PROJECT: PANORAMA APARTMENT COMPLEX DATE: 11/7/2023

LOCATION: LOT #1019 GILL DRIVE, IRONSHORE MONTEGO BAY, ST. JAMES

CARPETRY WORKS (PANORAMA)


Code Unit DESCRIPTION OF TASK rate
1.00 m² ASSEMBLY AND REMOVAL OF FORMWORK TO R.C. BACKUP BOARD FOR FOUNDATION $ 1,000.00
2.00 m² ASSEMBLY AND REMOVAL OF FORMWORK TO R.C. COLUMN FOOTING $ 1,000.00
3.00 m² ASSEMBLY AND REMOVAL OF FORMWORK TO R.C. COLUMN $ 1,000.00
4.00 m² ASSEMBLY AND REMOVAL OF FORMWORK TO R.C. CIRCULAR COLUMN $ 1,125.00
5.00 m² ASSEMBLY AND REMOVAL OF FORMWORK TO R.C. BEAM $ 1,000.00
6.00 m² ASSEMBLY AND REMOVAL OF FORMWORK BACKUP BOARD $ 1,000.00
7.00 ml ASSEMBLY AND REMOVAL OF FORMWORK TO R.C. STIFFNER (2-SIDE) $ 750.01
8.00 ml ASSEMBLY AND REMOVAL OF FORMWORK TO R.C. BELT BEAM (2-SIDE) $ 650.00
9.00 m² ASSEMBLY AND REMOVAL OF FORMWORK TO R.C. FLAT SLAB ROOF $ 900.00
10.00 m² ASSEMBLY AND REMOVAL OF FORMWORK TO R.C. INCLINED SLAB $ 1,250.00
11.00 m² ASSEMBLY AND REMOVAL OF FORMWORK TO R.C. FLAT SLAB ROOF (DOUBLE HIEGHT) $ 1,500.00
12.00 m² ASSEMBLY AND REMOVAL OF FORMWORK R.C. SHEARWALL ONE SIDE $ 1,000.00
13.00 ml ASSEMBLY AND REMOVAL OF PROFILE BOARD $ 200.03
NOTE: …. ALL PRICES ARE IN JMD DOLLARS

APPROVED BY: AGREED BY:

Maikel Bizet
Managing Director General sub contractor