Monitoring 2012 TRU
Monitoring 2012 TRU
Monitoring
Leica Geosystems TruStory
Monitoring Along the Construction
Site of the Warsaw Metro Line 2
Customer
AGP Metro Polska S.C. (Astaldi -
Güllermak-Przedsiębiorstwo Budowy
Dróg i Mostów Sp. z o.o.)
Metro Warszawskie Sp. z o.o.
Objective
3D deformation monitoring of an
urban area along the construction site
of the Warsaw Metro Line 2
Challenge
Providing geodetic real-time monito-
ing along the construction site of the
Warsaw Metro with limited access
Date
June 2011 – ongoing
Location
Warsaw, Poland
with appropriate actions. The collected scientific and public institutions for
geotechnical data (provided mainly analytical purposes.
by SisGeo) is analyzed in the operation
center together with the geodetic In Poland, the described deformation
results displayed with GeoMoS. monitoring system is a completely
new approach in terms of underground
Data Sharing and tunnel monitoring. The customer,
There is an agreement between however, is experienced, as they
the consortium (AGP Metro provided a similar integrated surveying
Poland) and the purchaser (Metro system in Rome, Italy, deciding to
Warszawskie Sp. z o.o. and The trust the already checked solution.
City of Warsaw) allowing the Nevertheless, there are differences
possibility of exchanging data with between Rome and Warsaw, mainly
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Monitoring Europe’s
Tallest Building
Customer
Byrne Bros (Formwork)
Project period
August 2009 – June 2012
Location
Southwark, London, United Kingdom
Project Results
This new and innovative approach
for controlling the position of a
slip-form rig has proved highly
successful on The Shard project.
The fact that the results obtained
could be verified and correlated to
WLAN Bridge System Effects of Tilt on GNSS position those obtained via traditional
methods was extremely important
The position of each antenna on The rig positioning interface uses in building confidence in the system.
the rig was computed with respect the open architecture of GeoMoS This allied to the fact that Leica
to nearest SmartNet reference which is built on a Microsoft SQL Geosystems Monitoring Support
station which was approximately database. An OBDC link is establis- team could support this system
1.5 miles away. This yielded a 3 hed between the GeoMoS database remotely even during out of hours
dimensional coordinate quality of and the bespoke interface which meant that in the early stages of
better than +/-25mm. displays the results graphically and this project in particular confidence
that is easy to understand by the in the system was assured. Already
The GNSS positions are computed rig manager. This interface enables other tall buildings in London being
every second within GNSS Spider the rig manager to make adjustment constructed using slip-form metho-
and the median result of these to the rig position via the use of dology have adopted this system
observations are sent every 10 hydraulic pumps. traffic light system and Byrne Bros plan to use this
seconds to Leica GeoMoS where of warnings are displayed within system again on future projects.
they are synchronised with the the interface. If the computed results
data from the dual axis inclinometers exceed +/-25mm lateral displacement
and the wind speed. A computation against the design position or
is simultaneously carried out within +/- 4mm/m of tilt on any corner of For more information on monitoring
GeoMoS which applies the lateral the rig then an orange display is solutions from Leica Geosystems Ltd
shift caused by the tilt of the GNSS shown. A exaggerated rig display contact James Whitworth on
antenna to the vertical position. and level ‘bubble’ display allow +44 (0)77 958 440 75
instant visualisation of results. james.whitworth@leica-geosystems.com
www.leica-geosystems.co.uk
Leica Geosystems TruStory
Monitoring of the Central-Wanchai
Bypass During Construction
Objective
Deformation monitoring of bridge
construction works
Customer/Institution
Chun Wo Construction and
Engineering Company Limited
Challenge
Planning and installation of a
temporary monitoring system
within a daySmooth transition from
a temporary into a permanent
monitoring system Real-time
deformation monitoring throughout
the construction
Date
Since February 2011
Location
Temporary to Permanent
After the initial structural movements
travelling around. Incorporating Monitoring System Setup in February 2011, the customer
all these features, measurements The monitoring consists of a TM30 demanded a fully automatic
could be taken round the clock total station, a computer and more monitoring system from Leica
and the system remains stable than one hundred Leica prisms. Geosystems Hong Kong with only
and precise at all times. Measuring The total station is mounted on a a half-days’ notice. The monitoring
over a hundred monitoring prisms platform next to a bridge abutment system planning, with the position
mounted on bridge abutments and and protected by a fixed metal of the total station, prisms and
other surfaces, monitoring data stand, once the system became setup, had to be done within
were measured in a one-hour cycle. a permanent set-up. The prisms hours. The Leica monitoring system
For the monitoring of such a critical are mounted on various surfaces, components were set up very easy
road bridge, with cars frequently which are distributed around the with plug & play for a one month
passing by, outliers or data gaps concerned slip road in the construction temporary installation. To reach the
cannot be tolerated. With the site. Reference prisms are installed highest standards of a monitoring
Leica TM30 total station, the in stable areas to provide a control system, it was turned into a
system provides high accuracy an- network for the Leica TM30 total permanent setup one month later.
gular measurements of 0.5” station. The computer, with Leica During the installation period of
and precise distance measurements GeoMoS for the total station control the permanent set-up, the temporary
with 0.6 mm + 1 ppm. With the and data acquisition, is located just set-up continued operating until it
direct drives and the SmartEye next to the total station in a heavy had worked for two whole months,
vision the total station can perform transportable box. In addition, an so that surveyors could compare
the measurements to all the uninterrupted power supply (UPS) the data between the two set-ups
monitoring prisms in a short cycle. is installed so that the complete and adjust them accordingly.
the reasons behind the notification
and confirm whether the message
was due to faulty equipment
(displaced prism), human error or
construction activities. They decide
what kind of actions need to be
taken, e.g. increasing monitoring
frequency or even a temporary
suspension of all nearby works.
Conclusion
The implementation of the automatic
deformation monitoring system
after the initial structural movements
has been highly beneficial, as with
the help of the monitoring system,
the Central-Wanchai Bypass project
could be resumed safely and the
public can be constantly kept
informed about the situation. The
Data Visualization Messaging System monitoring system has allowed the
All the measured monitoring data As the name of automatic deformation progress of construction projects
is first processed by the computer monitoring system suggests, every to continue, in addition to ensuring
with GeoMoS Monitor. The responsible process should work without human public safety.
surveyors can then view the data intervention. Therefore, instead of
directly with GeoMoS Analyzer on employing a person to watch the data
the computer located on the con- 24 hours a day, computers notify
struction site or via a web interface, surveyors and engineers immediately
as the data is immediately uploaded when any deformation beyond tolerance
to the Internet. After logging into occurs with the system. After the
the web page the users can display monitoring positions of the prisms
the data with numerical or graphical are measured, they are compared
reports, their associated limit levels with the set limit levels. If any moni-
and download raw data. The actual toring data reaches or exceeds one
monitoring data can be displayed of the three limit levels, the messaging
with reference to the initial values system is immediately activated. The
measured at the start of the monitoring designated personnel are notified
or as trends. through various media and by e-mail.
The surveyors in charge then investigate
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Yesterday’s Negligence Becomes
Today’s Problem
http://vermessung.emchberger.ch/
Objective
Subsidence monitoring of a building
Customer/Institution
Emch+Berger AG Vermessung, Solothurn
Challenge
Real-time subsidence monitoring
during remediation
Notification via SMS when any sensor
exceeds set limit levels
Pure geotechnical monitoring project
Date
While pumping and active charcoal filtering is taking place, the new building is continuously 2010 – 2015
monitored with several inclination Leica Nivel220 sensors.
Location
The level of pollution at the geology and groundwater levels.
Zuchwil/Switzerland
Schnepfenmatt site in Zuchwil Remediation works for a new build-
makes it one of most contaminated ing to the east of the Schnepfen-
pieces of ground in the Swiss matt site led to the realisation that
canton of Solothurn. Although the pollution could be treated by
the pollution threatens two of extracting water through wellpoints
Solothurn’s public drinking water without risk to the sur-rounding
sources, it has not been possi- buildings.
ble to successfully remediate the “Decades of careless handling of
land until now. Emch+Berger is environmentally hazardous materials
working on the remediation of and wastes have left their mark
Project Summary
this contaminated waste site. in the soils of Switzerland.” Swiss
Instruments
Federal Office for the Environment
- Leica Nivel220
Background (BAFU), 2009 - Groundwater piezometers
In 1998, during the course of a - Flow sensors
redevelopment project in Zuchwil, Site work - Water pressure sensors
it was discovered that there was Emch+Berger is responsible for the Software
considerable contamination of the site work and the evaluation and - Leica GeoMoS Monitor/Analyzer
ground (soil, groundwater), on what interpretation of the monitoring - Leica GeoMoS Web
is now the Schnepfenmatt site, with data. The CHC-contaminated Communication
chlorinated hydrocarbons (CHC). groundwater is purified by passing - ComBox20
Previous attempts at remediation it through an active charcoal filter - Campbell Scientific datalogger
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Landslide Monitoring in Acri, Italy
Scope/Objective
Monitoring of a landslide over the main
access road. This road is the only way
to connect a town with the main high-
ways.
Customer/Institution
ANAS S.p.A. - Calabria
Challenge
Replacing the 24/7 military garrison
with an automatic monitoring system
Date
Started in August 2010
Location
Acri, Italy
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Structural Monitoring of
Michigan’s Highway Bridges
Company/Institution
Michigan Department of
Transportation
Construction and Technology
Division
Challenge
Reliable Real-Time Deformation
Monitoring of many bridges within
the State of Michigan with wireless
data coverage
Date
2010 - ongoing
Location
State of Michigan / USA
A temporary bridge being monitored while work is completed on the rebuilding of the
permanent bridge.
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Slope Monitoring at Adaro
Tutupan Coal Mine/Indonesia
Scope/Objective
Monitoring the open cut coal mining
slopes’ deformation to predict the time of
slope failures and to protect personnel and
equipments from slope failures
Customer/Institution
Adaro Indonesia, South Kalimantan,
Indonesia
Challenge
Continously operate the complete system
within immediate distance to the excavation
Date
Project started in June 2004
Tutupan mine is one of the In addition, six meteo sensors are
largest open cut coal mines in installed within the mine, automatically Location
Indonesia, situated in the South measuring atmospheric conditions and Banjarmasin, Indonesia
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Monitoring System at Tsuen Wan
West Station, MTR West Rail Line
Scope/Objective
Tunnel deformation monitoring
Customer/Institution
MTR, Hongkong
Date
2009 - ongoing
Location
Hongkong
The TW7 area in Tsuen Wan West System design and setup
Station Hong Kong, is the planned The design of the tunnel monitoring
location for the development of system started in 2009 and required Project Summary
a new urban infrastructure. Since two months to complete the design, Used Instruments
the construction is very close to preparation, setup and testing. In Leica TM30
an existing MTR (Mass Transit total, six high accurate Leica TM30 Leica Geosystems L-bar prisms
Railway, the rapid transit railway total stations, two computers, one Software
system in Hong Kong) tunnel and backup computer, 42 reference Leica GeoMoS Monitor / Analyzer
station, an automatic deformation prisms and 234 monitoring prisms Web Service for data viewing
monitoring system (ADMS) must have been installed for the monitoring of the SU Hongkong
be installed for security, because system. The locations of the total Third party adjustment software
Communication
any deformation to the MTR could stations and prisms were carefully
Cables
threaten the lives of thousands selected so that measurement cov-
of passengers. erage, efficiency and the costs of
Challenge
the project were balanced. The total - Monitor a length of 400 meters
A Netherlands company has been stations were distributed along a - Ensure the required clearance
contracted to monitor the develoment 400 meter segment of the railway between installation and railway
of this project for any deformation tunnel. The total stations we infrastructure
that may occur due to earth and piling installed in three groups of two, - Fully automated and reliable system
works. To perform the deformation with one total station of each pair to very limited access to the site
monitoring Leica Monitoring solutions was set to monitor the uptrack, the
has been selected. This is because other the downtrack (see Figure 4).
the realtime monitoring is able to The monitoring prisms were
continuously detect any deformation, installed next to overhead line
therefore providing an alert to any cables, on the sides of the tunnel
possible disasters. and next to the pedestrian walkway.
Benefits
- Ensure the safety for the daily
railway operation
- React proactive on any occurring
deformation to avoid downtimes
of the railway tunnel / station
For each prism a clear line of sight outside the monitoring area and addition, the end customers have
to the total stations and safety partly inside the monitoring area. As the ability to access via a web inter-
clearance to the tracks and over- not every total station had a line of face the measured monitoring data
head lines was required. sight to the outside stable reference that represents the deformations in
points, it was necessary to compute easily understandable graphical and
Communication network adjustments for the complete numerical deformation reports.
was established between the total network based on the outside stable
stations and the dedicated monitoring reference points, so that the inside Messaging System
computers using cables. These com- reference points could be updated. To enable quick response to any
puters were located in a separate For that reason, at the beginning of irregularities in the project area, a
office with a workstation equipped each complete monitoring cycle, the messaging system was implemented.
with Leica GeoMoS Software. This total stations measure all the reference This system automatically informs
is responsible for the Leica TM30 points. These measurements are used the responsible staff via e-mails in
cotrol, data collection, analysis and to compute the network adjustment. any situation when a measured
visualization. In addition, third party The coordinates of the total station displacement exceeds set limit levels.
network adjustment software was standpoints and the reference points These limit level values have been
used. Reliability to the system was inside the monitoring area are set through the system beforehand
ensured by using uninterrupted updated with the results. Leica by the surveyors. After a limit level
power supplies (UPS), to reduce the GeoMoS software then measures is exceeded, the surveyors in charge
problems of power outages, and the monitoring points based on the investigate the reasons behind the
data was frequently backed up. updated reference points. This exceedance and confirm whether
Regular maintenance and checks complete measurement cycle, with the measurement was due to outliers,
including cleaning the optical prisms stable reference and monitoring human errors, construction activities
twice a week, allowed the system to points, occurs every 2 hours. or a real movement.
operate smoothly and accurately as
the trains, running frequently next Deformation Data Conclusion
to the instruments, could cause The monitoring data is available in In the last decade, it has been proven
unwanted displacements and dust real-time for displaying through the that the automatic deformation
coverage of the prisms. Internet. The monitoring staff, with monitoring systems have effectively
appropriate access codes, can login prevented accidents from happening
Monitoring Network to the complete monitoring system since its implementation in various
The stable reference prisms were information and display both deformation projects in Hong Kong.
installed along the tunnel, partly values and the system health. In
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Chemical Plant Monitoring
Scope/Objective
Monitor of a highly explosive plant
during consolidation works
Challenge
Continuously evaluate data to check
the position of the pipes in the plant
Date
December 2011 - ongoing
Location
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Railway Bridge Monitoring
Kirchtobel – Switzerland
Monitoring Company
Schällibaum AG, Switzerland
www.schaellibaum.ch
Builder
Schweizerische Südostbahn AG
Challenge
Monitor and display the move-
ments of a railway bridge during
100 year old railway bridge “Kirchtobel” and the monitoring system setup the construction of a second par-
allel bridge
The extension of the railway movements and inform the
line between St. Gallen – Arth- key people in the railway Date
Goldau is part of the integration service “SOB Südostbahn” in
November 2011 to May 2012
of Eastern Switzerland with any case of emergency.
the New Railway Link through
Location
the Alps (NRLA). There are Monitoring Object
several engineering projects The railway bridge crosses a
associcated with this enlargment, steep forested ravine and has
such as the building of the new a length of 150 m and the
railway bridge close to St. maximum height is about 30 m.
Gallen. As the new bridge will The overpass consists of four
be built close to the existing minor and six main arcs, and
one hundred year old brigde, there are trains crossing the
the project is complex as the ravine every 15 minutes in both
old bridge is made of natural directions. Project Summary
stone and the foundation of Instruments
its pillars are not accurately During the building process of Leica TCA2003, Leica TCA1800
defined. This means that the new bridge, the structure of Leica Prisms
construction work can affect the old bridge and the overlying Leica Nivel220 Bus System
the old bridge in the forms tracks has to be monitored. Due W&T Meteo Sensor
of settlement and torsion. A to a geological report, the people Webcam
permanent monitoring system in charge concluded that the Software
is required to monitor these existing bridge foundations will GeoMoS Monitor and Analyzer
be influenced by the construction GeoMoS Web
work around the old bridge, Communication
especially during the building of Leica ComBox20
a temporary road through the Leica TCPS27 Radio Modem
ravine, which could lead to GSM/UMTS, Ethernet, RS232/485
subsidence and rotation of the
Power
piers. Movements in the foundation
Fuel Cells
of a railway bridge can be
Alarming
disastrous for the railway service
SMS and E-Mail
Important swiss railway connections and distortions in the railroad
Monitoring System
Benefit
For this monitoring project
• Redundant measurements
primarily tachometric measuring
of monitoring points from
equipment (Leica TCA2003,
different TPS locations
TCA1800) was selected. The
• Nivel220 Bus System as a
required measurement accuracy
fallback system for bad weather
is ± 2-3 mm. The total stations
conditions
have been placed on each side
• Data access anytime and any-
of the bridge in the ravine. With
where over Leica GeoMoS Web
the choice of these instrument
• Efficient messaging via SMS and
stand points, the piers of the
E-Mail
arcs can be monitored from each
side, leading to redundant. A • Flexible and secure
total of 81 prisms are mounted communication setup
in a uniform pattern on the bridge. • Fuel cell technology provides
For setting up and orienting the a secure and self-sufficient
total stations, there are twelve power supply in the outback
stable fixed points available • Automatic versus manual
around the viaducts that are monitoring systems reduces
mounted on concrete pedestals. costs
• Leica Geosystems Support
Special pillars are created to
ensure the stability of the total covers this region, which impedes
station locations. These pillars geodetic measurements. Due
are made of a solid foundation, to these problems, six inclination
where the frost depth is sensors (Leica Nivel220 bus
considered, a stable outer shell system) are installed at the
serves to protect against bridge head. These high-resolution
temperature and mechanical sensors monitor the longitudinal
damage. The measuring device and transverse tilt of the bridge.
is installed on the core of these They form redundant measure-
pillars. ments and a fall-back for the
monitoring system, if optical
To use optical measuring measurement techniques fail.
instruments as total stations,
a clear view of the monitoring The automatic monitoring
object must be ensured. For that system also determines the
reason several problems need atmospheric corrections for
to be taken into account for geodetic measurements with
this project. Firstly, because meteo data (temperature,
Distributed monitoring prisms
this gorge is heavily wooded, pressure and humidity) from a
tracks are the most critical factor certain shrubs and trees have meteorological sensor. Further-
in the rail geometry. Therefore, to be felled. Secondly, the new more, these weather data are
in addition to monitoring the bridge will obscure a face of helpful for the concreting phases
various foundations, focus is also the old bridge during its of the new bridge elements.
placed on the bridge head where construction progress, which
the tracks lay. The expected cannot be prevented. Thirdly, Beside all these measuring
movement at the foot of the in winter months, fog often sensors, a rotating webcam is
bridge could be in the millimetre
to centimetre range. In addition
to these conditions, the location
of the object, the different
weather conditions and the
progress of construction of the
new bridge must be also consi-
dered during the design process
of the monitoring system.
Monitoring System Calibration
Before a system is set to active,
a proper null measurement
of the monitoring object is
necessary. During this phase,
the measurement data of the
stationary bridge, and thus
the intrinsic behaviour of the
bridge are studied. It is also an
opportunity to fine tune the
moni-toring system.
Conclusion
By using such an automated
monitoring system through the
Graphical visualisation of the monitoring data in Leica GeoMoS Web: web cam image, construction, the companies
weather forecast, rain radar, meteo data, inclinations with shown limit levels, etc. involved get an image of the
health status of the constantly
also used to monitor the is not available at the site and
monitored object. With high-
surveying process and the must therefore be supplied by
resolution and independent
measurement equipment. fuel cells. The development of
measuring techniques and the
The measured data of the power-boxes in combination
deployment of modern means
individual sensors (Leica total with fuel cells and batteries
of communication, the reliability
stations and Nivel220) are generates emission-free
and quality of measurement
collected in a master station electricity and runs the system
results can be increased.
(Leica ComBox20) and are self-sufficiently for several days
These are essential prerequi-
transferred, on the mobile or weeks.
sites for monitoring tasks. Such
internet (GSM/UMTS), to the
control centre (Leica GeoMoS) By using Leica GeoMoS in the
where the whole system is control centre, the data is vali-
supervised. The connection dated on the basis of filter
from the master station to the criteria, processed and stored
different sensors is done via in a database. If any measure-
cable and/or wireless connec- ment results exceeds set limits
tions and the data transfer and satisfies the filter conditions,
interfaces are serial RS232/485 the messaging system notifies
and TCP/IP protocols. the appropriate people in charge.
Via the SMS service, the connetion These messages are sent via
status (e.g. UMTS signal strength) e-mail and SMS service. After
of the master station can be the messages are sent, further
queried and in addition, the action will be taken based on Power-Box (fuel cell) and ComBox
station may also be rebooted set regulations. This begins
in the event of various faults in with a consultation of the a monitoring system increases
the communication. Since the monitoring data through the the efficiency and flexibility of
project is in rural areas, the Leica web portal GeoMoS Web, the construction and therefore
power of the monitoring system then a site visit if necessary, allows costs to be saved (e.g.
is somewhat more complicated. which can lead to immediate insurance premiums for con-
Before the construction of the closure of the railway operation. structions, manual monitoring
new bridge, mains electricity costs, etc.).
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
GNSS Observation of Volcanic
Activities in Sakurajima
Objective
Volcano monitoring to predict
volcanic eruptions
Customer/Institution
Geosurf Corporation
Disaster Prevention Research
Institute Kyoto University, Sakurajima
Volcanological Observatory
Date
Start August 1994
Location
Kagoshima Prefecture, Japan
Web interface ü ü
CF card ü ü
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Monitoring to Secure an Area
With Hydrogeological Instability
Scope/Objective
Automatic and continuous monitoring
of a mountain slope affected by
hydrogeological instability
Customer/Institution
The Region of Valle d’Aosta
Challenge
Continuous monitoring of any
movements in the area for activation
of the Civil Protection plan
Date
July 2009 - ongoing
Location
Valle d’Aosta, Italy
The Aosta Valley (Valle d‘Aosta) Since 2000 the Region of Valle
is a mountainous semi-auto- d’Aosta and the department for
nomous region in north-western “Inspectorate for public works, soil
Italy. It is bordered by Rhône- conservation and water resources
Alpes, France to the west, – Geological Service” have carried
Valais, Switzerland to the north out a series of surveys in order to Project Summary
and the region of Piedmont to gain in-depth knowledge on the Instruments
the south and east. With an instability and to understand its Leica TCA2003 Total Station
area of 3,263 km2 (1,260 sq dynamics. Leica NIVEL210 Tilt Sensor
mi) and a popu-lation of about Leica GMX902 GG
130,000, it is the smallest and As a result, today this area is moni- Leica AS10
least densely populated region tored 24 hours, 7 days a week with Leica GMX901 with communication box
Leica Geosystems Monitoring prisms
of Italy. It is an Alpine valley a fully automatic and integrated
Master Unit PC
that, with its side valleys, deformation monitoring system.
Software
includes the Italian slopes of The system combines geodetic
Leica GeoMoS Monitor
the Mont Blanc (Monte Bianco), and geotechnical instrumentation Leica GNSS Spider
Monte Rosa and the Matterhorn. as well as ground radar measure- SystemAnywhere (data synchronisa-
ments. tion & calculations) and Analysis (data
Some areas are affected by slope Based on the surveying results of view)
instability called DGPV (Deep-seated the last years and the importance Communication
Gravitational Slope). The main of the regions, dedicated monitoring Wireless LAN
State Road 26 section accessing points on the slopes have been GSM/GPRS
the Mont Blanc Tunnel, as well as selected for automatic deformation Office
the districts of Entrev and Palud are monitoring and stability analysis. Analysis
influenced. About 30 monitoring prism and
5 reference prisms are installed. of the buffer battery on site. The
These prisms are measured with a power system consists of solar Benefits
Leica TCA2003 total station every panels and a methanol tank system. - Study of landslide dynamics
Protecting the safety of the
hour. The total station is installed A special electronic device controls
population
in a stable area with a pillar secured automatically and intelligently the
- Analysis and study of an
to a rock on site. In addition, a correct power input to the monitoring
efficient integrated approach
dual axis inclination sensor Leica equipment between the solar panel to multisensor monitoring
Nivel210 is installed to verify the and the methanol tank system.
stability of the station with an
independent sensor. Near to the The complete automatic monitoring located in the headquarters of
Leica TCA2003 total station, a system is left unattended in the the customer. This SystemAnywhere
separate GMX902 GG receiver with remote environment of the Aosta retrieves the pure raw data and
Leica AS10 antenna is installed. Valley. The total station and the then automatically computes the
Also, several Leica GMX901 have Leica GMX receivers are managed total station corrections as
been installed with co-located by Leica GeoMoS and Leica GNSS orientation, free station, ppm etc.
prisms that record data with 1Hz. Spider, which are installed on a Total station and GNSS baselines
The monitoring prisms and the master computer (embedded in- are combined and limit checks
Leica GMX901 are installed over dustrial PC), located inside the total computed.
the slope to monitor critical posi- station measurement hut. The
tions. total station, the Leica GMX902 GG In case the three different set limit
sensor and the Leica Nivel are thresholds are exceeded, the
Commonly for alpine valleys, human connected via cable to the master reponsible staff member in charge
access to the monitoring sensors is computer and the GMX901 sensors is informed and the required actions
very limited. All installed equipment are connected via 5GHz wireless are taken to ensure the safety in
requires a reliable and autonomous link. the Aosta Valley.
energy source that guarantees that As a result, the monitoring system
the equipment works properly. Due The acquired raw data from Leica includes two independent geodetic
to the amount of snow and the GeoMoS and Leica GNSS Spider is measuring sensors, total station
reduced solar irradiation during downloaded from the monitoring and GNSS data, that increase the
winter months, a combined power site, with the software called reliability of the system. The data
supply system was installed for SystemAnywhere, to another dedi- is correlated for further evaluation.
continuous power and recharging cated monitoring system computer
This autonomous monitoring system
is beneficial for the Aosta Valley,
as continuous monitoring data is
collected and analysed providing
detailed deformation information.
In addition, messages are sent to
notify the required personnel of
exceeded limit levels providing
advance warning of possible
problems and protecting the safety
of the local population.
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Rail Tunnel Monitoring
in Sochi/Russia
www.tunnels.ru
Objective
Rail tunnel monitoring during
construction
Customer/Institution
Tunneldorstroy
Date
2011 – ongoing
Location
Sochi/Russia
A railway tunnel near Sochi in the existing tunnel to detect pos-
the Russian Krasnodar region is sible deformations resulting from
being monitored as part of the the construction of the road tunnels
construction preparations for and to detect possible problems
the 2014 Winter Olympic Games. before they become critical.
The tunnel is part of the only
rail line for all passenger traffic Frequent trains and the necessity
to the Sochi resort area from of acquiring data every two hours
central parts of Russia and for made it nearly impossible to perform
cargo traffic supplying construc- classic methods of monitoring.
tion sites in Sochi. Due to the Therefore, total stations and the
planned construction of two automatic deformation monitoring
road tunnels above the railways, system Leica GeoMoS were installed Project Summary
the decision was made in 2011 and have been working around the Instruments
to set up an automatic monitor- clock. Project planning recommended Leica TM30 Monitoring Sensors
ing system for the existing tun- installing two Leica TM30 (1‘’) robotic Leica Geosystems Monitoring prisms
nel. total stations in the middle of the Software
existing rail tunnel to have line of Leica GeoMoS Monitor / Analyzer
The company Tunneldorstroy is sight to all prisms and to measure Communication
building two road tunnels, with a reliable data. These instruments - Ethernet via LAN cables and mobile
total length of 770m, above the can achieve an angle accuracy of 1’’ Internet
current rail tunnel. and a distance accuracy of 0.6mm + - Uninterrupted Power Supply (UPS)
1ppm. Automatic target recognition
Out of concern for the safety of (ATR) allows the Leica TM30 to Challenge
passenger and freight trains pass- reliably aim to the center of each Real-time deformation monitoring
ing through the current tunnel, it reflector and thus to determine the among frequent rail traffic
was decided to monitor a part of smallest deformations.
Benefits
Once the automatic monitoring
system was installed, the system
works beside all difficulties caused
by lack of electricity and heavy train
traffic absolutely reliable and delivers
high accurate monitoring data
Because of an unreliable power along the entire rail tunnel structure. It is responsible for control of the
supply inside the tunnel construction All points are measured every two total station, data acquisition, data
area, an uninterrupted power supply hours. storage and automatic processing
(UPS) and power conditioner had to of the instrument’s resection (free
be set up for continuous operation Communication station computation).
of the total stations and the com- The total stations are connected
munication devices. to a GPRS/GSM modem installed In case of a deformation event an
near one tunnel end by LAN cable SMS or email is sent to the respon-
Four stable control prisms were and the Ethernet converters inside sible staff for further investigation
mounted on each side of the tunnel. the rail tunnel. The communication and inspection of the deformation.
These points are frequently checked between the total stations and the The monitoring data analysis includ-
by an independent survey campaign. software is via TCP/IP and Mobile ing graphs and reports is completed
Before the monitoring points are Internet. using Leica GeoMoS Analyzer.
measured, each total station positions
to the stable control prisms located Data Processing Center
in the deformation-free area. The measurements of the Leica
These measurements are used to TM30 total stations are managed by
compute the actual total station the Leica GeoMoS.
position and corrections (e.g. With an integrated TCP/IP connec-
orientation or Vz correction) using tion GeoMoS is able to establish a
resection calculations. For the actual bi-directional communication with
monitoring, five monitoring prisms the total stations over the GPRS/
were installed in each tunnel profile. GSM modem and the tunnel LAN.
The distances between the profiles The GeoMoS Monitor software is
are between 1 to 5m. A total of installed at the Tunneldorstroy
196 monitoring prisms are located office on the other side of the city.
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Monitoring Bridge Structures
Under Static Loads
Scope/Objective
An innovative integrated surveying
system applied in the monitoring of
bridge structures under static loads
Customer/Institution
Road and Bridge Research institute
Date
April 2011
The Maria Skłodowska-Curie Bridge are ready to be used in many, usually
(Polish: Most Marii Skłodowskiej- very distant, places in a short time. Location
Curie, formerly North Bridge) is Moreover, the research body of the Warsaw, Poland
a road bridge over the Vistula Road and Bridge Research Institute
River in Warsaw, Poland. The road came across the idea of developing
bridge in the capital of Poland new technology, which could bring
links the northern suburbs of new possibilities and make the whole
Białołęka and Bielany and opened process of static load testing more
on 24 March 2012. The total comfortable and useful.
length of the bridge is 795 m (the
main river span is 160 m). The The new architecture of the North
applied precise Nivel220 inclino- bridge load monitoring system
meters network makes it possible comprises an integrated work Project Summary
to measure the deflections of a between 20 precise Leica Nivel220 Instruments
bridge construction under static inclinometers and a Leica TM30 Leica TM30 Monitoring Sensors
loads without the necessity of Monitoring Sensor. Leica Nivel220 Precision Inclination
using external reference points. Sensors
The project has been implement- Monitoring Setup on the Bridge Leica GMP104 Monitoring Prisms
ed in cooperation of the Road The Leica Nivel220 inclinometers have Leica GMP112 Prisms
and Bridges Research Institute been placed in specially designed Software
in Warsaw, Leica SU Poland and adapters, to detect deflections of Leica GeoMos Monitor + Analyzer
O.N.T Krakow. the bridge construction. The adapters
have to be attached to the bridge Additional Field Equipment
The most typical application of the construction or set up along the Specially-designed adapters
new system is deflection monitoring construction’s edge. Each Leica Power wires of different lengths
of various bridge constructions, Nivel220 device is powered and (25 m, 50 m and 100 m)
where installing mechanical sen- linked to the next one by cables, so Power supply system with backup
sors would be very difficult or even that a network (maximum 32 pieces) batteries
impossible (road traffic or intensive is built up. The first Leica Nivel220 Military toughbook
exploitation of railway tracks). is attached to a “master station”
consisting of a military toughbook, Communication
Why a New Approach? power supply with backup battery Satelline radiomodems
Before implementing the bridge load and an integrated radio modem. Bluetooth® Wireless Technology
monitoring system, the customer From this “master station” the
had been doing classical surveying monitoring data is sent to the Mobile on-site Office
(leveling supported by precise monitoring office. Panasonic Toughbook
measurements TDA5005 high-accurate 3rd party analytical software based
industrial total station). Such The Leica TM30 total station is on Matlab® engine for reading data
approaches were successful until operated via Bluetooth® technology, from the SQL database, calculating the
the construction boom in Poland, making the whole application more bridge deflection curve and visualizing
resulting in a necessity of applying flexible. & saving the data (in on-line mode)
high-speed online systems, which
Benefits
• Flexible installation
• Reliable and precise sensor network
• Real-time data transmission
• High accuracy and reliability of
collected data
www.ibdim.edu.pl
www.mostpolnocny.warszawa.pl
Data Analysis and Results Bridge monitoring was performed are invited to participate in practical
The Leica GeoMoS monitoring soft- during construction works, final tests projects run on-site. The customer
ware run in the monitoring office, and further exploitation of a structure. saves time in addition to getting
schedules the Nivel220 readings The proposed and successfully more reliable and accurate data. Based
and stores the data to the SQL implemented bridge load monitoring on the new amount of data, they
database. Afterwards, a third party system brings many benefits for are able to implement new modeling
application powered by Matlab® both its user and other customers. algorithms running on highly efficient
core presents the results, by First of all, it can compete against computers, making examined con-
modeling the data with special the classical methods mainly based structions safer and expressing real
“spline-curves” algorithm. This on leveling. In many cases, a bridge behavior during the exploitation.
application accesses the measured construction is unique, long and
raw data from the SQL database extraordinary, making it difficult The designed bridge load monitoring
and processes the data to the to perform time-consuming and system is one of the most precise
particular demands of the project. in many cases erroneous leveling and at the same time flexible bridge
methods. Moreover, a system user monitoring installations in Europe.
In addition, the Nivel220 inclinometer can analyze constructions in real
network is supported by total station time, considering static loads while The Road and Bridge Research
surveying data (high accurate results examining bridge construction, Institute in Warsaw has been a key
given by the Leica TM30 0,5’’ precise which is simply crucial. customer of Leica Geosystems
total station) exemplifying the Poland since 2006. The area of
deflection progress of the tested Customer Benefits common co-operation comprises
bridge structure. Based on the The customer appreciates the highest integrated monitoring systems,
surveying results (inclination angles) accuracy and reliability of collected precise leveling and high-accurate
the system constantly determines monitoring data. That’s the reason total station surveying combined
the height displacement line by why the institute has been using with innovative software and data-
modeling the data with a specially- Leica Geosystems equipment, as base solutions. The project was
developed algorithm using “spline- well as the constant and still thriving carried out by specialists from Road
curves”. Moreover, the system cooperation between specialists and Bridge Research Institute under
delivers very high accurate data as from both sides. Leica Geosystems, the supervision of Dr Ing. Piotr
well as high frequency of sampling. responsible for the delivery of Olaszek in cooperation with: Dr Ing.
instruments and accessories and Krzysztof Karsznia from Leica
Conclusion also for the whole process of the Geosystems Poland. Dr Ing. Mariusz
The system was tested on several project implementation. For example, Pauluk, Msc Ing. Miłosz Augustyński
newly built as well as on already Leica Geosystems provides a full & Msc Ing. Paweł Bytnar from
existing bridge structures, examined CCP service and maintenance in Oprogramowanie Naukowo Techniczne,
under static loads, across Poland. aftersales. Very often, the specialists MathWorks distributor in Poland
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Monitoring a dam wall in a Polish Copper
Ore Enrichment Facility (PL)
Scope
Establishing a continuous, automatic
monitoring system for a section of an
extremely large dam wall.
Customer
KGHM Polska Mied SA (Polish Copper),
Hydrotechnical Department (HD),
Rudna (Lubin), Western Poland.
Date
December 2008 - Ongoing
Location
View from the monitoring hut towards the tailings dam wall.
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Concrete Dam Monitoring in
Montereale Valcellina (IT)
Scope/Objective
Automatic and continuous monitoring
of the Ravedis mass gravity concrete
dam
Customer/Institution
Consorzio di Bonifica Cellina Meduna
Challenge
Continuous automatic monitoring of
the behaviour of the structure on a
daily basis
Date
Operational since November 2011
Location
Montereale Valcellina
Automatic monitoring system with dual station operation with the Leica TM30 station.
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Automated Deformation Monitoring
Apollo Bridge, Bratislava, Slovakia
Company
Department of Surveying of
the STU Bratislava
Challenge
Deformation due traffic load and
external conditions (e.g. temperature)
Date
October 2010
Location
Bratislava, Slovakia
The Apollo Bridge is one of five modern and often very complex
road bridges across the Danube structure of these objects underlines
in Bratislava, connecting the the importance of high accurate
centre of the city with the measurements of their movements.
district Petržalka. The traffic
load and temperature changes Bridge Structure
cause deformation of the bridge The Apollo Bridge is one of the most
Project
structure. In addition, the use important transportation corridors
Instruments
of the developed automated in Bratislava, the capital of Slovakia.
Leica TS30
measurement system (AMS) for The traffic load, the changes Danube
Leica Nivel200 Series
long term monitoring allows the water level and many other factors
Leica Viva GNSS
Department of Surveying of the influence the basic function and
Meteo sensor
STU Bratislava to determine safety of the bridge. The steel
Software
actual information about the bridge has a total length of 517.5 m
Leica GeoMoS
deformation of the main structure and consists of eight sections;
Data logging software
in real time. The AMS consists the main section is an arch steel
of the Leica TS30 high-precision structure with a span length of
Objectives
total station with Automated 231.0 m and an arch height of 36 m.
- 3D determination of bridge
Target Recognition (ATR), a
deformation
Leica Viva GS15 and GPS1200+ The main structure of the bridge
- Measurement of bridge deck
GNSS receiver, and a Leica consists of two steel arches and the
vibrations using accelerometers
Nivel 220 inclination sensors deck. The bridge deck consists of
- Synchronisation of system
as well as accelerometers. 6 sections with spans of 52.5 m,
components
2 x 61.0 m, 63.0 m, 231.0 m and
- Feasibility study for the long-term
One of the main safety tasks of 49.0 m, separated by dilatations
monitoring of all bridges across the
civil engineering structures is the and supported by 5 bridge piers.
Danube in Bratislava
measurement of deformation. The Only one of the piers supporting
Benefits
- Real Time 3D Monitoring
- Effectiveness of measuring
real time deformation
the bridge floor is positioned in the GPS1200+. The measurement cycles and data processing in each
river. The top of bridge arches is system was completed by Leica 146 epochs. The Leica Viva GS15
36.0 m above the bridge deck. The Nivel210 inclinometer sensor, a and GPS1200+ use GPS (NAVSTAR)
main bridge deck with arches was Reinhardt DFT-1 metrological station, and GLONASS satellite signals.
constructed on the river bank and and 13 standard prisms (GPR1) The second part of the system
then moved (rotated) to the final from Leica Geosystems. The angle comprises of two Leica Nivel 220
position over the piers and cross- and distance measurements were inclination sensors and four 1D
ing the river. This operation of 36 made by Leica TS30 using Leica HBM B12/200 accelerometers.
hour duration was fully navigated GeoMoS and the ATR function The measured data is registered
and monitored by geodetic technology. every 10 minutes in two faces with 1 Hz and 10 Hz frequency.
with automated data acquisition. The homogeneity of data and
Monitoring System Setup The inclination sensor controls synchronisation of the notebook
The measurement system was the stability of the total station time are achieved by using special
positioned according to the geometry position on the pillar. All three time server LTS, which use the GPS
of bridge structure and consists of devices are connected to the time signal from GPS satellites.
geodetic and geotechnical sensors personal computer and the The accuracy of this time signal
connected to the Leica GeoMoS measurement data is sent directly is ± 5 msec and the time signal
software. The geodetic sensors to the computer with the Leica from LTS is transferred via WiFi
are a motorised Leica TS30 high- GeoMoS Monitoring software antennas with 5 GHz operation
precision total station, and GNSS installed, which is also used for frequency.
receivers; Leica Viva GS15 and controlling the measurement
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
© Kanto Regional Development Bureau, MLIT
Heavy Loads on
Weak Foundations
by Kazuhiro Nii and Dr. Yun Zhang the joints between pier/taxiway were assumed to be
moving and/or to sink due to secular change. Move-
The newly opened D-Runway at Tokyo Interna- ments must be accurately measured, especially dur-
tional Airport Haneda was a complex structure ing earthquakes, as the amount of movement is one
to build, as it is located on reclaimed land. Heavy of the criteria used to assess whether D-Runway is
airplanes weighing hundreds of tons each, take in a satisfactory condition for safe operation or not.
off and land on the newly constructed runway
daily. Continuous monitoring is important for Installation of the System
safe operation, as large movements can influ- The monitoring system was designed for mainte-
ence the safety of the runway. nance and management of the runway with its com-
plex characteristics. Dozens of GNSS monitoring
D-Runway was constructed on Japan’s first hybrid points were installed and have been monitoring sec-
structure at the mouth of Tama River in Tokyo Bay, ular changes as well as any movements during earth-
consisting of reclaimed land, platforms of piers, and quakes since the runway was opened. The system
a taxiway, all connected to the present airport. In measures the movements of two relative positions;
the landfill portion, soil needed to be improved and sets of two points were installed in these positions
re-filled to prevent consolidation subsidence caused across the joints to measure the movements at the
by weak foundations. At the pier site, steel pipes joints in the different structures.
nearly 100 m long were sunk into the sea at specified
intervals. A cover was built around it to keep the river Antennas were installed at ground level near the run-
flowing smoothly. way at the landfill and pier sides to avoid interfer-
ence with aircraft operation, and at the taxiway they
With this complex structure and construction meth- were installed at points outside the airport height
od, the connection between landfill/pier as well as restriction.
30 | Reporter 66
© Kanto Regional Development Bureau, MLIT
A Leica GMX902 GG with an AX1203+ GNSS antenna
were installed on the roof of the Fire Department’s
east building at the side of the airport, rather than
near the runway. The antenna was seismically iso-
lated by fixing a vibration absorber around it so posi-
tioning can be performed even in the middle of an
earthquake. Since antennas were put in the ground,
data reception may be disrupted by aircraft activ-
ity, so the system also collects data using GLONASS
signals to maintain a horizontal accuracy of 10 mm
(0.39 in).
Objective
Automatic deformation monitoring
combined with a mining control system
Customer/Institution
Bełchatów
http://www.kwbbelchatow.pgegiek.pl/
Date
2009 – ongoing
Location
Bełchatów, Poland
station situated on an adjacent values between the GNSS antenna data for analysis and storage in an
area, which is stable and free from and the total stations as well as open SQL database. As a result, the
any influences imposed by the mine. the GNSS antenna and the prisms customer observes the slope stability
Apart from the permanently working are applied within the monitoring displacements in a local coordinate
total station, there is a second Leica software Leica GeoMoS. In addition, system.
TCA1201M total station, that is used a meteo sensor is installed inside the
for semi-automatic monitoring in Bełchatów mine and the total stations System approval and benefits
areas of the mine where access is slope distances are corrected with The automatic monitoring system
quite difficult, but monitoring is still the atmospheric corrections. deployment for the Bełchatów
necessary, although not constant. brown coal mine was completed
Communication with a final acceptance test based
Slope Monitoring A permanent data transfer between on functioning and accuracy checks
Both total stations are continuously each total station and the GNSS of the entire system. The installed
measuring over 50 monitoring points antenna / receivers to the centralized system monitors the mining slopes
located on the slopes directly around computer runs over a wireless network. and the open pit ground. It reduces
them, as well as on the ground of The monitoring communication has the risk of slope failures during the
an underground salt piercing fold, the ability to switch automatically, coal excavation, provides a continuous
which divides the mining area into for example in the case of wireless control of the slopes’ dynamics, as
two excavation pits (Szczerców and network disturbances, from the well as the possibility of applying
Bełchatów). The underground salt WLAN to the mobile Internet with integrated management of the mine’s
piercing fold is a geological structure, GPRS as a backup solution. work. Moreover, the salt piercing fold
to be more detailed, a layer of salt that impacts the mining excavation
beneath the mining area. Data collection and analysis is under control. The slope stability
The GNSS reference frame consists The data acquisition and baseline monitoring project in the Bełchatów
of three two-frequency GNSS computation of the GNSS reference mine was the first monitoring project
receivers. One Leica GRX1200GG Pro network is operated by the GNSS for Leica Geosystems Poland set
at the reference station and two Spider software. The total stations out in a mining area. The customer
Leica GMX902GG; one of which is are controlled with the GeoMoS appreciates the robustness of Leica
located on the roof of a measuring Monitor software. In addition, the Geosystems products as well as the
container and the second is colocated GeoMoS Monitor software retrieves high accurate data they provides.
with prisms for the stable orientation the GNSS baselines coordinates
of the total station. The offset from GNSS Spider and combines the
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Monitoring System for
Hong Kong Airport Express Line
Challenge
There are 3 sections of railways settlement
measurement, included tunnel, trough and
ballasted sections of total 1.2km, total 18 Total
Stations and 600 prisms needed for
measurement, Leica GeoMoS measurement
cycle with 2 hours each. Running for 24 hours
for 36 months non-stop. There are only
2 hours at night and 2-3 days per week to get
the installation work and the tasks needed to
be finished in two months time.
After the system running, everyday, it is
necessary to get a line safety report on 5:00am
morning to all the related engineers and station
manager for status of the railway in order to
commerce the construction work.
Customer
The Kowloon-Canton Railway Corporation/
Hong Kong
Date
The Kowloon Southern Link project connects the East Rail with the West Rail of the December 2005
Kowloon-Canton Railway.
Project Summary
Instruments
The Kowloon Southern Link (KSL) the construction works do not Leica TCA2003 and prisms
will be a 3.8 km connection Field
have serious structural effect and
Metro sensor, stand, pillar,
between the East and West Rail distributing daily operation and
cable running for 2 km.
in Hong Kong. The construction safety of the Airport Express Rail,
Office
of the $8.3 billion KSL is an Automatic Deformation
Workstatons, Web Server with Web Interface,
scheduled for completion in 2009. Monitoring System is deployed Leica GeoMoS Professional
The Kowloon-Canton Railway mainly to continuously monitor
Corporation (KCRC) in Hong Kong settlement along the affected rail Benefits:
acquired an Automation • Real time continue monitoring system with
track.
SMS, email alert, web interface for client to
Deformation Monitoring System
get the data in real time.
from Leica Geosystems in The 1.2km track is divided into
• Continue monitor the progress of the
December 2005 for continuously three different sections (600m,
contractor work if the work disturb the
monitoring settlement and overall 210m and 400m) for continuously railway systems
deformation of a section of monitoring where cover ballasted • Eliminate the 24 hours manual measurement
existing Airport Express Railway. section, trough section and tunnel on MTRC railway and tunnel which are
section. A pair of mini prisms with dangerous and labour intensive.
The Kowloon Southern Link project is tailor-made protection is installed • Complement the existing geotechnical
a 3.8 km extension of KCRC's West in every 13 m interval along the sensors work
Rail Link from Nam Cheong Station rail track. TCA2003 Total Station
connecting to East Tsim Sha Tsui that are driven remotely via a data
Station of KCRC's East Rail Link. There communication network by Leica
is about 1.2km of the new extension GeoMoS software at the Control
area located very closely to the Center measure the positional
existing Airport Express Rail and MTRC change of each target prism
Tung Chung Line. In order to ensure automatically in every 2 hours
Through section (210 m) Total station configuration in the Through section.
interval. To get the best line of afterward. Thus, even any SMS. At the same time, the alarm
sight for measurement, those structural movement happening and a report will also be
Total Stations are installed at vari- at the Total Station location does automatically sent to those
ous locations including tunnel wall, not have any affect to the overall persons by email. Thus, engineers
roof of rail station and structure measurement accuracy and the and surveyors can verify the
along the track. There is system can achieve less than 1mm settlement immediately and take
continuous power supply at each measurement error over a distance necessary actions to prevent
Total Station location and they are of 100m. damages and maintain rail safety
well protected by special design to passengers. As said by Mr.
mounting device and security lock. The measurement reading is Andrew Wong, Engineering
transmitted to Leica GeoMoS Solution Manager of Leica
To ensure achieving the highest software for computing the Geosystems: “It is a well-proof
accuracy and reliability of the rail updated coordinates of all solution for engineer making quick
deformation measurement result, monitoring points. Then, and right decisions and also take
the highest accuracy automatic coordinates comparison can be necessary actions regarding the
Total Station available in the made against the initial reading influence of new construction
current market - Leica TCA2003 is and the deviation and trend of works to existing structure”.
used, which can achieve +/-0.5” movement can be easily presented
angular accuracy and 1mm +/- as numeric and graphical The system installation works since
1ppm distance accuracy. presentation report to engineers February 2006 for a period of 36
Thanks to the automatic target and surveyors every 2 hours. months continuously.
reorganization technology built in All the information can be found
the Leica TCA2003, it can from an Intranet webpage and
automatically pin-point the center engineers can also remote control
of each target prism and detect the system configuration and
slight positional changes. monitor its performance via the
Furthermore, before taking every Ethernet. They can also preset
cycle of monitoring points various levels of settlement
measurement, each Total Station tolerance in the software, so
also first measures assigned when the measurement result
control reference points located at reach the critical level, then
stable structures (reference various alarm messages will be
prisms) and then re-adjust its own automatically sent to all mobile
position and monitoring reading phones of assigned persons via
Leica Geosystems AG
Heerbrugg, Switzerland
www.leica-geosystems.com
Leica Geosystems TruStory
Permanent Slope Stability Monitoring
Brown Coal Excavation, Czech Republic
Company
Severočeské doly a.s., Nastup
Tusimice Mine
Challenge
Slope Stability/Landslide Monitoring
and prediction of failures
Date
Since September 2011
Location
Tusimice, Czech Republic
Monitoring Sensor inside the In addition, the Leica TM30 Monitoring specific analysis, based on mean-
measurement hut and the DTM Sensor combines speed and accuracy. ingful results, to make the right
meteo sensor outside. Measurement As it is especially designed for decision if movements should
data transfer and communications Monitoring applications the sensor occur.
are established via mobile internet provides high accuracy angular
GPRS. measurements of 0.5”. The long More information about
range ATR detects and measures Severočeské doly a.s. at
The Leica TM30 currently measures, to prisms within a range of up to http://www.sdas.cz
at hourly intervals, 15 monitoring 3000m with millimetre accuracy. The
prisms placed on the slopes at modern drives, based on piezo
distances of 250m to 2.240m from technology, support a high rotation
the Monitoring Sensor. In the near speed of 180°/s allowing shorter
future, measurements to a total time intervals between measure-
of 40 prisms are planned. The ments cycles, if required.
measurement cycle can be adapted With the TargetCapture technology,
at any time according to the needs. obstructions in the line of site
Compared to the previous monitoring can be inspected remotely and
installations, the new system documented. Also, with TargetView,
provides a complete Plug&Play the sensor detects the correct
solution that was easy to setup. prism when multiple prisms are
All connections and communication close together.
are placed in the rugged ComBox
housing. The integrated Leica MonBox Additionally, Leica GeoMoS supports
also serves as an independent the integration of the DTM meteo
internet backup, which means that sensor for data processing, taking
data is not lost if a communication atmospheric corrections into All connections and communication are placed in the
breakdown arises. account, allowing a precise and rugged ComBox housing.
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Real Time Bridge Deck Guidance
Using GNSS Systems (Spain)
Company
Dragados S.A. Spain
Challenge
Real Time monitoring and guiding of a
moving structure (motorway bridge)
Date
March 2008
Location
Project Summary
Instruments
6 Leica GX1230 GG Receivers
6 Leica AX1202 GG Antennas
Arbizelay´s bridge, 380 meters 406 Mhz Satel radios. Other types
Software
long, 6 spans high, 5 pylons of communications (GPRS, Wi-Fi)
Leica GNSS Spider
and 12 meters wide is part of were tested and finally discarded
Leica GeoMoS
the AP-1 Vitoria - San Sebastián due to frequency inhibitors and Leica Alignment Monitoring
Motorway and is located near poor GSM coverage. Communications
the city of Mondragon. Thanks Radio, GPRS, UMTS, Wi-Fi
to Leica GNSS technology, it Both bridge´s decks (one from
Benefits
was possible to successfully each side of the valley) were built
- Real Time 3D Monitoring of the
complete the manoeuvre of on site by pouring concrete over a
structure
incremental launching of the steel structure. Once the structure - Displacements Calculations compared
bridge´s deck over the pylons was ready, it was pushed over to 3D alignments
with an error of less than 3 the pylons with the method of - Continous hydraulic pushing
centimetres. incremental launching of the deck manouvre thanks to the real time
with the help of hydraulic jacks monitoring and GeoMoS alarms
Using 6 GX1230 GG receivers (5 (incremental launching cycles were - Database storage of all measurements
rovers placed over the deck with 3 meters). In addition to the jacks, - Instant and continuous operation
1 reference on a concrete pillar), the hydraulic system relied on a reports with Leica Alignment
the whole deck structure can be pair of cables that were able to Monitoring
- Easy Monitoring system configuration
monitored in real time while the completely retain the bridge´s deck
and installation and User friendly
manoeuvre takes place. in case of emergency.
software
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
Monitoring Rail Tracks during
Construction of Noise Barriers/HK
Objective
Deformation monitoring due
construction works close to existing
railway tracks
Customer/Institution
MTR (Mass Transit Railway, Hong Kong)
Date
2009 – ongoing
Location
As one of the busiest and most have been built along the tracks Project Summary
crowded rapid transit system in the since 2009. However, before any Instruments
world, MTR (Mass Transit Railway, works started, safety had to be Leica TCA2003 Total Station
Hong Kong) operates high frequency ensured. Since the barriers were Leica Geosystems Monitoring prisms
train services from early morning built very close to the existing Software
until midnight. Due to the noise tracks, deformation due to digging Leica GeoMoS Monitor / Analyzer
of the trains, areas where trains and various works for the con- Web viewer for displaying data and
reports
operate outdoors, like Tai Wai, struction of the barriers might
Communication
suffer significantly from noise have seriously affected the position
Cables
pollution. Serving as the busest of the tracks and subsequently
Uninterrupted Power Supley (UPS)
interchange station in New Territories, train operation. Therefore, an
connecting Ma On Shan Line to automatic deformation monitoring Challenge
East Rail Line, Tai Wai Station and system was implemented so that - Real-time deformation monitoring
Depot are also one of the busiest relevant preventive actions could throughout the construction
hubs for train operation. As resdents be performed if an unpredicted - Maintenance of the prisms and total
move into the newly built residential deformation was detected by the stations in restricted MTR zones
buildings above Tai Wai Depot, real time monitoring system.
the noise pollution problem is Benefits
expected to affect an increased Monitoring System Setup - Continuous and remote monitoring
- The safety of millions of MTR
number of people. The monitoring systems consists
passengers can be ensured round
of six total stations TCA2003, two
the clock
In order to alleviate the noise computers, 23 reference prisms
pollution problem, noise barriers and over hundreds of monitoring
monitoring measurements were
taken continuously in automatic
two-hour cycles using the Leica
GeoMoS software. All monitoring
results were uploaded to the
Internet for instant browsing
and were closely monitored by
surveyors. Any deviated data
would immediately be investigated
by surveyors to check the accuracy.
Messaging System
One of the main purposes of setting
up an automatic deformation
monitoring system was to inform
the responsible staff of a situation
when irregularities occurred in the
construction site. After the monitoring
Control Center of the Monitoring System
positions of the optical prisms are
prisms. The total stations were and power cables respectively. measured, they are compared with
sub-divided into two groups and The two computers were located the set limit levels. If any monitoring
located in Zone 1 and 2 of the in a workstation equipped with data reached or exceeded one of
construction site. Each location Leica GeoMoS software which is the three limit levels, the messaging
for the total stations was selected responsible for the control of the system would immediately be
under various conditions, including sensors, collection and analysis activated. The designated personnel
solid foundations, safe distance of data and the. In addition, both of MTR and the Contractor would
from tracks and high-voltage computers were connected to a be notified by e-mail. The surveyors
overhead lines, and a clear sight web server via broadband internet, in charge would then investigate
to every monitoring and reference so that users can access the the reasons behind the notification
prism. sys-tem remotely. and confirm whether the message
The monitoring prisms were installed was due to faulty equipment, human
at the upper and lower levels of Leica TCA2003 Total Station can error or construction activities.
overhead line masts to check achieve an accuracy of ± 0.5” Additional respective measures
tilting and also on the railway in angle and 1 mm ± 1 ppm in may be taken according to the
sleepers. The reference prisms distance. To achieve good visibility severity of the message, ranging
were distributed around the total for the total stations, clean and from increasing the monitoring
stations so that each total station not fogged prims in the correct frequency to immediate cessation
could measure to approximately position with a constant light con- of all foundation and excavation
six prisms and compute the dition with a dark background and works.
stability and orientation of the no atmospheric disturbance were
total stations. needed. Reporting
An uninterrupted power supply All monitoring data was displayed
(UPS) was provided to each total Data Acquisition in graphs showing and every 24
station to ensure the system could The operation of the automatic hours a report was generated.
overcome any temporary power deformation monitoring systems
shortage. started two weeks before the Maintaining Stability
construction works commenced as Notwithstanding the high precision
The total stations were connected so-called reference or null epoch of the surveying instruments and
to two computers and the UPS in data had to be collected. Throughout careful planning, every component
the workstation via signal cables the construction, the deformation in the system must perform
sturdily to provide reliable data. the instruments be examined for display the monitoring results to
However, maintaining the stability damage or defects on regular the customer.
of such a complex system is never basis, but surveyors also assessed
an easy task. First and foremost, the system for any possible future High Precision: As surveying has
maintenance of the equipment damage caused by other construc- always been renowned for its high
was carried out annually and wear tion activities or improvement accuracy, surveyors strived to
outs and damages were fixed works carried out by MTRC. produce measurements as accurate
during this maintenance period. as possible. However, human
Since most of the instruments Advantages measurements can never be as
were installed along the tracks Continuous Measurements: The accurate as those of machines,
and masts, which belong to the most important reason of imple- especially in a dark environment.
restricted zone, working group menting an automated system was To provide a highly precise moni-
meetings with MTRC were arranged its non-stop measurements taking. tor-ing system, the automatic
to discuss the permitted working In the past, when measurements deformation monitoring system
hours and site possession. Other were taken by manual survey, data minimizes the use of human
than hardware maintenance, collected could be fragmented as labour with the replacement of
calibration of instruments was it was impossible for surveyors to newly developed total stations,
another important element to work all day resulting in incomplete which ensures extremely reliable
maintain stability. The system was analysis and the process was not measurements.
tested prior to installation of the cost-effective. With the automatic
instruments to ensure that they deformation monitoring system, Conclusion
were working and configured comprehensive reports could be The success of the monitoring
properly. From time to time, generated solely by computers system has shown that safety can
during the course of monitoring, and an efficient messaging system be ensured with the help of ad-
the positions of the back sight enables deformation to be vanced technology, especially for
prisms on the total station masts detected at all times. works carried out in a train system
and the selected monitoring target which carries millions of passengers
prisms were checked by manual Remote Monitoring: A considerably every day. Such a flexible yet
survey to verify that the automatic short period of time available for efficient system has demonstrated
measurements had been made track possession was another that safety can be maintained
correctly, as the prisms might have significant constraint for works round the clock and does not
been displaced either acciden- in an operational railway system. necessarily come with interference
tally or naturally. The automatic With surveyors monitoring the to our daily lives.
measurements could be corrected system anywhere via the Internet,
using data from manual system the system could be operated
checks when necessary. At the without interfering with train
same time, all optical prisms were services. Surveyors and other staff
regularly cleaned and checked did not have to travel to the site
for stability, orientation and firm to check for any irregularities and
attachments. In cases of obstruction reports could be seen in just a few
to the sight line of the total stations, clicks.
prisms were relocated to other
stable locations. They would also User-Friendliness: To increase the
be re-installed if they were found efficiency of the system, a user-
loose. Moreover, not only would friendly web interface was used to
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Leica Geosystems TruStory
GNSS Guide System for Pile
Embedding Port of Cádiz (Spain)
Company
Dragados S.A. Spain
Challenge
GNSS Real Time Guidance of the barge
for embedding piles for the construc-
tion of the bridge in the Bay of Cadiz
(Puente de la Pepa).
Date
August 2008
Location
The new Bridge in the Bay of deviation. This software stores the
Cadiz, known as “Puente de la points to stakeout, tolerances and
Pepa” (1812 Spanish Constitution), Coordinate Systems. It is also
was the highest bridge in possible to control the software Project Summary
Europe in 2010. Its 3.1 km using a laptop computer on-board Instruments
length, 180 metres height and the barge. 2 Leica GMX902 GG Receivers
540 metres span makes it a Firstly, the platform is roughly 1 Leica GX1230 GG Receiver
true surveying challenge. positioned close to the final pile 3 Leica AX1202GG Antennas
position. Later it is anchored and Software
Using a Leica GX1230 GG receiver its position is fixed to the seafloor Leica GNSS Spider
Leica Alignment Monitoring
as a reference (GPS and GLONASS) using 2 hydraulic jacks, allowing
Communications
connected to the control centre at for precision positioning. Leica
GPRS
Dragado´s offices, which in turn was Alignment Monitoring software is
connected to Leica Spider Software, able to store a detailed report Benefits
differential corrections were sent of the positioning and stakeout - Rover GNSS receivers on portable
to 2 GMX902 GG (small and full process (1 Hz) in addition to the installation
- GPRS communication between the
performance GNSS receivers). logging (txt file) of the instant
Monitoring Control Centre and the
GNSS Antennas were the reference position.
Support Computer.
points for which navigation and Once the pile´s embedding phase
- Reference GX1230 GG also
stakeout tasks were referred to. A comes to an end, the monitoring transmitting via Radio to the
crane on the barge with a vibrator system can be used in other GX1230 GG rovers.
head places and drives the steel construction tasks: drawers - GX1230 GG very versatile; reference,
casing. Leica Spider software receives guidance (as part of the pylon’s rover, machine guide, surveying...
the signal from the 2 rovers by GPRS, footings), and final structural bridge - User friendly and intuitive Software.
computes the baseline and sends monitoring when finished. For these
the position to Leica Alignment tasks Leica Spider will run together
Monitoring. Coordinates are displayed with Leica GeoMoS, controlling
at 1 Hz with 10-15 mm 3D standard possible displacements, registering
data and displaying graphics.
Leica Geosystems AG
Heinrich-Wild-Strasse
CH-9435 Heerbrugg
Switzerland
Phone +41 71 727 31 31
www.leica-geosystems.com
Whether you monitor the movement of a volcanic slope, the structure of a
long bridge or track the settlement of a dam; whether you measure, analyse
and manage the structures of natural or man-made objects: the monitoring
systems by Leica Geosystems provide you with the right solution for every
application.