PAVEMENT MARKINGS FOR FIRE LANES, PARKING CONTRACTOR ACCORDING TO CITY OF GEORGETOWN AND TCEQ REQUIREMENTS. FOLLOWING/LISTED “CONSTRUCTION NOTES” IN NO WAY REPRESENT AN APPROVED EXCEPTION BY THE ED TO ANY PART OF TITLE 30 TAC,
STALLS, HANDICAPPED PARKING SYMBOLS, AND MISCELLANEOUS STRIPING WITHIN PARKING LOT 5. ALL PVC TO RCP CONNECTIONS SHALL BE CONSTRUCTED WITH CONCRETE CHAPTERS 213 AND 217, OR ANY OTHER TCEQ APPLICABLE REGULATION
6. THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES SHOWN ON THE PLANS WERE OBTAINED AND AROUND BUILDING AS SHOWN ON THE PLANS. ALL PAINT FOR PAVEMENT MARKINGS SHALL COLLARS. 8. WASTEWATER MANHOLES SHALL BE VACUUM TESTED AND COATED BY THE CONTRACTOR
FROM AVAILABLE UTILITY COMPANY RECORDS AND PLANS AND ARE CONSIDERED APPROXIMATE. IT SHALL BE THE ADHERE TO CITY OF GEORGETOWN STANDARD DETAILS AND SPECIFICATIONS. ACCORDING TO CITY OF GEORGETOWN AND TCEQ REQUIREMENTS.
CONTRACTOR'S RESPONSIBILITY TO VERIFY LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ADJACENT AND/OR 6. ALL ONSITE STORM SEWER LINES SHALL BE HDPE, ALL PRIVATE STORM SHALL 1. A written notice of construction must be submitted to the TCEQ regional office at least 48 hours prior
BE NOTED AS ON PLANS. CONTRACTOR TO CONTACT ENGINEER WITH 9. WASTEWATER MAINS SHALL BE CAMERA TESTED BY THE CONTRACTOR AND SUBMITTED TO THE
CONFLICTING UTILITIES SUFFICIENTLY IN ADVANCE OF CONSTRUCTION IN ORDER THAT ADJUSTMENTS CAN BE MADE 6. REFER TO GEOTECHNICAL REPORT FOR PAVING JOINT LAYOUT PLAN. to the start of any regulated activities. This notice must include:
QUESTIONS ABOUT PIPE MATERIAL PRIOR TO ORDERING. CONTRACTOR CITY ON DVD FORMAT PRIOR TO PAVING THE STREETS.
TO PROVIDE ADEQUATE CLEARANCES. THE CONTRACTOR SHALL PRESERVE AND PROTECT PUBLIC AND PRIVATE - the name of the approved project;
UTILITIES AT ALL TIMES DURING CONSTRUCTION. ANY DAMAGE TO UTILITIES RESULTING FROM CONTRACTOR'S 7. REFER TO GEOTECHNICAL REPORT FOR REINFORCEMENT STEEL. SHALL SUBMIT TECHNICAL DATA TO PROJECT ENGINEER AND CITY ENGINEER 10. PRIVATE WATER SYSTEM FIRE LINES SHALL BE TESTED BY THE CONTRACTOR TO 200 PSI FOR 2 - the activity start date; and
OPERATIONS SHALL BE RESTORED AT THEIR EXPENSE. THE ENGINEER SHALL BE NOTIFIED WHEN PROPOSED FOR APPROVAL PRIOR TO ORDERING MATERIAL. HOURS. - the contact information of the prime contractor.
FACILITY GRADES CONFLICT WITH EXISTING UTILITY GRADES. 8. REFER TO GEOTECHNICAL REPORT FOR SOIL COMPACTION SPECIFICATION.
7. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE STANDARD 11. PRIVATE WATER SYSTEM FIRE LINES SHALL BE DUCTILE IRON PIPING FROM THE WATER MAIN TO 2. All contractors conducting regulated activities associated with this project must be provided with
7. CONTRACTOR SHALL USE ALL NECESSARY PRECAUTIONS TO AVOID CONTACT WITH OVERHEAD AND UNDERGROUND 9. FIRE LANES SHALL BE DESIGNATED BY CONTINUOUS PAINTED LINES FOUR (4) INCHES IN WIDTH ON SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION FOR NORTH CENTRAL complete copies of the approved Water Pollution Abatement Plan (WPAP) and the TCEQ letter
THE BUILDING SPRINKLER SYSTEM, AND 200 PSI C900 PVC FOR ALL OTHERS.
POWER LINES. EACH SIDE OF THE FIRE LANE STARTING AT THE ENTRANCE FROM THE STREET AND TO BE TEXAS, LATEST EDITION, AND ANY SPECIAL PROVISION AS APPROVED BY THE indicating the specific conditions of its approval. During the course of these regulated activities, the
CONTINUED TO THE EXIT. SUCH LINES SHALL BE BRIGHT RED IN COLOR. CITY OF GEORGETOWN, TX. 12. PUBLIC WATER SYSTEM MAINS SHALL BE 150 PSI C900 PVC AND TESTED BY THE CONTRACTOR AT contractors are required to keep on-site copies of the approved plan and approval letter.
8. THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS SHOWN ON THE PLANS AND REVIEW ALL FIELD 150 PSI FOR 4 HOURS.
CONDITIONS, INCLUDING EXISTING GRADES AND UTILITY FLOW LINES, AND SHOULD DISCREPANCIES OCCUR, THE 10. FIRE LANES ADJACENT TO CURBS SHALL BE OUTLINED BY A FOUR (4) INCH WIDE STRIP PAINTED 8. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING FOR ALL STORM 3. If any sensitive feature(s) (caves, solution cavity, sink hole, etc.) is discovered during construction, all
CONTRACTOR SHALL NOTIFY THE ENGINEER TO OBTAIN THE ENGINEER'S CLARIFICATION BEFORE COMMENCING WITH BRIGHT RED IN COLOR ALONG THE CURB'S GUTTER LINE. SEWER LINES AND OTHER UTILITIES. 13. ALL BENDS AND CHANGES IN DIRECTION ON WATER MAINS SHALL BE RESTRAINED AND THRUST regulated activities near the sensitive feature must be suspended immediately. The appropriate
CONSTRUCTION. BLOCKED. TCEQ regional office must be immediately notified of any sensitive features encountered during
11. THE WORDS "FIRE LANE" AND "NO PARKING" SHALL BE STENCILED IN FOUR (4) INCH HIGH WHITE 9. EMBEDMENT FOR ALL ONSITE SEWER LINES, PUBLIC OR PRIVATE, SHALL BE construction. Construction activities may not be resumed until the TCEQ has reviewed and approved
9. THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE ANY PHYSICAL DAMAGE TO PRIVATE PROPERTY, LETTERS ALTERNATELY EVERY FIFTEEN (15) FEET ALONG THE RED FIRE LANE STRIPES. PER CITY OF GEORGETOWN, TX STANDARD DETAILS. 14. LONG FIRE HYDRANT LEADS SHALL BE RESTRAINED. the appropriate protective measures in order to protect any sensitive feature and the Edwards Aquifer
INCLUDING, BUT NOT LIMITED TO FENCES, WALLS, PAVEMENT, GRASS, TREES, LAWN SPRINKLER AND IRRIGATION from potentially adverse impacts to water quality.
12. ALL HANDICAP RAMPING, STRIPING, AND PAVEMENT MARKINGS SHALL CONFORM TO THE 10. REFER TO TCEQ DESIGN GUIDELINES (CHAPTER 290) FOR ALL UTILITY 15. ALL WATER LINES ARE TO BE BACTERIA TESTED BY THE CONTRACTOR ACCORDING TO THE CITY
SYSTEMS AT NO COST TO THE OWNER. THIS WORK SHALL BE SUBSIDIARY TO THE CONTRACT (UNLESS OTHERWISE
AMERICANS WITH DISABILITIES ACT THAT IS MOST CURRENT. CROSSINGS. STANDARDS AND SPECIFICATIONS.
NOTED) AND IS NOT A SEPARATE PAY ITEM. 4. No temporary or permanent hazardous substance storage tank shall be installed within 150 feet of a
16. WATER AND SEWER MAIN CROSSINGS SHALL MEET ALL REQUIREMENTS OF THE TCEQ AND THE water supply source, distribution system, well, or sensitive feature.
10. THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS AND APPROVALS PRIOR TO 13. REFERENCE CITY OF GEORGETOWN, TX STANDARD CONSTRUCTION DETAILS FOR HANDICAP 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING AND CITY.
CONSTRUCTION. RAMP AND OTHER PAVING DETAILS. IMPLEMENTING A TRENCH PROTECTION PLAN FOR ALL OPEN TRENCH 5. Prior to beginning any construction activity, all temporary erosion and sedimentation (E&S) control
EXCAVATION. 17. FLEXIBLE BASE MATERIAL FOR PUBLIC STREETS SHALL BE TXDOT TYPE A GRADE 1. measures must be properly installed and maintained in accordance with the approved plans and
11. THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF THE APPROVED CONTRACT 14. CONTRACTOR RESPONSIBLE FOR PREPARATION, SUBMITTAL, AND APPROVAL BY CITY OF manufacturers specifications. If inspections indicate a control has been used inappropriately, or
DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, AND SPECIAL CONDITIONS, COPIES OF ANY REQUIRED GEORGETOWN, TX OF TRAFFIC CONTROL PLAN PRIOR TO START OF CONSTRUCTION. 12. USE 4 FOOT JOINTS WITH BEVELED ENDS IF RADIUS OF STORM SEWER IS LESS 18. HOT MIX ASPHALTIC CONCRETE PAVEMENT SHALL BE TYPE D UNLESS OTHERWISE SPECIFIED AND incorrectly, the applicant must replace or modify the control for site situations. These controls must
CONSTRUCTION PERMITS, EROSION CONTROL PLANS, SWPPP AND INSPECTION REPORTS. THAN 100 FEET. SHALL BE A MINIMUM OF 2 INCHES THICK ON PUBLIC STREETS AND ROADWAYS. remain in place until the disturbed areas have been permanently stabilized.
15. SIDEWALKS ADJACENT TO CURB SHALL BE CONNECTED TO BACK OF CURB USING LONGITUDINAL
BUTT JOINT. 13. ALL PRIVATE LANDSCAPE AREA DRAINS SHALL BE OF MATERIAL APPROVED BY 19. ALL SIDEWALK RAMPS AND SIDEWALK ALONG PARKLAND, OPEN SPACE, OR OTHER
12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN NEAT AND ACCURATE CONSTRUCTION RECORD PLANS. 6. Any sediment that escapes the construction site must be collected and properly disposed of before
BOTH ENGINEER AND LANDSCAPE ARCHITECT. NON-RESIDENTIAL LOTS ARE TO BE INSTALLED WITH THE PUBLIC INFRASTRUCTURE.
the next rain event to ensure it is not washed into surface streams, sensitive features, etc.
13. CONNECTIONS TO EXISTING FACILITIES SHALL BE ACCOMPLISHED IN A NEAT AND PROFESSIONAL MANNER. WHEN 16. UNLESS THE PLANS SPECIFICALLY DICTATE TO THE CONTRARY, ON-SITE AND OTHER DIRECTIONAL 20. A MAINTENANCE BOND IS REQUIRED TO BE SUBMITTED TO THE CITY PRIOR TO ACCEPTANCE OF
FIELD CONDITIONS INDICATE ANY VARIANCE FROM DETAILED METHODS, THE CONTRACTOR SHALL PROVIDE SIGNS SHALL BE LOCATED OUT OF THE PEDESTRIAN AND AUTOMOBILE ROUTES AND SHALL BE THE PUBLIC IMPROVEMENTS. THIS BOND SHALL BE ESTABLISHED FOR 2 YEARS IN THE AMOUNT OF 7. Sediment must be removed from the sediment traps or sedimentation basins not later than when it
COMPREHENSIVE AND DETAILED DRAWINGS (FOR APPROVAL) OF METHODS PROPOSED. LOCATED BETWEEN THREE TO FIVE FEET BEHIND THE NEAREST BACK OF CURB. SIGN HEIGHT, WATER AND SANITARY SEWER NOTES occupies 50% of the basin's design capacity.
10% OF THE COST OF THE PUBLIC IMPROVEMENTS AND SHALL FOLLOW THE CITY FORMAT.
LOCATION, AND STRUCTURE SHALL BE SUCH THAT THE SIGNS POSE NO THREAT TO PUBLIC
14. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT SAFETY. 1. ALL MATERIALS AND WORKMANSHIP TO CONFORM TO THE REQUIREMENTS SET 21. RECORD DRAWINGS OF THE PUBLIC IMPROVEMENTS SHALL BE SUBMITTED TO THE CITY BY THE 8. Litter, construction debris, and construction chemicals exposed to stormwater shall be prevented from
AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE FORTH IN THE CITY OF GEORGETOWN WATER AND WASTEWATER DESIGN ENGINEER PRIOR TO ACCEPTANCE OF THE PROJECT. THESE DRAWINGS SHALL BE ON being discharged offsite.
WITHOUT PRIOR APPROVAL OF THE OWNER AND NOTIFICATION TO THE ENGINEER. NO CONSIDERATION WILL BE 17. UNLESS THE PLANS SPECIFICALLY DICTATE TO THE CONTRARY, ON-SITE AND OTHER DIRECTIONAL CONSTRUCTION STANDARDS AND DETAILS, LATEST EDITION. MYLAR OR ON TIFF OR PDF DISK (300DPI). IF A DISK IS SUBMITTED, A BOND SET SHALL BE
GIVEN TO CHANGE ORDERS FOR WHICH THE OWNER AND ENGINEER WERE NOT CONTACTED PRIOR TO SIGNS SHALL BE ORIENTED SO THEY ARE READILY VISIBLE TO THE ONCOMING TRAFFIC FOR INCLUDED WITH THE DISK. 9. All spoils (excavated material) generated from the project site must be stored on-site with proper E&S
CONSTRUCTION OF THE AFFECTED ITEM. WHICH THEY ARE INTENDED, FIELD ADJUSTMENTS OF LOCATION AND ORIENTATION OF THE SIGNS 2. WATER PIPE SHALL BE PVC C-900 DR 18, EXCEPT WHEN OTHERWISE NOTED. controls. For storage or disposal of spoils at another site on the Edwards Aquifer Recharge Zone, the
ARE TO BE MADE TO ACCOMPLISH THIS. 22. IT IS THE RESPONSIBILITY OF THE PROPERTY OWNER, AND SUCCESSORS TO THE CURRENT owner of the site must receive approval of a water pollution abatement plan for the placement of fill

©
15. ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE TO BE SENT TO THE OWNER 3. SEWER PIPE SHALL BE MINIMUM SDR 35 PVC OR ULTRA RIB PVC SDR 26. PROPERTY OWNER, TO ENSURE THE SUBJECT PROPERTY AND ANY IMPROVEMENTS ARE material or mass grading prior to the placement of spoils at the other site.
AND DESIGN ENGINEER OF RECORD DIRECTLY FROM THE TESTING AGENCY. 18. THE CONTRACTOR FOR THE PROJECT SHALL NOT PLACE ANY PERMANENT PAVEMENT UNTIL ALL MAINTAINED IN CONFORMANCE WITH THIS SITE DEVELOPMENT PLAN.
SLEEVING FOR ELECTRIC, GAS, TELEPHONE, CABLE TV, SITE IRRIGATION, OR ANY OTHER 4. WATER MAINS SHALL HAVE THE FOLLOWING MINIMUM COVER BELOW STREET 10. If portions of the site will have a temporary or permanent cease in construction activity lasting longer
UNDERGROUND UTILITY HAS BEEN INSTALLED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY GRADES: 23. THE DEVELOPMENT SHALL COMPLY WITH ALL STANDARDS OF THE UNIFIED DEVELOPMENT CODE than 14 days, soil stabilization in those areas shall be initiated as soon as possible prior to the 14th
16. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES, JURISDICTIONAL AGENCIES AND/OR
TO CONFIRM THAT ALL SLEEVING IS IN PLACE PRIOR TO PLACEMENT OF PERMANENT PAVEMENT. SIZE COVER (UDC), THE CITY OF GEORGETOWN CONSTRUCTION STANDARDS AND SPECIFICATIONS MANUAL, day of inactivity. If activity will resume prior to the 21st day, stabilization measures are not required.
UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO THE FINAL CONNECTION OF SERVICES.
6" 3.5' THE DEVELOPMENT MANUAL AND ALL OTHER APPLICABLE CITY STANDARDS. If drought conditions or inclement weather prevent action by the 14th day, stabilization measures
17. CONTRACTOR SHALL VERIFY BENCHMARKS AND DATUM PRIOR TO COMMENCING CONSTRUCTION OR STAKING OF 19. BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY THAT SUITABLE HANDICAPPED 8" 4.0' shall be initiated as soon as possible.
24. THE SITE DEVELOPMENT PLAN SHALL MEET THE UDC STORMWATER REQUIREMENTS.
IMPROVEMENTS. ROUTES (PER A.D.A. & T.A.S) EXIST TO AND FROM EVERY DOOR. IN NO CASE SHALL HANDICAP 10" 4.0'
RAMP SLOPES EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS 12" 5.0' 25. ALL SIGNAGE REQUIRES A SEPARATE APPLICATION AND APPROVAL FROM THE INSPECTION 11. The following records shall be maintained and made available to the TCEQ upon request:
18. ALL HORIZONTAL DIMENSIONS GIVEN ARE TO FACE OF CURB AND TO PIPE CENTERLINES, UNLESS OTHERWISE NOTED SLOPES EXCEED 2.0 PERCENT. IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPES EXCEED 5.0 LARGER AS SHOWN ON PLANS SERVICES DEPARTMENT. NO SIGNAGE IS APPROVED WITH THE SITE DEVELOPMENT PLAN. - the dates when major grading activities occur;
ON PLANS. PERCENT. CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO PAVING IF ANY EXCESSIVE - the dates when construction activities temporarily or permanently cease on a portion
SLOPES ARE ENCOUNTERED. NO CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR A.D.A. 5. PLASTIC TAPE FOR UTILITY SERVICES SHALL BE ATTACHED TO THE ENDS OF 26. SIDEWALKS SHALL BE PROVIDED IN ACCORDANCE WITH THE UDC. of the site; and
19. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION STAKING. CONSTRUCTION STAKING SHALL BE AND T.A.S. COMPLIANCE ISSUES. ALL WATER AND SEWER SERVICE LINES AND EXTEND ABOVE GROUND LEVEL. - the dates when stabilization measures are initiated.
THE TAPE SHALL MEET THE FOLLOWING SPECIFICATION: 27. DRIVEWAYS WILL REQUIRE APPROVAL BY THE DEVELOPMENT ENGINEER OF THE CITY OF
PERFORMED BY A REGISTERED PUBLIC SURVEYOR IN THE STATE OF TEXAS.
20. STREETS, SIDEWALKS, DRIVEWAYS, AND STORM DRAINAGE FACILITIES IN THE PUBLIC A. "GEORGETOWN MARKING TAPE" OR APPROVED EQUAL. GEORGETOWN. 12. The holder of any approved Edward Aquifer protection plan must notify the appropriate regional office
20. THE CONTRACTOR SHALL TOPSOIL, SEED AND FERTILIZE ALL AREAS DISTURBED BY CONSTRUCTION. THE RIGHT-OF-WAY SHALL BE CONSTRUCTED IN CONFORMANCE WITH THE CITY OF GEORGETOWN B. ROLL MARKED CONTINUOUSLY, "CAUTION WATER LINE" OR "CAUTION SEWER in writing and obtain approval from the executive director prior to initiating any of the following:
28. OUTDOOR LIGHTING SHALL COMPLY WITH SECTION 7.05 OF THE UDC.
CONTRACTOR SHALL PROVIDE WHATEVER MEASURES ARE NEEDED INCLUDING TEMPORARY IRRIGATION TO ENSURE INFRASTRUCTURE DESIGN & DEVELOPMENT STANDARDS MANUAL, LATEST EDITION. LINE".
FULL COVERAGE OF GRASSING. UNLESS OTHERWISE NOTED, PRIVATE LAWN AREAS AND PARKWAYS IN FRONT OF C. SIX (6) INCHES IN WIDTH. 29. SCREENING OF MECHANICAL EQUIPMENT, DUMPSTERS AND PARKING SHALL COMPLY WITH A. any physical or operational modification of any water pollution abatement structure(s), including
PRIVATE LAWN AREAS DISTURBED BY CONSTRUCTION SHALL BE REPLACED WITH BLOCK SOD OF A SIMILAR GRASS 21. FIRE LANES SHALL REMAIN OPEN/ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION; FIRE LANE D. RED TAPE FOR SEWER SERVICES. CHAPTER 8 OF THE UDC. THE SCREENING IS SHOWN ON THE LANDSCAPE AND ARCHITECTURAL but not limited to ponds, dams, berms, sewage treatment plants, and diversionary structures;
TO THAT EXISTING. ALL SEEDED OR SODDED AREAS SHALL RECEIVE SIX(6) INCHES OF TOPSOIL. ANY AREAS SHALL BE INSTALLED & ACCEPTED BY THE CITY PRIOR TO ANY CONSTRUCTION ABOVE THE E. BLUE TAPE FOR WATER SERVICES. PLANS, AS APPLICABLE.
B. any change in the nature or character of the regulated activity from that which was originally 2/21/24
DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE FOUNDATION.
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 6. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY EXACT LOCATIONS 30. THE COMPANION LANDSCAPE PLAN HAS BEEN DESIGNED AND PLANT MATERIALS SHALL BE approved or a change which would significantly impact the ability of the plan to prevent pollution
OF EXISTING PUBLIC AND PRIVATE UTILITIES AND SERVICES PRIOR TO INSTALLED TO MEET ALL REQUIREMENTS OF THE UDC. of the Edwards Aquifer;
21. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED SMOOTH. THE AREAS SHALL THEN BE COMMENCING CONSTRUCTION. THE CONTRACTOR SHALL CALL 811 FOR FIELD
GRADING NOTES LOCATION OF EXISTING UTILITIES. CALL AT LEAST 48 HOURS BEFORE 31. ALL MAINTENANCE OF REQUIRED LANDSCAPE SHALL COMPLY WITH THE MAINTENANCE C. any development of land previously identified as undeveloped in the original water pollution
SEEDED, IRRIGATED, AND STABILIZED AS SPECIFIED IN THE PLANS, AND MAINTAINED UNTIL SOIL IS STABILIZED IN ALL
LOCATIONS ARE NEEDED. NOTE THAT THE DIG TESS SERVICE DOES NOT STANDARDS OF CHAPTER 8 OF THE UDC. abatement plan.
AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE CORRECTED
1. ALL CONSTRUCTION SHALL BE IN GENERAL ACCORDANCE WITH THESE PLANS, CITY OF LOCATE ALL UTILITIES, ONLY THOSE REGISTERED WITH THE SERVICE.
BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE STABILIZED AND 32. A SEPARATE IRRIGATION PLAN SHALL BE REQUIRED AT THE TIME OF BUILDING PERMIT
GEORGETOWN, TX STANDARD SPECIFICATIONS, THE FINAL GEOTECHNICAL REPORT, AND
MULCHED AS SHOWN ON THE LANDSCAPE, GRADING, AND EROSION CONTROL PLANS. APPLICATION. THE DISTRICT ENGINEER, JONEY-HEROY & ASSOCIATES, INC. (KEN HEROY, PH. 512-989-2200)
COMMONLY ACCEPTED CONSTRUCTION STANDARDS. 7. REFER TO SITE GRADING PLANS, PAVING PLANS, AND LANDSCAPE PLANS FOR SHALL BE CONTACTED 48 HOURS PRIOR TO:
22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING AND SCATTERING IN THE FINAL GRADES FOR DETERMINING PROPOSED MANHOLE RIM ELEVATIONS. 33. FIRE FLOW REQUIREMENTS OF 1,500 GALLONS PER MINUTE ARE BEING MET BY THIS PLAN. 1. PRE-CONSTRUCTION MEETINGS
2. UNLESS OTHERWISE NOTED, PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN IN
AIR DURING CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL. 2. BEGINNING EACH PHASE OF CONSTRUCTION
PAVED AREAS REFLECT TOP OF PAVEMENT SURFACE. ADD .50' TO PAVING GRADE FOR TOP 8. LOCATIONS AND SIZES OF EXISTING PUBLIC AND PRIVATE UTILITIES SHOWN ON 34. ANY HERITAGE TREE NOTED ON THIS SITE DEVELOPMENT PLAN IS SUBJECT, IN PERPETUITY, TO
THE CONTRACTOR SHALL COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL 3. TESTING OF WATER AND/OR WASTEWATER LINES; AND,
OF CURB GRADE. THE LIMITS OF EARTHWORK IN PAVED AREAS IS THE BOTTOM OF THESE PLANS ARE FROM CITY AND UTILITY COMPANY RECORDS ONLY. THE THE MAINTENANCE, CAR, PRUNING, AND REMOVAL REQUIREMENTS OF THE UDC.
PROTECTION. 4. FINAL WALK-THROUGH OF FACILITIES
PAVEMENT. CONTRACTOR IS SOLELY RESPONSIBLE FOR LOCATING ALL UTILITIES AND FOR

GENERAL NOTES (SHEET


DAMAGES RESULTING FROM FAILURE TO DO SO. 35. AT THE CONCLUSION OF CONSTRUCTION AND AS PART OF THE PROCESS FOR THE CITY TO
23. SOD MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES WITHIN TO PREVENT EROSION, SEDIMENTATION OR
3. THE CONTRACTOR SHALL MAINTAIN ADEQUATE SITE DRAINAGE DURING ALL PHASES OF ACCEPT THIS PHASE. THE FIRE HYDRANTS SHALL BE FLOWED AND TESTED A AT THE CONCLUSION
TURBID DISCHARGES.
CONSTRUCTION. THE CONTRACTOR SHALL USE SILT FENCES (OR OTHER METHODS 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING "RECORD" PLANS OF CONSTRUCTION AND AS PART OF THE PROCESS FOR THE CITY TO ACCEPT THIS PHASE. THE
APPROVED BY THE ENGINEER AND CITY) AS REQUIRED TO PREVENT SILT AND TO THE ENGINEER SHOWING THE LOCATION OF WATER AND SEWER SERVICES FIRE HYDRANTS SHALL BE FLOWED AND TESTED A COPY OF THE REPORT SHALL BE EMAILED INTO
24. CONTRACTOR IS TO CONSTRUCT A STABILIZED CONSTRUCTION EXIT AT ALL PRIMARY POINTS OF ACCESS. THIS
CONSTRUCTION DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES. CONTRACTOR AND ANY DEVIATIONS FROM PLANS MADE DURING CONSTRUCTION. THE FIRE DEPARTMENT AND THE HYDRANTS SHALL BE PAINTED AND COLOR CODED** CAUTION IF
STABILIZED EXIT SHALL BE CONSTRUCTED PER CITY DETAILS.
SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, OR LOCAL EROSION, PRESSURE REDUCING VALVES WERE INSTALLED IN THIS PHASING THEY MUST BE SET PRIOR TO
CONSERVATION, AND SILTATION REQUIREMENTS. CONTRACTOR SHALL REMOVE ALL 10. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS SHOWN, COORDINATING THE FIRE HYDRANT FLOW TESTING.***
25. CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING THE STORM WATER POLLUTION PREVENTION PLAN
TEMPORARY EROSION CONTROL DEVICES UPON COMPLETION OF PERMANENT DRAINAGE HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITY SERVICES ENTERING
(SWPPP). THE CONTRACTOR MUST REVIEW AND MAINTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION
FACILITIES AND THE ESTABLISHMENT OF A STAND OF GRASS OR OTHER GROWTH TO THE BUILDING AND/OR CROSSING OTHER UTILITIES.
PLAN WITH ALL CONDITIONS, ATTACHMENTS, EXHIBITS, AND PERMIT MODIFICATIONS IN GOOD CONDITION AT THE THE FIRE CODE, SECTION LA- 507.5.7 CITY OF GEORGETOWN FIRE HYDRANT COLOR CODE
PREVENT EROSION. CONTRACTOR IS RESPONSIBLE FOR FILING N.O.I. AND N.O.T. WITH THE
CONSTRUCTION SITE. THE COMPLETE SWPPP MUST BE MADE READILY AVAILABLE AT THE TIME OF AN ON-SITE SYSTEM, IS HEREBY ADDED TO READ AS FOLLOWS:
TCEQ. CONTRACTOR SOLELY RESPONSIBLE FOR ALL MANDATED SWPPP RECORD KEEPING 11. ALL WATER AND SANITARY SEWER SERVICES SHALL TERMINATE FIVE (5) FEET
INSPECTION TO: THE EXECUTIVE DIRECTOR; A FEDERAL, STATE, OR LOCAL AGENCY APPROVING SEDIMENT AND
AND REPORTING. OUTSIDE THE BUILDING, UNLESS NOTED OTHERWISE.

1 OF 2)
EROSION PLANS, GRADING PLANS, OR STORMWATER MANAGEMENT PLANS; LOCAL GOVERNMENT OFFICIALS; AND
THE OPERATOR OF A MUNICIPAL SEPARATE STORM SEWER (MS4) RECEIVING DISCHARGES FROM THE SITE. LA-507.5.7 CITY OF GEORGETOWN FIRE HYDRANT COLOR CODE SYSTEM. PRIVATE FIRE HYDRANT
4. ALL EXCAVATING IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. 12. THE SITE UTILITY CONTRACTOR SHALL PROVIDE ALL MATERIALS AND MAINTENANCE SHALL BE IN ACCORDANCE WITH NFPA 291.
UNUSABLE EXCAVATED MATERIAL AND ALL WASTE RESULTING FROM SITE CLEARING AND APPURTENANCES NECESSARY FOR COMPLETE INSTALLATION OF THE UTILITIES.
26. ANY ENTITY THAT MEETS THE DEFINITION OF A "PRIMARY OPERATOR" FOR A LARGE CONSTRUCTION ACTIVITY (FIVE
GRUBBING SHALL BE DISPOSED OF OFF SITE BY THE GRADING CONTRACTOR AT HIS ALL PUBLIC PIPE, STRUCTURES, AND FITTINGS SHALL BE INSPECTED BY THE
OR MORE ACRES) SHALL BE RESPONSIBLE FOR COMPLETING AND SUBMITTING A NOTICE OF INTENT (NOI) AND A A. ALL PRIVATE HYDRANT BARRELS WILL BE PAINTED RED WITH THE BONNET PAINTED USING THE
EXPENSE. CITY INSPECTOR PRIOR TO BEING COVERED. THE INSPECTOR MUST ALSO BE
NOTICE OF TERMINATION (NOT) WITH THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY (TCEQ). HYDRANT FLOW STANDARD IN PARAGRAPH C OF THIS SECTION TO INDICATE FLOW. IT WILL BE
PRESENT DURING DISINFECTION AND PRESSURE TESTING OF ALL MAINS. THE THE CUSTOMER'S RESPONSIBILITY TO TEST AND MAINTAIN THEIR PRIVATE FIRE HYDRANT(S).
5. BEFORE ANY EARTHWORK IS PERFORMED, THE CONTRACTOR SHALL STAKE OUT AND MARK CONTRACTOR'S BID PRICE SHALL INCLUDE ALL INSPECTION FEES.
27. THE CONTRACTOR MUST CONSTRUCT AND MAINTAIN A PERMANENT STABLE PROTECTIVE COVER (GRASS) FOR
THE LIMITS OF PAVEMENT AND OTHER ITEMS ESTABLISHED BY THE PLANS. THE
EROSION AND SEDIMENT CONTROL ON ALL LAND SURFACES EXPOSED OR DISTURBED BY CONSTRUCTION OF THE B. ALL PRIVATE FIRE HYDRANTS SHOULD BE INSPECTED, MAINTAINED, AND FLOW TESTED
CONTRACTOR SHALL PROVIDE ALL NECESSARY ENGINEERING AND SURVEYING FOR LINE 13. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SITE TRENCH SAFETY
PERMITTED PROJECT. THE PROTECTIVE COVER MUST BE INSTALLED WITHIN FOURTEEN DAYS AFTER FINAL GRADING ANNUALLY, AND COLOR CODED TO INDICATE THE EXPECTED FIRE FLOW FROM THE HYDRANT
AND GRADE CONTROL POINTS RELATED TO EARTHWORK. DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL SUBMIT A
OF THE AFFECTED LAND SURFACE. A PERMANENT STABLE COVER MUST BE ESTABLISHED WITHIN 60 DAYS OF IT'S DURING NORMAL OPERATION. SUCH COLOR APPLIED TO THE FIRE HYDRANT BY PAINTING THE
INSTALLATION. TRENCH EXCAVATION PROTECTION PLAN, SEALED BY A GEOTECHNICAL
6. REFERENCE STRUCTURAL DRAWINGS AND SPECIFICATIONS AND GEOTECHNICAL REPORT BONNET THE APPROPRIATE COLOR FOR THE EXPECTED FLOW CONDITION.
ENGINEER REGISTERED IN THE STATE OF TEXAS, FOR ALL TRENCHES DEEPER
FOR STRUCTURAL SCOPE AND PAVING SUBGRADE INFORMATION. THAN FIVE (5) FEET.
28. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL PROVIDE AS-BUILT PLANS IDENTIFYING ALL DEVIATIONS
C. HYDRANT FLOW CODING STANDARDS. PUBLIC HYDRANTS BARRELS WILL BE PAINTED SILVER,
OR VARIATIONS OF ORIGINAL PLANS. AS-BUILT PLANS ARE SUBSIDIARY TO ALL OTHER BID ITEMS AND SHALL NOT BE
7. THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE AND PLACE, COMPACT, AND MOISTURE 14. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING FOR ALL WATER THE HYDRANTS WILL BE FLOW TESTED, AND THE BONNET PAINTED USING THE HYDRANT FLOW
PAID FOR AS A SEPARATE LINE ITEM.
CONDITION ALL FILL PER THE PROJECT GEOTECHNICAL ENGINEER'S SPECIFICATIONS. THE AND SANITARY SEWER LINES AND OTHER UTILITIES. STANDARD IN AS FOLLOWS: AT 20 PSI RESIDUAL.
FILL MATERIAL TO BE USED SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR FLOW COLOR
29. DURING CONSTRUCTION, ALL MATERIAL TESTING SHALL BE COORDINATED WITH THE CITY OF GEORGETOWN
TO PLACEMENT. 15. REFER TO TCEQ DESIGN GUIDELINES (CHAPTER 290) FOR ALL UTILITY
CONSTRUCTION INSPECTOR. THE CONTRACTOR WILL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CITY GREATER THAN 1500 GPM BLUE
STANDARD SPECIFICATIONS. ALL SOILS TESTING IS THE RESPONSIBILITY OF AND WILL BE PAID FOR BY THE CROSSINGS.
8. GRADING CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANIES FOR ANY 1000- 1500 GPM GREEN
CONTRACTOR. MATERIAL TESTING SHALL BE PERFORMED BY AN INDEPENDENT TESTING LABORATORY. 500-999 GPM ORANGE
REQUIRED UTILITY ADJUSTMENTS AND/OR RELOCATIONS. 16. CONTRACTOR TO SEQUENCE CONSTRUCTION AS TO AVOID INTERRUPTION OF
WATER OR SANITARY SEWER SERVICE TO SURROUNDING AREAS. LESS THAN 500 GPM RED
30. ALL EXISTING TRAFFIC AND STREET SIGNS DISTURBED SHALL BE REINSTALLED WHERE APPLICABLE BY THE
9. TESTING OF MATERIALS REQUIRED FOR THE CONSTRUCTION OF THE PAVING NOT WORKING BLACK OR BAGGED
CONTRACTOR.
IMPROVEMENTS SHALL BE PERFORMED BY AN APPROVED AGENCY FOR TESTING MATERIALS. 17. EXISTING MANHOLE TOPS, VALVE BOXES, ETC. ARE TO BE ADJUSTED AS OF THE REPORT SHALL BE EMAILED INTO THE FIRE DEPARTMENT AND THE HYDRANTS SHALL BE
THE NOMINATION OF THE TESTING LABORATORY AND THE PAYMENTS FOR SUCH TESTING REQUIRED TO MATCH PROPOSED GRADES. PAINTED AND COLOR CODED.
31. ALL EXISTING SHRUBS, TREES, PLANTING, AND OTHER VEGETATION, OUTSIDE OF PROPERTY LIMITS DISTURBED
SERVICES SHALL BE MADE BY THE CONTRACTOR. THE OWNER SHALL APPROVE THE
DURING CONSTRUCTION SHALL BE REPLACED WITH EQUIVALENT MATERIAL BY THE CONTRACTOR AT NO ADDITIONAL *** CAUTION IF PRESSURE REDUCING VALVES WERE INSTALLED IN THIS PHASING THEY MUST BE
LABORATORY NOMINATED TO DO THE TESTING OF MATERIALS. IT SHALL BE THE 18. FIRE HYDRANTS SHALL BE LOCATED A MINIMUM OF TWO (2) FEET AND A
COST. SET PRIOR TO FIRE HYDRANT FLOW TESTING.***

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


CONTRACTOR'S RESPONSIBILITY TO SHOW BY STANDARD TESTING PROCEDURES THAT THE MAXIMUM OF SIX (6) FEET BEHIND THE CURB LINE OF FIRE LANE AND STREET.
WORK CONSTRUCTED DOES MEET THE REQUIREMENTS OF THE CITY'S SPECIFICATIONS AND
32. THE CONTRACTOR SHALL SALVAGE AND PROTECT ALL EXISTING POWER POLES, SIGNS, MANHOLES, TELEPHONE

HIGHLANDS
THESE PLANS.

CITY OF GEORGETOWN
RISERS, WATER VALVES, ETC. DURING ALL CONSTRUCTION PHASES. 19. ANY WATER OR SANITARY SEWER SERVICE LOCATED OUTSIDE OF A STREET,
ALLEY OR EASEMENT SHALL BE INSTALLED BY A PLUMBER AND BE INSPECTED
10. PROPOSED CONTOURS ARE APPROXIMATE. PROPOSED SPOT ELEVATIONS AND DESIGNATED BY CODE ENFORCEMENT.
33. CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL SILT AND DEBRIS OFFSITE FROM THE EXISTING ROADWAYS AND
GRADIENT ARE TO BE USED IN CASE OF DISCREPANCY.

PHASE 3
PROJECT SITE THAT ARE A RESULT OF THE PROPOSED CONSTRUCTION AS REQUESTED BY THE CITY OF
GEORGETOWN. AT A MINIMUM, THIS TASK SHOULD OCCUR ONCE A WEEK.
11. REFER TO SITE PLAN AND/OR DIMENSION CONTROL PLAN AND FINAL PLAT FOR HORIZONTAL
DIMENSIONS.
34. CONNECTIONS TO EXISTING FACILITIES SHALL BE ACCOMPLISHED IN A NEAT AND PROFESSIONAL MANNER. WHEN NOTE:
FIELD CONDITIONS INDICATE ANY VARIANCE FROM DETAILED METHODS, THE CONTRACTOR SHALL PROVIDE
12. REFER TO EROSION CONTROL PLAN FOR EROSION CONTROL DEVICES TO BE INSTALLED
COMPREHENSIVE AND DETAILED DRAWINGS (FOR APPROVAL) OF METHODS PROPOSED.

Know what'sbelow.
PRIOR TO COMMENCING CONSTRUCTION. THE DISTRICT ENGINEER, JONES-HEROY & ASSOCIATES, INC. (KEN HEROY, PH:
512-989-2200) SHALL BE CONTRACTED 48 HOURS PRIOR TO:

Call before you dig.


35. WATER SHALL NOT BE PERMITTED IN OPEN TRENCHES DURING CONSTRUCTION. 1. PRE-CONSTRUCTION MEETINGS;
13. NO TREE SHALL BE REMOVED OR DAMAGED WITHOUT PRIOR AUTHORIZATION OF THE
OWNER OR OWNER'S REPRESENTATIVE. EXISTING TREES SHALL BE PRESERVED WHENEVER 2. BEGINNING EACH PHASE OF CONSTRUCTION;
36. CONTRACTOR SHALL CONTACT THE DESIGNATED CONSTRUCTION INSPECTOR ASSIGNED TO THIS PROJECT AT LEAST 3. TESTING OF WATER AND/OR WASTEWATER LINES; AND,
POSSIBLE.
48 HOURS PRIOR TO STARTING CONSTRUCTION. 4. FINAL WALK-THROUGH OF FACILITIES
14. CONTRACTOR SHALL VERIFY HORIZONTAL AND VERTICAL CONTROL PRIOR TO COMMENCING
37. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING A TRENCH SAFETY PLAN TO THE CITY OF GEORGETOWN
CONSTRUCTION AND SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES BEFORE
PUBLIC WORKS DEPARTMENT AT THE TIME OF THE PRECONSTRUCTION MEETING, OR PRIOR TO BEGINNING
CONSTRUCTION COMMENCES.
CONSTRUCTION OF THESE IMPROVEMENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING TRENCH
SAFETY REQUIREMENTS IN ACCORDANCE WITH CITY STANDARDS, TEXAS STATE LAW, AND O.S.H.A. STANDARDS FOR
15. AFTER PLACEMENT OF SUBGRADE AND PRIOR TO PLACEMENT OF PAVEMENT, CONTRACTOR
ALL EXCAVATION IN EXCESS OF FIVE FEET IN DEPTH. NO OPEN TRENCHES WILL BE ALLOWED OVERNIGHT WITHOUT
SHALL TEST AND OBSERVE PAVEMENT AREAS FOR EVIDENCE OF PONDING. ALL AREAS
THE PRIOR SPECIFIC WRITTEN APPROVAL OF THE CITY OF GEORGETOWN PUBLIC WORKS DEPARTMENT, OR WARNING: CONTRACTOR IS TO
SHALL ADEQUATELY DRAIN TOWARDS THE INTENDED STRUCTURE TO CONVEY STORM
DESIGNATED REPRESENTATIVE. ONSITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. VERIFY PRESENCE AND EXACT
RUNOFF. CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER AND ENGINEER IF ANY
DISCREPANCIES ARE DISCOVERED. LOCATION OF ALL UTILITIES
38. CONTRACTOR TO REVIEW DESIGN INTENT OF THESE PLANS AND SUBMIT REQUESTS-FOR-INFORMATION IN A TIMELY PRIOR TO CONSTRUCTION.
MANNER PRIOR TO COMMENCING THAT WORK.

39. ALL APPURTENANCES INSTALLED IN PAVEMENT AREAS SHALL BE ADJUSTED AS REQUIRED TO BE FLUSH WITH
FINISHED PAVEMENT.

40. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR COMPLETING AND IMPLEMENTING TRAFFIC CONTROL PLAN. C-04
OF C-37
2023-24-CON
KH GENERAL NOTES EFFECTIVELY CONTROL EROSION AND PREVENT SEDIMENTATION FROM WASHING OFF THE SITE, THEN THE CONTRACTOR SHALL APPROVED TREE PRESERVATION PLANS BY THE LANDSCAPE ARCHITECT. 19. ALL FIRE HYDRANTS, VALVES, TEES, BENDS, WYES, REDUCERS, FITTINGS, AND ENDS SHALL BE MECHANICALLY RESTRAINED AND/OR
NOTIFY THE ENGINEER. 31.CONTRACTOR SHALL REFER TO THE LANDSCAPING AND TREE PRESERVATIONS PLANS FOR ALL INFORMATION AND DETAILS THRUST BLOCKED TO CITY STANDARDS.
OVERALL: 11. OFF-SITE SOIL BORROW, SPOIL, AND STORAGE AREAS (IF APPLICABLE) ARE CONSIDERED AS PART OF THE PROJECT SITE AND MUST REGARDING EXISTING TREES TO BE REMOVED AND PRESERVED. 20.CONTRACTOR SHALL INSTALL A FULL SEGMENT OF WATER OR WASTEWATER PIPE CENTERED AT ALL UTILITY CROSSINGS SO THAT THE
1. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THESE PLANS, CITY (OR TOWN) STANDARD DETAILS AND ALSO COMPLY WITH THE EROSION CONTROL REQUIREMENTS FOR THIS PROJECT. THIS INCLUDES THE INSTALLATION OF BMP'S TO 32.NO TREE SHALL BE REMOVED UNLESS A TREE REMOVAL PERMIT HAS BEEN ISSUED BY THE CITY, OR CITY HAS OTHERWISE CONFIRMED JOINTS ARE GREATER THAN 9-FEET FROM THE CROSSING.
SPECIFICATIONS, THE FINAL GEOTECHNICAL REPORT AND ALL ISSUED ADDENDA, AND COMMONLY ACCEPTED CONSTRUCTION CONTROL EROSION AND SEDIMENTATION AND THE ESTABLISHMENT OF PERMANENT GROUND COVER ON DISTURBED AREAS PRIOR TO IN WRITING THAT ONE IS NOT NEEDED FOR THE TREE(S). 21.ALL CROSSINGS AND LOCATIONS WHERE WASTEWATER IS LESS THAN 9-FEET FROM WATER, WASTEWATER CONSTRUCTION AND
STANDARDS. THE CITY SPECIFICATIONS SHALL GOVERN WHERE OTHER SPECIFICATIONS DO NOT EXIST. IN CASE OF CONFLICTING FINAL APPROVAL OF THE PROJECT. CONTRACTOR IS RESPONSIBLE FOR MODIFYING THE SWPPP AND EROSION CONTROL PLAN TO 33.NO TREE SHALL BE REMOVED OR DAMAGED WITHOUT PRIOR AUTHORIZATION OF THE OWNER OR OWNER'S REPRESENTATIVE. MATERIALS SHALL COMPLY WITH TCEQ CHAPTER 217.53.
SPECIFICATIONS OR DETAILS, THE MORE RESTRICTIVE SPECIFICATION AND DETAIL SHALL BE FOLLOWED. INCLUDE BMPS FOR ANY OFF-SITE THAT ARE NOT ANTICIPATED OR SHOWN ON THE EROSION CONTROL PLAN. EXISTING TREES SHALL BE PRESERVED WHENEVER POSSIBLE AND GRADING IMPACT TO THEM HELD TO A MINIMUM. 22.ALL CROSSING AND LOCATIONS WHERE WATER IS LESS THAN 9-FEET FROM WASTEWATER, WATER CONSTRUCTION AND MATERIALS
2. THE CONTRACTOR SHALL COMPLY WITH CITY (OR TOWN) “GENERAL NOTES” FOR CONSTRUCTION, IF EXISTING AND REQUIRED BY THE 12. ALL STAGING, STOCKPILES, SPOIL, AND STORAGE SHALL BE LOCATED SUCH THAT THEY WILL NOT ADVERSELY AFFECT STORM WATER 34.AFTER PLACEMENT OF SUBGRADE AND PRIOR TO PLACEMENT OF PAVEMENT, CONTRACTOR SHALL TEST AND OBSERVE PAVEMENT SHALL COMPLY WITH TCEQ CHAPTER 290.44.
CITY. FOR INSTANCES WHERE THEY CONFLICT WITH THESE KH GENERAL NOTES, THEN THE MORE RESTRICTIVE SHALL APPLY. QUALITY. PROTECTIVE MEASURES SHALL BE PROVIDED IF NEEDED TO ACCOMPLISH THIS REQUIREMENT, SUCH AS COVERING OR AREAS FOR EVIDENCE OF PONDING AND INADEQUATE SLOPE FOR DRAINAGE. ALL AREAS SHALL ADEQUATELY DRAIN TOWARDS THE 23.ALL WATER AND WASTEWATER SHALL BE TESTED IN ACCORDANCE WITH THE CITY, AWWA, AND TCEQ STANDARDS AND
3. THE CONTRACTOR SHALL FURNISH ALL MATERIAL AND LABOR TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE ENCIRCLING THE AREA WITH AN APPROPRIATE BARRIER. INTENDED STRUCTURE TO CONVEY STORMWATER RUNOFF. CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER AND ENGINEER IF ANY SPECIFICATIONS. AT A MINIMUM, THIS SHALL CONSIST OF THE FOLLOWING:
CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE AUTHORITIES' SPECIFICATIONS AND REQUIREMENTS. 13. CONTRACTORS SHALL INSPECT ALL EROSION CONTROL DEVICES, BMPS, DISTURBED AREAS, AND VEHICLE ENTRY AND EXIT AREAS AREAS OF POOR DRAINAGE ARE DISCOVERED. a. ALL WATERLINES SHALL BE HYDROSTATICALLY TESTED AND CHLORINATED BEFORE BEING PLACED INTO SERVICE. CONTRACTOR
4. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING TO DETERMINE EXISTING CONDITIONS. WEEKLY AND WITHIN 24 HOURS OF ALL RAINFALL EVENTS OF 0.5 INCHES OR GREATER, AND KEEP A RECORD OF THIS INSPECTION IN 35.CONTRACTOR FIELD ADJUSTMENT OF PROPOSED SPOT GRADES IS ALLOWED, IF THE APPROVAL OF THE CIVIL ENGINEER IS OBTAINED. SHALL COORDINATE WITH THE CITY FOR THEIR REQUIRED PROCEDURES AND SHALL ALSO COMPLY WITH TCEQ REGULATIONS.
5. THE EXISTING CONDITIONS SHOWN ON THESE PLANS WERE PROVIDED BY THE TOPOGRAPHIC SURVEY PREPARED BY THE PROJECT THE SWPPP BOOKLET IF APPLICABLE, TO VERIFY THAT THE DEVICES AND EROSION CONTROL PLAN ARE FUNCTIONING PROPERLY. b. WASTEWATER LINES AND MANHOLES SHALL BE PRESSURE TESTED. CONTRACTOR SHALL COORDINATE WITH THE CITY FOR THEIR
SURVEYOR, AND ARE BASED ON THE BENCHMARKS SHOWN. THE CONTRACTOR SHALL REFERENCE THE SAME BENCHMARKS. 14. CONTRACTOR SHALL CONSTRUCT A STABILIZED CONSTRUCTION ENTRANCE AT ALL PRIMARY POINTS OF ACCESS IN ACCORDANCE RETAINING WALLS: REQUIRED PROCEDURES AND SHALL ALSO COMPLY WITH TCEQ REGULATIONS. AFTER COMPLETION OF THESE TESTS, A TELEVISION
6. THE CONTRACTOR SHALL REVIEW AND VERIFY THE EXISTING TOPOGRAPHIC SURVEY SHOWN ON THE PLANS REPRESENTS EXISTING WITH CITY SPECIFICATIONS. CONTRACTOR SHALL ENSURE THAT ALL CONSTRUCTION TRAFFIC USES THE STABILIZED ENTRANCE AT 1. RETAINING WALLS SHOWN ARE FOR SITE GRADING PURPOSES ONLY, AND INCLUDE ONLY LOCATION AND SURFACE SPOT ELEVATIONS INSPECTION SHALL BE PERFORMED AND PROVIDED TO THE CITY AND OWNER ON A DVD.
FIELD CONDITIONS PRIOR TO CONSTRUCTION, AND SHALL REPORT ANY DISCREPANCIES FOUND TO THE OWNER AND ENGINEER ALL TIMES FOR ALL INGRESS/EGRESS. AT THE TOP AND BOTTOM OF THE WALL. 24.CONTRACTOR SHALL INSTALL DETECTABLE WIRING OR MARKING TAPE A MINIMUM OF 12” ABOVE WATER AND WASTEWATER LINES.
IMMEDIATELY. 15. SITE ENTRY AND EXITS SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT THE TRACKING AND FLOWING OF SEDIMENT AND 2. RETAINING WALL TYPE OR SYSTEM SHALL BE SELECTED BY THE OWNER. MARKER DECALS SHALL BE LABELED “CAUTION - WATER LINE”, OR “CAUTION - SEWER LINE”. DETECTABLE WIRING AND MARKING TAPE
7. IF THE CONTRACTOR DOES NOT ACCEPT THE EXISTING TOPOGRAPHIC SURVEY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN DIRT ONTO OFF-SITE ROADWAYS. ALL SEDIMENT AND DIRT FROM THE SITE THAT IS DEPOSITED ONTO AN OFF-SITE ROADWAY SHALL BE 3. RETAINING WALL DESIGN SHALL BE PROVIDED BY OTHERS AND SHALL FIT IN THE WALL ZONE OR LOCATION SHOWN ON THESE PLANS. SHALL COMPLY WITH CITY STANDARDS, AND SHALL BE INCLUDED IN THE COST OF THE WATER AND WASTEWATER PIPE.
THE CONTRACTOR SHALL SUPPLY AT THEIR OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED PROFESSIONAL LAND REMOVED IMMEDIATELY. STRUCTURAL DESIGN AND PERMITTING OF RETAINING WALLS, RAILINGS, AND OTHER WALL SAFETY DEVICES SHALL BE PERFORMED BY 25.DUCTILE IRON PIPE SHALL BE PROTECTED FROM CORROSION BY A LOW-DENSITY POLYETHYLENE LINER WRAP THAT IS AT LEAST A
SURVEYOR TO THE OWNER AND ENGINEER FOR REVIEW. 16. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL SILT AND DEBRIS FROM THE AFFECTED OFF-SITE ROADWAYS THAT ARE A A LICENSED ENGINEER AND ARE NOT PART OF THIS PLAN SET. SINGLE LAYER OF 8-MIL. ALL DUCTILE IRON JOINTS SHALL BE BONDED.
8. CONTRACTOR SHALL PROVIDE ALL CONSTRUCTION SURVEYING AND STAKING. RESULT OF THE CONSTRUCTION, AS REQUESTED BY OWNER AND CITY. AT A MINIMUM, THIS SHOULD OCCUR ONCE PER DAY FOR THE 4. RETAINING WALL DESIGN SHALL MEET THE INTENT OF THE GRADING PLAN AND SHALL ACCOUNT FOR ANY INFLUENCE ON ADJACENT 26.WATERLINES SHALL BE INSTALLED AT NO LESS THAN THE MINIMUM COVER REQUIRED BY THE CITY.
9. CONTRACTOR SHALL VERIFY HORIZONTAL AND VERTICAL CONTROL, INCLUDING BENCHMARKS PRIOR TO COMMENCING OFF-SITE ROADWAYS. BUILDING FOUNDATIONS, UTILITIES, PROPERTY LINES AND OTHER CONSTRUCTABILITY NOTES. 27.CONTRACTOR SHALL PROVIDE CLEAN-OUTS FOR PRIVATE SANITARY SEWER LINES AT ALL CHANGES IN DIRECTION AND 100-FOOT
CONSTRUCTION OR STAKING OF IMPROVEMENTS. PROPERTY LINES AND CORNERS SHALL BE HELD AS THE HORIZONTAL CONTROL. 17. WHEN WASHING OF VEHICLES IS REQUIRED TO REMOVE SEDIMENT PRIOR TO EXITING THE SITE, IT SHALL BE DONE IN AN AREA 5. RETAINING WALL ENGINEER SHALL CONSULT THESE PLANS AND THE GEOTECHNICAL REPORT FOR POTENTIAL CONFLICTS. INTERVALS, OR AS REQUIRED BY THE APPLICABLE PLUMBING CODE. CLEAN-OUTS REQUIRED IN PAVEMENT OR SIDEWALKS SHALL
10. THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS, ELEVATIONS, AND FIELD CONDITIONS THAT MAY AFFECT STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP BMP. HAVE CAST IRON COVERS FLUSH WITH FINISHED GRADE.
CONSTRUCTION. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT 18. CONTRACTOR SHALL INSTALL A TEMPORARY SEDIMENT BASIN FOR ANY ON-SITE DRAINAGE AREAS THAT ARE GREATER THAN 10 PAVING: 28.CONTRACTOR SHALL PROVIDE BACKWATER VALVES FOR PLUMBING FIXTURES AS REQUIRED BY THE APPLICABLE PLUMBING CODE (E.G.
AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR ACRES, PER TCEQ AND CITY STANDARDS. IF NO ENGINEERING DESIGN HAS BEEN PROVIDED FOR A SEDIMENTATION BASIN ON THESE 1. ALL PAVING MATERIALS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY STANDARD DETAILS AND FLOOR ELEVATION OF FIXTURE UNIT IS BELOW THE ELEVATION OF THE MANHOLE COVER OF THE NEXT UPSTREAM MANHOLE IN THE
APPROVAL OF THE ARCHITECT, ENGINEER, AND IF APPLICABLE THE CITY AND OWNER. NO CONSIDERATION WILL BE GIVEN TO CHANGE PLANS, THEN THE CONTRACTOR SHALL ARRANGE FOR AN APPROPRIATE DESIGN TO BE PROVIDED. SPECIFICATIONS, THE FINAL GEOTECHNICAL REPORT AND ALL ISSUED ADDENDA, AND COMMONLY ACCEPTED CONSTRUCTION PUBLIC SEWER). CONTRACTOR SHALL REVIEW BOTH MEP AND CIVIL PLANS TO CONFIRM WHERE THESE ARE REQUIRED.
ORDERS FOR WHICH THE CITY, ENGINEER, AND OWNER WERE NOT CONTACTED PRIOR TO CONSTRUCTION OF THE AFFECTED ITEM. 19. ALL FINES IMPOSED FOR SEDIMENT OR DIRT DISCHARGED FROM THE SITE SHALL BE PAID BY THE RESPONSIBLE CONTRACTOR. STANDARDS. THE CITY SPECIFICATIONS SHALL GOVERN WHERE OTHER SPECIFICATIONS DO NOT EXIST. IN CASE OF CONFLICTING 29.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND SUBMITTING A TRENCH SAFETY PLAN, PREPARED BY A PROFESSIONAL
11. CONTRACTOR SHALL THOROUGHLY CHECK COORDINATION OF CIVIL, LANDSCAPE, MEP, ARCHITECTURAL, AND OTHER PLANS PRIOR TO 20.WHEN SEDIMENT OR DIRT HAS CLOGGED THE CONSTRUCTION ENTRANCE VOID SPACES BETWEEN STONES OR DIRT IS BEING TRACKED SPECIFICATIONS OR DETAILS, THE MORE RESTRICTIVE SPECIFICATION/DETAIL SHALL BE FOLLOWED. ENGINEER IN THE STATE OF TEXAS, TO THE CITY PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TRENCH
COMMENCING CONSTRUCTION. OWNER/ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCY PRIOR TO COMMENCING WITH ONTO A ROADWAY, THE AGGREGATE PAD MUST BE WASHED DOWN OR REPLACED. RUNOFF FROM THE WASH-DOWN OPERATION SHALL 2. ALL PRIVATE ON-SITE PAVING AND PAVING SUBGRADE SHALL COMPLY WITH THE PROJECT'S FINAL GEOTECHNICAL REPORT (OR LATEST SAFETY REQUIREMENTS IN ACCORDANCE WITH CITY, STATE, AND FEDERAL REQUIREMENTS, INCLUDING OSHA FOR ALL TRENCHES. NO
CONSTRUCTION. NOT BE ALLOWED TO DRAIN DIRECTLY OFF SITE WITHOUT FIRST FLOWING THROUGH ANOTHER BMP TO CONTROL SEDIMENTATION. EDITION), INCLUDING ALL ADDENDA. OPEN TRENCHES SHALL BE ALLOWED OVERNIGHT WITHOUT PRIOR WRITTEN APPROVAL OF THE CITY.
12.IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES WHICH MAY HAVE BURIED OR AERIAL PERIODIC RE-GRADING OR NEW STONE MAY BE REQUIRED TO MAINTAIN THE EFFECTIVENESS OF THE CONSTRUCTION ENTRANCE. 3. ALL FIRELANE PAVING AND PAVING SUBGRADE SHALL COMPLY WITH CITY STANDARDS AND DETAILS. IF THESE ARE DIFFERENT THAN 30.THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM WATER.
UTILITIES WITHIN OR NEAR THE CONSTRUCTION AREA BEFORE COMMENCING WORK TO HAVE THEM LOCATE THEIR EXISTING UTILITIES 21.TEMPORARY SEEDING OR OTHER APPROVED STABILIZATION SHALL BE INITIATED WITHIN 14 DAYS OF THE LAST DISTURBANCE OF ANY THOSE IN THE GEOTECHNICAL REPORT, THEN THE MORE RESTRICTIVE SHALL BE FOLLOWED.
ABBREVIATIONS AND DEFINITIONS:
PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE AN ADEQUATE MINIMUM NOTICE TO ALL UTILITY COMPANIES PRIOR TO AREA, UNLESS ADDITIONAL CONSTRUCTION IN THE AREA IS EXPECTED WITHIN 21 DAYS OF THE LAST DISTURBANCE. 4. ALL PUBLIC PAVING AND PAVING SUBGRADE SHALL COMPLY WITH CITY STANDARD CONSTRUCTION DETAILS AND SPECIFICATIONS.
BEGINNING CONSTRUCTION. 22.CONTRACTOR SHALL FOLLOW GOOD HOUSEKEEPING PRACTICES DURING CONSTRUCTION, ALWAYS CLEANING UP DIRT, LOOSE 5. CONTRACTOR IS RESPONSIBLE FOR ALL PAVING AND PAVING SUBGRADE TESTING AND CERTIFICATION, UNLESS SPECIFIED OTHERWISE
13. CONTRACTOR SHALL CALL TEXAS 811 AN ADEQUATE AMOUNT OF TIME PRIOR TO COMMENCING CONSTRUCTION OR ANY EXCAVATION. MATERIAL, AND TRASH AS CONSTRUCTION PROGRESSES. BY OWNER. ALL PAVING AND PAVING SUBGRADE TESTING SHALL BE COORDINATED WITH THE APPROPRIATE CITY INSPECTOR. A AREA
14. CONTRACTOR SHALL USE EXTREME CAUTION AS THE SITE CONTAINS VARIOUS KNOWN AND UNKNOWN PUBLIC AND PRIVATE UTILITIES. 23.UPON COMPLETION OF FINE GRADING, ALL SURFACES OF DISTURBED AREAS SHALL BE PERMANENTLY STABILIZED. STABILIZATION IS TESTING SHALL BE PERFORMED BY AN APPROVED INDEPENDENT AGENCY FOR TESTING PAVING AND SUBGRADE. OWNER SHALL ADA AMERICANS WITH DISABILITIES ACT
15. THE LOCATIONS, ELEVATIONS, DEPTH, AND DIMENSIONS OF EXISTING UTILITIES SHOWN ON THE PLANS WERE OBTAINED FROM ACHIEVED WHEN THE AREA IS EITHER COVERED BY PERMANENT IMPERVIOUS STRUCTURES, SUCH AS BUILDINGS, SIDEWALK, APPROVE THE AGENCY NOMINATED BY THE CONTRACTOR FOR PAVING AND PAVING SUBGRADE TESTING. AWWA AMERICAN WATER WORKS ASSOCIATION
AVAILABLE UTILITY COMPANY MAPS AND PLANS, AND ARE CONSIDERED APPROXIMATE AND INCOMPLETE. IT SHALL BE THE PAVEMENT, OR A UNIFORM PERENNIAL VEGETATIVE COVER. 6. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO SHOW, BY THE STANDARD TESTING PROCEDURES OF THE PAVING AND PAVING B-B BACK TO BACK
CONTRACTORS' RESPONSIBILITY TO VERIFY THE PRESENCE, LOCATION, ELEVATION, DEPTH, AND DIMENSION OF EXISTING UTILITIES 24.AT THE CONCLUSION OF THE PROJECT, ALL INLETS, DRAIN PIPE, CHANNELS, DRAINAGEWAYS AND BORROW DITCHES AFFECTED BY THE SUBGRADE, THAT THE WORK CONSTRUCTED MEETS THE PROJECT REQUIREMENTS AND CITY SPECIFICATIONS. BC BEGIN CURVE
SUFFICIENTLY IN ADVANCE OF CONSTRUCTION SO THAT ADJUSTMENTS CAN BE MADE TO PROVIDE ADEQUATE CLEARANCES. THE CONSTRUCTION SHALL BE DREDGED, AND THE SEDIMENT GENERATED BY THE PROJECT SHALL BE REMOVED AND DISPOSED IN 7. DUE TO THE POTENTIAL FOR DIFFERENTIAL SOIL MOVEMENT ADJACENT TO THE BUILDING, THE CONTRACTOR SHALL ADHERE TO BC BACK OF CURB
ENGINEER SHALL BE NOTIFIED WHEN A PROPOSED IMPROVEMENT CONFLICTS WITH AN EXISTING UTILITY. ACCORDANCE WITH APPLICABLE REGULATIONS. GEOTECHNICAL REPORT'S RECOMMENDATION FOR SUBGRADE PREPARATION SPECIFIC TO FLATWORK ADJACENT TO THE PROPOSED BCR BEGIN CURB RETURN
16. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ANY ADJUSTMENTS AND RELOCATIONS OF EXISTING UTILITIES THAT BUILDING. THE OWNER AND CONTRACTOR ARE ADVISED TO OBTAIN A GEOTECHNICAL ENGINEER RECOMMENDATION SPECIFIC TO BMP BEST MANAGEMENT PRACTICE
CONFLICT WITH THE PROPOSED IMPROVEMENTS, INCLUDING BUT NOT LIMITED TO, ADJUSTING EXISTING MANHOLES TO MATCH STORM WATER DISCHARGE AUTHORIZATION: FLATWORK ADJACENT TO THE BUILDING, IF NONE IS CURRENTLY EXISTING. BOC BACK OF CURB
PROPOSED GRADE, RELOCATING EXISTING POLES AND GUY WIRES THAT ARE LOCATED IN PROPOSED DRIVEWAYS, ADJUSTING THE 1. CONTRACTOR SHALL COMPLY WITH ALL TCEQ AND EPA STORM WATER POLLUTION PREVENTION REQUIREMENTS. 8. CURB RAMPS ALONG PUBLIC STREETS AND IN THE PUBLIC RIGHT-OF-WAY SHALL BE CONSTRUCTED BASED ON THE CITY STANDARD
BVCE BEGIN VERTICAL CURVE ELEVATION
HORIZONTAL OR VERTICAL ALIGNMENT OF EXISTING UNDERGROUND UTILITIES TO ACCOMMODATE PROPOSED GRADE OR CROSSING 2. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE TCEQ GENERAL PERMIT TO DISCHARGE UNDER THE TEXAS CONSTRUCTION DETAIL AND SPECIFICATIONS.
BVCS BEGIN VERTICAL CURVE STATION
WITH A PROPOSED UTILITY, AND ANY OTHERS THAT MAY BE ENCOUNTERED THAT ARE UNKNOWN AT THIS TIME AND NOT SHOWN ON POLLUTANT DISCHARGE ELIMINATION SYSTEM TXR 150000. 9. PRIVATE CURB RAMPS ON THE SITE (I.E. OUTSIDE PUBLIC STREET RIGHT-OF-WAY) SHALL CONFORM TO ADA AND TAS STANDARDS AND
THESE PLANS. 3. THE CONTRACTOR SHALL ENSURE THAT ALL PRIMARY OPERATORS SUBMIT A NOI TO TCEQ AT LEAST SEVEN DAYS PRIOR TO SHALL HAVE A DETECTABLE WARNING SURFACE THAT IS FULL WIDTH AND FULL DEPTH OF THE CURB RAMP, NOT INCLUDING FLARES. BW BOTTOM OF WALL
17. CONTRACTOR SHALL ARRANGE FOR OR PROVIDE, AT ITS EXPENSE, ALL GAS, TELECOMMUNICATIONS, CABLE, OVERHEAD AND COMMENCING CONSTRUCTION (IF APPLICABLE), OR IF UTILIZING ELECTRONIC SUBMITTAL, PRIOR TO COMMENCING CONSTRUCTION. 10. ALL ACCESSIBLE RAMPS, CURB RAMPS, STRIPING, AND PAVEMENT MARKINGS SHALL CONFORM TO ADA AND TAS STANDARDS, LATEST CFS CUBIC FEET PER SECOND
UNDERGROUND POWER LINE, AND UTILITY POLE ADJUSTMENTS NEEDED. ALL PRIMARY OPERATORS SHALL PROVIDE A COPY OF THE SIGNED NOI TO THE OPERATOR OF ANY MS4 (TYPICALLY THE CITY) EDITION. CITY CITY, TOWN, OR OTHER APPLICABLE LOCAL GOVERNMENT JURISDICTION
18. CONTRACTOR IS RESPONSIBLE FOR COORDINATING INSTALLATION OF FRANCHISE UTILITIES THAT ARE NECESSARY FOR ON-SITE AND RECEIVING DISCHARGE FROM THE SITE. 11. ANY COMPONENTS OF THE PROJECT SUBJECT TO RESIDENTIAL USE SHALL ALSO CONFORM TO THE FAIR HOUSING ACT, AND COMPLY C/L CENTERLINE
OFF-SITE CONSTRUCTION, AND SERVICE TO THE PROPOSED DEVELOPMENT. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMPLEMENTATION OF THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IF WITH THE FAIR HOUSING ACT DESIGN MANUAL BY THE US DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. CL CENTERLINE
19. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ALL DAMAGES DUE TO THE CONTRACTORS' FAILURE TO EXACTLY LOCATE AND APPLICABLE, INCLUDING POSTING SITE NOTICE, INSPECTIONS, DOCUMENTATION, AND SUBMISSION OF ANY INFORMATION REQUIRED 12. CONTRACTOR SHALL CONSTRUCT PROPOSED PAVEMENT TO MATCH EXISTING PAVEMENT WITH A SMOOTH, FLUSH, CONNECTION. CONC CONCRETE
PRESERVE ALL UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR COST INCURRED BY THE TCEQ AND EPA (E.G. NOI). 13. CONTRACTOR SHALL FURNISH AND INSTALL ALL PAVEMENT MARKINGS FOR FIRE LANES, PARKING STALLS, HANDICAPPED PARKING CY CUBIC YARD
BECAUSE OF THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES OR STRUCTURES. IF IT IS NECESSARY TO SHORE, BRACE, SWING 5. ALL CONTRACTORS AND SUBCONTRACTORS PROVIDING SERVICES RELATED TO THE SWPPP SHALL SIGN THE REQUIRED CONTRACTOR SYMBOLS, AND MISCELLANEOUS STRIPING WITHIN PARKING LOT AND AROUND BUILDING AS SHOWN ON THE PLANS. ALL PAINT AND DEMO DEMOLITION
OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED BY THE CONTRACTOR AND THEIR CERTIFICATION STATEMENT ACKNOWLEDGING THEIR RESPONSIBILITIES AS SPECIFIED IN THE SWPPP. PAVEMENT MARKINGS SHALL ADHERE TO CITY AND OWNER STANDARDS. DG DECOMPOSED GRANITE
PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK. 6. A COPY OF THE SWPPP, INCLUDING NOI, SITE NOTICE, CONTRACTOR CERTIFICATIONS, AND ANY REVISIONS, SHALL BE SUBMITTED TO 14.REFER TO GEOTECHNICAL REPORT FOR PAVING JOINT LAYOUT PLAN REQUIREMENTS FOR PRIVATE PAVEMENT.
DTL DETAIL
20.BRACING OF UTILITY POLES MAY BE REQUIRED BY THE UTILITY COMPANIES WHEN TRENCHING OR EXCAVATING IN CLOSE PROXIMITY THE CITY BY THE CONTRACTOR AND SHALL BE RETAINED ON-SITE DURING CONSTRUCTION. 15.REFER TO CITY STANDARD DETAILS AND SPECIFICATIONS FOR JOINT LAYOUT PLAN REQUIREMENTS FOR PUBLIC PAVEMENT.
TO THE POLES. THE COST OF BRACING POLES WILL BE BORNE BY THE CONTRACTOR, WITH NO SEPARATE PAY ITEM FOR THIS WORK. 7. A NOTICE OF TERMINATION (NOT) SHALL BE SUBMITTED TO TCEQ BY ANY PRIMARY OPERATOR WITHIN 30 DAYS AFTER ALL SOIL 16. ALL REINFORCING STEEL SHALL CONFORM TO THE GEOTECHNICAL REPORT, CITY STANDARDS, AND ASTM A-615, GRADE 60, AND SHALL EA EACH
THE COST IS INCIDENTAL TO THE PAY ITEM. DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED AND A UNIFORM VEGETATIVE COVER HAS BEEN ESTABLISHED ON ALL BE SUPPORTED BY BAR CHAIRS. CONTRACTOR SHALL USE THE MORE STRINGENT OF THE CITY AND GEOTECHNICAL STANDARDS. EC END CURVE
21.CONTRACTOR SHALL USE ALL NECESSARY SAFETY PRECAUTIONS TO AVOID CONTACT WITH OVERHEAD AND UNDERGROUND POWER UNPAVED AREAS AND AREAS NOT COVERED BY STRUCTURES, A TRANSFER OF OPERATIONAL CONTROL HAS OCCURRED, OR THE 17. ALL JOINTS SHALL EXTEND THROUGH THE CURB. ECR END CURB RETURN
LINES. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE, FEDERAL AND UTILITY OWNER REGULATIONS PERTAINING OPERATOR HAS OBTAINED ALTERNATIVE AUTHORIZATION UNDER A DIFFERENT PERMIT. A COPY OF THE NOT SHALL BE PROVIDED TO 18. THE MINIMUM LENGTH OF OFFSET JOINTS AT RADIUS POINTS SHALL BE 2 FEET. EG EXISTING GROUND

©
TO WORK SETBACKS FROM POWER LINES. THE OPERATOR OF ANY MS4 RECEIVING DISCHARGE FROM THE SITE. 19. CONTRACTOR SHALL SUBMIT A JOINTING PLAN TO THE ENGINEER AND OWNER PRIOR TO BEGINNING ANY OF THE PAVING WORK. EL ELEVATION
22.THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL REQUIRED CONSTRUCTION PERMITS, APPROVALS, AND BONDS PRIOR TO 20.ALL SAWCUTS SHALL BE FULL DEPTH FOR PAVEMENT REMOVAL AND CONNECTION TO EXISTING PAVEMENT. ELEC ELECTRICAL / ELECTRICITY
CONSTRUCTION. DEMOLITION: 21.FIRE LANES SHALL BE MARKED AND LABELED AS A FIRELANE PER CITY STANDARDS. ELEV ELEVATION
23.THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES A COPY OF THE CONTRACT DOCUMENTS INCLUDING PLANS, 1. KH IS NOT RESPONSIBLE FOR THE MEANS AND METHODS EMPLOYED BY THE CONTRACTOR TO IMPLEMENT THIS DEMOLITION PLAN. 22.UNLESS THE PLANS SPECIFICALLY DICTATE TO THE CONTRARY, ON-SITE AND OTHER DIRECTIONAL SIGNS SHALL BE ORIENTED SO EPA UNITES STATES ENVIRONMENTAL PROTECTION AGENCY
GEOTECHNICAL REPORT AND ADDENDA, PROJECT AND CITY SPECIFICATIONS, AND SPECIAL CONDITIONS, COPIES OF ANY REQUIRED THIS PRELIMINARY DEMOLITION PLAN SIMPLY INDICATES THE KNOWN OBJECTS ON THE SUBJECT TRACT THAT ARE TO BE DEMOLISHED THEY ARE READILY VISIBLE TO THE ONCOMING TRAFFIC FOR WHICH THEY ARE INTENDED. ESMT EASEMENT
CONSTRUCTION PERMITS, EROSION CONTROL PLANS, SWPPP AND INSPECTION REPORTS. AND REMOVED FROM THE SITE. 23.CONTRACTOR IS RESPONSIBLE FOR INSTALLING NECESSARY CONDUIT FOR LIGHTING, IRRIGATION, ETC. PRIOR TO PLACEMENT OF
EVCE END VERTICAL CURVE ELEVATION
24.ALL SHOP DRAWINGS AND OTHER DOCUMENTS THAT REQUIRE ENGINEER REVIEW SHALL BE SUBMITTED BY THE CONTRACTOR 2. KH DOES NOT WARRANT OR REPRESENT THAT THE PLAN, WHICH WAS PREPARED BASED ON SURVEY AND UTILITY INFORMATION PAVEMENT. ALL CONSTRUCTION DOCUMENTS (CIVIL, MEP, LANDSCAPE, IRRIGATION, AND ARCHITECT) SHALL BE CONSULTED.
EVCS END VERTICAL CURVE STATION
SUFFICIENTLY IN ADVANCE OF CONSTRUCTION OF THAT ITEM, SO THAT NO LESS THAN 10 BUSINESS DAYS FOR REVIEW AND RESPONSE PROVIDED BY OTHERS, SHOWS ALL IMPROVEMENTS AND UTILITIES, THAT THE IMPROVEMENTS AND UTILITIES ARE SHOWN 24.BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY THAT SUITABLE ACCESSIBLE PEDESTRIAN ROUTES (PER ADA, TAS, AND
IS AVAILABLE. ACCURATELY, OR THAT THE UTILITIES SHOWN CAN BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING ITS OWN SITE FHA) EXIST TO AND FROM EVERY DOOR AND ALONG SIDEWALKS, ACCESSIBLE PARKING SPACES, ACCESS AISLES, AND ACCESSIBLE EX. EXISTING
25.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES, JURISDICTIONAL AGENCIES, AND/OR UTILITY SERVICE RECONNAISSANCE TO SCOPE ITS WORK AND TO CONFIRM WITH THE OWNERS OF IMPROVEMENTS AND UTILITIES THE ABILITY AND ROUTES. IN NO CASE SHALL AN ACCESSIBLE RAMP SLOPE EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK F-F FACE TO FACE
COMPANIES SHALL BE PERFORMED PRIOR TO USE OF THE FACILITY AND THE FINAL CONNECTION OF SERVICES. PROCESS FOR THE REMOVAL OF THEIR FACILITIES. CROSS SLOPE EXCEED 2.0 PERCENT. IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPE EXCEED 5.0 PERCENT. ACCESSIBLE PARKING FG FINISHED GROUND
26.CONTRACTOR SHALL ARRANGE FOR REQUIRED CITY INSPECTIONS. 3. THIS PLAN IS INTENDED TO GIVE A GENERAL GUIDE TO THE CONTRACTOR, NOTHING MORE. THE GOAL OF THE DEMOLITION IS TO LEAVE SPACES AND ACCESS AISLES SHALL NOT EXCEED 2.0 PERCENT SLOPE IN ANY DIRECTION. FH FIRE HYDRANT
27.CONTRACTOR'S BID PRICE SHALL INCLUDE ALL INSPECTION FEES. THE SITE IN A STATE SUITABLE FOR THE CONSTRUCTION OF THE PROPOSED DEVELOPMENT. REMOVAL OR PRESERVATION OF 25.CONTRACTOR SHALL TAKE FIELD SLOPE MEASUREMENTS ON FINISHED SUBGRADE AND FORM BOARDS PRIOR TO PLACING PAVEMENT FL FLOW LINE
28.ALL SYMBOLS SHOWN ON THESE PLANS (E.G. FIRE HYDRANT, METERS, VALVES, INLETS, ETC.…) ARE FOR PRESENTATION PURPOSES IMPROVEMENTS, UTILITIES, ETC. TO ACCOMPLISH THIS GOAL ARE THE RESPONSIBILITY OF THE CONTRACTOR. TO VERIFY THAT ADA/TAS SLOPE REQUIREMENTS ARE PROVIDED. CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO PAVING IF ANY FOC FACE OF CURB
ONLY AND ARE NOT TO SCALE. CONTRACTOR SHALL COORDINATE FINAL SIZES AND LOCATIONS WITH APPROPRIATE CITY INSPECTOR. 4. CONTRACTOR IS STRONGLY CAUTIONED TO REVIEW THE FOLLOWING REPORTS DESCRIBING SITE CONDITIONS PRIOR TO BIDDING AND EXCESSIVE SLOPES ARE ENCOUNTERED. NO CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR ADA AND TAS SLOPE FT FEET
29.THE SCOPE OF WORK FOR THE CIVIL IMPROVEMENTS SHOWN ON THESE PLANS TERMINATES 5-FEET FROM THE BUILDING. REFERENCE IMPLEMENTING THE DEMOLITION PLAN: COMPLIANCE ISSUES. HGL HYDRAULIC GRADE LINE
THE BUILDING PLANS (E.G. ARCHITECTURAL, STRUCTURAL, MEP) FOR AREAS WITHIN 5-FEET OF THE BUILDING AND WITHIN THE a. ENVIRONMENTAL SITE ASSESSMENT PROVIDED BY THE OWNER, KH KIMLEY-HORN AND ASSOCIATES, INC.
BUILDING FOOTPRINT. b. ASBESTOS BUILDING INSPECTION REPORT(S) PROVIDED BY THE OWNER, STORM DRAINAGE:
KHA KIMLEY-HORN AND ASSOCIATES, INC.
30.REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR ALL FINAL BUILDING DIMENSIONS. c. GEOTECHNICAL REPORT PROVIDED BY THE OWNER. 1. ALL STORM SEWER MATERIALS AND CONSTRUCTION SHALL COMPLY WITH CITY STANDARD CONSTRUCTION DETAILS AND
LAT LATERAL
31.THE PROPOSED BUILDING FOOTPRINT(S) SHOWN IN THESE PLANS WAS PROVIDED TO KIMLEY-HORN AND ASSOCIATES, INC. (KH) BY THE d. OTHER REPORTS THAT ARE APPLICABLE AND AVAILABLE. SPECIFICATIONS.
PROJECT ARCHITECT AT THE TIME THESE PLANS WERE PREPARED. IT MAY NOT BE THE FINAL CORRECT VERSION BECAUSE THE 5. CONTRACTOR SHALL CONTACT THE OWNER TO VERIFY WHETHER ADDITIONAL REPORTS OR AMENDMENTS TO THE ABOVE CITED 2. THE SITE UTILITY CONTRACTOR SHALL PROVIDE ALL MATERIALS AND APPURTENANCES NECESSARY FOR COMPLETE INSTALLATION OF LF LINEAR FEET
2/21/24
BUILDING DESIGN WAS ONGOING. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONFIRMING THE FINAL CORRECT VERSION OF THE REPORTS HAVE BEEN PREPARED AND TO OBTAIN/REVIEW/AND COMPLY WITH THE RECOMMENDATION OF SUCH STUDIES PRIOR TO THE STORM SEWER. LT LEFT
BUILDING FOOTPRINT WITH THE ARCHITECT AND STRUCTURAL ENGINEER PRIOR TO LAYOUT. DIMENSIONS AND/OR COORDINATES STARTING ANY WORK ON THE SITE. 3. THE CONTRACTOR SHALL FIELD VERIFY THE SIZE, CONDITION, HORIZONTAL, AND VERTICAL LOCATIONS OF ALL EXISTING STORM MAX MAXIMUM
SHOWN ON THESE PLANS WERE BASED ON THE ABOVE STATED ARCHITECTURAL FOOTPRINT, AND ARE THEREFORE A PRELIMINARY 6. CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS REGARDING THE DEMOLITION OF OBJECTS ON SEWER FACILITIES THAT ARE TO BE CONNECTED TO, PRIOR TO START OF CONSTRUCTION OF ANY STORM SEWER, AND SHALL NOTIFY ME MATCH EXISTING ELEVATION
LOCATION OF THE BUILDING. THE CONTRACTOR IS SOLELY RESPONSIBLE TO VERIFY WHAT PART OF THE BUILDING THE ARCHITECT'S THE SITE AND THE DISPOSAL OF THE DEMOLISHED MATERIALS OFF-SITE. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO REVIEW THE ENGINEER OF ANY CONFLICTS DISCOVERED. MH MANHOLE
FOOTPRINT REPRESENTS (E.G. SLAB, OUTSIDE WALL, MASONRY LEDGE, ETC.….) AND TO CONFIRM ITS FINAL POSITION ON THE SITE THE SITE, DETERMINE THE APPLICABLE REGULATIONS, RECEIVE THE REQUIRED PERMITS AND AUTHORIZATIONS, AND COMPLY. 4. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL DIMENSIONS SHOWN, INCLUDING THE HORIZONTAL AND VERTICAL LOCATION MIN MINUTE / MINIMUM
BASED ON THE FINAL ARCHITECTURAL FOOTPRINT, CIVIL DIMENSION CONTROL PLAN, SURVEY BOUNDARY AND/OR PLAT. ANY 7. KH DOES NOT REPRESENT THAT THE REPORTS AND SURVEYS REFERENCED ABOVE ARE ACCURATE, COMPLETE, OR COMPREHENSIVE OF CURB INLETS AND GRATE INLETS AND ALL UTILITIES CROSSING THE STORM SEWER. NO NUMBER
DIFFERENCES FOUND SHALL BE REPORTED TO KH IMMEDIATELY. SHOWING ALL ITEMS THAT WILL NEED TO BE DEMOLISHED AND REMOVED. 5. FLOW LINE, TOP-OF-CURB, RIM, THROAT, AND GRATE ELEVATIONS OF PROPOSED INLETS SHALL BE VERIFIED WITH THE GRADING PLAN NOI NOTICE OF INTENT, REF. TCEQ GENERAL PERMIT
32.ALL CONSTRUCTION SHALL COMPLY WITH THE PROJECT'S FINAL GEOTECHNICAL REPORT (OR LATEST EDITION), INCLUDING 8. SURFACE PAVEMENT INDICATED MAY OVERLAY OTHER HIDDEN STRUCTURES, SUCH AS ADDITIONAL LAYERS OF PAVEMENT, AND FIELD CONDITIONS PRIOR TO THEIR INSTALLATION. NOT NOTICE OF TERMINATION, REF. TCEQ GENERAL PERMIT
SUBSEQUENT ADDENDA. FOUNDATIONS OR WALLS, THAT ARE ALSO TO BE REMOVED. 6. ALL PUBLIC STORM SEWER CONSTRUCTION, PIPE, STRUCTURES, AND FITTINGS SHALL ADHERE TO CITY PUBLIC WORKS STANDARD NTS NOT TO SCALE
33.CONTRACTOR IS RESPONSIBLE FOR ALL MATERIALS TESTING AND CERTIFICATION, UNLESS SPECIFIED OTHERWISE BY OWNER. ALL DETAILS AND SPECIFICATIONS. CONTRACTOR SHALL ARRANGE FOR REQUIRED CITY INSPECTIONS.
OC ON CENTER
MATERIALS TESTING SHALL BE COORDINATED WITH THE APPROPRIATE CITY INSPECTOR AND COMPLY WITH CITY STANDARD GRADING: 7. ALL PRIVATE STORM SEWER CONSTRUCTION, PIPE, STRUCTURES, AND FITTINGS SHALL ADHERE TO THE APPLICABLE PLUMBING CODE.
SPECIFICATIONS AND GEOTECHNICAL REPORT. TESTING SHALL BE PERFORMED BY AN APPROVED INDEPENDENT AGENCY FOR 1. THE CONTRACTOR AND GRADING SUBCONTRACTOR SHALL VERIFY THE SUITABILITY OF EXISTING AND PROPOSED SITE CONDITIONS CONTRACTOR SHALL ARRANGE FOR REQUIRED CITY INSPECTIONS. OFF OFFSET
TESTING MATERIALS. OWNER SHALL APPROVE THE AGENCY NOMINATED BY THE CONTRACTOR FOR MATERIALS TESTING. INCLUDING GRADES AND DIMENSIONS BEFORE START OF CONSTRUCTION. THE CIVIL ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF 8. ALL PVC TO RCP CONNECTIONS AND ALL STORM PIPE CONNECTIONS ENTERING STRUCTURES OR OTHER STORM PIPES SHALL HAVE A OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PC POINT OF CURVATURE

GENERAL NOTES (SHEET


34.ALL COPIES OF MATERIALS TEST RESULTS SHALL BE SENT TO THE OWNER, ENGINEER AND ARCHITECT DIRECTLY FROM THE TESTING ANY DISCREPANCIES. CONCRETE COLLAR AND BE GROUTED TO ASSURE THE CONNECTION IS WATERTIGHT.
AGENCY. 2. CONTRACTOR SHALL OBTAIN ANY REQUIRED GRADING PERMITS FROM THE CITY. 9. ALL PUBLIC STORM SEWER LINES SHALL BE MINIMUM CLASS III RCP. PRIVATE STORM SEWER LINES 18-INCHES AND GREATER SHALL BE PCC PORTLAND CEMENT CONCRETE / POINT OF COMPOUND CURVATURE
35.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO SHOW, BY THE STANDARD TESTING PROCEDURES OF THE MATERIALS, THAT THE 3. UNLESS OTHERWISE NOTED, PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN IN PAVED AREA REFLECT TOP OF PAVEMENT CLASS III RCP OR OTHER APPROVED MATERIAL. PGL PROPOSED GRADE LINE
WORK CONSTRUCTED MEETS THE PROJECT REQUIREMENTS AND CITY SPECIFICATIONS. SURFACE. IN LOCATIONS ALONG A CURB LINE, ADD 6-INCHES (OR THE HEIGHT OF THE CURB) TO THE PAVING GRADE FOR TOP OF CURB 10. WHERE COVER EXCEEDS 20-FEET OR IS LESS THAN 2-FEET, CLASS IV RCP SHALL BE USED. PI POINT OF INFLECTION
36.DUE TO THE POTENTIAL FOR DIFFERENTIAL SOIL MOVEMENT ADJACENT TO THE BUILDING, THE CONTRACTOR SHALL ADHERE TO ELEVATION. 11.IF CONTRACTOR PROPOSES TO USE HDPE OR PVC IN LIEU OF RCP FOR PRIVATE STORM SEWER, CONTRACTOR SHALL SUBMIT PROP PROPOSED
GEOTECHNICAL REPORT'S RECOMMENDATION FOR SUBGRADE PREPARATION SPECIFIC TO FLATWORK ADJACENT TO THE PROPOSED 4. PROPOSED SPOT ELEVATIONS AND CONTOURS OUTSIDE THE PAVEMENT ARE TO TOP OF FINISHED GRADE. TECHNICAL DATA TO THE OWNER, ENGINEER AND CITY ENGINEER/INSPECTOR FOR APPROVAL PRIOR TO ORDERING THE MATERIAL. PRC POINT OF REVERSE CURVATURE
BUILDING. THE OWNER AND CONTRACTOR ARE ADVISED TO OBTAIN A GEOTECHNICAL ENGINEER RECOMMENDATION SPECIFIC TO 5. PROPOSED CONTOURS ARE APPROXIMATE. PROPOSED SPOT ELEVATIONS AND DESIGNATED GRADIENT ARE TO BE USED IN CASE OF ANY PROPOSED HDPE AND PVC SHALL BE WATERTIGHT. PSI POUNDS PER SQUARE INCH
FLATWORK ADJACENT TO THE BUILDING, IF NONE IS CURRENTLY EXISTING. DISCREPANCY. 12. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION SURVEYING FOR ALL STORM SEWER LINES.
PT POINT OF TANGENCY
37.ALL CONTRACTORS MUST CONFINE THEIR ACTIVITIES TO THE WORK AREA. NO ENCROACHMENTS OUTSIDE OF THE WORK AREA WILL BE 6. ALL FINISHED GRADES SHALL TRANSITION UNIFORMLY BETWEEN THE FINISHED ELEVATIONS SHOWN. 13.EMBEDMENT FOR ALL STORM SEWER LINES, PUBLIC OR PRIVATE, SHALL BE PER CITY STANDARD DETAILS.
PVC POLYVINYL CHLORIDE
ALLOWED. ANY DAMAGE RESULTING THEREFROM SHALL BE CONTRACTOR'S SOLE RESPONSIBILITY TO REPAIR. 7. CONTOURS AND SPOT GRADES SHOWN ARE ELEVATIONS OF TOP OF THE FINISHED SURFACE. WHEN PERFORMING THE GRADING 14. ALL WYE CONNECTIONS AND PIPE BENDS ARE TO BE PREFABRICATED AND INSTALLED PER MANUFACTURERS SPECIFICATIONS.
38.THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES, UTILITIES, MANHOLES, POLES, GUY WIRES, VALVE COVERS, VAULT OPERATIONS, THE CONTRACTOR SHALL PROVIDE AN APPROPRIATE ELEVATION HOLD-DOWN ALLOWANCE FOR THE THICKNESS OF 15.USE 4 FOOT JOINTS WITH BEVELED ENDS IF RADIUS OF STORM SEWER IS LESS THAN 100 FEET. PVI POINT OF VERTICAL INFLECTION
LIDS, FIRE HYDRANTS, COMMUNICATION BOXES/PEDESTALS, AND OTHER FACILITIES TO REMAIN AND SHALL REPAIR ANY DAMAGES AT PAVEMENT, SIDEWALK, TOPSOIL, MULCH, STONE, LANDSCAPING, RIP-RAP AND ALL OTHER SURFACE MATERIALS THAT WILL 16. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND SUBMITTING A TRENCH SAFETY PLAN, PREPARED BY A PROFESSIONAL PVMT PAVEMENT

2 OF 2)
NO COST TO THE OWNER. CONTRIBUTE TO THE TOP OF FINISHED GRADE. FOR EXAMPLE, THE LIMITS OF EARTHWORK IN PAVED AREAS IS THE BOTTOM OF THE ENGINEER IN THE STATE OF TEXAS, TO THE CITY PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TRENCH RCP REINFORCED CONCRETE PIPE
39.THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE ANY PHYSICAL DAMAGE TO PRIVATE PROPERTY OR PUBLIC PAVEMENT SECTION. SAFETY REQUIREMENTS IN ACCORDANCE WITH CITY, STATE, AND FEDERAL REQUIREMENTS, INCLUDING OSHA FOR ALL TRENCHES. NO ROW RIGHT OF WAY
IMPROVEMENTS, INCLUDING BUT NOT LIMITED TO: FENCES, WALLS, SIGNS, PAVEMENT, CURBS, UTILITIES, SIDEWALKS, GRASS, TREES, 8. NO REPRESENTATIONS OF EARTHWORK QUANTITIES OR SITE BALANCE ARE MADE BY THESE PLANS. THE CONTRACTOR SHALL OPEN TRENCHES SHALL BE ALLOWED OVERNIGHT WITHOUT PRIOR WRITTEN APPROVAL OF THE CITY. RT RIGHT
LANDSCAPING, AND IRRIGATION SYSTEMS, ETC.… TO ORIGINAL CONDITION OR BETTER AT NO COST TO THE OWNER. PROVIDE THEIR OWN EARTHWORK CALCULATION TO DETERMINE THEIR CONTRACT QUANTITIES AND COST. ANY SIGNIFICANT 17. THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM WATER. SF SQUARE FEET
40.ALL AREAS IN EXISTING RIGHT-OF-WAY DISTURBED BY SITE CONSTRUCTION SHALL BE REPAIRED TO ORIGINAL CONDITION OR BETTER, VARIANCE FROM A BALANCED SITE SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CIVIL ENGINEER. SS SANITARY SEWER
INCLUDING AS NECESSARY GRADING, LANDSCAPING, CULVERTS, AND PAVEMENT. 9. ALL GRADING AND EARTHWORK SHALL COMPLY WITH THE PROJECT'S FINAL GEOTECHNICAL REPORT (OR LATEST EDITION), INCLUDING POND NOTES: SSMH SANITARY SEWER MANHOLE
41.THE CONTRACTOR SHALL SALVAGE ALL EXISTING POWER POLES, SIGNS, WATER VALVES, FIRE HYDRANTS, METERS, ETC... THAT ARE SUBSEQUENT ADDENDA. 1. ANY PONDS THAT ARE INTENDED TO HOLD WATER INDEFINITELY SHALL BE CONSTRUCTED WATERTIGHT. STA STATION
TO BE RELOCATED DURING CONSTRUCTION. 10. ALL EXCAVATION IS UNCLASSIFIED AND SHALL INCLUDE ALL MATERIALS ENCOUNTERED. UNUSABLE EXCAVATED MATERIAL AND ALL 2. FOR ANY PONDS INTENDED TO HOLD WATER INDEFINITELY: THE CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT FOR
STD STANDARD
42.CONTRACTOR SHALL MAINTAIN ADEQUATE SITE DRAINAGE DURING ALL PHASES OF CONSTRUCTION, INCLUDING MAINTAINING EXISTING WASTE RESULTING FROM SITE CLEARING AND GRUBBING SHALL BE REMOVED FROM THE SITE AND APPROPRIATELY DISPOSED BY THE POND LINER SPECIFICATIONS.
SY SQUARE YARD
DITCHES OR CULVERTS FREE OF OBSTRUCTIONS AT ALL TIMES. CONTRACTOR AT NO ADDITIONAL EXPENSE. 3. A GEOTECHNICAL ENGINEER SHALL REVIEW AND APPROVE ALL POND LINER MATERIAL, PLACEMENT PROCEDURES, AND PROVIDE
43.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND SUBMITTING A TRENCH SAFETY PLAN, PREPARED BY A PROFESSIONAL 11.EROSION CONTROL DEVICES SHOWN ON THE EROSION CONTROL PLAN FOR THE PROJECT SHALL BE INSTALLED PRIOR TO THE START TESTING TO ENSURE THE POND LINER MATERIAL PLACED IS WATERTIGHT. TAS ARCHITECTURAL BARRIERS TEXAS ACCESSIBILITY STANDARDS
ENGINEER IN THE STATE OF TEXAS, TO THE CITY PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TRENCH OF GRADING. REFERENCE EROSION CONTROL PLAN, DETAILS, GENERAL NOTES, AND SWPPP FOR ADDITIONAL INFORMATION AND 4. STORM SEWER PIPES AND HEADWALLS THAT CONNECT TO A POND INTENDED TO HOLD WATER INDEFINITELY SHALL BE INSTALLED TC TOP OF CURB
SAFETY REQUIREMENTS IN ACCORDANCE WITH CITY, STATE, AND FEDERAL REQUIREMENTS, INCLUDING OSHA FOR ALL TRENCHES. NO REQUIREMENTS. WITH WATERTIGHT JOINTS TO AT LEAST 1-FOOT ABOVE THE NORMAL POOL WATER SURFACE ELEVATION. TCEQ TEXAS COMMISSION OF ENVIRONMENTAL QUALITY
OPEN TRENCHES SHALL BE ALLOWED OVERNIGHT WITHOUT PRIOR WRITTEN APPROVAL OF THE CITY. 12.BEFORE ANY EARTHWORK IS PERFORMED, THE CONTRACTOR SHALL STAKE OUT AND MARK THE LIMITS OF THE PROJECT'S PROPERTY 5. ANY GRAVEL OR OTHER PERVIOUS EMBEDMENT AROUND PIPES OR OUTFALL STRUCTURES NEAR THE POND SHALL BE ELIMINATED FOR TEMP TEMPORARY
44.THE CONTRACTOR SHALL KEEP TRENCHES FREE FROM WATER. LINE AND SITE IMPROVEMENTS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY ENGINEERING AND SURVEYING FOR LINE AND AT LEAST 20-FEET FROM THE POND SO NO ROUTE FOR WATER TO LEAK THROUGH THE EMBEDMENT MATERIAL IS PROVIDED. BACKFILL TXDOT TEXAS DEPARTMENT OF TRANSPORTATION
45.SITE SAFETY IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. GRADE CONTROL POINTS RELATED TO EARTHWORK. IN THESE AREAS SHALL BE OF IMPERVIOUS MATERIAL. TXMUTCD TEXAS MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
46.THESE PLANS DO NOT EXTEND TO OR INCLUDE DESIGNS OR SYSTEMS PERTAINING TO THE SAFETY OF THE CONTRACTOR OR ITS 13. CONTRACTOR TO DISPOSE OF ALL EXCESS EXCAVATION MATERIALS IN A MANNER THAT ADHERES TO LOCAL, STATE AND FEDERAL 6. FOR ANY PONDS INTENDED TO HOLD WATER INDEFINITELY: THE WATER LEVEL FOLLOWING COMPLETION AND FILLING OF THE POND TW TOP OF WALL
EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE ENGINEER'S SEAL HEREON DOES NOT EXTEND LAWS AND REGULATIONS. THE CONTRACTOR SHALL KEEP A RECORD OF WHERE EXCESS EXCAVATION WAS DISPOSED, ALONG WITH SHALL BE MONITORED BY THE CONTRACTOR FOR AT LEAST 60 DAYS TO OBSERVE WATER INFLOW, OUTFLOW, AND CALCULATE TYP TYPICAL
TO ANY SUCH SAFETY SYSTEM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTATION OF ALL REQUIRED SAFETY THE RECEIVING LANDOWNER'S APPROVAL TO DO SO. EVAPORATION TO VERIFY THAT THE POND IS WATERTIGHT. VC VERTICAL CURVE
PROCEDURES AND PROGRAMS. 14. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF TOPSOIL AT THE COMPLETION OF FINE GRADING. CONTRACTOR 7. FOR ANY PONDS INTENDED TO HOLD WATER INDEFINITELY: THE POND WATER LEVEL SHALL ALSO BE MAINTAINED BY THE
WTR WATER
47.SIGNS RELATED TO SITE OPERATION OR SAFETY ARE NOT INCLUDED IN THESE PLANS. SHALL REFER TO LANDSCAPE ARCHITECTURE PLANS FOR SPECIFICATIONS AND REQUIREMENTS FOR TOPSOIL. CONTRACTOR FOR THE DURATION OF CONSTRUCTION SO THAT IT REMAINS FULL TO ITS DESIGN WATER LEVEL, AND IS NOT LOWERED,
WW WASTEWATER
48.CONTRACTOR OFFICE AND STAGING AREA SHALL BE AGREED ON BY THE OWNER AND CONTRACTOR PRIOR TO BEGINNING OF 15. CONTRACTOR SHALL MAINTAIN ADEQUATE SITE DRAINAGE DURING ALL PHASES OF CONSTRUCTION, INCLUDING MAINTAINING EXISTING AS THIS MAY DRY-OUT THE POND LINER AND RISK ITS WATERTIGHT PROPERTIES.
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITTING REQUIREMENTS FOR THE CONSTRUCTION OFFICE, TRAILER, DITCHES OR CULVERTS FREE OF OBSTRUCTIONS AT ALL TIMES.
STORAGE, AND STAGING OPERATIONS AND LOCATIONS. 16.NO EARTHWORK FILL SHALL BE PLACED IN ANY EXISTING DRAINAGE WAY, SWALE, CHANNEL, DITCH, CREEK, OR FLOODPLAIN FOR ANY WATER AND WASTEWATER:
49.LIGHT POLES, SIGNS, AND OTHER OBSTRUCTIONS SHALL NOT BE PLACED IN ACCESSIBLE ROUTES. REASON OR ANY LENGTH OF TIME, UNLESS THESE PLANS SPECIFICALLY INDICATE THIS IS REQUIRED. 1. ALL WATER AND WASTEWATER MATERIALS AND CONSTRUCTION SHALL COMPLY WITH CITY STANDARD CONSTRUCTION DETAILS AND
50.ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM 17. TEMPORARY CULVERTS MAY BE REQUIRED IN SOME LOCATIONS TO CONVEY RUN-OFF. SPECIFICATIONS.
TRAFFIC CONTROL DEVICES". 18.REFER TO DIMENSION CONTROL PLAN, AND PLAT FOR HORIZONTAL DIMENSIONS. 2. CONTRACTOR SHALL FIELD VERIFY THE SIZE, CONDITION, HORIZONTAL, AND VERTICAL LOCATIONS OF ALL EXISTING WATER AND
51.TOP RIM ELEVATIONS OF ALL EXISTING AND PROPOSED MANHOLES SHALL BE COORDINATED WITH TOP OF PAVEMENT OR FINISHED 19. THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE AND PLACE, COMPACT, AND CONDITION FILL PER THE PROJECT GEOTECHNICAL WASTEWATER FACILITIES THAT ARE TO BE CONNECTED TO, PRIOR TO START OF CONSTRUCTION OF ANY WATER OR WASTEWATER

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


GRADE AND SHALL BE ADJUSTED TO BE FLUSH WITH THE ACTUAL FINISHED GRADE AT THE TIME OF PAVING. ENGINEER'S SPECIFICATIONS. THE FILL MATERIAL TO BE USED SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO CONSTRUCTION, AND SHALL NOTIFY THE ENGINEER OF ANY CONFLICTS DISCOVERED.
52.CONTRACTOR SHALL ADJUST ALL EXISTING AND PROPOSED VALVES, FIRE HYDRANTS, AND OTHER UTILITY APPURTENANCES TO MATCH PLACEMENT. 3. CONTRACTOR SHALL VERIFY AND COORDINATE ALL DIMENSIONS SHOWN, INCLUDING THE HORIZONTAL AND VERTICAL LOCATION OF

HIGHLANDS
CITY OF GEORGETOWN
ACTUAL FINISHED GRADES AT THE TIME OF PAVING. 20.CONTRACTOR IS RESPONSIBLE FOR ALL SOILS TESTING AND CERTIFICATION, UNLESS SPECIFIED OTHERWISE BY OWNER. ALL SOILS ALL UTILITY SERVICES ENTERING THE BUILDING.
53.THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION SEQUENCING AND PHASING, AND SHALL CONTACT THE APPROPRIATE CITY TESTING SHALL BE COORDINATED WITH THE APPROPRIATE CITY INSPECTOR AND SHALL COMPLY WITH CITY STANDARD 4. THE CONTRACTOR SHALL FIELD VERIFY THE ELEVATION OF ALL UTILITY CROSSINGS PRIOR TO THE INSTALLATION OF ANY PIPE.
OFFICIALS, INCLUDING BUILDING OFFICIAL, ENGINEERING INSPECTOR, AND FIRE MARSHALL TO LEARN OF ANY REQUIREMENTS. SPECIFICATIONS AND THE GEOTECHNICAL REPORT. SOILS TESTING SHALL BE PERFORMED BY AN APPROVED INDEPENDENT AGENCY 5. THE SITE UTILITY CONTRACTOR SHALL PROVIDE ALL MATERIALS AND APPURTENANCES NECESSARY FOR COMPLETE INSTALLATION OF
54.CONTRACTOR IS RESPONSIBLE FOR PREPARATION, SUBMITTAL, AND APPROVAL BY THE CITY OF A TRAFFIC CONTROL PLAN PRIOR TO FOR TESTING SOILS. THE OWNER SHALL APPROVE THE AGENCY NOMINATED BY THE CONTRACTOR FOR SOILS TESTING. THE WATER AND WASTEWATER IMPROVEMENTS.

PHASE 3
THE START OF CONSTRUCTION, AND THEN THE IMPLEMENTATION OF THE PLAN. 21.ALL COPIES OF SOILS TEST RESULTS SHALL BE SENT TO THE OWNER, ENGINEER AND ARCHITECT DIRECTLY FROM THE TESTING 6. ALL PUBLIC WATER AND WASTEWATER CONSTRUCTION, PIPE, STRUCTURES, AND FITTINGS SHALL ADHERE TO CITY PUBLIC WORKS THESE PLAN AND GENERAL NOTES REFER TO:
55.CONTRACTOR SHALL KEEP A NEAT AND ACCURATE RECORD OF CONSTRUCTION, INCLUDING ANY DEVIATIONS OR VARIANCES FROM AGENCY. STANDARD DETAILS AND SPECIFICATIONS. CONTRACTOR SHALL ARRANGE FOR REQUIRED CITY INSPECTIONS. GEOTECHNICAL ENGINEERING REPORT
THE PLANS. 22.IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO SHOW, BY THE STANDARD TESTING PROCEDURES OF THE SOILS, THAT THE WORK 7. ALL PRIVATE WATER AND WASTEWATER CONSTRUCTION, PIPE, STRUCTURES, AND FITTINGS SHALL ADHERE TO THE APPLICABLE
MLA GEOTECHNICAL
56.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AS-BUILT PLANS TO THE ENGINEER AND CITY IDENTIFYING ALL DEVIATIONS CONSTRUCTED MEETS THE PROJECT REQUIREMENTS AND CITY SPECIFICATIONS. PLUMBING CODE. CONTRACTOR SHALL ARRANGE FOR REQUIRED CITY INSPECTIONS.
AND VARIATIONS FROM THESE PLANS MADE DURING CONSTRUCTION. 23.THE SCOPE OF WORK FOR CIVIL IMPROVEMENT SHOWN ON THESE PLANS TERMINATES 5-FEET FROM THE BUILDING. CONTRACTOR 8. FIRE SPRINKLER LINES SHALL BE DESIGNED AND INSTALLED BY A LICENSED FIRE SPRINKLER CONTRACTOR, AND COMPLY TO THE Project No. 22101103.001

Know what'sbelow.
SHALL REFER TO THE GEOTECHNICAL REPORT AND STRUCTURAL PLANS AND SPECIFICATIONS FILL, CONDITIONING, AND PREPARATION APPLICABLE CODES AND INSPECTIONS REQUIRED. THESE PLANS WERE PREPARED WITHOUT THE BENEFIT OF THE FIRE SPRINKLER OCTOBER 2022
EROSION CONTROL: IN THE BUILDING PAD. DESIGN. CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY DISCREPANCIES.

Call before you dig.


INCLUDING ALL REVISIONS AND ADDENDA TO THIS
1. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL EROSION CONTROL AND WATER QUALITY REQUIREMENTS, 24.DUE TO THE POTENTIAL FOR DIFFERENTIAL SOIL MOVEMENT ADJACENT TO THE BUILDING, THE CONTRACTOR SHALL ADHERE TO 9. EMBEDMENT FOR ALL WATER AND WASTEWATER LINES, PUBLIC OR PRIVATE, SHALL BE PER CITY STANDARD DETAILS.
REPORT THAT MAY HAVE BEEN RELEASED AFTER
LAWS, AND ORDINANCES THAT APPLY TO THE CONSTRUCTION SITE LAND DISTURBANCE. GEOTECHNICAL REPORT'S RECOMMENDATION FOR SUBGRADE PREPARATION SPECIFIC TO FLATWORK ADJACENT TO THE PROPOSED 10. CONTRACTOR SHALL TAKE REQUIRED SANITARY PRECAUTIONS, FOLLOWING ANY CITY, TCEQ, AND AWWA STANDARDS, TO KEEP
THE NOTED DATE.
2. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE “TCEQ GENERAL PERMIT TO DISCHARGE UNDER THE TEXAS BUILDING. THE OWNER AND CONTRACTOR ARE ADVISED TO OBTAIN A GEOTECHNICAL ENGINEER RECOMMENDATION SPECIFIC TO WATER PIPE AND FITTINGS CLEAN AND CAPPED AT TIMES WHEN INSTALLATION IS NOT IN PROGRESS.
POLLUTANT DISCHARGE ELIMINATION SYSTEM TXR 150000”. FLATWORK ADJACENT TO THE BUILDING, IF NONE IS CURRENTLY EXISTING. 11. CONTRACTOR SHALL PROVIDE CONSTRUCTION SURVEYING FOR ALL WATER AND WASTEWATER LINES.
3. EROSION CONTROL DEVICES SHOWN ON THE EROSION CONTROL PLAN FOR THE PROJECT SHALL BE INSTALLED PRIOR TO THE START 25.CONTRACTOR SHALL ENSURE THAT SUFFICIENT POSITIVE SLOPE AWAY FROM THE BUILDING PAD IS ACHIEVED FOR ENTIRE PERIMETER 12. ALL WATER AND WASTEWATER SERVICES SHALL TERMINATE 5-FEET OUTSIDE THE BUILDING, UNLESS NOTED OTHERWISE.
OF LAND DISTURBANCE. OF THE PROPOSED BUILDING(S) DURING GRADING OPERATIONS AND IN THE FINAL CONDITION. IF THE CONTRACTOR OBSERVES THAT 13. CONTRACTOR SHALL COMPLY WITH CITY REQUIREMENTS FOR WATER AND WASTEWATER SERVICE DISRUPTIONS AND THE AMOUNT OF
4. ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS FOR THE THIS WILL NOT BE ACHIEVED, THE CONTRACTOR SHALL CONTACT THE ENGINEER TO REVIEW THE LOCATION. PRIOR NOTICE THAT IS REQUIRED, AND SHALL COORDINATE DIRECTLY WITH THE APPROPRIATE CITY DEPARTMENT.
PROJECT. 26.THE CONTRACTOR SHALL TAKE ALL AVAILABLE PRECAUTIONS TO CONTROL DUST. CONTRACTOR SHALL CONTROL DUST BY 14. CONTRACTOR SHALL SEQUENCE WATER AND WASTEWATER CONSTRUCTION TO AVOID INTERRUPTION OF SERVICE TO SURROUNDING
5. CONTRACTOR IS SOLELY RESPONSIBLE FOR INSTALLATION, IMPLEMENTATION, MAINTENANCE, AND EFFECTIVENESS OF ALL EROSION SPRINKLING WATER, OR BY OTHER MEANS APPROVED BY THE CITY, AT NO ADDITIONAL COST TO THE OWNER. PROPERTIES.
CONTROL DEVICES, BEST MANAGEMENT PRACTICES (BMPS), AND FOR UPDATING THE EROSION CONTROL PLAN DURING 27.CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANIES FOR ANY REQUIRED UTILITY ADJUSTMENTS AND/OR RELOCATIONS 15. CONTRACTOR SHALL MAINTAIN WATER SERVICE AND WASTEWATER SERVICE TO ALL CUSTOMERS THROUGHOUT CONSTRUCTION (IF
CONSTRUCTION AS FIELD CONDITIONS CHANGE. NEEDED FOR GRADING OPERATIONS AND TO ACCOMMODATE PROPOSED GRADE, INCLUDING THE UNKNOWN UTILITIES NOT SHOWN ON NECESSARY, BY USE OF TEMPORARY METHODS APPROVED BY THE CITY AND OWNER). THIS WORK SHALL BE CONSIDERED WARNING: CONTRACTOR IS TO
6. CONTRACTOR SHALL DOCUMENT THE DATES OF INSTALLATION, MAINTENANCE OR MODIFICATION, AND REMOVAL FOR EACH BMP THESE PLANS. CONTRACTOR SHALL REFER TO THE GENERAL NOTES “OVERALL” SECTION THESE PLANS FOR ADDITIONAL SUBSIDIARY TO THE PROJECT AND NO ADDITIONAL COMPENSATION SHALL BE ALLOWED. VERIFY PRESENCE AND EXACT
EMPLOYED IN THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IF APPLICABLE. INFORMATION. 16. THE CONTRACTOR IS RESPONSIBLE TO PROTECT ALL WATER AND WASTEWATER LINES CROSSING THE PROJECT. THE CONTRACTOR LOCATION OF ALL UTILITIES
7. AS STORM SEWER INLETS ARE INSTALLED ON-SITE, TEMPORARY EROSION CONTROL DEVICES SHALL BE INSTALLED AT EACH INLET PER 28.EXISTING TREE LOCATIONS SHOWN ON THESE PLANS ARE APPROXIMATE. CONTRACTOR SHALL REPORT ANY DISCREPANCIES FOUND SHALL REPAIR ALL DAMAGED LINES IMMEDIATELY. ALL REPAIRS OF EXISTING WATER MAINS, WATER SERVICES, SEWER MAINS, AND PRIOR TO CONSTRUCTION.
APPROVED DETAILS. IN THE FIELD THAT AFFECT THE GRADING PLAN TO THE CIVIL ENGINEER. SANITARY SEWER SERVICES ARE SUBSIDIARY TO THE WORK, AND NO ADDITIONAL COMPENSATION SHALL BE ALLOWED.
8. THE EROSION CONTROL DEVICES SHALL REMAIN IN PLACE UNTIL THE AREA IT PROTECTS HAS BEEN PERMANENTLY STABILIZED. 29.CONTRACTOR SHALL FIELD VERIFY ALL PROTECTED TREE LOCATIONS, INDIVIDUAL PROTECTED TREE CRITICAL ROOT ZONES, AND 17. VALVE ADJUSTMENTS SHALL BE CONSTRUCTED SUCH THAT THE COVERS ARE AT FINISHED SURFACE GRADE OF THE PROPOSED
9. CONTRACTOR SHALL PROVIDE ADEQUATE EROSION CONTROL DEVICES NEEDED DUE TO PROJECT PHASING. PROPOSED SITE GRADING, AND NOTIFY THE CIVIL ENGINEER AND LANDSCAPE ARCHITECT OF ANY CONFLICTS WITH THE TREE PAVEMENT.

C-05
10. CONTRACTOR SHALL OBSERVE THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES AND MAKE FIELD ADJUSTMENTS AND PRESERVATION PLAN BY THE LANDSCAPE ARCHITECT PRIOR TO COMMENCING THE WORK. 18. THE ENDS OF ALL EXISTING WATER MAINS THAT ARE CUT, BUT NOT REMOVED, SHALL BE PLUGGED AND ABANDONED IN PLACE. THIS
MODIFICATIONS AS NEEDED TO PREVENT SEDIMENT FROM LEAVING THE SITE. IF THE EROSION CONTROL DEVICES DO NOT 30.TREE PROTECTION MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE CITY STANDARD TREE PROTECTION DETAILS AND THE WORK SHALL BE CONSIDERED AS A SUBSIDIARY COST TO THE PROJECT AND NO ADDITIONAL COMPENSATION SHALL BE ALLOWED.

OF C-37
2023-24-CON
5935

PHASE 1
5936

0 60' 120'
5934
503
5932
5933
SF 502 GRAPHIC SCALE 60'

500
LEGEND
1 - 6" IRRIGATION SLEEVE
1
SF
2 - 4" IRRIGATION SLEEVES
31
5931
5930 1
5928 5929
CE PHASE LINE
1 - 6" IRRIGATION SLEEVE
5927 CE 2 - 4" IRRIGATION SLEEVES
1
SF 2 LIMITS OF CONSTRUCTION
WATER QUALITY REFER TO CITY OF GEORGETOWN
STANDARD DETAIL EC06 30
2
POND REFER TO CITY OF GEORGETOWN
STANDARD DETAIL EC06 PROPOSED WALL

BURRELL EAVES SURVEY 2


CW CONCRETE WASHOUT

ABSTRACT NO. 216 3


SS
13.208 ACRES 29 STAGING AND SPOILS AREA

NYX DRIVE
JARRELL ISD ELEMENTARY 3
SCHOOL #4 IP

CK
IP INLET PROTECTION
FFE=812'

15' BUILDING SET BA


3
4 SF SILT FENCE

4
28 EXISTING
SF TREE PROTECTION

REDDING WAY
DETENTION SEE SHEET C-08

POND

546.81'
4 TREE PROTECTION
7745
5 SS 27
SEE SHEET C-08
DETENTION POND

S02° 55' 28"W


5
STABILIZED CONSTRUCTION
CE
ENTRANCE
IP CW
5
6
IP
TREE TO BE REMOVED
6
26 IP

501 TREE TO REMAIN

7
25
7 HERITAGE TREE

©
(1066)
RB ROCK BERM

8 BLOCK
BLOCK B 24 FLOW ARROW
5969
8 C TP
BLOCK
5967 A 7

NOTES

NYX DRIVE
9 23
IP IP 1. FOR TREE PROTECTION SEE SHEET C-08
9 2. CONTRACTOR IS SOLELY RESPONSIBLE FOR IMPLEMENTATION, MAINTENANCE, AND
5954
(1067) EFFECTIVENESS OF ALL SWPPP CONTROLS - CONTROLS SHOWN ON THIS SITE MAP
8
ARE SUGGESTED CONTROLS ONLY.
5955
5957
3. CONTRACTOR SHALL RECORD INSTALLATION, MAINTENANCE OR MODIFICATION, AND
5968
REMOVAL DATES FOR EACH BMP EMPLOYED (WHETHER CALLED OUT ON ORIGINAL
5956
10 22 SWPPP OR NOT) DIRECTLY ON THE SITE MAP.
SF 4. THE ENVIRONMENTAL INSPECTOR HAS THE AUTHORITY TO ADD AND/OR MODIFY
5958
EROSION/SEDIMENTATION CONTROLS ON SITE TO KEEP PROJECT IN COMPLIANCE
WITH THE CITY OF GEORGETOWN RULES AND REGULATIONS 2/21/24
9
5. CONTRACTOR SHALL UTILIZE DUST CONTROL MEASURE DURING SITE CONSTRUCTION
5953 IP SUCH AS IRRIGATION TRUCKS AND MULCHING AS PER THE CITY OR AS DIRECTED BY
K 10 THE ENVIRONMENTAL INSPECTOR.
BAC 11 21
G SET 6. TEMPORARY AND PERMANENT STABILIZATION PRACTICES AND BMP'S SHALL BE
DIN 11 SLEEVE
1 - 6" IRRIGATION INSTALLED AT THE EARLIEST POSSIBLE TIME DURING THE CONSTRUCTION SEQUENCE.
B UIL 2 - 4" IRRIGATION SLEEVES
25' 10 AS AN EXAMPLE, PERIMETER SILT FENCE SHALL BE INSTALLED BEFORE
12 COMMENCEMENT OF ANY GRADING ACTIVITIES. OTHER BMP'S SHALL BE INSTALLED AS
SF SOON AS PRACTICABLE AND SHALL BE MAINTAINED UNTIL FINAL SITE STABILIZATION IS
13 12
IP ATTAINED. CONTRACTOR SHALL ALSO REFERENCE CIVIL AND LANDSCAPE PLANS
20 SINCE PERMANENT STABILIZATION IS PROVIDED BY LANDSCAPING, THE BUILDING(S),
IP AND SITE PAVING.
14 11 7. BMP'S HAVE BEEN LOCATED AS INDICATED ON THIS PLAN IN ACCORDANCE WITH
GENERALLY ACCEPTED ENGINEERING PRACTICES IN ORDER TO MINIMIZE SEDIMENT

EROSION CONTROL PLAN


'
.34

Y
672 15 IP TRANSFER. FOR EXAMPLE: SILT FENCES LOCATED AT TOE OF SLOPE AND INLET

WA
"W
' 17
° 50 13 PROTECTION FOR INLETS RECEIVING SEDIMENT FROM SITE RUN-OFF.
S68 19

G
DIN
16 8. ADDITIONAL EROSION AND SEDIMENTATION CONTROLS MAY BE REQUIRED BY THE
CITY DURING CONSTRUCTION.

RED
12 9. REFERENCE EROSION CONTROL DETAILS SHEET C-33.
IVE IP 10. IF DISTURBED AREA IS NOT TO BE WORKED ON FOR MORE THAN 14 DAYS, DISTURBED
DR
DA
ZEL AREA NEEDS TO BE STABILIZED BY REVEGETATION, MULCH, TARP OR REVEGETATION
IP 14 18 MATTING [ECM 1.4.4.B.3, SECTION 5, I.]. THE CONTRACTOR WILL CLEAN UP SPOILS
THAT MIGRATE ONTO THE ROADS A MINIMUM OF ONCE DAILY [ECM 1.4.4.D.4].
TEMPORARY TURNAROUND EASEMENT
DOC#:________________
7 IP 11. USE J-HOOKS WHERE SILT FENCE CANNOT BE INSTALLED PARALLEL TO THE EXISTING
13

- PHASE 3
BLOCK CONTOURS.
D
6 CONTRACTOR TO MAINTAIN AND UPDATE AS NECESSARY PER TCEQ REQUIREMENTS.
1 - 6" IRRIGATION SLEEVE 12. CONTRACTOR TO INSTALL, MAINTAIN AND UPDATE PROPOSED SILT FENCE AS
15 2 - 4" IRRIGATION SLEEVES
5 17 NECESSARY PER TCEQ REQUIREMENTS.
13. ALL SILT FENCE IS REQUIRED TO BE FABRIC PRODUCT AND NOT WOVEN MATERIAL.
OSHA APPROVED IMPALEMENTS CAPS ARE REQUIRED FOR ALL REBAR AND STAKING.
4 IP 14
IVE

14. ALL PROPOSED GRADING SHOULD BE WITHIN SILT FENCE AREA. CONTRACTOR TO
DR

VERIFY THAT ALL GRADING AND PROPOSED IMPROVEMENTS IS WITHIN THE LIMITS OF
3 TP
NYX

THE SILT FENCE PRIOR TO INSTALLING.


16 15. CONTRACTOR TO VERIFY IF EXISTING LANDSCAPE IMPROVEMENTS ARE WITHIN LOC
2 IP PRIOR TO INSTALLING SILT FENCE. IF EXISTING LANDSCAPE IMPROVEMENTS ARE
15 INSIDE THE LOC, CONTRACTOR TO NOTIFY THE ENGINEER OF RECORD PRIOR TO
1 INSTALLING SILT FENCE.
8
1 - 6" IRRIGATION SLEEVE
2 - 4" IRRIGATION SLEEVES
9 AN
DR
IVE SF

AY
E
WB
5'
LO

GW
WIL EROSION CONTROL MEASURES SEQUENCING
IP 16
.1
542
(1059)
10

DIN
RED
3"W
11
13 BEFORE ANY SITE GRADING ACTIVITIES:
IP 0 ' 5 1. INSTALL PERIMETER SILT FENCE
°4
S68
12 12 2. INSTALL STORM DRAIN INLET PROTECTION
3. CONSTRUCTION STABILIZED CONSTRUCTION
13 11 ENTRANCE
SF 4. CONSTRUCT SEDIMENT BASINS
BERRY CREEK (GEORGETOWN) ASLI IX LLC 10
REMAINING PORTION OF
15
14 IP
CALLED 314.54 ACRES
BLOCK SITE GRADING
E 9

BERRY CREEK
1. BEGIN SITE CLEARING AND GRUBBING

WILLIAMSON COUNTY, TEXAS


DOCUMENT NO. 2018106295
OFFICIAL PUBLIC RECORDS 8 OPERATIONS

HIGHLANDS
CITY OF GEORGETOWN
2. BEGIN OVERALL SITE GRADING
TEMPORARY TURNAROUND EASEMENT
DOC#:________________ RIV
E
7 3. ESTABLISH TOP SOIL STOCKPILE
ND
EA

3'
W B 4. INSTALL SILT FENCE AROUND STOCKPILES

PHASE 3
LLO
WI
.9
261
6 5. DISTURBED AREAS WHERE CONSTRUCTION
WILL CEASE FOR MORE THAN 14 DAYS SHALL
5
'21 "W BE STABILIZED WITH EROSION CONTROLS
°43
S68
4

SF
Know what'sbelow.
2

1
Call before you dig.

. 03'
571
WARNING: CONTRACTOR IS TO
VERIFY PRESENCE AND EXACT

0"W
LOCATION OF ALL UTILITIES

5 '0 PRIOR TO CONSTRUCTION.


°4
S68 C-06
OF C-37
2023-24-CON
S
C RE ),
4 A WN 0 100' 200'
1 4.5 ETO
3 G
ED EOR GRAPHIC SCALE 100'
E
D (G LC R WC
M
AI EK , L O P
T CL RE KI IX 295 ES
1
I C AL 810 6
QU RRY 1 A CR LEGEND
BE 0 0 2
C #2 1 2.5 46
DO D 3 01
D EE 1208 3 PHASE LINE
N 0 C AU
I TIO C# 2 RW TU E
P 4
RT DO O M LIMITS OF CONSTRUCTION
PA N
SU 5
1 E PROPOSED WALL
LN 6
CW CONCRETE WASHOUT
2 7

8 SS STAGING AND SPOILS AREA

CE
3
E 9
W
W

B IP INLET PROTECTION
4 1

RD
SF SILT FENCE

E
10

I
5

NN
W
W

RD
W

2
W

TREE PROTECTION

IP
FA
AE
SEE SHEET ####
3
6 M

W
W
D E
LI
TREE PROTECTION

EL
4 SEE SHEET ####
31
7 1

IP
STABILIZED CONSTRUCTION
CE

W
5

W
30 ENTRANCE
8 2

N
29

AU
6

YO
TREE TO BE REMOVED
3

TU
9 28

M
7

AN

N
I 4

SU
TREE TO REMAIN

YC
10 27 8

E
IP
1

LN
RD
D 5

BO
26 9 HERITAGE TREE

©
IP
11

NIE
2

W
W
W
25 6
B

FAN
10

CO
12 RB ROCK BERM
3
24

SI
11 7

E
FLOW ARROW

NN
13 4
501 20 23

A
BE

WW
D 12 8
14
5 NOTES

AR
22

AU
21
FOR TREE PROTECTION SEE SHEET NOTES

RD
6 9 1. C-08

TU
E4
13
E1
2. CONTRACTOR IS SOLELY RESPONSIBLE FOR IMPLEMENTATION, MAINTENANCE, AND
15

MN
21 EFFECTIVENESS OF ALL SWPPP CONTROLS - CONTROLS SHOWN ON THIS SITE MAP
S 7

AS
22
A S 19 10 ARE SUGGESTED CONTROLS ONLY.
PH LOT

SU
16 14 3. CONTRACTOR SHALL RECORD INSTALLATION, MAINTENANCE OR MODIFICATION, AND

PH
(1195)
8
52
REMOVAL DATES FOR EACH BMP EMPLOYED (WHETHER CALLED OUT ON ORIGINAL

IP
EL
18 20 11

WW
SWPPP OR NOT) DIRECTLY ON THE SITE MAP.

IP
4. THE ENVIRONMENTAL INSPECTOR HAS THE AUTHORITY TO ADD AND/OR MODIFY

N
17 C 15 EROSION/SEDIMENTATION CONTROLS ON SITE TO KEEP PROJECT IN COMPLIANCE
9 19 12
17 C WITH THE CITY OF GEORGETOWN RULES AND REGULATIONS 2/21/24
5. CONTRACTOR SHALL UTILIZE DUST CONTROL MEASURE DURING SITE CONSTRUCTION
24 16IP SUCH AS IRRIGATION TRUCKS AND MULCHING AS PER THE CITY OR AS DIRECTED BY
16 10 18 13 THE ENVIRONMENTAL INSPECTOR.

WW
6. TEMPORARY AND PERMANENT STABILIZATION PRACTICES AND BMP'S SHALL BE
F INSTALLED AT THE EARLIEST POSSIBLE TIME DURING THE CONSTRUCTION SEQUENCE.
PL
IP (1194)
25 11 14
17 EE
AS AN EXAMPLE, PERIMETER SILT FENCE SHALL BE INSTALLED BEFORE
500 23 15 D AV COMMENCEMENT OF ANY GRADING ACTIVITIES. OTHER BMP'S SHALL BE INSTALLED AS
SOON AS PRACTICABLE AND SHALL BE MAINTAINED UNTIL FINAL SITE STABILIZATION IS
26 15 ATTAINED. CONTRACTOR SHALL ALSO REFERENCE CIVIL AND LANDSCAPE PLANS

SM
12 SINCE PERMANENT STABILIZATION IS PROVIDED BY LANDSCAPING, THE BUILDING(S),
22 14

UD
AND SITE PAVING.
1 16 7. BMP'S HAVE BEEN LOCATED AS INDICATED ON THIS PLAN IN ACCORDANCE WITH
27 (1192)
(1191)

GE
2 GENERALLY ACCEPTED ENGINEERING PRACTICES IN ORDER TO MINIMIZE SEDIMENT

EROSION CONTROL PLAN


21 13 3 TRANSFER. FOR EXAMPLE: SILT FENCES LOCATED AT TOE OF SLOPE AND INLET

W
4 17 PROTECTION FOR INLETS RECEIVING SEDIMENT FROM SITE RUN-OFF.
1 SE 28

AY
L

IP
20 8. ADDITIONAL EROSION AND SEDIMENTATION CONTROLS MAY BE REQUIRED BY THE
TH RD
F EP 5
PHASE 1 VE 6
CITY DURING CONSTRUCTION.
IR DA 18 9. REFERENCE EROSION CONTROL DETAILS SHEET C-33.
IE

D 29 19 7 F 10. IF DISTURBED AREA IS NOT TO BE WORKED ON FOR MORE THAN 14 DAYS, DISTURBED
NN

8 AREA NEEDS TO BE STABILIZED BY REVEGETATION, MULCH, TARP OR REVEGETATION


FA

9 56 19 MATTING [ECM 1.4.4.B.3, SECTION 5, I.]. THE CONTRACTOR WILL CLEAN UP SPOILS
30 THAT MIGRATE ONTO THE ROADS A MINIMUM OF ONCE DAILY [ECM 1.4.4.D.4].
10
PHASE 3 55 11. USE J-HOOKS WHERE SILT FENCE CANNOT BE INSTALLED PARALLEL TO THE EXISTING
SF

- PHASE 5
11
20' POND SETBACK
18 CONTOURS.
31 12
F 54 IP I 20 CONTRACTOR TO MAINTAIN AND UPDATE AS NECESSARY PER TCEQ REQUIREMENTS.
503
(885)
13 53 12. CONTRACTOR TO INSTALL, MAINTAIN AND UPDATE PROPOSED SILT FENCE AS
52 21 NECESSARY PER TCEQ REQUIREMENTS.
3 G 32 13. ALL SILT FENCE IS REQUIRED TO BE FABRIC PRODUCT AND NOT WOVEN MATERIAL.

IP
51

IP
17 OSHA APPROVED IMPALEMENTS CAPS ARE REQUIRED FOR ALL REBAR AND STAKING.
IP

WW

50

502
4 33 TP 14 22 14. ALL PROPOSED GRADING SHOULD BE WITHIN SILT FENCE AREA. CONTRACTOR TO

AU
49 Y VERIFY THAT ALL GRADING AND PROPOSED IMPROVEMENTS IS WITHIN THE LIMITS OF
WA
W
W

16
W

20' POND SETBACK


15
20
IP THE SILT FENCE PRIOR TO INSTALLING.
AS
IP

T
5 48
IP

OM

UM
34
(1337)
(1338) H 15. CONTRACTOR TO VERIFY IF EXISTING LANDSCAPE IMPROVEMENTS ARE WITHIN LOC

19
SE

CE 47 H 23
F TP T PRIOR TO INSTALLING SILT FENCE. IF EXISTING LANDSCAPE IMPROVEMENTS ARE
IP
TT

NS
46
TH

6
TP
ERE INSIDE THE LOC, CONTRACTOR TO NOTIFY THE ENGINEER OF RECORD PRIOR TO
45 EV 18 INSTALLING SILT FENCE.
IR

501
35
CW

UE
44 17
D

(1357)

LN
7 43 IP 16
PH

36
42 15
IP 10.0016 ACRES EROSION CONTROL MEASURES SEQUENCING
AS

8 41 14
37 SF FELIBERTO
13
E1

F 40 IP GARZA, III ET UX BEFORE ANY SITE GRADING ACTIVITIES:


12 1. INSTALL PERIMETER SILT FENCE
9 DOC#2000014422
W
W

38 AY H 11 2. INSTALL STORM DRAIN INLET PROTECTION


SW OPRWC
SF

10
10 39 O MA 9
(1289) 3. CONSTRUCTION STABILIZED CONSTRUCTION
TH ENTRANCE
ETT
20' POND SETBACK

G 8 4. CONSTRUCT SEDIMENT BASINS


11 VER WW

7
E
TP 6
DRAINAGE AREA SITE GRADING
5
WW

BERRY CREEK
12 4 TP 1. BEGIN SITE CLEARING AND GRUBBING

WILLIAMSON COUNTY, TEXAS


3 (1410) 10.0 ACRES OPERATIONS

HIGHLANDS
CITY OF GEORGETOWN
13 WW

2 (1362) EKRAM SHARIF 2. BEGIN OVERALL SITE GRADING


TP
SE

1 MEZAYEK ET UX 3. ESTABLISH TOP SOIL STOCKPILE


TH

14 DOC# 2004040065 4. INSTALL SILT FENCE AROUND STOCKPILES

PHASE 3
OPRWC 5. DISTURBED AREAS WHERE CONSTRUCTION
IR

(936)
SF TP
WILL CEASE FOR MORE THAN 14 DAYS SHALL
D

Know what'sbelow.
15 BE STABILIZED WITH EROSION CONTROLS

(979)
WW

Call before you dig.


BENCHMARKS
SF

TBM# 101 "(" SET IN HEADWALL OF CULVERT


LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
WARNING: CONTRACTOR IS TO
19.317 ACRES BONNET LANE.
VERIFY PRESENCE AND EXACT
ELEVATION = 821.82 FEET (AS SHOWN)
PHILIP H. ANNIS ET UX LOCATION OF ALL UTILITIES
DOC# 2005100364 PRIOR TO CONSTRUCTION.
TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED
OPRWC 3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-07
OF C-37
2023-24-CON
(836)
PHASE 1
5936

(1046)

5934

5933 503 502


5932
(835) (897)
(1070)
500
(838) 1
31
5930 1
5931
(837) (1079)
0 60' 120'
5928 5929

GRAPHIC SCALE 60'


5927
(1083) 1
WATER QUALITY 2
30 (1068)
2
POND
BURRELL EAVES SURVEY (839) (1080)
2 LEGEND
ABSTRACT NO. 216
(1069)
3
13.208 ACRES 29

NYX DRIVE
JARRELL ISD ELEMENTARY 3 PROPERTY LINE

SCHOOL #4

CK
(1082) (1081) TREE TO REMAIN
FFE=812'

15' BUILDING SET BA


3
4 TREE TO BE REMOVED
4
28 EXISTING

REDDING WAY
(1873) (1858)
DETENTION HERITAGE TREES

POND

546.81'
4
7745
5 HERITAGE TREES TO BE REMOVED
27
DETENTION POND

S02° 55' 28"W


5 (1859)
(1084)
TREE PROTECTION FENCING
(1872)
5
6
26
6

(1088) 501

7
25
7 (1848)
(1089)
6

(1849) (1066)
(1871)
8 BLOCK
BLOCK B 24

©
8 C
5969
BLOCK
5967 A 7
(1846)

NYX DRIVE
9 23
9
5954
(1870) (1067)
8
(1847)
5957
5955
5968

5960 5956
10 22

5958

9
(1835)
5953

K (1890) 10
BAC 11 (1860) 21
SET
(1895)
G 2/21/24
IL DIN 11
BU
5952
25' 10
12

13 12 20 (1087)

14 11
'
.34

Y
672 15 (1836)

WA
"W
(1078) (1064)
' 17
° 50 13
S68 19

ING
(1850)
16

D
RED
12
R IVE (1065)
DAD
ZEL

TREE PRESERVATION
(1893)
14

PLAN (SHEET 1 OF 2)
(1077)
18
(1837)
TEMPORARY TURNAROUND EASEMENT (1894) 7
DOC#:________________
BLOCK 13 (1075) (1063)
D
6 (1845)
(1061)

5 15 (1060)
17
(1869)

4 (1076) 14
IVE
DR

(1074)
3
NYX

(1851) (1073)
16 (1844)
2 (1852)
15
(1853)
1 8
(1900) (1854)
E (1843)
RIV
9 ND

Y
A
BE

WA
(1866)
'
W (1842)
LO

.15
WIL
16

ING
(1867) (1062)

2
(1841) (1059)
10
54

D
(1868) (1085)

RED
(1840)

W
'53"
13
11 (1839)
(1072)

40

(1855)

S6 Know what'sbelow.
12 12
(1924) (1865)

Call before you dig.


(1071)
13 (1856) 11

BERRY CREEK (GEORGETOWN) ASLI IX LLC 15


14
(1864)
10
REMAINING PORTION OF (1911)
BLOCK (1838)
(1086)
CALLED 314.54 ACRES E 9 (1861)
(1892)
DOCUMENT NO. 2018106295
OFFICIAL PUBLIC RECORDS (1891) 8 (1862)

TEMPORARY TURNAROUND EASEMENT (1863)


IVE 7

BERRY CREEK
DOC#:________________ DR

WILLIAMSON COUNTY, TEXAS


AN (1857)

93'
BE
L OW
WIL
1 .

HIGHLANDS
6 WARNING: CONTRACTOR IS TO
26

CITY OF GEORGETOWN
(1901) VERIFY PRESENCE AND EXACT

1"W
5 LOCATION OF ALL UTILITIES

3' 2 PRIOR TO CONSTRUCTION.

8°4

PHASE 3
4

3
S6
2

1
BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.

3'
ELEVATION = 821.82 FEET (AS SHOWN)
.0
571 TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED

0" W 3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN

45'0
3.703 ACRE TRACT.
°
S68
ELEVATION = 820.55 FEET (AS SHOWN)

C-08
OF C-37
2023-24-CON
PROTECTION OF CRITICAL ROOT ZONE
REQUIRED TREE PROTECTION:
1. NO CONSTRUCTION OR DISTURBANCE SHALL OCCUR WITHIN AN AREA THAT 1-10 TREES PER ACRE REQUIRES 30% OF THE OVERALL TREE DENSITY TO BE PROTECTED
CONSTITUTES MORE THAN 50% OF THE TOTAL CRZ AND 1/2 THE RADIAL
DISTANCE OF THE CRZ FOR EACH TREE BEING PRESERVED. THIS DEFINED 84 TREES \ 16.885 ACRES = 5 TREES PER ACRE
AREA SHALL BE FLAGGED AND ENCIRCLED WITH PROTECTIVE FENCING 84 TREES x 30% = 26 TREES REQUIRED TO BE PROTECTED
DURING CONSTRUCTION.

2. CUT OR FILL GREATER THAN 4" IN DEPTH AND SEVERING OF MAJOR ROOTS TREE MITIGATION:
SHALL BE CONSIDERED DISTURBANCE. MITIGATION SHALL BE PROVIDED AT A 3:1 INCH BASIS FOR THE TOTAL DIAMETER INCHES OF
HERITAGE TREES REMOVED, MEASURED AT DBH.
3. WITHIN THE PROTECTED CRZ, ONLY FLATWORK, DECKING, OR SIMILAR
CONSTRUCTION, MAY BE APPROVED AND SHALL NOT AFFECT THE *EXCEPTIONS:
BRANCHING OF THE TREE. NO MITIGATION SHALL BE REQUIRED FOR PROTECTED OR HERITAGE TREES THAT ARE APPROVED
FOR REMOVAL DUE TO POOR HEALTH.

TREES TO BE REMOVED ON SITE: DEAD OR POOR CONDITION


HERITAGE: NONE

TREES TO BE REMOVED ON SITE: PROTECTED


NO MITIGATION IS PROPOSED FOR THE REMOVED PROTECTED TREES PER SECTION 8.02.010 OF THE
CITY OF GEORGETOWN MUNICIPAL CODE.

TREES TO BE REMOVED AND MITIGATED ON SITE: HERITAGE

©
16.885 ACRES
84
5
30%
26

N/A
N/A
N/A

2/21/24

0
0
0

0
0

TREE PRESERVATION
PLAN (SHEET 2 OF 2)
0

29+27+28 = 84*3 = 252"


84 TREES

$56,700

The Architect/Engineer assumes 0


252 x $225/in = $56,700
responsibility for appropriate
use of this standard.

Know what'sbelow.
Call before you dig.
Georgetown Utility Systems
Your Community Owned Utility

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
WARNING: CONTRACTOR IS TO

CITY OF GEORGETOWN
VERIFY PRESENCE AND EXACT
LOCATION OF ALL UTILITIES
PRIOR TO CONSTRUCTION.

PHASE 3
BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-09
OF C-37
2023-24-CON
5935

LOPE
S
PHASE 1

REAR
INCLIN

SLOPE

PE
INCLIN
SWALE

AY SLO
CTIVE
5936

REAR

FRONT

FRONT
FRONT

T
PROTE

PARKW

STREE
PROT.
5934

5933 503 502 0 60' 120'


5932

GRAPHIC SCALE 60'


TYPE C LOT TYPE A LOT 500
TYPE A LOT 1
31
5931
5930 1
LEGEND
LOT GRADING TYPE C 5928 5929
TYPE C LOT
ALL DRAINAGE TO REAR LOT LINE PHASE LINE
5927
TYPE C LOT 1
TYPE A LOT
WATER QUALITY TYPE A LOT 2
30 LIMITS OF CONSTRUCTION
2
POND FP 675.00 PROPOSED FINISHED PAD ELEVATION

BURRELL EAVES SURVEY TYPE C LOT


TYPE C LOT
2
55.5 PROPOSED SPOT ELEVATION
ABSTRACT NO. 216 TYPE A LOT 3
TYPE A LOT
EX 55.5 EXISTING SPOT ELEVATION
13.208 ACRES 29

NYX DRIVE
SLOPE

JARRELL ISD ELEMENTARY 3

SLOPE
PROPOSED REAR YARD SWALE
SCHOOL #4

CK
REAR

PE
TYPE C LOT

FRONT
FFE=812' LOT DRAINAGE FLOW DIRECTION

15' BUILDING SET BA


AY SLO
TYPE C LOT 3
TYPE A LOT
4 STREET DRAINAGE FLOW DIRECTION

CTIVE
EXISTING
TYPE A LOT

T
28

PARKW

STREE
*
SIDE S
LOPE 4

REDDING WAY
PROTE
INDICATES SIDE OF LOT WHERE DRIVEWAY

TYPE C LOT
DETENTION MUST BE LOCATED DUE TO GRADE
DIFFERENTIAL OR CONFLICT
SIDE
POND

546.81'
SWA
LE TYPE C LOT 4
7745 TYPE A LOT
TYPE A LOT 5 PROPOSED CONTOUR
27
DETENTION POND

S02° 55' 28"W


LOT GRADING TYPE A 5 EXISTING CONTOUR
ALL DRAINAGE TO STREET
TYPE C LOT
TYPE C LOT 5 EXISTING TREE TO REMAIN
TYPE A LOT
TYPE A LOT
6
26
6
SIDEWALK TO BE BUILT BY DEVELOPER
SLOPE

SIDE
SWA
L E
501
TYPE C LOT
TYPE A LOT
REAR

7
SLOPE

TYPE A LOT SIDEWALK TO BE BUILT MY HOME-BUILDER


25
7
CTIVE

TYPE C LOT
FRONT

PE

6
PROTE

AY SLO
CTIVE

TYPE C LOT (1066)


T
PARKW

STREE

TYPE A LOT
8 BLOCK

©
SIDE S TYPE A LOT
PROTE

LOPE

GRADING GENERAL NOTES


BLOCK B 24
SIDE 8 C
5969
SWA TYPE C LOT
LE BLOCK
5967 A 7 1. CONTRACTOR SHALL CUT 3' BEHIND BACK OF CURB TO SUBGRADE ELEVATION.

2. ALL PERIMETER SLOPES TO NATURAL GROUND ARE TO BE 4:1 MAX, UNLESS OTHERWISE

NYX DRIVE
TYPE C LOT
TYPE A LOT
LOT GRADING TYPE B NOTED.
DRAINAGE BOTH TO STREET & REAR LOT LINE 9 23
TYPE A LOT
3. ALL SIDEWALKS SHALL NOT EXCEED A MAXIMUM 2% CROSS SLOPE & A 5% LONGITUDINAL
9 TYPE C LOT
5954 SLOPE.
8
5957 7. CONTRACTOR TO MATCH EXISTING GRADES AT ALL PHASE BOUNDARIES
5955 TYPE C LOT TYPE A LOT
5968
8. GRADES PROVIDED ARE TO TOP OF PAVEMENT AND/OR TOP OF GROUND. CONTRACTOR TO
5956
10 22
MASS GRADE TO TOP OF PAVEMENT SUBGRADE FOR FUTURE ROADWAYS, AND TO TOP OF
FINISHED PAD, AND TO TOP OF GROUND FOR LOTS/LANDSCAPE AREAS.
TYPE C LOT
5958

TYPE B LOT 9 9. REFER TO GEOTECH REPORT BY MLA REPORT NO. 22101103.001.


5953 TYPE A LOT
TYPE C LOT
10. ALL PROPOSED ELEVATIONS (SPOT GRADES AND CONTOURS) ARE TO FUTURE TOP OF
K 10
BAC 2/21/24
TYPE B LOT
11 21 GROUND AND PAVEMENT. CONTRACTOR TO CONSTRUCT ROADWAYS AND R.O.W. TO FINAL
ET
GS TOP OF PAVEMENT, CURB, AND GROUND ELEVATIONS PER THESE PLANS. CONTRACTOR TO
DIN 11 TYPE C LOT
B UIL TYPE B LOT VERIFY EXISTING TOP OF SUBGRADE ELEVATIONS PRIOR TO CONSTRUCTION AND NOTIFY
25' 10 ENGINEER IMMEDIATELY IF ANY DISCREPANCIES.
12
TYPE B LOT
TYPE C LOT TYPE A LOT 11. INDIVIDUAL LOT OWNERS/BUILDERS ARE REQUIRED TO SUBMIT A DETAILED LOT GRADING
TYPE B LOT 13 12 20 PLAN THAT CONFORMS TO THE DRAINAGE PATTERNS SHOWN ON SHEET C-10 IN THE
TYPE C LOT APPROVED CIVIL CONSTRUCTION PLANS FOR THE DEVELOPMENT, THAT IS SIGNED AND
14 SEALED BY A TEXAS REGISTERED P.E., TO THE CITY ALONG WITH THEIR BUILDING PERMIT
11
TYPE B LOT APPLICATION.
' TYPE C LOT
.34

Y
672 15

WA
TYPE A LOT
' 17
"W TYPE B LOT 12. ALL REQUIRED RETAINING WALLS TO BE DESIGNED & CONSTRUCTRD BY THE HOMEBUILDER.
° 50 13
S68 19

ING
16 13. HOMEBUILDER MUST MAINTAIN LOT GRADING CRITERIA AS FOLLOWS:

D
TYPE C LOT

RED
12 ~ FRONT YARD: 1.1% - 6% (MAX DRIVEWAY SLOPE OF 10%)
E ~ MINIMUM LOT SLOPE: 1.1% FOR A & C LOTS, 1.5% FOR B LOTS
RIV
D AD TYPE C LOT ~ MAX BACKYARD SLOPE: 10% - 15%
ZEL TYPE A LOT
TYPE C LOT
14 18
TEMPORARY TURNAROUND EASEMENT 7 TYPE C LOT
NOTE:

GRADING PLAN
DOC#:________________
BLOCK TYPE C LOT 13 1. CONTRACTOR TO PROVIDE STRUCTURAL WALL
D
6 DESIGN FOR ALL WALLS.
TYPE C LOT
TYPE A LOT
15 2. BW = BOTTOM OF GRADE
TEMPORARY TURNAROUND 5 17
TYPE C LOT
TW = TOP OF GRADE
4 TYPE C LOT
IVE
14
SEE STRUCTURAL FOR TOP OF FOOTING AND TOP
OF BLOCK.
DR

3
TYPE C LOT TYPE C LOT 3. ANY REVISIONS TO RETAINING WALLS WILL
NYX

16 REQUIRE CITY APPROVAL


TYPE C LOT
2 TYPE C LOT 4. CONTRACTOR TO VERIFY EXISTING TOPOGRAPHY
TYPE C LOT
TYPE A LOT 15 IS CORRECT PRIOR TO CONSTRUCTION.
1 8 CONTRACTOR TO INFORM ENGINEER OF RECORD
TYPE C LOT TYPE A LOT OF ANY DISCREPANCIES IN THE EXISTING
IVE
DR TOPOGRAPHY PRIOR TO CONSTRUCTION IN
9 AN

Y
E
WB

WA
5'
TYPE C LOT
WIL
LO ORDER FOR THE CORRECT CUT/FILL VOLUME TO
.1
TYPE A LOT
16

ING
542
10
TYPE C LOT
(1059)
BE ACCOUNTED FOR.

D
RED
TYPE A LOT

11
13
3"W
40'5
TYPE A LOT TYPE C LOT

°
S68
12 12
TYPE C LOT
TYPE A LOT

Know what'sbelow.
13 11
TYPE A LOT TYPE C LOT

BERRY CREEK (GEORGETOWN) ASLI IX LLC


REMAINING PORTION OF
CALLED 314.54 ACRES
15
14
BLOCK
TYPE C LOT
10
Call before you dig.
E 9
DOCUMENT NO. 2018106295
OFFICIAL PUBLIC RECORDS 8
TYPE C LOT

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


TEMPORARY TURNAROUND EASEMENT
IVE 7 TYPE C LOT
DOC#:________________ DR NTS
AN TYPE C LOT

HIGHLANDS
E

93'
WB

CITY OF GEORGETOWN
LO
WIL
.
261
6 WARNING: CONTRACTOR IS TO
TYPE C LOT VERIFY PRESENCE AND EXACT
5
'21 "W LOCATION OF ALL UTILITIES

PHASE 3
TEMPORARY TURNAROUND TYPE C LOT
PRIOR TO CONSTRUCTION.
° 4 3
S68
4
TYPE C LOT

3
TYPE C LOT

2
TYPE C LOT

1 BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

.0 3' TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED

571 3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN

"W
3.703 ACRE TRACT.

' 0 0 ELEVATION = 820.55 FEET (AS SHOWN)

° 45
S68

C-10
OF C-37
2023-24-CON
CURVE TABLE
CURVE RADIUS LENGTH CHORD BEARING CHORD DELTA TANGENT

CO
WB 0 40' 80'

10.0' P.U.E.
OY
CA 26
NY
ON 1 GRAPHIC SCALE 40'
DR
IVE NOTE:
25 1. ALL CROWN TRANSITIONS TO INTERSECTIONS
2 BEGIN AT THE POINT OF CURVATURE. LEGEND
24 2. PRIOR TO CONSTRUCTION CONTRACTOR TO
FIELD VERIFY EXISTING STREET TIE-IN CENTERLINE OF ROAD
3 23
ELEVATIONS AND NOTIFY THE ENGINEER OF
RECORD OF ANY DISCREPANCIES FROM ADA CROSSING
BLOCK
B 22 WHAT IS17
SHOWN IN THE APPROVED PLANS.
EXISTING CURB RAMP (TYP) 21 20 19 18 PROPERTY LINE
4
INDICATES SIDE OF LOT WHERE

5 * DRIVEWAY MUST BE LOCATED DUE TO


GRADE DIFFERENTIAL OR CONFLICT

PROPOSED STORM SEWER HEADWALL

E.
CO PROPOSED FLOW DIRECTION
WB 6

.U.
OY

0' P
CA PROPOSED CONTOUR
NY
ON

10.
DR
IVE 7 EXISTING CONTOUR

E.
.U.
E
RIV RIGHT-OF-WAY BOUNDARY

0' P
D
YX
8
N
P.U.E BOUNDARY

10.
TIME OF CONCENTRATION

WILLOW BEAN DRIVE


503 9 PHASE BOUNDARY LINE
1
10 11 16 CURB RAMP
12 13 14 15
BUILDING SETBACK LINE
2
CONCRETE VALLEY GUTTER

3 SIDEWALK TO BE BUILT BY HOME


BUILDER

10.0' P.U.E.
4

R2
5.
0'
VE
5 DRI
NYX

©
50.0' ROW
32.0' B-B
6 CURB RAMP (TYP) TYPE 2
REF COG DETAIL SD31
NYX DRIVE
BLOCK

10.0' P.U.E.
C5' SIDEWALK (BY DEVELOPER)
Y

CONCRETE VALLEY
7
PO UALIT

GUTTER
'
.81
546

'
CK

5.0
BA W
ET 28"

R2
ND

GS 55'
8
Q

°
DIN S02
BU
IL 5' SIDEWALK
TER

15'
(BY DEVELOPER)
10 7 8
WA

WILLOW BEAN DRIVE


5930

ZELDA DRIVE
SHEET C-14 SHEET C-13

2/21/24

KEYMAP
NTS

PROFILE SCALE

PAVING PLAN & PROFILE -


SPEED
LIMIT

NYX DRIVE
30

BERRY CREEK HIGHLANDS PHASE 1


BERRY CREEK HIGHLANDS PHASE 3
Know what'sbelow.
Call before you dig.

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
WARNING: CONTRACTOR IS TO
VERIFY PRESENCE AND EXACT
LOCATION OF ALL UTILITIES

PHASE 3
PRIOR TO CONSTRUCTION.

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-11
OF C-37
2023-24-CON
CURVE TABLE
CURVE RADIUS LENGTH CHORD BEARING CHORD DELTA TANGENT

CO
WB NOTE:
OYC
AN 1. ALL CROWN TRANSITIONS TO INTERSECTIONS
YO 0 40' 80'
N DR BEGIN AT THE POINT OF CURVATURE.
IVE 2. PRIOR TO CONSTRUCTION CONTRACTOR TO GRAPHIC SCALE 40'
500 FIELD VERIFY EXISTING STREET TIE-IN
ELEVATIONS AND NOTIFY THE ENGINEER OF LEGEND
RECORD OF ANY DISCREPANCIES FROM
1 WHAT IS SHOWN IN THE APPROVED PLANS. CENTERLINE OF ROAD

ADA CROSSING
2 PROPERTY LINE

INDICATES SIDE OF LOT WHERE


3
* DRIVEWAY MUST BE LOCATED DUE TO
GRADE DIFFERENTIAL OR CONFLICT

S68°40'53"W 542.15'
PROPOSED STORM SEWER HEADWALL
EXISTING CURB RAMP (TYP) 4
PROPOSED FLOW DIRECTION

.
U.E
PROPOSED CONTOUR
5

' P.
EXISTING CONTOUR

0
10.
CO RIGHT-OF-WAY BOUNDARY
WB
OY 501
CAN P.U.E BOUNDARY

.E
YO 6
ND
RIV .U. TIME OF CONCENTRATION
0' P
E
Y
WA
10.

G
PHASE BOUNDARY LINE
DIN
RE
D 5' SIDEWALK 7
(BY DEVELOPER) 8 CURB RAMP

BLOCK
9 10 11 12 13 14 15 16
31 BUILDING SETBACK LINE
A
E1

CONCRETE VALLEY GUTTER

30 INSTALL 8 LF SAWTOOTH CURB -


SEE DETAIL SHEET C-34 SIDEWALK TO BE BUILT BY HOME
BUILDER
AS

29

10.0' P.U.E.
502

©
28 CURB RAMP (TYP) TYPE 2
PH

REF COG DETAIL SD31

50.0' ROW

32.0' B-B
27 REDDING WAY REDDING WAY

10.0' P.U.E.
26 CONCRETE VALLEY
1 GUTTER
5' SIDEWALK
25 (BY DEVELOPER)
2
24 13
3
23
WILLOW BEAN DRIVE 2/21/24
SHEET C-13

KEYMAP
NTS

PROFILE SCALE

PAVING PLAN & PROFILE -


SPEED

REDDING WAY
LIMIT

30

BERRY CREEK HIGHLANDS PHASE 1


BERRY CREEK HIGHLANDS PHASE 3
FUTURE BERRY CREEK HIGHLANDS PHASE
BERRY CREEK HIGHLANDS PHASE 3

Know what'sbelow.
Call before you dig.

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
WARNING: CONTRACTOR IS TO
VERIFY PRESENCE AND EXACT
LOCATION OF ALL UTILITIES

PHASE 3
PRIOR TO CONSTRUCTION.

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-12
OF C-37
2023-24-CON
0 40' 80'

NOTE: GRAPHIC SCALE 40'


1. ALL CROWN TRANSITIONS TO INTERSECTIONS
BEGIN AT THE POINT OF CURVATURE.
2. PRIOR TO CONSTRUCTION CONTRACTOR TO
FIELD VERIFY EXISTING STREET TIE-IN
ELEVATIONS AND NOTIFY THE ENGINEER OF
RECORD OF ANY DISCREPANCIES FROM
WHAT IS SHOWN IN THE APPROVED PLANS. LEGEND
CENTERLINE OF ROAD
NYX DRIVE REDDING WAY ADA CROSSING
SHEET C-11 SHEET C-12
PROPERTY LINE

16 17 INDICATES SIDE OF LOT WHERE


CONCRETE VALLEY
GUTTER
* DRIVEWAY MUST BE LOCATED DUE TO
GRADE DIFFERENTIAL OR CONFLICT

PROPOSED STORM SEWER HEADWALL

10.0' P.U.E.
'
5' SIDEWALK

6.0
INSTALL

R
25
(BY DEVELOPER)

R3
TEMPORARY PROPOSED FLOW DIRECTION

.0
'
BARRICADE R5 PROPOSED CONTOUR
0.0
'

50.0' ROW
WILLOW BEAN DRIVE EXISTING CONTOUR

32.0' B-B
WILLOW BEAN DRIVE (50' R.O.W.)
WILLOW BEAN DRIVE
RIGHT-OF-WAY BOUNDARY
TEMPORARY
TURNAROUND P.U.E BOUNDARY

10.0' P.U.E.
CONCRETE VALLEY TIME OF CONCENTRATION

'
.0
GUTTER

25
PHASE BOUNDARY LINE
CURB RAMP (TYP) TYPE 2
R3

R
REF COG DETAIL SD31 CURB RAMP (TYP) TYPE 2
6.0

CURB RAMP
REF COG DETAIL SD31
'

BUILDING SETBACK LINE


BLOCK
E CONCRETE VALLEY GUTTER

REDDING WAY
SIDEWALK TO BE BUILT BY HOME
BUILDER

©
2/21/24

KEYMAP
NTS
FUTURE BERRY CREEK HIGHLANDS PHASE

PROFILE SCALE

PAVING PLAN & PROFILE -


BERRY CREEK HIGHLANDS PHASE 3

WILLOW BEAN DRIVE


SPEED
LIMIT

30

Know what'sbelow.
Call before you dig.

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
WARNING: CONTRACTOR IS TO
VERIFY PRESENCE AND EXACT
LOCATION OF ALL UTILITIES

PHASE 3
PRIOR TO CONSTRUCTION.

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-13
OF C-37
2023-24-CON
0 40' 80'

GRAPHIC SCALE 40'


NOTE:
1. ALL CROWN TRANSITIONS TO INTERSECTIONS
BEGIN AT THE POINT OF CURVATURE.
2. PRIOR TO CONSTRUCTION CONTRACTOR TO
FIELD VERIFY EXISTING STREET TIE-IN
ELEVATIONS AND NOTIFY THE ENGINEER OF
RECORD OF ANY DISCREPANCIES FROM
WHAT IS SHOWN IN THE APPROVED PLANS. LEGEND
CENTERLINE OF ROAD

ADA CROSSING

NYX DRIVE PROPERTY LINE


SHEET C-11
INDICATES SIDE OF LOT WHERE

* DRIVEWAY MUST BE LOCATED DUE TO


GRADE DIFFERENTIAL OR CONFLICT

PROPOSED STORM SEWER HEADWALL

10.0' P.U.E.
6. 0'
INSTALL

R2
PROPOSED FLOW DIRECTION

R3

5.
TEMPORARY

0'
BARRICADE R5 PROPOSED CONTOUR
0.0 11
' EXISTING CONTOUR

50.0' ROW
32.0' B-B
ZELDA DRIVE
RIGHT-OF-WAY BOUNDARY
TEMPORARY
P.U.E BOUNDARY
TURNAROUND
CONCRETE VALLEY

10.0' P.U.E.
TIME OF CONCENTRATION
0 ' GUTTER
2 5. 12 PHASE BOUNDARY LINE
R

R3
CURB RAMP (TYP) TYPE 2

6.0
CURB RAMP
REF COG DETAIL SD31

'
BUILDING SETBACK LINE
BLOCK
D CONCRETE VALLEY GUTTER

SIDEWALK TO BE BUILT BY HOME


BUILDER

©
2/21/24

KEYMAP
NTS
FUTURE BERRY CREEK HIGHLANDS PHASE

PROFILE SCALE

PAVING PLAN & PROFILE -


BERRY CREEK HIGHLANDS PHASE 3

SPEED

ZELDA DRIVE
LIMIT

30

Know what'sbelow.
Call before you dig.

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
WARNING: CONTRACTOR IS TO
VERIFY PRESENCE AND EXACT
LOCATION OF ALL UTILITIES

PHASE 3
PRIOR TO CONSTRUCTION.

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-14
OF C-37
2023-24-CON
5935

C2
5936

BUR 5932 5933


5934

R
ABS ELL EA
TR V
13. ACT ES SU
208 NO RV
AC . 21 EY
5931
5930

RES 6
5928
5927 5929

7745
JARRELL ISD ELEMENTARY WA
TE PH
SCHOOL #4 RQ AS
FFE=812' PO UAL E1
ND ITY

CK
T BA
SE
ING
DE
TE

ILD
N TIO

BU
N PO

15'

'
.81
ND

546
8"W
5' 2
°5
S02
5954

©
5955
5957

5956

5958
0 60' 120'

5967
GRAPHIC SCALE 60'
5969

LEGEND
X-1 AREA DESIGNATOR
9.9 ac AREA IN ACRES
5968
5.5 cfs Q100 FLOW IN CFS

POINT OF ANALYSIS 2/21/24


25' BUILDING SET BACK
EXISTING
S68° 50' 17"W 672.34'
EX-1 DETENTION PROPERTY LINE

13.21 ac POND EXISTING STORM DRAIN LINE

EXISTING DRAINAGE DIVIDE

TIME OF CONCENTRATION LINE

EXISTING FLOW DIRECTION

EXISTING CONTOUR

EXISTING DRAINAGE
PROPOSED CONTOUR

PHASE 1
NOTE:

AREA MAP
1. THE LIMITS OF BERRY CREEK HIGHLANDS PHASE 3 ARE
INCLUDED IN THE APPROVED DETENTION POND SIZING
AND CAPACITY CALCULATIONS WITHIN BERRY CREEK
HIGHLANDS PHASE 1 (2019-53-CON). PLEASE REFER TO
SHEET C-25 OF C-69 TO REPRESENT THE OVERALL
EXISTING RUNOFF CALCULATIONS.
2. BERRY CREEK HIGHLANDS PHASE 3 DRAINAGE AREA EX-1
LIMITS ARE INCLUDED IN DRAINAGE AREA A-1 IN THE
APPROVED PHASE 1 CONSTRUCTION PLANS.
3. THE POINT OF ANALYSIS A CALCULATIONS ARE SHOWN IN
THE PHASE 1 PLANS (2019-53-CON).

OH

EX-4
E

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


0.88 ac
EX-3

HIGHLANDS
CITY OF GEORGETOWN
OH

0.94 ac
E

PHASE 3
OH
E

EX-2
1.98 ac
OH
E

OH
BENCHMARKS
E
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
OH ELEVATION = 821.82 FEET (AS SHOWN)
E

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
S68°45'00"W 571.03' S68°43'21"W 261.93' S68°40'53"W 542.15' ELEVATION = 820.55 FEET (AS SHOWN)

C-15
S68 OF C-37
°45 2023-24-CON
'16"
W
BUR
R 19
ABS ELL EA 29
TR V
13. ACT ES SU 30
208 NO RV
AC . 21 EY 20
5931
5930

RES 6
5928
5927 5929
503
7745
JARRELL ISD ELEMENTARY WA 23
TE PH
SCHOOL #4 RQ A SE
FFE=812' PO UAL 1
ND ITY 1

2 502
1

CK
BA
3

ET
2
31

GS
DE

IN
TE

E
ILD

RIV
NT

BU
ION

XD
4
PO

15'

NY
81'
3
N

.
30
D

546
500

8"W
5' 2
°5
S02
5
4
29
1

5954

©
6
5
5955 28
5957 2

t
Inle
10'

t
' Inle
10
5956

5958 7
6
27

Y
3

WA
5967

ING
5969

DD
RE
8
BLOCK 7
26
C 4

5968

8
9 25
5

t
' Inle
10
IVE

2/21/24

10'
Inle
EXISTING

t
25' BUILDING SET BACK
DR
NYX

S68° 50' 17"W 672.34'


BLOCK
B
DETENTION
501
POND
10' Inlet

24
TEM
PO
9 0 200' 400'
RA
RY
TUR
N
PR-1
DO AROU GRAPHIC SCALE 200'
C#: N
___ D EA
___ S
___ EMEN
12.76 ac 6

LEGEND
___ T
___
_ 16 15 14 13 12 11
10 23
10
BLOCK X-1 AREA DESIGNATOR
A
7 9.9 ac AREA IN ACRES
10 ' Inlet

DRAINAGE AREA
5.5 cfs Q100 FLOW IN CFS

10' Inlet
22

PHASE 1
11 POINT OF ANALYSIS

PROPOSED
10' Inlet

ZELDA DRIVE
PROPERTY LINE
8
EXISTING STORM DRAIN LINE

MAP
10' Inlet

21
12
EXISTING DRAINAGE DIVIDE

TIME OF CONCENTRATION LINE


BLOCK
D EXISTING FLOW DIRECTION
9
13 20 EXISTING CONTOUR
1 2 3 4 5 6 7
PROPOSED CONTOUR

10
10' Inlet
10' Inlet

14 19

NOTE:
REDDING WAY

TEM 11
1. THE LIMITS OF PHASE 3 ARE INCLUDED IN THE APPROVED
PO
DETENTION POND SIZING AND CAPACITY WITH BERRY CREEK
NYX DRIVE

R AR
YT
UR 15 18
N
DO AROU PR-2 HIGHLANDS PHASE 1 (2019-53-CON). PLEASE REFER TO SHEET C-26
10' Inlet

C#: N
___ D EA
___ S
___ EMEN OF C-69 TO REPRESENT THE CALCULATIONS FOR THE DETENTION
10' Inlet

___
___
T 2.55 ac
_ 15
14 13 12 11 10 9 8 POND.
12
2. BERRY CREEK HIGHLANDS PHASE 3 DRAINAGE AREA LIMITS ARE
10' Inlet

16 17 INCLUDED IN DRAINAGE AREA A-5 IN THE APPROVED PHASE 1


CONSTRUCTION PLANS.

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


3. THE PR-3 DRAINAGE AREA IS INCLUDED WITHIN DRAINAGE AREA A-9
13

HIGHLANDS
IN THE APPROVED PHASE 1 PLANS. THEREFORE, THE PROJECT IS

CITY OF GEORGETOWN
OH
E

OVERDETAINING AND OVER TREATING TO ACCOUNT FOR THIS FLOW


10' Inlet 10' Inlet 10' Inlet

WILLOW BEAN DRIVE WILLOW BEAN DRIVE


EXITING THE PROJECT SITE ON THE SOUTHERN BOUNDARY.

PHASE 3
E
OH
4. FLOWS FROM THE PR-2 DRAINAGE AREA WILL BE CONVEYED TO THE
14 DETENTION POND THROUGH A COMBINATION OF SHEET FLOW AND
10' Inlet

SHALLOW CONCENTRATED FLOW.


PR-3 E
OH
5. POINT OF ANALYSIS A CALCULATIONS ARE SHOWN ON THE
BLOCK APPROVED PHASE 1 PLANS (2019-53-CON).
E
1.59 ac 15
REDDING WAY

PR-5
1 2 3 4 5 6 7 8 9 10 11 12 13
OH
PR-4
E

0.28 ac
0.11 ac
16
OH
E

S68°45'00"W 571.03' S68°43'21"W 261.93' S68°40'53"W 542.15'

C-16
S68 OF C-37
°45 2023-24-CON
'16"
W
1
PHASE
S
ED
GE

52 LOT
11 81 OF
81 852 ED 9.108CONC
ED 9.11
100 GE RE
GE 85 OF
81 OF1 CO TE
ED9.31CO NC
GE 1 NCRE RE
TE
OF
CO TE CLOS
NC E
RE
TE
B

11
81 848
7725
ED9.11
262
1185 GE
11 81 84
OF9
81 847 819.340
ED9.296CONC
ED 9.240M WAT 1 GE RE
GE11 OF ER OF CO TE
81 846 CO SP NC
ED 9.250 NCRE IGOT RE
TE
GE TE CLOS
OF
CO
NC
RE
TE
E
7728
7726

N30° 08
B

7727

14"W '
11
11 81 835
81 842 ED8.239
ED 8.893 GE
OF
GE CO
OF NC
CO RE
NC TE
11 RE
81 843 TE
11 ED 8.747
81 844 GE OF

201.76'
ED9.180 CO
GE NC 11
OF
CO RE 81 836
NC TE ED 8.069
RE GE
TE OF
11 CLOS CO
NC
81 841 E RE
ED 8.964 TE
GE
OF
CO
NC
RE
TE

11
81 834
ED7.368
GE
OF
CO
11 NC
RE
81 837 TE
ED 7.895
GE
OF
CO
NC
RE
TE
CLOS
11 E
81 832
11 ED7.670

5935
GE
81 839 OF
ED8.957 CO
NC
GE RE
OF TE
CO B
NC
RE 11
TE
B 81 833
ED 7.504
GE
OF
CO
NC
RE
TE
11

C2
81 840
ED9.050
GE
OF
CO
NC
RE
TE

0 100' 200'

GRAPHIC SCALE 100'

5936
LEGEND
BUR 5932 5933
5934
X-1 AREA DESIGNATOR
R
AB ELL EA

N11° 28
7739
9.9 ac AREA IN ACRES

ST V
5.5 cfs Q100 FLOW IN CFS

13. RACT ES SU

' 36
7742

"W
208 NO RV >

231.68
A-1 INLET NUMBER
AC . 21 EY
5931
5930
>
RES 6

'
5928
5927 5929 PROPERTY LINE
7748 503
PROPOSED STORM SEWER LINE
7745
JARRELL ISD ELEMENTARY >
WA
TE
HP
PH EXISTING STORM SEWER LINE
SCHOOL #4 RQ > AS
FFE=812' PO UAL E1 PROPOSED DRAINAGE DIVIDE
ND ITY 1 HP
PROPOSED STORM SEWER INLET

>
> PROPOSED STORM SEWER MANHOLE

>
>
PROPOSED STORM SEWER HEADWALL

>
2 502
1 >

>
PROPOSED FLOW DIRECTION
SD-C

>
PROPOSED CONTOUR

K
AC
0.96 ac

>
TB
3

>
EXISTING CONTOUR
2

SE
> 31

>
RIGHT-OF-WAY BOUNDARY

ING
> HP
DE

>
SD-B
TE

ILD

IVE
N TIO > HP P.U.E BOUNDARY

DR
'

BU
.03

0.93 ac
NP
265

>

X
4

>
15'

NY
ON TIME OF CONCENTRATION

'
.81
3
D
E

30

546
08"

>

>
15'

500 PHASE BOUNDARY LINE

©
8"W

>

>
N0

5' 2

>
>

°5

>
S02
5
4 >

>
29
K

>
AC

1
>

>
TB

5961 5960

>

>
>
>
SE

5954

>
ING

5951

>
6 >

>
5
ILD

5955
5957 > > 28
2
BU

> LAT SD-A1


>
15'

5956
5953

> > 0.15 ac

>

>
5952 5958 7 LAT SD-C3 >
6 LAT SD-A2
>

>
27

Y
>
0.30 ac 3

>
5949 5967

WA
5950
0.80 ac

>

ING
5969

>

DD
LAT SD-C4

RE
5947
8

>
2/21/24
N15° 23' 56

>
7

>
BLOCK
5948 0.74 acC 26
4

>
>
>

>
"W

>

>
138.22'

>
5968

>
8 >
9 25
5

>
EIV
25' BUILDING SET BACK

DR
NYX

>
LAT SD-A3
BLOCK
> > >

>
>
S68° 50' 17"W 672.34'
> > > > > > > >
B
501

>
TEM 1.31 ac 24
PO 9

>
RA
RY
TUR

>

>
N

INLET DRAINAGE AREA


DO AROU
C#:
___ ND EA
___ S
___ EMEN 6
>

>
___ T
___ 16 15 14 13 12 11

>
_
10 23

>

>
10
>

SD-D

>
BLOCK

>
LAT SD-C2 A

>
0.89 ac
7
> > (1066)
0.66 ac > >
>

22
11

MAP
>
> > >

>
> > > > >

>
>

ZELDA DRIVE
> >
>

>

>
> 8

>
> LAT >SD-D1 > > > > > > > > > >
LAT SD-A4
BER 12
21
RY 0.27 ac 0.97 ac
CR
REMEEK (G

>

>
>
>

AI EO

>
DO CALL NING RGET BLOCK
E
OF CUME D 314PORTI OWN)
D
9

>

>
>
FIC
>

O
>

IAL NT NO.54 AC N O ASLI I

>
LAT SD-C1
>

13 20
PUB . 20 RE F XL
LC 1 2 3 4 5 6 7
LIC 181 S 0.49 ac
REC 062
>

OR 95
>

DS > > > > >

>
>
>

> >

>
10
14 19

>
>

>

LAT SD-A5
>
Know what'sbelow.
>

> > > > LAT SD-A6.1

REDDING WAY
>
Call before you dig.
0.31 ac
>

TEM
PO
0.62 ac 11
>
NYX DRIVE

RA

>
RY
>

>

>

TUR
N 15 18
DO AROU
C#:
___ ND EA

BERRY CREEK
>

WILLIAMSON COUNTY, TEXAS


___ S
___ EMEN
>

>

___ T
___

HIGHLANDS
_ 14
15 13 12 11 LAT 10
SD-A9 9 8
SD-A

CITY OF GEORGETOWN
>

12
0.89 ac 0.93 ac WARNING: CONTRACTOR IS TO
16 17 VERIFY PRESENCE AND EXACT

PHASE 3
>

>

>

LAT SD-A7 LOCATION OF ALL UTILITIES

>
PRIOR TO CONSTRUCTION.
0.80 ac
>

>

>
13

>
> > > > > > > >
> > > >

>
WILLOW BEAN DRIVE WILLOW BEAN DRIVE
LAT SD-A6.2
> > > > > > > > > >

>
> > > > > > > > > > > > > ac >
0.20 14
LAT SD-A8

>
>
0.44 ac
BLOCK

>
E
15

REDDING WAY
1 2 3 4 5 6 7 8 9 10 11 12 13

16

S68°45'00"W 571.03' S68°43'21"W 261.93'


53
790.61
BARB 227
ED
WIR
E FE
NC
E

S68°40'53"W 542.15' (1059)


C-17
OF C-37
2023-24-CON
2/21/24

BERRY CREEK
HIGHLANDS DRAINAGE
©
C-18
OF C-37

PHASE 3 CALCULATIONS
CITY OF GEORGETOWN
2023-24-CON

WILLIAMSON COUNTY, TEXAS


BUR 5932 5933
5934

R
ABS ELL EA
TR V
13. ACT ES SU
208 NO RV
AC . 21 EY
5931
5930

RES 6
5928
5929
503
5927

7745
JARRELL ISD ELEMENTARY WA PH
SCHOOL #4 TE
RQ AS
E1
FFE=812' PO UAL 1
ND ITY

0 50' 100'

2 502
1 GRAPHIC SCALE 50'

LEGEND
3 EXISTING WATER LINE
2 31

K
AC
EXISTING UNDERGROUND FIBER OPTIC LINE

TB
SE
DE EXISTING UNDERGROUND TELEPHONE LINE
T

G
EN

DIN
TIO EXISTING GAS LINE

IL
NP 4

BU
ON 3

'
.81
15'
EXISTING OVERHEAD ELECTRIC LINE
D 30

546
500 PROPOSED FIRE HYDRANT

8"W
5' 2
PROPOSED WATER LINE

°5
S02
5 PROPOSED SANITARY SEWER LINE
4 29
1 PROPOSED STORM SEWER LINE

5954 MATCH LINE

6 DOUBLE SANITARY SEWER SERVICE


5 28
5955
5957 2 SINGLE SANITARY SEWER SERVICE
RIGHT-OF-WAY BOUNDARY LINE
5956
P.U.E BOUNDARY LINE

5958 7
6 27 INSTALL: 4FT CHAIN LINK FENCE
5967 3 INSTALLED ON WINGWALLS
NOTE:
5969

©
1. ALL DIMENSIONS ARE TO CENTERLINE OF PIPE UNLESS NOTED
OTHERWISE.
8
BLOCK 7 26 2. CONTRACTOR TO FIELD VERIFY LOCATION OF ALL UTILITIES PRIOR
C 4 TO CONSTRUCTION. CONTACT ENGINEER IF FIELD CONDITIONS VARY.

3. CONTRACTOR TO PROVIDE CL IV RCP AT ALL LOCATIONS WITH LESS


5968 THAN 2.0' OF COVERAGE.

8 25
4. CONTRACTOR TO VERIFY LOCATIONS FOR EACH 18' WIDE
9 5 RESIDENTIAL DRIVEWAY FOR EACH LOT AND NOTIFY ENGINEER OF
RECORD OF ANY DISCREPANCIES PRIOR TO CONSTRUCTION.
25' BUILDING SET BACK
EXISTING
5. CONTRACTOR TO VERIFY THAT INLET RIM ELEVATIONS TIE INTO
DETENTION PROPOSED TOP OF CURB ELEVATIONS PRIOR TO ORDERING INLETS
FROM MANUFACTURER. CONTRACTOR TO NOTIFY ENGINEER OF
POND
S68° 50' 17"W 672.34'

BLOCK 501 RECORD ANY DISCREPANCIES PRIOR TO CONSTRUCTION.


24
9 B 6. CONTRACTOR TO MAINTAIN MINIMUM 2' HORIZONTAL SPACING
DISTANCE BETWEEN WATER/WASTEWATER LINE AND STORM
INFRASTRUCTURE. 2/21/24

6 7. PROPOSED DIVERSION DITCH WITHIN SCHOOL LOT WILL BE


PROVIDED BY OTHERS. DIVERSION DITCH TO CONNECT TO EXISTING
16 15 14 13 12 11 LAT SD-A7 FROM BCH PH1. PROPOSED DIVERSION CHANNEL WILL BE
10 23 BUILT WITH THE OWNERS OF THE SCHOOL LOT PER APPROVED
10 PRELIM PLANS AND BCH PH 1 PLANS.

8. ALL PROPOSED INLETS TO MATCH PROPOSED PAVING GRADES.


BLOCK 7 (1066)
A

22
11

12 21

STORM PLAN
OVERALL
BLOCK 9
D 13 20
1 2 3 4 5 6 7

10
14 19

11
15 18
Know what'sbelow.
15
14 13 12 11 10 9 8 Call before you dig.
12
16 17

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
13 WARNING: CONTRACTOR IS TO
VERIFY PRESENCE AND EXACT

PHASE 3
LOCATION OF ALL UTILITIES
PRIOR TO CONSTRUCTION.

14

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BLOCK 15 BONNET LANE.
E ELEVATION = 821.82 FEET (AS SHOWN)
1 2 3 4 5 6 7 8 9 10 11 12 13
TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED
3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)
16

C-19
53
790.61
BAR 22

S68°40'53"W 542.15'
BE7D

S68°45'00"W 571.03' S68°43'21"W 261.93'


WIR
E FE
NC
E

(1059)

OF C-37
2023-24-CON
POND

0 40' 80'

GRAPHIC SCALE 40'

LEGEND
EXISTING WATER LINE
500
EXISTING UNDERGROUND FIBER OPTIC LINE

1 EXISTING UNDERGROUND TELEPHONE LINE

EXISTING GAS LINE

2 EXISTING OVERHEAD ELECTRIC LINE


PROPOSED FIRE HYDRANT

3 PROPOSED WATER LINE

S68°40'53"W 542.15'
PROPOSED SANITARY SEWER LINE

4 PROPOSED STORM SEWER LINE

MATCH LINE
5
DOUBLE SANITARY SEWER SERVICE

SINGLE SANITARY SEWER SERVICE


501 RIGHT-OF-WAY BOUNDARY LINE
6 P.U.E BOUNDARY LINE
Y
WA G
ED
DIN
R 7
8
BLOCK
9 10 11 12 13 14 15 16
31
A
1

30
E

SHEET C-20
AS

29

©
502

28
PH

27 REDDING WAY REDDING WAY

26
1
25
2
24 13
3 2/21/24

BLOCK
23 KEY MAP
B 22 17 N.T.S.
4 21 20 19 18
MATCH LINE STA 10+00 SHEET C-21

PROFILE SCALE

STORM PLAN & PROFILE -


SD-A (SHEET 1 OF 2)
1. CONTRACTOR TO VERIFY LOCATIONS FOR
EACH 18' WIDE RESIDENTIAL DRIVEWAY
FOR EACH LOT AND NOTIFY ENGINEER OF
RECORD OF ANY DISCREPANCIES PRIOR
TO CONSTRUCTION.
2. CONTRACTOR TO VERIFY THAT INLET RIM
EXISTING GRADE ELEVATIONS TIE INTO PROPOSED TOP OF
AT CL OF PIPE CURB ELEVATIONS PRIOR TO ORDERING
INLETS FROM MANUFACTURER.

MATCH LINE STA 10+00 SHEET C-21


PROPOSED GRADE CONTRACTOR TO NOTIFY ENGINEER OF
AT CL OF PIPE RECORD ANY DISCREPANCIES PRIOR TO
CONSTRUCTION.
100-YR 3. CONTRACTOR TO MAINTAIN MINIMUM 2'
HORIZONTAL SPACING DISTANCE BETWEEN
WATER/WASTEWATER LINE AND STORM
INFRASTRUCTURE.

100 YR TW: 785.89'


PER 2019-53-CON
25-YR
25 YR TW: 784.60'
PER 2019-53-CON

Know what'sbelow.
Call before you dig.

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
WARNING: CONTRACTOR IS TO

PHASE 3
VERIFY PRESENCE AND EXACT
LOCATION OF ALL UTILITIES
PRIOR TO CONSTRUCTION.

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-20
OF C-37
2023-24-CON
0 40' 80'

GRAPHIC SCALE 40'

LEGEND
EXISTING WATER LINE

EXISTING UNDERGROUND FIBER OPTIC LINE

EXISTING UNDERGROUND TELEPHONE LINE

EXISTING GAS LINE

EXISTING OVERHEAD ELECTRIC LINE


PROPOSED FIRE HYDRANT
12 11 10 9 8 7 6 5 4 3 2 1
PROPOSED WATER LINE

PROPOSED SANITARY SEWER LINE

BLOCK
PROPOSED STORM SEWER LINE
E
MATCH LINE STA 10+00 SHEET C-20

MATCH LINE

DOUBLE SANITARY SEWER SERVICE

SINGLE SANITARY SEWER SERVICE


RIGHT-OF-WAY BOUNDARY LINE
P.U.E BOUNDARY LINE

WILLOW BEAN DRIVE WILLOW BEAN DRIVE

17 16

©
8 9 10 11 12 13 14
15

SHEET C-21
NYX DRIVE

2/21/24
KEY MAP
N.T.S.

PROFILE SCALE

STORM PLAN & PROFILE -


SD-A (SHEET 2 OF 2)
1. CONTRACTOR TO VERIFY LOCATIONS FOR
EACH 18' WIDE RESIDENTIAL DRIVEWAY
FOR EACH LOT AND NOTIFY ENGINEER OF
RECORD OF ANY DISCREPANCIES PRIOR
TO CONSTRUCTION.
2. CONTRACTOR TO VERIFY THAT INLET RIM
ELEVATIONS TIE INTO PROPOSED TOP OF
CURB ELEVATIONS PRIOR TO ORDERING
PROPOSED GRADE
INLETS FROM MANUFACTURER.
AT CL OF PIPE
CONTRACTOR TO NOTIFY ENGINEER OF
EXISTING GRADE RECORD ANY DISCREPANCIES PRIOR TO
AT CL OF PIPE CONSTRUCTION.
3. CONTRACTOR TO MAINTAIN MINIMUM 2'
HORIZONTAL SPACING DISTANCE BETWEEN
MATCH LINE STA 10+00 SHEET C-20

WATER/WASTEWATER LINE AND STORM


INFRASTRUCTURE.

100-YR

25-YR

Know what'sbelow.
Call before you dig.

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
WARNING: CONTRACTOR IS TO

PHASE 3
VERIFY PRESENCE AND EXACT
LOCATION OF ALL UTILITIES
PRIOR TO CONSTRUCTION.

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-21
OF C-37
2023-24-CON
LEGEND
EXISTING WATER LINE

0 40' 80' EXISTING UNDERGROUND FIBER OPTIC LINE


0 40' 80'
EXISTING UNDERGROUND TELEPHONE LINE
GRAPHIC SCALE 40' GRAPHIC SCALE 40'
EXISTING GAS LINE

EXISTING OVERHEAD ELECTRIC LINE


7 6 5
13 PROPOSED FIRE HYDRANT
25 26 27 28 29 30
PROPOSED WATER LINE

PROPOSED SANITARY SEWER LINE


BLOCK
D PROPOSED STORM SEWER LINE

MATCH LINE
12
DOUBLE SANITARY SEWER SERVICE

SINGLE SANITARY SEWER SERVICE


RIGHT-OF-WAY BOUNDARY LINE
THIS SPACE IS P.U.E BOUNDARY LINE

11 INTENTIONALLY LEFT BLANK


REDDING WAY

SD-B
SHEET C-22

10
10

©
11 12 SD-D
501 SHEET C-22
6 5 4 3 2

2/21/24
KEY MAP
N.T.S.

PROFILE SCALE

STORM PLAN & PROFILE -


1. CONTRACTOR TO VERIFY LOCATIONS FOR
EACH 18' WIDE RESIDENTIAL DRIVEWAY
FOR EACH LOT AND NOTIFY ENGINEER OF
RECORD OF ANY DISCREPANCIES PRIOR

SD-B & SD-D


TO CONSTRUCTION.
2. CONTRACTOR TO VERIFY THAT INLET RIM
ELEVATIONS TIE INTO PROPOSED TOP OF
CURB ELEVATIONS PRIOR TO ORDERING
INLETS FROM MANUFACTURER.
PROPOSED GRADE CONTRACTOR TO NOTIFY ENGINEER OF
EXISTING GRADE AT CL OF PIPE RECORD ANY DISCREPANCIES PRIOR TO
AT CL OF PIPE CONSTRUCTION.
3. CONTRACTOR TO MAINTAIN MINIMUM 2'
EXISTING GRADE HORIZONTAL SPACING DISTANCE BETWEEN
AT CL OF PIPE WATER/WASTEWATER LINE AND STORM
PROPOSED GRADE
INFRASTRUCTURE.
AT CL OF PIPE

100-YR
100-YR THIS SPACE IS
25-YR
25-YR
INTENTIONALLY LEFT BLANK
Know what'sbelow.
Call before you dig.

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
WARNING: CONTRACTOR IS TO

PHASE 3
VERIFY PRESENCE AND EXACT
LOCATION OF ALL UTILITIES
PRIOR TO CONSTRUCTION.

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-22
OF C-37
2023-24-CON
0 40' 80'

GRAPHIC SCALE 40'

LEGEND

5 10 5 BLOCK 12 EXISTING WATER LINE

5967
D EXISTING UNDERGROUND FIBER OPTIC LINE

EXISTING UNDERGROUND TELEPHONE LINE

EXISTING GAS LINE

EXISTING OVERHEAD ELECTRIC LINE

DE
6 9 6 11 PROPOSED FIRE HYDRANT

T ENTI
PROPOSED WATER LINE

O
5969
PROPOSED SANITARY SEWER LINE

N PO
PROPOSED STORM SEWER LINE

ND
MATCH LINE
7 9
8 7 10 DOUBLE SANITARY SEWER SERVICE

SINGLE SANITARY SEWER SERVICE


15'
8 S02
BU
ILD
RIGHT-OF-WAY BOUNDARY LINE
°5 ING
5' 2 SE P.U.E BOUNDARY LINE
8"W TB
AC
546 K
7 .81
'
8 BLOCK BLOCK
E C
NYX DRIVE
6

NYX
DR
IVE 5
9
4 SHEET C-23

©
3
WILLOW BEAN DRIVE

10 2
15 14 13 12 11
16 10

8
11 NY
XD
RIV
E
7
2/21/24
KEY MAP
6 N.T.S.

PROFILE SCALE

STORM PLAN & PROFILE -


1. CONTRACTOR TO VERIFY LOCATIONS FOR
EACH 18' WIDE RESIDENTIAL DRIVEWAY
FOR EACH LOT AND NOTIFY ENGINEER OF
RECORD OF ANY DISCREPANCIES PRIOR
TO CONSTRUCTION.
2. CONTRACTOR TO VERIFY THAT INLET RIM
ELEVATIONS TIE INTO PROPOSED TOP OF
CURB ELEVATIONS PRIOR TO ORDERING

SD-C
INLETS FROM MANUFACTURER.
CONTRACTOR TO NOTIFY ENGINEER OF
RECORD ANY DISCREPANCIES PRIOR TO
PROPOSED GRADE
CONSTRUCTION.
AT CL OF PIPE
3. CONTRACTOR TO MAINTAIN MINIMUM 2'
HORIZONTAL SPACING DISTANCE BETWEEN
EXISTING GRADE WATER/WASTEWATER LINE AND STORM
AT CL OF PIPE INFRASTRUCTURE.

100-YR

Know what'sbelow.
Call before you dig.
25-YR

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
WARNING: CONTRACTOR IS TO

PHASE 3
VERIFY PRESENCE AND EXACT
LOCATION OF ALL UTILITIES
PRIOR TO CONSTRUCTION.

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-23
OF C-37
2023-24-CON
PROFILE SCALE
1" = 40' HORIZONTAL
1" = 4' VERTICAL

PROPOSED GRADE
PROPOSED GRADE
AT CL OF PIPE
AT CL OF PIPE
PROPOSED GRADE
AT CL OF PIPE

EXISTING GRADE EXISTING GRADE


AT CL OF PIPE EXISTING GRADE
AT CL OF PIPE AT CL OF PIPE
PROPOSED GRADE
EXISTING GRADE AT CL OF PIPE
100-YR AT CL OF PIPE 100-YR
100-YR
25-YR 100-YR
25-YR
25-YR

25-YR

©
2/21/24

PROFILES (SHEET 1 OF 2)
STORM LATERAL
PROFILE SCALE
1" = 40' HORIZONTAL
1" = 4' VERTICAL

1. CONTRACTOR TO VERIFY
LOCATIONS FOR EACH 18'
WIDE RESIDENTIAL
DRIVEWAY FOR EACH LOT
EXISTING GRADE AND NOTIFY ENGINEER OF
EXISTING GRADE AT CL OF PIPE RECORD OF ANY
PROPOSED GRADE EXISTING GRADE EXISTING GRADE PROPOSED GRADE
AT CL OF PIPE DISCREPANCIES PRIOR TO
AT CL OF PIPE AT CL OF PIPE AT CL OF PIPE AT CL OF PIPE
PROPOSED GRADE CONSTRUCTION.
AT CL OF PIPE 2. CONTRACTOR TO VERIFY
PROPOSED GRADE THAT INLET RIM
AT CL OF PIPE ELEVATIONS TIE INTO
100-YR PROPOSED TOP OF CURB
100-YR ELEVATIONS PRIOR TO
ORDERING INLETS FROM
25-YR 100-YR 25-YR
MANUFACTURER.
100-YR 25-YR CONTRACTOR TO NOTIFY
ENGINEER OF RECORD ANY
25-YR DISCREPANCIES PRIOR TO

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


CONSTRUCTION.

HIGHLANDS
3. CONTRACTOR TO MAINTAIN

CITY OF GEORGETOWN
MINIMUM 2' HORIZONTAL
SPACING DISTANCE

PHASE 3
BETWEEN
WATER/WASTEWATER LINE
AND STORM
INFRASTRUCTURE

C-24
OF C-37
2023-24-CON
PROFILE SCALE
1" = 40' HORIZONTAL
EXISTING GRADE 1" = 4' VERTICAL
EXISTING GRADE AT CL OF PIPE
EXISTING GRADE
AT CL OF PIPE
AT CL OF PIPE
PROPOSED GRADE
PROPOSED GRADE
AT CL OF PIPE
PROPOSED GRADE PROPOSED GRADE AT CL OF PIPE
EXISTING GRADE AT CL OF PIPE AT CL OF PIPE
100-YR
AT CL OF PIPE
100-YR 25-YR

100-YR
100-YR 25-YR

25-YR 25-YR

©
2/21/24

PROFILES (SHEET 2 OF 2)
STORM LATERAL
PROFILE SCALE
1" = 40' HORIZONTAL
1" = 4' VERTICAL

1. CONTRACTOR TO VERIFY
LOCATIONS FOR EACH 18'
WIDE RESIDENTIAL
DRIVEWAY FOR EACH LOT
EXISTING GRADE AND NOTIFY ENGINEER OF
AT CL OF PIPE RECORD OF ANY
PROPOSED GRADE DISCREPANCIES PRIOR TO
AT CL OF PIPE CONSTRUCTION.
EXISTING GRADE
2. CONTRACTOR TO VERIFY
AT CL OF PIPE
100-YR THAT INLET RIM
ELEVATIONS TIE INTO
25-YR PROPOSED TOP OF CURB
PROPOSED GRADE ELEVATIONS PRIOR TO
AT CL OF PIPE ORDERING INLETS FROM
MANUFACTURER.
100-YR CONTRACTOR TO NOTIFY
ENGINEER OF RECORD ANY
DISCREPANCIES PRIOR TO

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


25-YR CONSTRUCTION.

HIGHLANDS
3. CONTRACTOR TO MAINTAIN

CITY OF GEORGETOWN
MINIMUM 2' HORIZONTAL
SPACING DISTANCE

PHASE 3
BETWEEN
WATER/WASTEWATER LINE
AND STORM
INFRASTRUCTURE.

C-25
OF C-37
2023-24-CON
AS
PH
27 WL-A
REDDING WAY
SHEET C-26

26
1
0 40' 80'
DOUBLE 25
SERVICE
2 GRAPHIC SCALE 40'

24
3
23
BLOCK
B 22 17
DOUBLE 4 21 20 19 18
SERVICE
UTILITY LEGEND
5
PROPERTY LINE

PROPOSED WASTE WATER LINE


DOUBLE 6
SERVICE
KEY MAP PROPOSED WATER LINE

N.T.S. WW
PROPOSED WASTE WATER MANHOLE
10' P.U.E. 7
DOUBLE IVE R (TYP.) WASTE WATER FLOW DIRECTION
XD
SERVICE NY
DOUBLE 8 PROPOSED FIRE HYDRANT
DOUBLE SERVICE

0'
EXISTING OVERHEAD POWER LINE
SERVICE

10.

WILLOW BEAN DRIVE


503 9 EXISTING WATER LINE
1

W.
EXISTING WASTE WATER LINE
10

.O.
11 16

0'
DOUBLE 12 13 14 15

0' R
DOUBLE EXISTING STORM SEWER LINE

29.
2 SERVICE
SERVICE

50.
EXISTING POWER POLE

EXISTING FIRE HYDRANT


3 8" PVC
DOUBLE DOUBLE EXISTING WATER METER
WATERLINE DOUBLE
SERVICE SERVICE
4 SERVICE WW EXISTING WASTE WATER MANHOLE

RIGHT-OF-WAY BOUNDARY LINE

5
E
RIV D P.U.E BOUNDARY LINE
DOUBLE NYX
SERVICE
8" WASTEWATER NOTE:
6 LINE CROSSING 1. PRESSURE PLANE AT TIE-IN POINT OF SUBDIVISION IS 1015'
NYX DRIVE
8" WASTEWATER - THE HIGHEST LOT SERVED IN PHASE 3 IS 805' (91 PSI) AND
BLOCK DOUBLE

©
LINE CROSSING LOWEST LOT SERVED IS 785' (100 PSI).
Y

7 C
PO UALIT

'
.81 SERVICE 2. A PRESSURE RELEASE VALVE MUST BE INSTALLED FOR
546
CK
BA W EACH LOT WITH A PRESSURE ABOVE 80 PSI.
8" PVC
T 8"
ND

3. PRESSURE PLANE PER THE APPROVED WATER MODEL


SE 5' 2
Q

5
8
ING °
ILD S02
WATERLINE DOUBLE REPORT DATED JULY 22, 2019.
TER

BU
15' SERVICE
7 8
WA

10
5930

9
5929
5931

5928

ND
PO
5927

ON

5969
NTI

6 9
TE

3/7/24
DE

0 40' 80'

OVERALL WATER PLAN


WL-B GRAPHIC SCALE 40'
SHEET C-26

(SHEET 1 OF 2)
16 15
HIGHEST LOT AT 805'
14 13 12 11
10 KEY MAP
10' P.U.E. 10 N.T.S.
(TYP.)
8" PVC
DOUBLE DOUBLE WATERLINE DOUBLE SINGLE
SERVICE SERVICE
SERVICE SERVICE
Know what'sbelow.
10.0'

11 Call before you dig.


50.0' R.O.W.

29.0'

ZELDA DRIVE

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
8" WASTEWATER 12 WARNING: CONTRACTOR IS TO

PHASE 3
VERIFY PRESENCE AND EXACT
LINE CROSSING LOCATION OF ALL UTILITIES
DOUBLE DOUBLE DOUBLE PRIOR TO CONSTRUCTION.
SERVICE SERVICE SERVICE
BLOCK
D

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-26
OF C-37
2023-24-CON
WL-C
SHEET C-26 0 40' 80'
500
GRAPHIC SCALE 40'

SINGLE 2
SERVICE

DOUBLE 3 UTILITY LEGEND

S68°40'53"W 542.15'
SERVICE
PROPERTY LINE
4
PROPOSED WASTE WATER LINE

5 KEY MAP PROPOSED WATER LINE

DOUBLE N.T.S. WW
PROPOSED WASTE WATER MANHOLE
DOUBLE SERVICE
SERVICE WASTE WATER FLOW DIRECTION
501 PROPOSED FIRE HYDRANT
SINGLE
6
SERVICE
Y 1" IRRIGATION EXISTING OVERHEAD POWER LINE
SINGLE WA G METER
EXISTING WATER LINE
SERVICE DIN D
RE 7
10' P.U.E. 8 EXISTING WASTE WATER LINE
(TYP.) BLOCK
9 10 11 12 13 14 15 16
31 DOUBLE EXISTING STORM SEWER LINE
SERVICE ADOUBLE
LOWEST LOT AT 785'

0'
EXISTING POWER POLE

10.
SERVICE
30 EXISTING FIRE HYDRANT
DOUBLE DOUBLE DOUBLE DOUBLE SINGLE

W.
EXISTING WATER METER
SERVICE SERVICE

.O.
DOUBLE SERVICE SERVICE SERVICE
29

0'

0' R
EXISTING WASTE WATER MANHOLE

29.
SERVICE
WW

50.
RIGHT-OF-WAY BOUNDARY LINE
28 8" PVC P.U.E BOUNDARY LINE
WATERLINE

27 REDDING WAY NOTE:


1. PRESSURE PLANE AT TIE-IN POINT OF SUBDIVISION IS 1015'
REDDING WAY

DOUBLE - THE HIGHEST LOT SERVED IN PHASE 3 IS 805' (91 PSI) AND

©
26 SERVICE LOWEST LOT SERVED IS 785' (100 PSI).
2. A PRESSURE RELEASE VALVE MUST BE INSTALLED FOR
DOUBLE EACH LOT WITH A PRESSURE ABOVE 80 PSI.
DOUBLE DOUBLE
25 SERVICE SERVICE 8" PVC SERVICE
3. PRESSURE PLANE PER THE APPROVED WATER MODEL
WATERLINE REPORT DATED JULY 22, 2019.
2
24 13
8" PVC
3 WATERLINE
23 8" WASTEWATER
BLOCK
B 22 CROSSING 17
4 21 20 19 18

3/7/24

0 40' 80'

OVERALL WATER PLAN


GRAPHIC SCALE 40'

(SHEET 2 OF 2)
15
14 13 12 11 10 9 8

10' P.U.E.
(TYP.) 16 17

DOUBLE DOUBLE
DOUBLE DOUBLE
SERVICE SERVICE
SERVICE SERVICE
10.0'
50.0' R.O.W.

29.0'

WILLOW BEAN DRIVE WILLOW BEAN DRIVE

WL-D
SHEET C-26

SINGLE
Know what'sbelow.
Call before you dig.
DOUBLE DOUBLE DOUBLE DOUBLE DOUBLE SERVICE
DOUBLE
SERVICE SERVICE SERVICE SERVICE SERVICE
SERVICE
BLOCK
E

REDDING WAY

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
1 2 3 4 5 6 7 8 9 10 11 12 13

CITY OF GEORGETOWN
KEY MAP WARNING: CONTRACTOR IS TO

PHASE 3
VERIFY PRESENCE AND EXACT
N.T.S. LOCATION OF ALL UTILITIES
PRIOR TO CONSTRUCTION.

BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-27
OF C-37
2023-24-CON
0 40' 80'

GRAPHIC SCALE 40'

2 UTILITY LEGEND
STA. 1+00 WWL-A
4' MANHOLE #1 24 PROPERTY LINE
REMOVE PLUG AND CONNECT
TO EXISTING WW STUB 3 PROPOSED WASTE WATER LINE
EX 8" FL: 786.62 23
BLOCK
RIM: 799.55 PROPOSED WATER LINE
B 22 17
FL 8" IN(S) 786.72
4 21 20 19 18 WW
PROPOSED WASTE WATER MANHOLE
DOUBLE
WASTE WATER FLOW DIRECTION
SERVICE
5
DOUBLE PROPOSED FIRE HYDRANT
SERVICE
EXISTING OVERHEAD POWER LINE
6
EXISTING WATER LINE

EXISTING WASTE WATER LINE


7
RIV
E DOUBLE EXISTING STORM SEWER LINE
DOUBLE D
X SERVICE
SERVICE NY EXISTING POWER POLE
8
EXISTING FIRE HYDRANT

WILLOW BEAN DRIVE


503 DOUBLE 9 EXISTING WATER METER
1 DOUBLE SERVICE STA. 4+59.57 WWL-A EXISTING WASTE WATER MANHOLE
SERVICE
WW

4' MANHOLE #2 10 11 16
RIM: 798.05 12 13 14 15 RIGHT-OF-WAY BOUNDARY LINE
2 FL 8" OUT(N) 788.52
STA. 5+63.49 WWL-A
FL 8" IN(S) 788.62 P.U.E BOUNDARY LINE
4' MANHOLE #3
RIM: 797.51
DOUBLE
3 DOUBLE
SERVICE
FL 8" OUT(N) 789.14
FL 8" IN(S) 789.24
STA. 8+79.86 WWL-A
4' MANHOLE #5
SERVICE STA. 6+82.86 WWL-A
STA. 1+00.00 WWL-B RIM: 795.67
DOUBLE INSTALL 4' MANHOLE #4 DOUBLE DOUBLE FL 8" OUT(N) 790.92
4 SERVICE FL 8" OUT(N) 789.83 SERVICE SERVICE
FL 8" IN(S) 789.93
FL 8" IN(W) 789.93

©
DOUBLE
5
E
RIV
SERVICE
D
NYX

6
NYX DRIVE
SINGLE
BLOCK
Y

SERVICE
7 C
PO UALIT

'
.81
CK 546
BA T W 8"
ND

SE 5' 2
Q

°5
ING
ILD S02
8 8" WATER LINE
TER

BU
15' CROSSING
WA

2/21/24

KEY MAP
N.T.S.

PROFILE SCALE

WASTEWATER PLAN &


PROFILE - WWL-A
PROPOSED GRADE
AT CL OF PIPE

EXISTING GRADE
AT CL OF PIPE

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
PHASE 3
BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-28
OF C-37
2023-24-CON
0 40' 80'

GRAPHIC SCALE 40'

UTILITY LEGEND
PROPERTY LINE

PROPOSED WASTE WATER LINE

PROPOSED WATER LINE

WW
PROPOSED WASTE WATER MANHOLE

WASTE WATER FLOW DIRECTION

PROPOSED FIRE HYDRANT


13
EXISTING OVERHEAD POWER LINE

BLOCK EXISTING WATER LINE


D EXISTING WASTE WATER LINE
DOUBLE DOUBLE DOUBLE
STA. 6+82.86 WWL-A 8" WATER LINE SINGLE EXISTING STORM SEWER LINE
SERVICE SERVICE SERVICE
STA. 1+00.00 WWL-B CROSSING SERVICE
124' MANHOLE #4
INSTALL EXISTING POWER POLE
FL 8" OUT(N) 789.83
FL 8" IN(S) 789.93 EXISTING FIRE HYDRANT
FL 8" IN(W) 789.93
EXISTING WATER METER

STA. 5+01.30 WWL-B WW EXISTING WASTE WATER MANHOLE


ZELDA DRIVE END & PLUG
RIM: 793.13 RIGHT-OF-WAY BOUNDARY LINE
11 FL 8" OUT(E) 791.94
P.U.E BOUNDARY LINE

DOUBLE DOUBLE DOUBLE SINGLE


SERVICE SERVICE SERVICE SERVICE

©
2/21/24

KEY MAP
N.T.S.

PROFILE SCALE

WASTEWATER PLAN &


PROFILE - WWL-B
PROPOSED GRADE
AT CL OF PIPE

EXISTING GRADE
AT CL OF PIPE

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
PHASE 3
BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-29
OF C-37
2023-24-CON
0 40' 80'

UTILITY LEGEND
GRAPHIC SCALE 40'

PROPERTY LINE
SINGLE
SERVICE STA. 1+00 WWL-C
3 PROPOSED WASTE WATER LINE

S68°40'53"W 542.15'
4' MANHOLE #6
REMOVE PLUG AND CONNECT PROPOSED WATER LINE
TO EXISTING WW STUB 4 PROPOSED WASTE WATER MANHOLE
EX 8" FL: 779.87 WW

RIM: 794.80
FL 8" IN(S) 779.97 WASTE WATER FLOW DIRECTION
5
PROPOSED FIRE HYDRANT
DOUBLE
SERVICE EXISTING OVERHEAD POWER LINE
501WWL-C
STA. 3+38.54 EXISTING WATER LINE
SINGLE DOUBLE 4' MANHOLE #7 6
SERVICE RIM: 793.36 EXISTING WASTE WATER LINE
AY SERVICE
FL 8" OUT(N) 781.16
DOUBLE GW FL 8" IN(S) 781.26 EXISTING STORM SEWER LINE
SERVICE
DIN D
RE 7
8 EXISTING POWER POLE
SINGLE
BLOCK
9 10 11 12 13 14 15 16
31 SERVICE STA. 4+09.01 WWL-C
EXISTING FIRE HYDRANT
A
4' MANHOLE #8
STA. 5+02.43 WWL-C STA. 5+98.80 WWL-C
4' MANHOLE #9 4' MANHOLE #10 EXISTING WATER METER
RIM: 792.78
DOUBLE RIM: 792.00 RIM: 791.19
30 SERVICE
FL 8" OUT(N) 781.62
FL 8" IN(S) 781.72
FL 8" OUT(N) 782.18 FL 8" OUT(N) 782.76 WW EXISTING WASTE WATER MANHOLE
FL 8" IN(S) 782.28 FL 8" IN(S) 782.86 STA. 8+52.18 WWL-C
DOUBLE STA. 1+00.00 WWL-D RIGHT-OF-WAY BOUNDARY LINE
DOUBLE DOUBLE INSTALL 4' MANHOLE #11
DOUBLE SERVICE DOUBLE
29 SERVICE SERVICE
FL 8" OUT(N) 784.13 P.U.E BOUNDARY LINE
SERVICE FL 8" IN(S) 784.23 SERVICE
FL 8" IN(W) 784.23

28

27 DOUBLE REDDING WAY REDDING WAY


SERVICE

©
26
DOUBLE STA. 9+44.62 WWL-C
SERVICE 4' MANHOLE #12
DOUBLE DOUBLE 8" WATER LINE RIM: 790.40
25 DOUBLE
SERVICE SERVICE CROSSING FL 8" OUT(N) 784.69
SERVICE
2

2/21/24

KEY MAP
N.T.S.

PROFILE SCALE

WASTEWATER PLAN &


PROFILE - WWL-C
PROPOSED GRADE
AT CL OF PIPE

EXISTING GRADE
AT CL OF PIPE

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
PHASE 3
BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-30
OF C-37
2023-24-CON
0 40' 80'

GRAPHIC SCALE 40'

UTILITY LEGEND
PROPERTY LINE

PROPOSED WASTE WATER LINE

REDDING WAY
PROPOSED WATER LINE

WW
PROPOSED WASTE WATER MANHOLE

WASTE WATER FLOW DIRECTION


15 PROPOSED FIRE HYDRANT
BLOCK STA. 3+89.60 WWL-D
4' MANHOLE #13 EXISTING OVERHEAD POWER LINE
E SINGLE
RIM: 794.18
FL 8" OUT(E) 785.68 SERVICE EXISTING WATER LINE
DOUBLE DOUBLE FL 8" IN(W) 785.78 DOUBLE STA. 7+98.43 WWL-D
DOUBLE DOUBLE DOUBLE EXISTING WASTE WATER LINE
SERVICE SERVICE SERVICE END & PLUG
8" WATER LINE SERVICE SERVICE SERVICE RIM: 789.01
STA. 8+52.18 WWL-C EXISTING STORM SEWER LINE
STA.141+00.00 WWL-D CROSSING FL 8" OUT(E) 787.82
INSTALL 4' MANHOLE #11 EXISTING POWER POLE
FL 8" OUT(N) 784.13
FL 8" IN(S) 784.23 EXISTING FIRE HYDRANT
FL 8" IN(W) 784.23
WILLOW BEAN DRIVE WILLOW BEAN DRIVE EXISTING WATER METER

WW EXISTING WASTE WATER MANHOLE

13 8" WATER LINE RIGHT-OF-WAY BOUNDARY LINE


CROSSING
DOUBLE DOUBLE SINGLE P.U.E BOUNDARY LINE
DOUBLE
SERVICE SERVICE SERVICE
SERVICE

17 16

©
2/21/24

KEY MAP
N.T.S.

PROFILE SCALE

WASTEWATER PLAN &


PROFILE - WWL-D
PROPOSED GRADE
AT CL OF PIPE

EXISTING GRADE
AT CL OF PIPE

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
PHASE 3
BENCHMARKS
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.
ELEVATION = 820.55 FEET (AS SHOWN)

C-31
OF C-37
2023-24-CON
13.
208
AC
RES 5927 5929
503
7745
JARRELL ISD ELEMENTARY WA PH
SCHOOL #4 T ER AS
Q E1
FFE=812' PO UAL 1
ND ITY

2 502
1

0 40' 80'

3 GRAPHIC SCALE 40'


2 31

CK
BA
EXISTING STREET LIGHT

ET
DE

S
TE

ING
NT

ILD
ION
4

BU
PO 3

'
.81
15'
ND 30

546
500

W
28"
55'
°
S02
5
4 29
1
5954

6
5 28
5955
5957 2
5956

5958 7
6 27
5967 3
5969

8
BLOCK 7 26
C 4

©
5968 NOTES:

8 25 1. STOP SIGNS (R1-1) ARE SHOWN FOR SCHEMATIC PURPOSES ONLY, SEE
9 5 DETAIL SHEET FOR PLACEMENT.
25' BUILDING SET BACK

2. STREET NAME SIGNS SHOULD MEET THE REQUIREMENTS OF CITY OF


GEORGETOWN STANDARD SD-25.
S68° 50' 17"W 672.34'

BLOCK 501
24 3. CONTRACTOR TO SEE BLUEBONNET ELECTRIC STREET LIGHT PLAN FOR
9 B
STREET LIGHT LOCATIONS.

4. ALL STOP BARS TO CONFORM TO TMUTCD STANDARDS FOR LOCATIONS


INSTALL TEMPORARY BARRICADE 6 AND DIMENSIONS AND THERMOPLASTIC STRIPING.
16 15 14 13 12 11
10 23 5. CROSS HATCHED STRIPING TO BE WHITE AND 4 INCHES WIDE WITH 10
10 FOOT SPACING (PER TMUTCD STANDARDS FOR THERMOPLASTIC
2/21/24
STRIPING).
INSTALL "FIRE LANE - TOW AWAY ZONE" SIGN
SEE DETAIL ON SHEET C-34 BLOCK 7 6. SIDEWALKS IN THE ROW MAY BE CONSIDERED PART OF THE NATURE
A TRAIL ROUTE, RATHER THAN ROADWAY EMBANKMENT.
22 7. CONTRACTOR TO ENSURE ALL STOP BARS ARE INSTALLED BEHIND
11 CROSSWALK. ALL ADA CROSSINGS SHALL NOT BE OBSTRUCTED BY CARS
STOPPING AT INTERSECTIONS. THEREFORE STOP SIGNS AND STOP BARS
SHALL BE INSTALLED AS TO NOT INTERFERE WITH ADA CROSSINGS.
8

12 21

STREET LIGHT & SIGN


BLOCK 9
D 13 20
1 2 3 4 5 6 7

PLAN
10
14 19

11
INSTALL TEMPORARY BARRICADE 15 18

SIGN R7-6R - NO PARKING


15
14 13 12 11 10 LOADING ZONE
9 8
MAIL KIOSK LOCATION 12
SIGN R7-6L - NO PARKING
16 17
INSTALL "FIRE LANE - TOW AWAY ZONE" SIGN
LOADING ZONE
SEE DETAIL ON SHEET C-34

13

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
14

PHASE 3
2 - 9'X18' STRIPING AREAS
FOR TEMPORARY PARKING

BLOCK 15
E
1 2 3 4 5 6 7 8 9 10 11 12 13 INSTALL TEMPORARY BENCHMARKS
BARRICADE
TBM# 101 "(" SET IN HEADWALL OF CULVERT
LOCATED IN THE MEDIAN OF STATE HIGHWAY AND
BONNET LANE.
16 ELEVATION = 821.82 FEET (AS SHOWN)

TBM# 102 "RAIL ROAD SPIKE" IN POWER POLE LOCATED


3.70' FROM THE EASTERLY CORNER OF THAT CERTAIN
3.703 ACRE TRACT.

S68°45'00"W 571.03' S68°43'21"W 261.93' S68°40'53"W 542.15' ELEVATION = 820.55 FEET (AS SHOWN)

C-32
OF C-37
2023-24-CON
2/21/24

BERRY CREEK
HIGHLANDS EROSION CONTROL
©
C-33
OF C-37

PHASE 3 DETAILS
CITY OF GEORGETOWN
2023-24-CON

WILLIAMSON COUNTY, TEXAS


NTS
LOCAL ROADWAY
2/21/24

BERRY CREEK
HIGHLANDS PAVING DETAILS ©
C-34
OF C-37

PHASE 3
CITY OF GEORGETOWN
2023-24-CON

WILLIAMSON COUNTY, TEXAS


©
2/21/24

UTILITY DETAILS (SHEET 1


OF 3)
BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
PHASE 3
VARIES
NOTE: RISER PIPES ARE FOR IDENTIFICATION
PURPOSES ONLY. PRIVATE RESIDENTIAL
VARIES CLEANOUTS TO BE INSTALLED BY HOME
BUILDER.
SERVICE CONNECTION RISERS SHALL TERMINATE
AT VARIED DISTANCE INSIDE THE PROPERTY LINE

C-35
OF C-37
2023-24-CON
©
N
100 STREET NAME ST
200

STOP
2/21/24

YIELD

UTILITY DETAILS (SHEET


2 OF 3)
The Architect/Engineer assumes
The Architect/Engineer assumes responsibility for appropriate
responsibility for appropriate use of this standard.
use of this standard.

Georgetown Utility Systems Georgetown Utility Systems


Your Community Owned Utility Your Community Owned Utility

BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
PHASE 3
STANDARD UTILITY ADJUSTMENT DETAIL

C-36
OF C-37
2023-24-CON
©
2/21/24

UTILITY DETAILS (SHEET


3 OF 3)
BERRY CREEK

WILLIAMSON COUNTY, TEXAS


HIGHLANDS
CITY OF GEORGETOWN
PHASE 3
The Architect/Engineer assumes
responsibility for appropriate
use of this standard.

Georgetown Utility Systems


Your Community Owned Utility

C-37
OF C-37
2023-24-CON