FORM: PF-01-06-020 Rev 00

PF Production Facilities
PROPOSAL #: CLARIFICATION LOG Original Issue Date:

CUSTOMER: Current Issue Date:


MELEIHA GAS TREATMENT PLANT
PROJECT NAME:

Section /
Item Document Paragraph / Comments Originator of
# Number Document Title Clause Revison Date Discipline Clarification Clarification Response SLB Response Response SLB Response SLB Response on 16th June Opened / Closed
Reference

Mechanical

1 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Design life of the skid package shall be 20 years. Vendor to confirm Process Piping schdule and vessel Response is not relevant. Vendor shall confirm to design life Confirmed Noted CLOSED
Technical Offer thickness asp per PMS and Data sheet. specified

Techno commercial proposal / Vendor to confirm clause wise compliance with IOGP S-619, Latest Edition,05490.MAT.MEC.SDS, deviation
2 WT-2361-R0 General 5/19/2023 Mechanical SLB shall be listed seperately in Annex -6 of TR.If there are no deviations please indicate " No deviations" and Ok Noted Noted CLOSED
Technical Offer send the Annex 6 of TR.

Techno commercial proposal / Local load analysis for nozzles and cleats shall be done by using ASME standards and WRC-537/ 297 for all
3 WT-2361-R0 General 5/19/2023 Mechanical SLB process & utilities required or Finite element analysis shall be performed for nozzle or cleats in which the Noted Confirmed Noted CLOSED
Technical Offer
stress values are outside the curve.(Nozzlepro accepted)

4 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Vendor to provide necessary access platform and ladder for the skid packages. Also provide unit price for the Noted offer revised Noted CLOSED
Technical Offer platform and ladder.

5 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB All nozzles connected to piping shall be designed for piping loads as per 05494.ENG.MEC.STD. Noted Confirmed Noted CLOSED
Technical Offer

Techno commercial proposal / One half of the specified corrosion allowance shall be applied to each exposed surface of non-corrosion Corosion allowance are as per the Data Noted
6 WT-2361-R0 General 5/19/2023 Mechanical SLB resistant removable internals.Corrosion allowance for welded CS internal shall be 6mm, 3 mm on either CLOSED
Technical Offer side.Consideration about corrosion allowance has to be given to Carbon steel blind flanges too. sheet and PMS

7 WT-2361-R0 Techno commercial proposal / LP Separator 5/19/2023 Mechanical SLB The gasket shall be alloy SS 316L spiral wound graphite filled with alloy SS 316L inner ring & SS outer ring for Noted Confirmed Noted CLOSED
Technical Offer Vessel flange size up to 24". Gasket dimensions shall be as per ASME B16.20

8 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Noted Confirmed Noted CLOSED
Technical Offer Fasteners are HDG as per ASTM A153. Vendor to confirm

Techno commercial proposal / Vendor to confirm that long term storage packing and preservation suitable for Ground or Sea Shipment is Preservation and packing should be suitable for seaworthy
9 WT-2361-R0 General 5/19/2023 Mechanical SLB included in the scope of supply.'Packing of materials shall comply with 05883.VAR.GEN.SDS Packing for the Vendor confirmed to store for 40 day, transport and suitable for the duration of 12 months from the Confirmed CLOSED
Technical Offer Dispatching of Materials and Equipment which has been attached with TR date of dispatch

BLAST PRESSURE NOT Considered as


The equipment shall be designed to withstand the blast pressure of 0.2 barg which shall meet the technical per data sheet , Kindly note
10 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Considering ​Blasting load will have Blast load is mandatory requirement, Vendor to advice what will LP Separator : Shell Thickness Increased from 20 MM to 25 Noted , Blast presure requirement shall Provide optional price for blast pressure Shirawi: Optional CLOSED
Technical Offer requirements given in 23043.ENG.GEN.PRG Rev.00. However, the blast pressure value will be confirmed MM with 3 mm Cladding with (Impact of 5500 Kg and Cost
during detailed engineering stage impact in the vessel thickness be the thickness impact while considering blast laod
impact )
be finalized after ferah study price provided in the commercial offer.
drastically and has PRICE IMPACT will
be charged to SLB

Vendor shall include Pre-commissioning and start-up spares in base scope and spares for 2 years operation
in optional scope
Techno commercial proposal / Commissioning and Start Up Spare Parts Set
11 WT-2361-R0 General 5/19/2023 Mechanical SLB • 10 % spare bolting for each size, with minimum 5 bolts and 2 Noted Confirmed Noted CLOSED
Technical Offer
nuts per bolts for manholes, nozzles equipped with blind
flanges, body flanges.
• Three additional gaskets for each body flange and for nozzles
with blind flanges
• 10% spare internal bolting for the internals supplied by the
vessel vendor

12 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Design and supply of all the process Internals shall be under vendor scope . Vendor to confirm the scope. Noted Confirmed Noted CLOSED
Technical Offer

13 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Internal fasters shall be SS316. Vendor to Confirm Noted Confirmed Noted CLOSED
Technical Offer

14 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB A36 structural material is not acceptable. Vendor to Confirm Noted Confirmed Noted CLOSED
Technical Offer

Techno commercial proposal / Both Indian and Chinese origins are restricted for raw material, casting, manufacturing, and assembly. Only Process Internals are from India ,
15 WT-2361-R0 General 5/19/2023 Mechanical SLB other materials are non china and non To be discussed further Noted Alshirwi Confirm Change in Indian Origin to UAE CLOSED
Technical Offer Vendor to confirm india

16 WT-2361-R0 Techno commercial proposal / Electric Heater 5/19/2023 Mechanical SLB Vendor to confirm clause wise compliance with IOGP S-723,, deviation shall be listed seperately. in Annex -6 Noted Confirmed CLOSED
Technical Offer of TR.If there are no deviations please indicate " No deviations" and send the Annex 6 of TR.

Vendor to provide material in ASME


Vendor shall provide MOC for the following designation
Techno commercial proposal / 1.Tube sheet Tube Sheet - CS Tube Sheet-SS316L Tube Sheet - Vessel- SA 105/A 106 Gr B
17 WT-2361-R0 Electric Heater 5/19/2023 Mechanical SLB 2.Element Sheath Baffles & Tierod - CS Confirmed and Offer revised Baffles & Tierod - SS 316L CLOSED
Technical Offer 3.Baffles & Tierod Gasket - SPWG Baffle/Tie Rod -SS316L Gasket - SPWG-SS-316L/Graphite
4.Gaskets Element and Sheeth- SS 316L

18 WT-2361-R0 Techno commercial proposal / Electric Heater 5/19/2023 Mechanical SLB Vendor to provide Element type for heater SS Please specify grade SS 321 Noted CLOSED
Technical Offer

Vendor shall provide Following Element Details


1.No of Active
19 WT-2361-R0 Techno commercial proposal / Electric Heater 5/19/2023 Mechanical SLB 2.No of Spare Noted CLOSED
Technical Offer 3.Diameter Will confirm the same during post
4.Active U award
5.Element Load

20 WT-2361-R0 Techno commercial proposal / Electric Heater 5/19/2023 Mechanical SLB Heater elements shall be constructed from 80/20 NiCr resistance wire surrounded by compacted magnesium Noted & confirmed Noted CLOSED
Technical Offer oxide powder. Vendor to confirm

21 WT-2361-R0 Techno commercial proposal / Electric Heater 5/19/2023 Mechanical SLB Spare withdrawable heater elements shall be supplied loose, For non-withdrawable heater elements, a Confirmed Noted CLOSED
Technical Offer minimum of 10 % spare elements shall be installed

22 WT-2361-R0 Techno commercial proposal / Electric Heater 5/19/2023 Mechanical SLB Vendor shall provide At least two temperature detectors attached to separate heater elements shall be Confirmed. All instrument as per P&ID Noted CLOSED
Technical Offer provided per heater bundle

23 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Vednor to fill and submit compliance sheets which is attached along with the TR as Appexindix -9 & 10 Already submitted Noted CLOSED
Technical Offer

24 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Painting & coating requirements shall be as per 29001.ENG.CPI.STD , 27591.ENG.CPI.SDS & Confirmed Noted CLOSED
Technical Offer 20000.VAR.PAI.FUN

25 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Vendor shall provide adequate supports and temporary reinforcement in order to avoid deformation of the Confirmed Noted CLOSED
Technical Offer equipment during transportation as well as necessary instructions for site removal of the same.

26 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Vendor has to consider PWHT as per Code. Venndor to confirm Confirmed Noted CLOSED
Technical Offer

27 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Vessel shall be checked for future hydrotest in erected position and in corroded condition during detail Confirmed Noted CLOSED
Technical Offer engineering stage. Vendor to confirm

28 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Vendor to provide type of supports for the Fuel Gas Filter separator. Will provide during engineering and Not provided in the offer Leg or Skirt type support, Offer revised Noted CLOSED
Technical Offer post award

Following data’s as applicable shall be filled as per the templates provided in 20203.DOC.GEN.SDS.
• Design Data
• Engineering List data
29 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB • Equipment Characteristics Will provide during engineering and Vendor to provide compliance at this stage Comply Noted CLOSED
Technical Offer • Vendor and Manufacturer data post award
• Cable route, Bulk material, MTO, Piping & Supports
• Documents & 3D model Data
Vendor shall also fill other necessary attachment indicated in 20203.DOC.GEN.SDS as necessary.

CPS - Project Delivery System 000000Page 1 of _x000D_#000000Schlumberger-Private CPS-F-7.1-007 Rev 02


Vendor shall provide compliance to the following LCI documents
1.6219.VAR.LCI.STD
2.28081.VAR.LCI.STD
30 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB 3.20198.VAR.LCI.STD Will provide during engineering and Vendor to provide compliance at this stage Comply Noted CLOSED
Technical Offer 4.28080.VAR.LCI.STD post award
5.27982.VAR.LCI.STD
6.20203.VAR.LCI.STD
7.27914.VAR.LCI.STD

31 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB P&ID Drafting shall be as per PF-W-01-06-118(Engineering Autocad Drafting Guidelines) Confirmed Noted CLOSED
Technical Offer

32 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Seismic loads on steel structures/equipment according to UBC-97, Zone Factor (2A) or Peak Ground Confirmed Noted CLOSED
Technical Offer Acceleration (0.15g) as per UBC 1997. Importance factor to be considered is 1.5, Soil type SB.

33 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB 3D model requirements shall be as per PF-0009.SLB.PI.PRO.0002 (3D Model Setup and Modelling Procedure) Confirmed Noted CLOSED
Technical Offer

Vendor to provide Unit rate for addition & deletion of nozzles for all size ranges from 2” to 24” 150#, 300#,
600# and 900#
34 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Separate rates for the following category shall be furnished: noted, pls refer our commercial offer Noted CLOSED
Technical Offer Nozzles with and without blind flanges and include stud with two nuts, service gasket and commissioning
spares for bolts, Nuts & Gaskets shall be considered for Nozzles with Blind flange.

Transportation load shall be as follows


Acceleration due to Road Transportation

Acceleration due to Sea Transportation

35 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Confirmed Noted CLOSED
Technical Offer

36 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Flange rating to be checked and confirmed by vendor for piping external loads as per UG-44 of ASME Sec. VIII Noted and confirmed Noted CLOSED
Technical Offer Div.1 Latest Edition

Techno commercial proposal / Vendor shall provide suitable lifting trunnion/lug design considering load factor 1.5. All the force and
37 WT-2361-R0 General 5/19/2023 Mechanical SLB moment acting on the internal/external attachments welded to the vessel including lifting trunions,platform Noted and confirmed Noted CLOSED
Technical Offer
support clips,piping support clips shall be analysed in accordance with WRC 537 or 297 .

38 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB NDE shall be carried out in accordance with the relevant standard (ASME VIII Div.1) and IOGP S-619Q, Noted and confirmed Noted CLOSED
Technical Offer 05490.ENG.MEC.STD which ever is more stringent

39 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB All instrument nozzles shall be 300# rated minimum. All nozzles 2" and below shall be Long weld neck type. Noted and confirmed Noted CLOSED
Technical Offer Vendor to confirm complaince

When vertical vessels are shop hydrotested in the horizontal position the hydrotest pressure shall be
40 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB increased by the static head that would have been experienced in the vertical. All vertical vessels shall be Noted and confirmed Noted CLOSED
Technical Offer designed to permit a full hydrotest in the vertical position with the vessel fully corroded and subject to 25%
of the design wind load

41 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Bidder to specify the empty weight, operating weight and hydrotest weight of complete package. Bidder to Noted will provide post award Noted CLOSED
Technical Offer advise plot area requirement or overall skid size for all the skids

Not received in the revised offer. Vendor to submit the following 1.Noted & Closed
Following needs to submitted with the revised offer - Typical ITP Noted, vendor to submit along with the 2.Vendor to sign and submit VDRL which is attached along
42 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB - Typical ITP Noted will provide post award - Commented VDRL ( Vendor Document Register List) attached Comply revised offer -Attached along with the with TR. Vendor to sign and submit VDRL which is attached along with CLOSED
Technical Offer - Commented VDRL ( Vendor Document Register List) attached along with TR along with TR offer for SLB review 3.Deviation list missing, please provide the same , if any TR. : Al Shirawi Response : Document Signed and Sent
- Deviation List - Deviation List deviations taken-Shirawi: Deviation list attached along with
the TR response.

Bidder to specify the Shipping weight and Shipping dimensions for each equipment.
The following maximum limits shall be considered during transportation: 1. Manifold : 8 -10 Mtr Lg x 2.5 to 3 Mtrs W x 2.5 Mtr H
43 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB Max Width: [6.5 m] Noted will provide after post award Not acceptable, Vendor to provide dimensional details at this 2. Fuel Gas : 10 Mtr Lg x 3 Mtrs W x 4 -5 Mtr H Noted CLOSED
Technical Offer Max Length: [14 m] stage Heightof the skid in no case shall exceed 4.5 m 3. Separator : 16 Mtr Lg x 5 Mtrs W x 5 Mtr H
Max Height: [5.5m] From top of the road to bottom side of Bridge (Metioned dimensons are approximate)

Vendor to refer commented offer and revsie the offer accordingly.


Also Following Revised datasheets are attached along with TQ. Vendor to confirm compliance to the same.
1. LP Separator
44 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Mechanical SLB 2. Fuel gas Scurubber Noted and confirmed Noted CLOSED
Technical Offer 3. Fuel gas Filter separator
4. Fuel gas superheater

Vendor to provide preliminary P&ID for fuel gas package Will be submit on 6th june2023 P&ID not received yet- Attached along CLOSED
with the offer for SLB review

All Technical deliverables submission from vendors shall be


accepted by SLB only through ACONEX (SLB EDMS System) PF-W- Comply Noted CLOSED
01-14-001 EDMS.

Name plate shall be as per 07001.ENG.MEC.SDS, Vendor to Confirm CLOSED


confirm

Vendor to fill and provide compliance for following IDS


(Inspection data sheets)
1.Vessel-(PRV101E5) Complied CLOSED
2.Filter-(FIL101E1)
3.Piping -(PLI129B2 & TUB107B1 )

Vendor to Provide following preliminary details ;


1.Fuel Gas Skid Dimentsions CLOSED
2.Fule Gas Skid Weight
Al Shirawi : Detail Provided

Vendor to fill Highlighted points in the complinace


(Production Separator & Fuel gas Skid Package) sheet which is CLOSED
sent along with the this TQs
Al Shirawi : Filled and Complied

45 QUALITY

46 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Quality SLB All plate used to fabricate vessel pressure parts shall be supplied in the normalised heat treated condition for Noted and confirmed Noted CLOSED
Technical Offer all thickness

47 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Quality SLB Radiography shall be by X-ray with fine grain, high contrast film type, unless otherwise agreed Radiography : Gamma Rays Radiography shall be carried out with Xrays as specified in ENI Complied and Offer revised Noted CLOSED
Technical Offer specifications

CPS - Project Delivery System 000000Page 2 of _x000D_#000000Schlumberger-Private CPS-F-7.1-007 Rev 02


48 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Quality SLB As a minimum, NDE operator shall be certified to ASNT-TC-1A, Level II, with interpretation by supervisors Noted and confirmed Noted CLOSED
Technical Offer certfied to Level III, with interpretation by supervisor certfied to level III or an approved equivalent.

49 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Quality SLB 28077.ENG.COR.STD PMI as applicable shall be complied by vendor. Vendor to confirm. Noted and confirmed Noted CLOSED
Technical Offer

50 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Quality SLB MRB shall be prepared following as per client specification 27982.VAR.LCI.STD Noted and confirmed Noted CLOSED
Technical Offer

The chloride content of the test water used for equipment with austenitic stainless steel or Ni-Cu alloy
51 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Quality SLB materials that is exposed to the test fluid shall not exceed 50 mg/kg (50 parts per million by mass). Upon Noted and confirmed Noted CLOSED
Technical Offer completion of the hydrostatic test, the equipment shall be promptly drained. Test certificate to be provide
by the vendor.

52 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Quality SLB After hydrostatic testing, all exterior pressure-retaining welds and all interior nozzle welds that are Noted and confirmed Noted CLOSED
Technical Offer accessible without disassembly shall be examined by the magnetic-particle or liquid-penetrant method.

53 WT-2361-R0 Techno commercial proposal / General 5/19/2023 Quality SLB Vendor to comply with inspection and testing requirements of IOGP S-723 of clause 09 for eletric process Noted and confirmed Noted CLOSED
Technical Offer heaters

54 Electrical
Bidder shall provide compliance to the following Eni specifications (as applicable). In case it is not possible to
fully comply with ENI specification then Bidder shall clearly indicate the deviation taken by justifying the
55 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB reason and alternate offer. Alternate offers to project specifications shall be best in the industry. Noted CLOSED
i) Electrical System Design (Eni Specification: 20208, Rev. 13 )
(ii) IOGP S-723 “Specification for Electric Process Heaters”.
(iii) 29001.ENG.CPI.STD - Paintings and Coatings for Onshore Facilities
56 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB Bidder to note that the bidder-supplied equipment shall be compatible to operate in the facility power Noted CLOSED
supply of 400V AC +/-5%, 50Hz +/-2% (three phase) and 230V AC +/-5%, 50Hz +/-2% (single phase).

all SS JB's are Exe . all nickel brass gland is Exd/Exe. Heater
57 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB All the electrical equipment shall be suitable for the hazardous area classification of Zone-2 IIA/IIB T3. Noted and Confirmed All Ex protection shall be as per electrical basis of design 20208. and its termination box is Exd. heater control panel is safe Noted. Cable gland shall be Ex"db""eb". Bidder to revise the offer accordingly. Noted and Closed CLOSED
Bidder to provide Ex protection details for approval. zone .all lights are Exd . light pole JB is Exe Bidder to provide compliance.- Comply

(i)All internal earthing and cabling within the package shall be done by the bidder. Earthing connection to the
58 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB plant earth grid shall be done by SLB. Noted and Confirmed CLOSED
(ii) Bidder to consider the cable trays and required supports within the skid in their scope.

(i)The cable sizes for the heaters shall be given during the detailed design. Bidder to arrange the termination
box of the heater accordingly. If Intermediate junction boxes are required for the termination, Bidder shall
consider it in their scope.
59 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB (ii) All equipment's inlcuding heaters shall be suitable for termination of cables via double compression, Noted and Confirmed CLOSED
explosion proof cable glands. Bidder shall note the same and consider the design of all equipment's
accordingly. Cables are not terminated by using conduits (FYI).
(iii) Cable glands and all the accessories required for the termination shall be under the bidder's scope.

(i) Noted, However, bidder to clarify the discrepancy in the


(i) Bidder provided load list consisted of INSTRUMENT loads load details of the TCP as the load of the TCP is mentioned as
only. Bidder to submit the preliminary electrical load list 341 kW in the page no-5 of the offer and the same is
Bidder to provide the utility load list and UPS load list with the required number of feeders corresponds to Load list and feeder details are required in bidding stage. Bidder Bidder to provide response.- Load list required for each package including UPS power feeders. mentioned as 255kW in the load list.
60 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB each skid. Noted and Confirmed (ii) Bidder to note that the power supply available in the plant (ii) Bidder to note that the power supply available in the plant CLOSED
to provide. provided in the offer for SLB review is as per point no-56. All other voltage levels required for the is as per point no-56. All other voltage levels required for the
bidder's supplied equipment shall be distributed internally by bidder's supplied equipment shall be distributed internally by
the bidder., Al Shirawi Load list Provided in the Offer the bidder. Bidder to provide compliance.
Al Shirawi : Complied
(i) Bidder to provide a detailed GA drawing with heaters in the revised offer.
(ii) Bidder to provide the deliverables list in the revised offer.
61 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB (iii) Bidder to include the following deliverable in the VDRL; termination diagram, datasheet for heaters and Noted will provide post award Noted. Please clarify item 4. item 4 :Typo Error, Offer corrected Noted and Closed. CLOSED
thyristor control panel, cable and cable routing diagram within the package, lighting, and earthing layout
within in the package, single line diagram and panel wiring diagram of Thyristor control panel etc., Bidder to provide the details of TCP Bidder to provide the response.Shirawi:Control panel
(iv) Bidder
Bidder to clarity
to provide thewhat is "PMS"
necessary listedofunder
details the list
Thyristor of client
Control free
Panel issue
such items.
as IP rating (including heater), heat These details are required for approval and Ehouse design. such as heat dissipation value of the dissipation value :2KW. Weight 250Kg. Dimensions
62 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB Noted will provide post award TCP is IP54 and heater is Exd panel, weight of the panel, clearance Noted and SLB shall provide two power feeders with a rating ofCLOSED
341 kW for the input power supply of the T
dissipation, weight, etc., Bidder to provide now. required for the panel when installed in 1000x500x1800mm. Clearance distance to safe zone
minimum 10 meters.
the safe zone, etc.,

63 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB The painting for the electrical control and protection boards and panels shall be Light grey (RAL7035) for Noted and Confirmed CLOSED
structures and Blue (RAL5017) for doors.

It is understood that there are three skids in the package. As per the offer, we understood the following
power supply requirement.
(i) Single point power supply for Lighting JB in LP Separator skid, Bidder to distribute all other voltage levels
within the skid from the lighting JB.
(ii) Single point power supply for Lighting JB in Inlet manifold skid, Bidder to distribute all other voltage levels
within the skid from the lighting JB. Bidder to provide the point-wise
(iii) Bidder to submit the single line diagram for power distribution philosophy for the Thyristor control panel power Cable between Heater and for light JB in all 03 skids 230VAC 50 Hz required individually . response. Bidder to note that the
and heaters at this stage. Thyristor control panel E-House (Safe TCP is in safe zone . TCP main power given by SLB . from the terminals of the heaters shall be Bidder to provide the response.: Al Shirawi Confirem and SLB understands that the bidder provided the compliance for CLOSED
64 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB (iv)Single point power supply shall be given to Thyristor control panel (supplied by Bidder) which shall be Area) is in SLB Scope, HEAT TRACING Bidder to clarify point wise. designed based on the cable sizes
TCP there is 4C power cable connected to heater . it is also is Complied all the listed out points in Column 'H' and Column 'L'.
located in E-House (Safe Area). Bidder to advise the number of heaters and power feeders required from the EXCLUDED , SLB to advise if required for in SLB scope . provided during detailed engineering
Thyristor control panel to the heater. Single point power supply from TCP to Fuel gas heater shall be by SLB. the package. phase. Terminations of cable on the
(v) Single point power supply for Lighting JB in Fuel gas skid, Bidder to distribute all other voltage levels heaters shall be done by the bidder.
within
(i) thetoskid
Bidder frominthe
clarify lighting
detail whatJB.
type of Ex"e" protection is provided for the lighting JB. 1) light pole JB is GRP and Exe . 2) LP seperator having 03 Exe Bidder to provide the response as point- Bidder to provide the response.Shirawi: updated in the Offer is not updated for the glands. Bidder to provide the
65 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB (vi)Bidder
(ii) Biddertotoclarify
includeinheat tracing
detail if required,
that the followingwithin their package
is applicable under
to all the skid;their
"Ex escope. Bidder
ss analog to consider
JB with thed
cable, Ex Noted Bidder to clarify point wise. SS JB . manifold having 02 Exe SS JB . Fuel gas having 03 SS Exe wise. response for the points in Column 'H'.Al Shirawi : Updated CLOSED
required technical offer
glands, SSfeeders from Earth
cable trays, bidder-supplied JB for the heat tracing.
and cable ties". JB . all 03 skdis having Exd gland , SS tray , earth and tie . and Confirmed
(vii) Bidder to include cathodic protection if required, within their package under their scope. Bidder to
consider the required feeders from bidder-supplied JB for the cathodic protection.
66 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB FRP type Sun shade is not acceptable. Bidder to provide the sunshades made of SS316L. Noted It is not updated in offer. Vendor shall update SS Sun shade updated Noted and Closed. CLOSED
67 WT-2361-R0 Technical Offer General 5/19/2023 Electrical SLB Bidder to include all the bulk items required for lighting for all three skids in their scope. Noted CLOSED

68 Civil and Structural

Vendor to provide the following details during Detail Engineering stage. This is part of base scope.
Skids BLAST PRESSURE NOT Considered as
* Loading Table (Dead, Live, Operating, test, Wind, Seismic, Blast etc.,) for Foundation design (within 2 per data sheet , Kindly note
weeks after PO award) Considering ​Blasting load will have Structural skid design is in bidder scope. Please refer to the optional price provided in the technical Not Caputed in Latest offer, vendor to update the lastest
69 WT-2361-R0 General 5/19/2023 Civil & Structural SLB * General Arangement and details of skid (within 2 weeks after PO award) Vendor to provide optional quote for blast Civil and Structuraaal NOT In our Scope Bidder to consider optional quote for offer accordingly CLOSED
impact in the vessel thickness offer
* Lifting details of skid drastically and has PRICE IMPACT will blast pressure 0.2 barg. Al Shirawi : Offer Updated
* Connection details be charged to SLB
* Foundation Anchor bolt arrangement.
* Structural design calculation note

70 WT-2361-R0 General 5/19/2023 Civil & Structural SLB Vendor to include the basic General Arrangement (GA) drawing in the proposed quote. Noted and Confirmed Noted Closed

71 WT-2361-R0 Material of construction Table 1.D 5/19/2023 Civil & Structural SLB Structural material is of S275JR, Euopean steel sections preferred Noted and Confirmed Noted Closed

Vendor to follow Anchor Bolt grade and design as per attached specification.

72 WT-2361-R0 Anchor bolt 1.A 5/19/2023 Civil & Structural SLB Noted and Confirmed Noted Closed

73 WT-2361-R0 General 5/19/2023 Civil & Structural SLB Steel gratings, chequered plates, ladders, stairs treads, Handrails and toe plates shall be hot dip galvanized. Noted and Confirmed Noted Closed
All bolts, nuts and washer shall be hot dip galvanized.

74 WT-2361-R0 General 5/19/2023 Civil & Structural SLB 1. Vendor to provide information about type of deck plate and its grade. Galvanized Grating Noted Closed
2. If chequered plate, to be hot dip galvanised.

BLAST PRESSURE NOT Considered as


per data sheet , Kindly note
Vendor to provide optional quote for Considering ​Blasting load will have For reply, refer point 69.-Blast Pressure
75 WT-2361-R0 General 5/19/2023 Civil & Structural SLB 1. Design for blast (Blast Overpressure of 0.14 bar with 60 ms duration) as specified by Process safety. Vendor to provide optional quote for blast and passive FP Civil and Structuraaal NOT In our Scope for structure can be included with Closed
impact in the vessel thickness
2. Passive fireproofing, Fire proofing type shall be Fendolite or similar. drastically and has PRICE IMPACT will additional cost of USD 4000
be charged to SLB

Vendor to perform all necessary Analysis during Detail Engineering (In-place, Transport, Lifting Analysis etc.,) Noted will provide during detail
76 WT-2361-R0 Structural Analysis for the skid Notes: 5/19/2023 Civil & Structural SLB and design the skid, supports, platforms, steel structure for the critical combinations and submit Structural engneering Noted Closed
calculations to SLB before fabrication. This is part of base scope.

77 WT-2361-R0 Spreader Bar with Lifting Sling Notes: 5/19/2023 Civil & Structural SLB Lifting lug calculation shall be provided by vendor. Noted will be provided Noted Closed

CPS - Project Delivery System 000000Page 3 of _x000D_#000000Schlumberger-Private CPS-F-7.1-007 Rev 02


Vendor to comply with the attached standard drawings.

78 WT-2361-R0 General 5/19/2023 Civil & Structural SLB Noted and Confirmed Noted Closed

As per latest BOD, Soil type is SB.


79 WT-2361-R0 General Seismic 5/19/2023 Civil & Structural SLB Based on seismic input, maximum design seismic shear coefficient to be determined by vendor and seismic Noted and Confirmed Noted Closed
froces to be calculated.
80 Process Safety

WT-2361-R0 ASECO - Technical Offer Agiba Skid General Process Safety SLB Bidder to comply accessibility / maintenance space requirements as per 28042.DOC.GEN.SDS_Rev.0 ,
Package Onshore Layout Engineering Guideline,
Maximum horizontal walking distance from any point on platform to exit point shall be limited to 12m.
Maximum length of dead-end platforms shall be limited to 6m.
81 5/19/2023 A minimum of 2 escape routes shall be provided in platforms greater than 18 m2 in area. Noted and Confirmed Noted CLOSED

WT-2361-R0 ASECO - Technical Offer Agiba Skid General Process Safety SLB Support for installing F&G Detectors (wherever required) and Deluge Water Spray System shall be included
Package in Bidder's Scope. 3D Modelling of F&G Detectors and Deluge System shall also be included in Bidder's Bidder to provide the cost for both the
82 5/19/2023 Scope. Support included for F&G dectors Procurement of F&G is excluded from Bidder's Scope. CLOSED
( Supply of F&G are NOT inclided ) Options:
Option 1: Vendor to perform light
Fireproofing is required for LP Separator. Fireproofing Cementoius Product NOT Recomended for transportation, weight cementitious FP at site- Vendor
83 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Process Safety SLB Fireproofing (if any) is by Others however vendor shall provide optional quote for the same. Bidder to Fire proofing NOT included, details to requirement (if any) for FG Skid / Inlet Manifold will be provided Hence we are propsing Epoxy Intumescent fire Proofing on dose not have site application facility, Noted CLOSED
Package include primer/cleats in their scope. The details will be shared later after the award of project. be provided by SLB by SLB after the receipt of FERA Report. Bidder to include FP in saddle and Approximated price 410 USD per SQ MTR hence SLB to consider the same while
WT-2361-R0 ASECO - Technical Offer Agiba Skid General Process Safety SLB 3D Model in DGN file format is required after the award of project for carrying out F&G Mapping Study. Optional Quote. considering for the overall facility PF
84 Package 5/19/2023 Noted Noted Option 2 : Vendor to provide total cost CLOSED
for Epoxy type FP.- Optional price is
WT-2361-R0 ASECO - Technical Offer Agiba Skid General Process Safety SLB Bidder to confirm the below compliance: provided in the offer.
Package
* The maximum permissible noise level (sound pressure level) at a distance of 1m from noise generating
equipment / control valves etc. shall be 85 dB (A)
* The maximum permissible noise level (sound pressure level) at a distance of 1m from Relief Valves shall be
85 5/19/2023 110 dB (A) Will confirm during engineering stage Noted Comply Noted CLOSED

86 Piping

87 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Piping SLB Noted and confirmed
Package Fuel Gas Filter equipment tag number to be corrected "004200CQ640" Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package All equipment and piping shall be neatly arranged on the skid in such a way that they do not obstruct
88 5/19/2023 Piping maintenance operations. The Contractor shall work closely with the Company to ensure that the most Noted and confirmed
maintenance-effective layout is achieved for the package.
Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
89 Package 5/19/2023 Piping Valves shall not be located on overhead pipe runs. Valves shall be preferably located on horizontal pipe runs Noted and confirmed
and, only when strictly necessary, on vertical pipe runs. Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package
90 5/19/2023 Piping The criteria for the selection of gaskets shall take into consideration the following. Noted and confirmed
a. Spiral wound metal-plastic gaskets are adopted for class rating 150, 600 and 300.
b. Ring-joint gaskets are largely adopted for class rating 900 and over. Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package
91 5/19/2023 Piping Noted and confirmed
All type of strainer shall comply with COMPANY TECHNICAL STANDARD Y-STRAINERS, TEEs AND TEMPORARY
STRAINERS 15701.ENG.PIP.STD Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
92 Package 5/19/2023 Piping Pipe stress annalysis shall be as per project document PF0009-SLB-PI-DBP-0002, Pipe stress analysis design Noted and confirmed
criteria Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package All 3D model shall be doen using AVEVA E3D 3.1.6, all files
extension .RVM (in text format), .RVM (BINARY format) and .ATT
3D Model shall comply 3d model review procedure , and 3d model review procedure developed during (in text format only)
93 5/19/2023 Piping detail engineering and all the Tags shall comply tagging Procedure and Facility functional unit of Eni Noted and confirmed 3D model Shall be ready as per the checklist reported in the Comply
Standards . 3D model with intelligent line number identification/ tag in the form of Step file and Native files attachment of 3D model review procedure
shall be shared with contractor as part of LCI requirements The consolidated 3D model project back-up shall be handed over
to COMPANY in as-builtstatus, in native format and complete
with instructions to reuse.
Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package Additional platform and stairs for all the packages from the grade considering 300mm foundation + Skid base Noted and confirmed
94 5/19/2023 Piping
frame height (approx.) with handrail requirements if any shall be followed as per Eni standard and shall be
provide by Vendor Closed
95 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Piping SLB Noted and confirmed
Package Vendor shall Provide the GAD with scope split, P&IDS Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB Paintings And Coatings for Onshore Facilities shall comply 29001.ENG.CPI.STD & 27591.ENG.CPI.STD,
96 5/19/2023 Piping EXTERNAL COATING FOR CORROSION 20550.ENG.CPI.STD Noted and confirmed Closed
Package
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package
97 5/19/2023 Piping Noted and confirmed
Insulation shall comply company standard THERMAL INSULATION FOR HOTTEMPERATURE SERVICE
03653.ENG.CPI.STD THERMAL INSULATION FOR COLD SERVICE03652.ENG.CPI.STD Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package

98 5/19/2023 Piping For skid packages whose overall installed height exceeds the maximum permitted shipping Noted and confirmed
dimensions(inclusive of packaging), CONTRACTOR shall consider appropriate shipping break points and shall
design structural, piping and instrument/electrical interfaces to minimize the complexity of reassembly at
site. Temporary bracing required for shipment shall be clearly identified as such and is included in
CONTRACTOR scope. Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package
99 5/19/2023 Piping Noted and confirmed
Layout of skid packages will permit the removal of vessel internals, strainers (with the exception of
commissioning strainers), pumps, motors, control valves and other in-line instruments without the need to
remove other skid mounted piping, equipment, instruments, valves etc. Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package All skid package piping tie-in points shall terminate with an appropriate ASME B16.5 flange. All piping
100 5/19/2023 Piping terminations shall be anchored at skid edge and orientated to facilitate simplified connection to the main Noted and confirmed
site pipe-rack Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package

101 5/19/2023 Piping All the Equipment, Valves, Instruments, Displays & Panels shall be accessible from the standing surface Noted and confirmed
(horizontal reach shall be within 0.45m). Adequate maintenance space needs to be considered for standing
& squatting/kneeling position as appropriate. The walkway width shall be minimum 0.9m with headroom
clearance of 2.1m. Dead end more than 6m shall be avoided. Bidder to comply the layout requirements from
Company Standard (28042.ENG.PIP.PRG-Onshore Layout Engineering Guideline) as appropriate. and Project
specific Piping design basis will be shared during detail Engineering PF0009-SLB-PI-DBP-0001 Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package
Vendor to include following as part of documentation
1.Piping GA ans isometrics to be included as part of submission for approval
102 5/19/2023 Piping 2. Vendor to include 3D Model for Customer Review and Approval Noted and confirmed
3. MTO for piping bulk item/ valves to be provided
4.Stress critical line list with P&ID mark up
5.Stress Analysis Report
6.Pipe support MTO
7.Pipe support index Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
103 Package 5/19/2023 Piping Vendor shall comply Eni standard /Project specific thermal insulation specification developed during Detail Noted and offer revised
engineering Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
104 Package 5/19/2023 Piping Vendor shall comply Eni standard Pipe class & Project specific Pipe material specifiaction, manual valve Noted and confirmed
specification Developed during detail Engineering Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package
105 5/19/2023 Piping Noted and confirmed
Few Pipe Class has Size lmitations.Vendor to follow min . Pipe Size as per the ENI/Project specific PMS
developed during detail Engineering Closed
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package 1.Threaded connections shall not be used unless where permitted by Company requirements.
106 5/19/2023 Piping Noted and confirmed
2.Socket weld type connections (including slip on flanges) are forbidden for hydrocarbon service and sour
Piping,
service shall
(e.g. comply
sour gas,with
sourCompany piping
production classes 06732.ENG.PIP.STD, Pipes and Piping Components for
water) Closed
Plants 05892.ENG.PIP.PRG and project specific PMS PF-0009-SLB-PI-SPC-0001.The final material selection
107 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Piping SLB
shall be subject to the Company approval. Noted and confirmed Closed
Package Valves shall conform to the Company Piping Classes : 15801 - “Manual Valves” and Project Specific Manual
108 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Piping SLB
valve specification PF0009-SLB-PI-SPC-0002. Gaskets for Flanged Joints shall comply 14365.ENG.PIP.STD Noted and confirmed Closed
Package
WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
109 Package 5/19/2023 Piping Noted and confirmed
Pipe supports shall be as per project document PF0009-SLB-PI-SPC-0003, PIPE SUPPORT STANDARD DETAILS Closed
110 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Piping SLB
PWHT is mentioned as NA. Vendor to consider PWHT requirements as per the applicable design code. Noted and confirmed Closed
Package
111 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Piping SLB
Vendor to confirm compliance to IOGP S-563 specifications. Noted and confirmed Closed
Package
The below highlighted items are in exclusions. Vendor need to include the same in their scope.

112 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Piping SLB
Package

Noted and confirmed Closed

CPS - Project Delivery System 000000Page 4 of _x000D_#000000Schlumberger-Private CPS-F-7.1-007 Rev 02


WT-2361-R0 ASECO - Technical Offer Agiba Skid General SLB
Package

113 5/19/2023 Piping Noted and confirmed


RAL codes not amatching as Client specifications. Vendor shall follow as per Paintings And Coatings for
Onshore Facilities shall comply 29001.ENG.CPI.STD & 27591.ENG.CPI.STD, EXTERNAL COATING FOR
CORROSION 20550.ENG.CPI.STD Closed

114 Process

115 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Process SLB Vendor to revise design pressure as per PF0009-SLB-PR-GLN-0001_Process Design Criteria Noted and confirmed - Closed
Package

116 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Process SLB The fuel gas skid to be designed for turndown capacity of 1.7 MMSCFD. This is a preliminary value, SLB will Noted and confirmed - Closed
Package confirm during detailed engineering.

117 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Process SLB Vendor shall not consider any chloride contamination in hydrocarbon gas supplied to fuel gas skid. Refer to Noted and confirmed - Closed
Package revised datasheet.

Package design for design pressure 27 As per our response to P&ID clarifications, the max operating
barg & design temp. 97.0°c. temperature the control valve and d/s isolation valve will be
exposed to is 150°c. Therefore, vendor to revise design pressure.
Sales gas compressor to pressure
control valve d/s first isolation valve line
(including valves) to be designed for
44.0 barg and 90.0°c

As disscussed, SLB has withdrawn our


response. Expected startup up line
operating temperature will be 40 degC.
Noted and 150 °c design temp. considered up to the first Vendor to consider DPDT as per design
isolation valve of the SALES GAS COMPRESSOR pressure criteria.
control valve. Noted on heater upstream and
ASECO - Technical Offer Agiba Skid Battery limit conditions and gas compositions are attached. Supply pressure and temperature during startup Heater upstream design temp. is 85.0°c and downstream downstream design temperature
118 WT-2361-R0 General 5/19/2023 Process SLB CLOSED
Package shall be 30 barg and 105 degC max. Vendor to ensure compliance with the provided data. design temp. 105­°c.
Note on design capacity

Process condition revised to 18.5 MMSCDF and awaiting reply As per our latest simulation, duty of
from SLB for Revised Heater Capcity each superheater is 296 kW (2 x 50%).
For the package design conditions, agreed on design pressure. However, Vendor shall calculate heater
However vendor to advise on design temperature upstream and duty during detailed engineering phase
downstream of Fuel Gas superheater. such that Fuel gas is superheated 28 °C
above HC dew point

119 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Process SLB Revised preliminary Fuel gas P&ID is attached for reference. Closed
Package
Noted and considered. -

120 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Process SLB Heat conservation insulation shall be provided for pipeline downstream of Fuel gas superheater Closed
Package
Noted and considered. -

121 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Process SLB Attaching revised preliminary P&ID for Inlet manifold skid and LP separator package for vendor reference. Closed
Package
Noted. -

Should conflict arise between the statements of different rules, codes or standards, the following list order
of precedence shall be respected:
1. Statutory Requirements (Acts);
2. Egyptian Laws and Regulations;
ASECO - Technical Offer Agiba Skid 3. “CLARIFICATIONS / INSTRUCTIONS” REGISTER AND OTHER INDICATIONS BY COMPANY DURING BIDDING
122 WT-2361-R0 General 5/19/2023 Process SLB PHASE Closed
Package
4. Design Basis, data sheets, Project Specifications and Drawings;
5. COMPANY Specifications;
6. International Codes and Standards.
If conflicts arise within this hierarchy, the most stringent requirement shall apply in its entirety for the
specific “topic". In all cases, Company shall be informed

Noted -
SLB noted that preliminary P&ID was submitted along with
the vendor Offer. However, this does not relieve the vendor
from complying with the specification requirement. Vendor to be discussed , Al Shirawi : Confirmed CLOSED
P&ID is retained for information only & it is not thoroughly
reviewed at this stage.Any modification comes during HAZOP

Ensure vendor shall comply to latest VDRL attached with TR.


Vendor shall also confirm that the following documents are
to be included in VDRL.
1, HEAT & MATERIAL BALANCES
2, SIMULATION FILES (NATIVE)
3, PROCESS SIMULATION REPORT
4, PROCESS FLOW DIAGRAMS
5, PROCESS SAFETY FLOW DIAGRAM
6, PROCESS EQUIPMENT LIST
7, CAUSE & EFFECTS MATRIX (PSD ESD)
8, PROCESS DATASHEET
9, PIPING AND INSTRUMENT DIAGRAMS (P&ID) CLOSED
10, UTILITY CONSUMPTION SUMMARY
11, UTILITIES & PROCESS EFFLUENT SUMMARY
12, PROCESS PERFORMANCE GUARANTEES FOR THE
PACKAGE.
13, PROCESS DESIGN CALCULATION (VESEL SIZING, PUMP
HYDRUILICS, LINE SIZING, LINE HYDRUILICS, COMBUSTION
CALCULATION, ETC...)
14, TRIP AND ALARM SETTINGS
15, OPERATING MANUAL (START-UP, NORMAL
OPERATIONS, EMERGENCY OPERATIONS, STOP)
Shirawi: Comply

Vendor to refer latest P&IDs for Manifold, LP Separator, Fuel Manifold PID Revised , LP SEPARATOR : Al Shirawi Scope CLOSED
gas skid Limited to Battery liimit

If there are no specific Process related


clarifications/confirmations from vendor on Project
specification it will be deemed as accepted by Vendor and it CLOSED
will form part of the PO. Shirawi: Comply. Shirawi consideres
that all the documents has been submitted to vendor as part
of TR during bidding

Vendor to consider following for Inlet manifold skid and LP


separator
1. Gas composition CO2= 10 % mole Vendor shall follow PMS for Piping and no internal coating is
2. H2S =16 ppm
3. The chloride content is 10 ppm @the gas outlet stream envisaged for the inlet sepearator and inlet manifold piping. CLOSED
Al Shirawi : NOTED
Shirawi: Noted. SLB to consider and advise the vednor any
internal coating for the process piping for the inlet manifold
and LP separator. Accordingly the price and time impact can
be advised.

vendor to include HMB stream numbers in the PFD drawing


during detail engineering , Refer attached sample CLOSED
Al Shirawi : NOTED & Confirmed

123 INSTRUMENTATION

124 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Instrumentation & Control Design shall be inline with the requirements as specified in the "PF0009-SLB-IE- Noted and confirmed Noted CLOSED
Package DBP-0001 - Design Basis – Instrumentation & Control". Vendor to confirm and comply.

CPS - Project Delivery System 000000Page 5 of _x000D_#000000Schlumberger-Private CPS-F-7.1-007 Rev 02


125 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Vendor to follow the Project specific requirement as stated in the P&ID Legends (for example, ESDV, BDV, Noted and confirmed Noted CLOSED
Package SDV, UV, Control Valve Typicals and Motor Typicals)

126 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Valves Material, Flange connections, ratings and Facings shall be inline with Project Piping Material Noted and confirmed Noted CLOSED
Package Specification.

127 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB All Instrument Wetted material part shall be SS 316 minimum and shall be compatible with the Process fluids Noted and confirmed Noted CLOSED
Package & Process conditions.

128 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Instrument Installation shall be inline with ENI Standard - 20047E03 - REQUIREMENTS FOR THE Noted and confirmed Noted CLOSED
Package INSTALLATION OF INSTRUMENTATION

129 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Instrument Cable shall be inline with ENI Standard - 06798E00 - INSTRUMENTATION ELECTRIC AND FIBER Noted and confirmed Noted CLOSED
Package OPTIC CABLES

130 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Instrument Earthing Shall be inline with ENI Standard - 20532E01 - DESIGN CRITERIA – EARTHING SYSTEM Noted and confirmed Noted CLOSED
Package FOR INSTRUMENTATION PLANTS

131 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Control Valves to be sized and accordingly valve size & rating shall be considered from Project Piping Noted and confirmed Noted CLOSED
Package Material Specification. Vendor to confirm.

132 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB On/Off Valves, Control Valves and Inline Flowmeters Rating shall be inline with the Project Piping Material Noted and confirmed Noted CLOSED
Package Specification. Vendor to confirm.

133 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Level Transmitters - GWR Type & Magnetic Level Transmitter with Level Gauge shall be considered. Vendor Noted and confirmed Noted CLOSED
Package to confirm.

134 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Temperature Gauge and Temperature Transmitters shall be supllied along with Thermowells. Vendor to Noted and confirmed Noted CLOSED
Package confirm.

135 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB BDV Size shall be inline with the P&ID. Vendor to confirm. Noted and confirmed Noted CLOSED
Package

136 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB All Instrument are considered inline with the P&ID requirement. Vendor to confirm. Noted and confirmed Noted CLOSED
Package

137 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Junction boxes shall be considered inline with signal seggregation - system wise (PCS, ESD) & Voltage levels Noted and confirmed Noted CLOSED
Package (Separate for JB for AI AO, JB for DI and JB for DO). Vendor to confirm.

138 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Vendor shall provice all the design engineering documents inline with project requirement and in required Noted and confirmed Noted CLOSED
Package templates. Vendor to confirm.

ASECO - Technical Offer Agiba Skid Vendor shall provide all the datasheets, sizing calculations and the necessary Vendor Drawings (like GAD)
139 WT-2361-R0 General 5/19/2023 Instrumentation SLB and Certificates (like Calibration Certificates, SIL Certificate with Safety manual, Inspection Test Certificates) Noted and confirmed Noted CLOSED
Package
for approval. Vendor to confirm.

140 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB All instruments as part of Package shall be certified for Zone 1 IIA/IIB/T3 as minimum. Noted and confirmed Noted CLOSED
Package

141 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB All Instruments, JBs shall be stainless steel AISI 316, Ex-e & IP 65 min. Noted and confirmed Noted CLOSED
Package

142 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Cable Glands shall be Stainless Steel AISI 316 and double compression type, Exd/Exe Certified & IP 65 min. Noted and confirmed Noted CLOSED
Package

143 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB Cable trays, with covers and accessories, shall be perforated heavy duty, return flanged, Hot Dipped Noted and confirmed Noted CLOSED
Package Galvanised Carbon Steel.

144 WT-2361-R0 ASECO - Technical Offer Agiba Skid General 5/19/2023 Instrumentation SLB All Instrument tubings shall be seamless stainless steel and 10- or 12-mm OD. x 1,5 mm (or 1/2” OD. x 0.05”) Noted and confirmed Noted CLOSED
Package wall thickness.

ASECO - Technical Offer Agiba Skid Vendor to check and reconfirm,


145 WT-2361-R3 General 6/14/2023 Instrumentation SLB Valves and Instruments Qty List, combined for Fuel Gas Package Skid as per P&ID. Comply CLOSED
Package (Example: PG, PDT, PSV and SDVs are not inluded)

146 WT-2361-R3 ASECO - Technical Offer Agiba Skid General 6/14/2023 Instrumentation SLB Vendor to note, the Blow Down Valves shall be GATE type . ENI Spec.20048.VAR.STA.SDS Clause 4.6.3 Comply CLOSED
Package accordingly.

Vendor to check and reconfirm,


147 WT-2361-R3 ASECO - Technical Offer Agiba Skid General 6/14/2023 Instrumentation SLB Valves and Instruments Qty List combined for LP Separator Skid as per P&ID. Comply CLOSED
Package (Example: PG & TG not inluded)

148 WT-2361-R3 ASECO - Technical Offer Agiba Skid General 6/14/2023 Instrumentation SLB For LP Separator skid, Vendor to include the Level Transmitter - MAGNETIC Type - 2 No's in the revised offer. Comply CLOSED
Package

ASECO - Technical Offer Agiba Skid Vendor to check and reconfirm,


149 WT-2361-R3 General 6/14/2023 Instrumentation SLB Valves and Instruments Qty List combined for Manifold Skid as per P&ID Comply CLOSED
Package (Example: PG & TG not inluded)

150 WT-2361-R3 ASECO - Technical Offer Agiba Skid General 6/14/2023 Instrumentation SLB Vendor shall provide EX- Register as per the template shared to vendor post award. Comply CLOSED
Package

151 WT-2361-R3 ASECO - Technical Offer Agiba Skid General 6/14/2023 Instrumentation SLB Instrument & Valve flange rating and facing shall be inline with the project Piping Material Specification, Comply CLOSED
Package PF0009-SLB-PI-SPC-0001

CPS - Project Delivery System 000000Page 6 of _x000D_#000000Schlumberger-Private CPS-F-7.1-007 Rev 02