Format. No : JSA-ASSA-CTC FORMAT REV.

NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: MASONARY WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Placing the vehicle at appropriate Fatal/ Near Fatal
location Serious Injury
Smashed people
1 Small Injury
Fracture

Opening DALA Crush Injury


Small Injury
2 Brush Injury
Contusion

Unloading Bricks or Blocks of material Any part of the body is staggering,


from the bed of the vehicle and placing Small Injury,
3 on ground level Back Pain during lifting materials

Stacking Blocks or Bricks, Sand and Leg or hand smashed Injury


Cement bags. Brush injury
Dust Injury
4 Back Pain

Shifting Materials to work area. Wrench or twisted of led during slip


Fall from height/ fracture
Skin problem
5

Brick or Block Work Major Injury


Fracture,
Brush Injury
Skin injury.

Mortar Preparation Dust Injury,


Skin rashes.
7
Cutting Of Block or Brick Hearing and Breathing problem,
Finger Injury,
Leg Injury,
Electrical shock

Scaffolding erection for the required Brush Injury,


height. Fracture
Stuck
Material damage

Climbing at the working height/platform. Serious Injury,


Cut Injury,
Hit Injury.

10

Lifting tools, materials at the working Hit injury to head,


height/ platform. fracture
11

Working at the platform/ working height. Serious Injury,


Cut Injury,
Hit Injury.

12

Getting down from working height/platform. Hit injury to head and body,
Fracture,
13
Removing of Residual Debris after work. Small Injury,
Brush Injury
14

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
V. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness.
2. Scotch/ triangular block should be place at the end of the tires.
3. Hand brake must be applied while vehicle placement.
4. Safety Shoe, Safety helmet

1. Training and Awareness


2. Safety Shoe, Safety Helmet, Hand gloves

1. Training and Awareness, Work With care


2. Safety Helmet, Safety Shoe

1. Proper Training and awareness.


2. Close Monitoring
3. Materials Stacking height should be not mortar than 1.5 meter. And 7 cement bags should stack
inn vertically.
4. Safety helmet, Safety Shoe, Nose Mask

1. Proper Access for height work.


2. Use proper ladder and or temporary access to reach upper floor area. (Access should be site
barrication in applicable area.)
3. safety Shoe, Safety helmet, Gloves

1. Platform to be made as per standard and it should be certified.


2. Toe guard to be provided for preventing from materials.
3. Loose materials shall not be allowed to remain on the gangways.
4. Take WAH permit before starting the activity
5. Use of Double rope full body harness and it should be anchored above the head height at
different two anchoring points.
6. Use of rubber hand gloves for avoiding of skin hazards
7. Safety Gumboot.
8. Safety helmet.
9. Nose mask for dust and chemical hazards.

1. Proper training and awareness.


2.Close Monitoring
3. Proper PPE Should be used Like - Safety Helmet, Safety Shoe, Nose Mask, Hand gloves
1. All workers must be trained and having the adequate knowledge of stone cutting
2. Block cutting area must be free from any obstacle or tripping hazard,
3. Take the power supply safely with double insulated cable,
4. There should be no open electrical joint,
5. All workers must wear all mandatory ppes like Hand gloves, Safety shoes, helmet, Safety goggle,
nose mask.
6. Always use machine guard in Cutter machine, Safety Shoes, Helmet,Hand Gloves, Nose
Mask,Ear plug

1. Trained & skilled workmen should be engaged in this operation.


2. No unwanted people should be there in the area where scaffolding is being erected.
3. Barricading must be done in the area to restrict unnecessary entry.
4. Safety shoe, helmets are mandatory for such operation.
5. Hand gloves should be used by the person handling the tubes, couplers of the scaffolding

6. Erection crew must use safety helmet and chin strap must be properly tied.
7. Double hook safety belt must be used by the person whenever he is at a height of 6 feet or
more.
8. Safety harness
safety shoes, safety helmet
Reflective jacket

1. Person must use double hook safety belt while climbing at the working platform or height.
2. Person must wear safety helmet with chin strap properly tied
3. Suitable working platform must be provided at required working height.
4. Safety harness
safety shoes
safety helmet

1. All person working in area must wear safety helmet.


2. No unwanted people should be there in area while materials are lifted upward.
3. Safety shoes, helmet,Safety harness

1. Safety net must be fixed before working platform before commencing the work.
2. Working platform must be properly fixed to the scaffolding.
3. Double hook Safety belt must be used while working at height.
4. Safety Helmet must be used while working at height and chin strap must be properly tied. All
person working in area must wear safety helmet.
5. No unwanted people should be there in area while materials are lifted upward.
6. Safety harness,Safety helmet, Safety shoes, Hand gloves, Reflective jacket

1. Person must use double hook safety belt while getting down from working platform or height.
2. Person must wear safety helmet with chin strap properly tied
3. Safety harness, Safety helmet, Safety shoes,Hand gloves,Reflective jacket
1. Residual materials should be collect from working area and stacked properly.
2. It should not be spread here and there or pathway.
3. Safety helmet,Safety Shoe, Rubber ,Hand gloves.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

e:
e:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: CARPENTRY WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Loading & Unloading of wood Material 1. Fall of material,
& Material Handling 2.trip of person,
3.stuck to the heavy material

Loading & Unloading of wood Material 1. Workers can be slipped during shifting materials
& Material Handling and get impact.
2. Materials can fall from head to floor or on person
and can be injured or damage of floor.
3. Wrong body posture while handling the Plywood.
4. Repetitive strain on body.
2

Carpenter Work 1. Hand can be cut during operations.


(1. Cutting of Plywood 2. Body parts can be injured due to breaking of
2. Drilling of Plywood wheel.
3. Plywood Paneling 3. Electric shock or fire produces due to damage,
4. Cutting of Veneer power overload or damage of cable.
5. Veneer Paneling) 4. Breathing problem due to cutting operation
produced heavy wooden dust.
5. Hearing problem due to running machine.
3

Removal of Residual materials from site. 1. Hand can be cut during collecting residual
materials.
2. Breathing problem during booming.
4 3. Repetitive strain on back
Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Just have a look of the stacking of the materials before commencing actual unloading.
3. No unwanted men should be there in vicinity.
4. Safety shoe, helmet, gloves are mandatory for such operation.
5. Don't lift the material from out of capacity,
6.Don't wear lose cloth like lungi, kurta, gamchha etc. during loading and unloading
7. Use safety shoes and cotton hand gloves.

1. All electrical equipment is to be tested by a competent electrician every quarter.


2. Employees are to be trained on the use of tools. All tools shall be inspected before use
3. Proper PPE shall be worn by the person, as required by their proximity to the work
task.
4. Sharp tools should be used carefully,
5. Use hand gloves before handling the ply board
6. Use nose mask during cutting the wood by electric cutter.

1. Only competent persons use the tools of Carpentry


2. Never Remove the Handle from the Tools
3. Proper hand gloves shall be worn at all time.
4. Ensure tool is insulated.
5. Make sure all Electrical Connections are in good condition.
6. Use inspected drilling machine.
7. Operate authorized persons only.
8. Use Mandatory PPE's.
9. Use hand gloves during veneer paneling,
10. Never scattered the nails around the working place
11. Always use ISI approved equipment's and tools for safe work
12. Should there good ventilation system.

1. Debris must be kept at a suitable place to avoid any disturbance in other site activities.
2. It must be cleared from site at the earliest.
3. Use Nose mask, Hand gloves, Safety shoes & helmet as Mandatory PPEs.
Reviewed & Approved By: Date:
Project Manager (Client): Date:
TE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: CHASE CUTTING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Marking the chase cutting area. Scratch,
(At approachable place without ladder) Small Injury.
1

Marking the chasing area. Tools damage,


(Above man height with ladder / platform) fracture,
brush injury
2

Cutting the chase with cutter machine Scratch,


( at approachable place) Cut,
Dust Allergy,
Breathing problem,
Impact injury,
3 respiratory problem,
Damage to ear and eye in long term
.

Cutting the chase with cutter machine Scratch,


(Above man height with ladder/platform) Cut,
Dust Allergy,
Breathing problem,
Impact injury,
respiratory problem,
Damage to ear and eye in long
term,
4 Hit Injury,
Cut Injury,
Fracture,
eye injury
Chiseling fragmented part of Hit injury,
concrete / plaster. Coughing due to dust ingestion,
( at approachable place) Eye irritation,
5

Chiseling fragmented part of concrete / Cut injury on finger,


plaster. hit Injury,
( Above man height with ladder / platform) Stone particle hit the eyes,
fall of person and material from
height
6

Removal of Residual materials from site. Scratch,


Cut,
Dust Allergy,
7 Breathing problem,
back Pain.

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
FORMAT REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Have a look of the entire area for any protruded part or sharp edges to
avoid cut or brush injury.
2. Safety helmet, Goggle,Nose mask, Hand gloves,Safety shoes.

1. Have a look of the entire area for any protruded part or sharp edges to
avoid cut or brush injury.
2. Structure or ladder being used must be rigid enough for the job.
3. Safety belt must be used if height is more than 6 feet.
4. Dust mask, Goggle,Helmet, Safety shoes

1. Backside guard must be there in the cutter to avoid backward through of


the small particles.
2. Goggles must be used to protect the eyes from small particle.
3. A firm grip on cutter machine must be maintained while cutting the
concrete or plaster.
4. Safety helmet, Goggle,Hand gloves

1. Proper training, Area barricading


2. Structure or ladder being used must be rigid enough for the job.
3. Safety belt must be used if height is more than 6 feet.
4. Safety helmet, Goggle,Nose mask, Hand gloves, ,Safety shoes
1. A due attention must be given to job while chiseling of fragmented plaster
or concrete.
2. Goggles must be used to protect the eyes from small particle.
3. Chisel must be griped firmly while chiseling operation.
4. Hand gloves, safety goggle

1. A due attention must be given to job while chiseling of fragmented plaster


or concrete.
2. Goggles must be used to protect the eyes from small particle.
3. Chisel must be griped firmly while chiseling operation
4. Structure or ladder being used must be rigid enough for the job.
5. Safety belt must be used if height is more than 6 feet.
6. Safety Shoes, Hand gloves,Safety Goggle, Nose mask, Helmet

1. Debris must be kept at a suitable place to avoid any disturbance in other


site activities.
2. It must be cleared from site at the earliest.
3. Nose mask , Hand gloves, Safety shoes, helmet

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: CONCRETE WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Site preparation, cleaning of foreign particles 1.exposure to dust can irritate nose,
1 skin contact may result in moderate
irritation

Fixing of concrete pump & pipeline till to 1. Fall of material


the site where work to be carried out 2. Skin irritation 3.improper lifting,
2 4. Poor ergonomics.

a)cleaning of surface with water, 1.slippery surface,


Spreading of cement to the surface. 2.exposure to dust can irritate nose, skin
contact may result in moderate irritation,

b) shuttering of area if necessary 1. Fall of material


2. Poor ergonomics.

pouring / placing of concrete (RMC)through 1. Fall of material


pump 2. Improper lifting,
4 3. Poor ergonomics.

compacting of concrete using electrical vibrator/ 1. Naked wire/ Damage wire,


mechanical/ manual 2. fall of material 3.imrproper handling 4.
finish of top using floater / manual method Wet condition 5. skin contact

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures Responsibility


1. Use nose musk, 1.Site Engineer
2. Hand gloves for avoiding skin contact irritation. 2.Site Supervisor
3.Safety Officer

1. use cotton hand gloves, 1.Site Engineer


2. Safety shoes must be wearing. 2.Site Supervisor
3. Competent person allowed only 3.Safety Officer

1. Use helmet ,
2. Rubber hand gloves
3. Use gumboot.
4. Use nose musk,
5. Hand gloves for avoiding skin contact irritation.
1.Site Engineer
2.Site Supervisor
3.Safety Officer
1. Use cotton hand gloves,
2. Safety shoes must be wearing.
3 .Competent person allowed only

1. Use cotton hand gloves, 1.Site Engineer


2. Safety shoes must be wear. 2.Site Supervisor
3 .Competent person allowed only 3.Safety Officer

1. Only competent person allowed 1.Site Engineer


2. use gumboot 2.Site Supervisor
3. Use rubber hand gloves. 3.Safety Officer
4. Only use proper connection by using proper plug top.
5. No naked wire.

1. Only competent person allowed,


2. use rubber and glove
3. Use gumboot.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: ELECTRICAL WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Un loading of material from vehicle 1. Fall of Material on leg or body of person
to floor level, nearby.
2. Fall of materials.
3. Repetitive strain on back
3. Back pain, Trip hazard, Finger injury, material
1 damaged due to falling

Shifting material from outside to the 1. Fall of Material on leg or body of person
specific storage location nearby.
2. Fall of materials.
2 3. Repetitive strain on back
4. Back pain, Finger injury, leg injury.

Stacking of Materials 1. Fall of Material on leg, Stuck, Impact.


2. Fall of materials may result
Hit Injury, Cut Injury, Brush Injury
3

Marking 1. Impact with wall as a result cut injury, brush


injury
4 2. Fall from height.

Chase Cutting 1. Breathing problem due to flying particles,

2.Eye injury due to flying particles,


3. Hearing problems due to high noise,
4. Machine Failure,
5 5. Fall from height,
6. Impact of rotating whe

Installing Conduit on Wall and Floor 1. Cut Injury on hands during cutting the PVC or
MS conduit,
2. Brush injury during Installing the Conduit on
6 wall
Installing Cable Tray 1. Cut Injury due to cutting the cable tray.
2. Physical injury due to fall from height
3.Fall of Material or person during cable tray
installations.

Cable Pulling 1. Fall of Material and person from height,


2. Hand scratch due to cable pulling,
8

Switch Box Installing 1. Hand can be cut by Sharp edge, may result
cut injury, brush injury.
2. Hitting the material to the body
9

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
T REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Have a look of the stacking of the materials before commencing actual unloading.
3. No unwanted men should be there in vicinity.
4. Safety shoe, helmet, gloves are mandatory for such operation.
5. Checking of license of Vehicle driver, test certificate and capacity of hydra.
6. Use Safety shoes, Hand gloves, Safety helmet.

1. Training & Awareness


2. Just have a look of the stacking of the materials before commencing actual
unloading.
3. No unwanted men should be there in vicinity.
4. Use Safety shoes, Hand gloves, Safety helmet

1. All materials must be stacked clear from aisles and passageway.


2. Use safety shoes, hand gloves, safety helmet.
3. All sharp edges of materials should be towards the wall side to avoid cut injury to
the by passers nearby.

1. Training and awareness.


2. Use safety shoes, safety helmet, hand gloves.
3. Use full body harness.

1. Must be used full body Apron,


2. Water spray to reduce the dust
3. Full body harness if working at height
4. Must be used Safety goggle and nose mask
5. Use safety shoes, safety goggles must be worn.
6. Use safety cotton hand gloves, ear plug for noise.

1. Proper training and Awareness.


2. Close Monitoring.
3. Use safety shoes, cotton hand gloves, nose mask.
1. Proper working platform must be provided before start of work.
2. Hand railing must be provided.
3. Safety Belt must be used while working on the platform as well as climbing up &
down to the platform.
4. While working with ladder always make sure that inclination of ladder should not
be more than 75 degree.
5. While working on ladder make sure that no one should be working on top 4 lugs of
ladder.
6. If ladder is being used at uneven surface then always make sure that someone
should be holding the ladder to avoid fall of ladder while working.
7. Use full body harness, safety helmet, hand gloves.

1. Only trained and Experienced person will perform the job,


2. Uses of proper tools,
3. Area Inspection before performing the job,
4. Use full body harness, safety helmet, safety shoes, hand gloves.

1. Uses of proper tools


2. Proper material handlings
3. Keep first-aid kit ready
4. Use safety shoes, cotton hand gloves.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: FALSE CEILING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Un loading of Gypsum Board from 1. Fall of Gypsum Board on leg
vehicle to floor level. 2. Brush injury to hand of the workmen
3. Fall of Gypsum Board on leg of self or co-
worker
4. Repetitive strain on back
1 5. Gypsum board can be breaking while
unloading. (Due to flexibility)

Shifting Gypsum Board from outside to 1. Fall of Gypsum Board on leg


specific storage location. 2. Brush injury to hand of the workmen
3. Fall of Gypsum Board on leg of self or co-
worker
4.Repetitive strain on back
2 5. Gypsum board can be breaking while
unloading. (Due to flexibility)

Cutting of gypsum 1. May be cut during cutting or handling


machine. (by cutting machine or by blade)
2. Impact during handling board
3 3. Dust produce during cutting.

Surface Preparation for painting 1. Impact from blade of grinder machine.


(Scrubbing or sanding) 2. Noise pollution during rubbing the surface.
3. Inhalation of dust
4
Fall hazard during working at height 1. Fall from height man or materials get serious
injured.
2. Bellow materials can damage by fall of
materials.
3. Leg injury, serious injury.

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
EV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures Responsibility


1. Training & Awareness 1.Site Engineer
2. Just have a look of the stacking of the materials before commencing actual 2.Site Supervisor
unloading. 3.Safety Officer
3. No unwanted men should be there in vicinity.
4. Positioning of the leg and back should be proper while manual lifting. (Back
should be straight.)

1. Training & Awareness 1.Site Engineer


2. Just have a look of the stacking of the materials before commencing actual 2.Site Supervisor
unloading. 3.Safety Officer
3. No unwanted men should be there in vicinity.
4. Positioning of the leg and back should be proper while manual lifting.(Back
should be straight.)
5. Use safety shoes, safety goggles, hand gloves.

1. Proper Training and awareness 1.Site Engineer


2. Wiring of Cutting machine must be proper, no loose & cut wire should be 2.Site Supervisor
there. 3.Safety Officer
3. Use safety shoe, helmet, safety goggles, nose mask, ear plug, hand gloves.

1.Proper training and awareness 1.Site Engineer


2. Use safety shoes, rubber hand gloves, mask, and safety goggles. 2.Site Supervisor
3.Safety Officer
1. Proper working platform must be provided before start of work. 1.Site Engineer
2. Hand railing must be provided. 2.Site Supervisor
3. Safety Belt must be used while working on the platform as well as climbing 3.Safety Officer
up & down to the platform.
4. While working with ladder always make sure that inclination of ladder should
not be more than 75 degree.
5. While working on ladder make sure that no one should be working on top 4
lugs of ladder.
6. If ladder is being used at uneven surface then always make sure that
someone should be holding the ladder to avoid fall of ladder while working.

7. Proper Training about height job.


8. Use full body harness, safety goggles, and safety shoes.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: GAS CUTTING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Cylinder Handling 1) Fall of Cylinder
2) Trips & Falls
3) Repetitive strain on back
1

Storage of Cylinders 1)) Fall of cylinders on leg during storage,


2) Fall cylinder on leg during shifting from
outside to store.
2

Gas cutting operation 1) Blast due to use of nonstandard hose

2) Valve leakage, Hose pipe leakage


3) Burn,
4) Uses of defective Tools,
5) Heat Radiation
6) Finger Injury, Burn Injury, Suffocation, Minor
Injury, Brush Injury

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
FORMAT REV. NO :00 DATE : 01/04/2021
nt)
Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1) Trolley with chain provided to secure the cylinder while using & Transporting
2) Valves to be secured using the Safety caps
3) Must wear safety shoes, helmet, hand gloves.

1) Oxygen and acetylene cylinder must be storage in good ventilation


2) Cylinders are not storage on direct sun rays
3) Keep Oxygen-acetylene Cylinders safely at least 5 meters away from the work
location.
5) must worn safety shoe, hand gloves,

1) Standard regulator with double valve opening type must be used.


2) Provide/Using Flash back arrestor
3) Hoses/torches and other accessories must be checked by a competent person
before use.
4) No combustible material should be present within 5 mtr radios of work area
Barricading.
5) Only trained workers should do the job of cutting.
6) One DCP extinguisher must be kept available near the work Place.
7) Gas Cutter must use proper PPE like helmet, shoe, insulating gloves, face-shield
8) Only Skilled worker doing this work
9) TBT & Job specific training to be conducted
10) Inspection of gas cutting set with check list prior to the commencement of job
11) Supervisor to be present while performing the job,
12) Periodically soap test to be performed with warm water for any leakages at
the cylinder valve.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: GYPSUM PARTITION WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Material Unloading 1.Fall of Material,
2.Tripping,
3. Fall of person,
4. Cut injury, brush injury, Fracture
1

Shifting of Material (gypsum board) to 1. Fall of Material, Tripping,


the Working Place 2. Fall of person, Slipping of Material

Aluminum cutting for frame work by 1. Fall of Material, Tripping


cutting machine 2. Spark
3. Electrical shock
3 4. Cut injury, brush injury

Aluminum frame fixing at height 1. Falling of aluminum frame on the legs,


2. Impact of hand between surface and
aluminum frame, Sharp edge
4 3. Leg Injury, Brush injury or finger injury, Cut
injury due to sharp edge of stone,

Gypsum cutting for frame work by 1. Fall of Material,


cutting machine 2. Tripping
3. Spark
5 4. Electrical shock
5. Cut injury, brush injury
Gypsum board fixing at height 1. Falling of gypsum board on the legs,

2. Impact of hand between surface and


aluminum frame, Sharp edge
6 3. Leg Injury,
4. Brush injury or finger injury,
5.Cut injury due to sharp edge of stone,

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
EV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Just have a look of the stacking of the materials before commencing actual
unloading.
3. No unwanted men should be there in vicinity.
4. Safety shoe, helmet, gloves are mandatory for such operation.
5. Don’t lift the material from out of capacity.

1. Proper training of loading and unloading,


2. Uses of all required PPEs before starting the work,
3. Proper Information of the shifting place,
4. Never lift the material out of capacity.
5. Use safety shoe, safety helmet, hand gloves.

1. Use proper plug top & No damage wire.


2. Use safety shoes ,safety goggles, cut resistant hand gloves,
3. Must wear Safety shoes, Hand gloves and safety helmet during job,

4. Avoid wearing loose clothes and ornaments like chain, ring or watches.

1. All workers must wear all required ppe,


2. Use hand gloves during screwing,
3. Wear nose mask and goggle during drilling the stone,
4. If working at height must wear safety harness,
5. During height work must barricade the area

1. Use proper plug top & No damage wire.


2. Use safety shoes ,safety goggles, cut resistant hand gloves,
3. Must wear Safety shoes, Hand gloves and safety helmet during job,

4. Avoid wearing loose clothes and ornaments like chain, ring or watches.
1. All workers must wear all required ppe,
2. Use hand gloves during screwing,
3. Wear nose mask and goggle during drilling the stone,
4. If working at height must wear full body harness.
5. During height work must barricade the area

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: WORK AT HEIGHT
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Scaffolding erection for the required 1. Fall of material on leg or someone else
height. working nearby, fall of person and get
injured.
2. Bellow materials can damage by fall of
materials from height.
3. Cut injury, fracture / damage.

Climbing at the working height/platform. 1. Fall while climbing, scaffolding collapsed


2. Materials can fall during climbing.
2

Lifting tools, materials at the working 1. Fall of material on leg or someone else
height/ platform. working nearby, fall of person and get
injured.
3 2. Bellow materials can damage by fall of
materials from height.

Working at the platform/ working height. 1. Fall of material on leg or someone else
working nearby, fall of person and get
injured.
2. Bellow materials can damage by fall of
materials from height.
4

Getting down from working 1. Fall while climbing, scaffolding collapsed,


height/platform. serious damage, fracture.
2. Materials can fall during getting down,
5 fracture, leg injury.
Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Trained & skilled workmen should be engaged in this operation.
2. No unwanted people should be there in the area where scaffolding is being
erected.
3. Barricading must be done in the area to restrict unnecessary entry.
4. Safety shoe, helmets are mandatory for such operation.
5. Hand gloves should be used by the person handling the tubes, couplers of the
scaffolding
6. Erection crew must use safety helmet and chin strap must be properly tied.
7. Double hook safety belt must be used by the person whenever he is at a height
of 6 feet or more.
8. Use safety shoes, full body harness, hand gloves.

1. Person must use double hook safety belt while climbing at the working platform
or height.
2. Person must wear safety helmet with chin strap properly tied
3. Suitable working platform must be provided at required working height.

1. All people working in area must wear safety helmet.


2. No unwanted people should be there in area while materials are lifted upward.
3. Use safety shoes, safety helmet, full body harness.

1. Safety net must be fixed before working platform before commencing the work.
2. Working platform must be properly fixed to the scaffolding.
3. Double hook Safety belt must be used while working at height.
4. Safety Helmet must be used while working at height and chin strap must be
properly tied. All people working in area must wear safety helmet.
5. No unwanted people should be there in area while materials are lifted upward.

1. Person must use double hook safety belt while getting down from working
platform or height.
2. Person must wear safety helmet with chin strap properly tied
3. Use full body harness, safety helmet safety shoes.
Reviewed & Approved By: Date:
Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: SCAFFOLDING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Lifting of materials Initial position 1- Falls of material on leg
2. Brush injury to hand of the workmen
3.Collapse of material on someone.
4. Cut of hand due to handling sharp
materials
1 5. Repetitive strain on back

Lifting of material from the ground level 1. Hand, finger may crush.
and placing at desired location 2. Collapse of material on someone.
3. Repetitive strain on back

Collapse of structure due to loose soil at 1. Man can get serious injured due to fall of
the base of scaffolding scaffolding structure
2. Materials can be damage due to hit with
3 other structure.

Loosening of cross members of 1. Man can be injured due to loosening of


scaffolding cross members of scaffolding
2. Materials can be damage due to hit with
4 other structure.

Working on the scaffolding 1. Man can fall from height get serious
injury.
2. Fall of materials from height and can be
damage floor or other materials. Fracture /
5 material damage, cut injury, leg injury, brush
injury
Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Just have a look of the stacking of the materials before commencing actual
unloading.
3. No unwanted men should be there in vicinity.
4. Positioning of the leg and back should be proper while manual lifting.(Back
should be straight.)
5. Use safety shoe, safety helmet, hand gloves.

1. Training & Awareness


2. Just have a look of the stacking of the materials before commencing actual
unloading.
3. No unwanted men should be there in vicinity.
4. Positioning of the leg and back should be proper while manual lifting.(Back
should be straight.)

1. Checking of soil condition before erection of the scaffolding.


2. Educate the scaffolding erecting team about the same.
3. Use proper base plate / u- Head.
4. Properly Compaction the soil of scaffolding base area.

1. Check the joints in case of MS scaffolding and knots of the rope before use of
scaffolding.
2. Cup should be properly placed on the bottom MS pipe.
3. Educate the scaffolding erecting team about the same.

1. Proper working platform must be provided before start of work.


2. Hand railing must be provided.
3. Safety Belt must be used while working on the platform as well as climbing up &
down to the platform.
4. Should have life line where is lake of anchoring point.
5. Use full body harness, safety helmet, safety shoes.
Reviewed & Approved By: Date:
Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: STONE CUTTING & POLISHING
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Material Unloading Damaged of material,
Body injury,
Back pain,
Cut Injury,
Fracture

Shifting of Material to the Working Place Material Damage,


Limbs Injury,
Cut Injury
2

Placement of Stone for Cutting Finger Injury,


Stone damage,
Back Pain,

Cutting of Stone Hearing and Breathing problem, Finger Injury,


Leg Injury, Electrical shock

4
Fixing of Stone to the Designated place Leg Injury,
Brush injury or finger injury,
Cut injury due to sharp edge of stone,

Back pain due to handling of stone


5

Polishing of Stone Breathing Problem,


Hearing problem,
Brush Injury
6

Debris Cleaning from the Site Breathing problems,


Brush injury,
7

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
O :00 DATE : 01/04/2021

ev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Just have a look of the stacking of the materials before commencing actual unloading.
3. No unwanted men should be there in vicinity.
4. Safety shoe, helmet, gloves are mandatory for such operation.
5. Don’t lift the material from out of capacity,
6.Don’t wear lose cloth like lungi, kurta, gamchha etc. during loading and unloading
7. Safety Shoes, Helmet, Hand Gloves,

1. Proper training of loading and unloading,


2. Uses of all required PPEs before starting the work,
3. Proper Information of the shifting place,
4. Never lift the material out of capacity.
5. Safety Shoes, Helmet, Hand Gloves,

1) Area Inspection before placement of stone,


2) Be careful during the placement of stone on the sand for cutting,
3) Avoid keeping finger under the stone,
4) Must wear Safety shoes, Hand gloves and safety helmet during job,
5) Avoid wearing loose clothes and ornaments like chain, ring or watches.
6) Safety Shoes, Helmet, Hand Gloves

1. All workers must be trained and having the adequate knowledge of stone cutting
2. Stone cutting area must be free from any obstacle or tripping hazard,
3. Take the power supply safely with double insulated cable, 4.
There should be no open electrical joint,
5. All workers must wear all mandatory PPE’s like Hand gloves, Safety shoes, helmet,
Safety goggle, nose mask.
6. Always use machine guard in Cutter machine,
7. Safety Shoes, Helmet, Hand Gloves, Nose Mask, Ear plug
1. All workers must wear all required PPE’s
2. Lift the stone according your capacity,
3. Use hand gloves and nose mask before applying adhesive on the stone,
4. Be careful during placing the stone on the wall or ground,
5. Wear nose mask and goggle during drilling the stone,
6. If working at height must wear safety harness,
7. During height work must barricade the area
8. Safety shoes, Helmet, Goggle, Nose mask, Hand gloves, Earplug

1. Must use machine guard


2. Keep the electrical cables away from the water
3. No naked cable should be there near working area,
4. If working on height must use safety harness,
5. Must use goggle, Nose mask hand gloves and safety shoes.

1. Debris must be kept at a suitable place to avoid any disturbance in other site activities.
2. It must be cleared from site at the earliest.
3. Safety shoes, Hand gloves, Nose mask, Helmet

Reviewed & Approved By: Date:


Project Manager (Client): Date:
E : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: WALL CLADING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Material Unloading Damaged of material,
Body injury,
Back pain,
Cut Injury,
Fracture
1

Shifting of Material to the Working Place Material Damage,


Limbs Injury,
Cut Injury
2

Placement of Stone for Cutting Finger Injury,


Stone damage,
Back Pain,
3

Cutting of Stone Hearing and Breathing problem,


Finger Injury,
Leg Injury,
Electrical shock

4
Fixing of Stone to the Designated place Leg Injury,
Brush injury or finger injury,
Cut injury due to sharp edge of stone,

Back pain due to handling of stone


5

Polishing of Stone Breathing Problem,


Hearing problem,
Brush Injury
6

Debris Cleaning from the Site Breathing problems,


Brush injury,
7

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
T REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Just have a look of the stacking of the materials before commencing actual unloading.
3. No unwanted men should be there in vicinity.
4. Safety shoe, helmet, gloves are mandatory for such operation.
5. Don’t lift the material from out of capacity,
6.Don’t wear lose cloth like lungi, kurta, gamchha etc. during loading and unloading
7. Safety Shoes, Helmet, Hand Gloves,

1. Proper training of loading and unloading,


2. Uses of all required PPEs before starting the work,
3. Proper Information of the shifting place,
4. Never lift the material out of capacity.
5. Safety Shoes, Helmet, Hand Gloves

1. Area Inspection before placement of stone,


2. Be careful during the placement of stone on the sand for cutting,
3. Avoid keeping finger under the stone,
4. Avoid wearing loose clothes and ornaments like chain, ring or watches.
5. Safety Shoes, Helmet, Hand Gloves,

1. All workers must be trained and having the adequate knowledge of stone cutting
2. Stone cutting area must be free from any obstacle or tripping hazard,
3. Take the power supply safely with double insulated cable, 4.
There should be no open electrical joint,
5. All workers must wear all mandatory ppes like Hand gloves, Safety shoes, helmet, Safety
goggle, nose mask.
6. Always use machine guard in Cutter machine,
7. Safety Shoes, Helmet, Hand Gloves, Nose Mask, Ear plug
1. All workers must wear all required ppe,
2. Lift the stone according your capacity,
3. Use hand gloves and nose mask before applying adhesive on the stone,
4. Be careful during placing the stone on the wall or ground,
5. Wear nose mask and goggle during drilling the stone,
6. If working at height must wear safety harness,
7. During height work must barricade the area
8. Safety shoes, Helmet, Goggle, Nose mask, Hand gloves, Earplug

1. Must use machine guard


2. Keep the electrical cables away from the water
3. No naked cable should be there near working area,
4. If working on height must use safety harness,
5. Safety shoes, Hand gloves, Nose mask, Helmet

1. Debris must be kept at a suitable place to avoid any disturbance in other site activities.
2. It must be cleared from site at the earliest.
3. Safety shoes, Hand gloves, Nose mask, Helmet

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: WELDING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Placing the Machine to the designated Scratch,
1 place Cut,
Impact, Back Pain

Ready the Machine for the Welding job Scratch Injury,


Electric Shock,
Flash or Burn.

Fabrication Work Scratch, Cut, Impact injury, back pain,


respiratory problem,
Damage to ear and eye in long term .

Chipping from chisel and brushing Eye injury


4

Removal of Residual materials from site. Scratch,


Cut,
Dust Allergy,
5 Breathing problem,
back Pain.

Comments:
Safety Officer (ASSA CONSTRUCTION): Date:
Project Manager (ASSA CONSTRUCTION) Date:
EV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures Responsibility


1. Proper Training describing safe handling of machine 1.Site Engineer
2. Safety Shoes, Helmet, Goggle, Hand gloves 2.Site Supervisor
3.Safety Officer

1. Ensure the worksite free from flammable materials. 1.Site Engineer


2. Take Hot work Permit before start the work 2.Site Supervisor
3. Tool Box Talk for Welding operation. 3.Safety Officer
4. One DCP extinguisher must be kept available near the work spot.
5. Appropriate supervision must be provided for the job.
6. Using electric cable should be double insulated.
7. In welding operations should there proper Earthlings.
8. Top & 3 pin Plug should be used while taking electric connection.
9. There should be MCB/RCCB in electric board.
10. Hand Gloves, Safety Shoe and Safety Helmet.

1. Ensure the worksite free from flammable materials. 1.Site Engineer


2. Take Hot work Permit before start the work 2.Site Supervisor
3. Tool Box Talk for Welding operation. 3.Safety Officer
4. One DCP extinguisher must be kept available near the work spot.
5. Appropriate supervision must be provided for the job.
6. Using electric cable should be double insulated.
7. In welding operations should there proper Earthlings.
8. Top & 3 pin Plug should be used while taking electric connection.
9. There should be MCB/RCCB in electric board.
10. Full body apron, Welding shield, Leather hand gloves, Safety shoes

1. Proper training about chipping work. 1.Site Engineer


2. Work with care. 2.Site Supervisor
3.Safety Officer

1. Debris must be kept at a suitable place to avoid any disturbance in other 1.Site Engineer
site activities. 2.Site Supervisor
2. It must be cleared from site at the earliest. 3.Safety Officer
3. Nose mask , Hand gloves, Safety shoes, helmet
Reviewed & Approved By: Date:
Project Manager (Client): Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: GLASS FIXING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Un loading of Glass from vehicle to 1)Cut Injury,
floor level. 2)Small injury, Brush injury,
3)Back pain

Cutting of Glass 1)Cut injury,


2) Small injury, Brush injury,
3) Glass dust particles get in to eye.
2

Fall hazard during working at height 1)Fatal ,


2)Fracture injury,

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures Responsibility


1) Training & Awareness 1.Site Engineer
2) Have a look of the stacking of the materials before commencing actual 2.Site Supervisor
unloading. 3.Safety Officer
3) No unwanted men should be there in vicinity.
4) Positioning of the leg and back should be proper while manual lifting (Back
should be straight.)
5) Using Proper PPE’s

1) Proper training and awareness of glass work 1.Site Engineer


2) Goggles and nose mask must be used while cutting operation to avoid cut 2.Site Supervisor
injury, swallowing and eye from small particle. 3.Safety Officer
3) Using Proper PPE’s

1) Proper working platform must be provided before start of work. 1.Site Engineer
2) Hand railing must be provided. 2.Site Supervisor
3) Safety Belt must be used while working on the platform as well as climbing 3.Safety Officer
up & down to the platform.
4) No work and unwanted people to be allowed below the area where glass
work is under progress.
5) Using Proper PPE’s

Reviewed & Approved By: Date:


Project Manager (Client): Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: GRINDING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Checking of Machine 1)Cut injury
2)Hit Injury

To ready the Machine for work 1)Brush Injury


2)Burn Injury
3)Electric shock
4)Eye injury from high intensity light

2
Grinding 1)Cut injury
2)Burn injury or shock,
3) Breathing and hear related problem.

Removal of Residual materials from site. 1)Scratch & Cut


2)Dust Allergy, Breathing problem
3) Back Pain.
4

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
T REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures Responsibility


1) Machine should be well maintained. There should be no vibration 1.Site Engineer
2) Bearing & flanges should be in good condition 2.Site Supervisor
3) Check crack / damage of grinding wheel. 3.Safety Officer
4) Maximum operating speed (MOS) is mentioned on the wheel.
Ensure machine speed is less than MOS
5) Safety guard and Handle Must be Use in Grinding Machine.
6) Electrical Cable without cuts and joints.
7) Check the machine switch lock
8) Machine should be free from grease, oil or any type of moisture,
9) Check that Auxiliary handle is fixed properly

1) Only use insulated cables in machine 1.Site Engineer


2) Use industrial plug top 2.Site Supervisor
3) Using RCCB in Distribution board 3.Safety Officer
4) Works should do with Proper PPE.
5) Should be done Proper Earthing in Machine.
6) Take the electrical cable in proper and arranged way to avoid tripping
hazard.
7) Make sure that there is no watery or moist surface nearby
8) Ensure the worksite free from free from flammable or toxic gases
9) Take Hot work Permit before start the work
10) Tool Box Talk for Grinding operation
11) One DCP extinguisher must be kept available near the work Place.
12) Wheel must easily fit on the spindle.
13) Visually inspect wheel for cracks
14) Replace all missing and damage points.
16) Using Proper PPE’s
1) Grinding Machine and other accessories must be checked by a competent 1.Site Engineer
person before use. 2.Site Supervisor
2) It must have a wheel guard. 3.Safety Officer
3) No combustible material should be present within 5 mtr. radius of work
area Barricading
4) Only trained workers should do the job of Grinding
5) Keep First Aid Kit at Site
6) Clearance must be obtained from Authorities in Safety Work Permit for
explosive and hazardous work situations.
7) Using Proper PPE’s

1) Debris must be kept at a suitable place to avoid any disturbance in other 1.Site Engineer
site activities. 2.Site Supervisor
2) It must be cleared from site at the earliest. 3.Safety Officer
3) Using Proper PPE’s

Reviewed & Approved By: Date:


Project Manager (Client): Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: LOADING & UNLOADING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Lifting of materials Initial position Cut Injury,
Small injury,
Brush injury,
Back pain
1

Lifting of material from the ground Cut Injury,


level and placing at desired location Small injury,
Brush injury,
Back pain
2

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
AT REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Just have a look of the stacking of the materials before commencing actual
unloading.
3. No unwanted men should be there in vicinity.
4. Positioning of the leg and back should be proper while manual lifting (Back should
be straight.)

1. Training & Awareness


2. Just have a look of the stacking of the materials before commencing actual
unloading.
3. No unwanted men should be there in vicinity.
4. Positioning of the leg and back should be proper while manual lifting (Back should
be straight.)

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: MATERIAL HANDLING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Lifting of materials Initial position 1) Back and muscle strain,
2) Impact injury.

Lifting of material from the ground level 1)Cut Injury,


and placing at desired location 2)Small injury,
Brush injury,
3)Back pain
4)Over exertion
5)Poor housekeeping
2

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
T REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1) Training & Awareness
2) Just have a look of the stacking of the materials before commencing actual unloading.
3) No unwanted men should be there in vicinity.
4) Positioning of the leg and back should be proper while manual lifting (Back should be
straight.)
5) Using Proper PPE’s

1) Training & Awareness


2) Recommended not to exceed load.
3) Daily house keeping
4) Proper material handling to be done
5) All PPEs should be worn during access & egress should be without obstruction during
Material handling.
6) Over load lifting is not allowed.
7) Proper illumination is to be provided in pathway.
8) Using Proper PPE’s

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: PAINTING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Un loading paint drum, putty bags or Leg swelling,
other materials from outside to specific Smashed toe,
storage location. Small injury,
Brush injury,
Back pain
1

Shifting paint drum, putty bags or other Leg swelling,


materials from outside to specific Smashed toe,
storage location. Small injury,
Brush injury,
Back pain
2

Surface Preparation for POP/Putty Cut injury,


Brush Injury,
Fatigue,
3 Asthma and Respiratory problem fracture.

Applying putty and leveling the same Fatigue,


(Multiple times) Asthma and Respiratory problem fracture.
4

Surface Preparation for painting Fatigue,


Asthma and Respiratory problem, fracture,
Eye Problem
5
Painting (Multiple time) Fatigue,
Asthma and Respiratory problem, fracture,
Eye Problem

Storage filled paint drum and disposal Fracture,


of empty paint drum. Small Injure , Brush Injury,

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
AT REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1) Training & Awareness
2) Just have a look of the stacking of the materials before commencing actual unloading.
3) No unwanted men should be there in vicinity.
4) Positioning of the leg and back should be proper while manual lifting (Back should be
straight.)
5) Using Proper PPE’s

1) Training & Awareness


2) Just have a look of the stacking of the materials before commencing actual unloading.
3) No unwanted men should be there in vicinity.
4) Positioning of the leg and back should be proper while manual lifting (Back should be
straight.)
5) Using Proper PPE’s

1) Proper Training and Awareness.


2) Using Proper PPE’s

1) Proper Training and Awareness.


2) Using Proper PPE’s

1) Proper Training and Awareness.


2) Using Proper PPE’s
1) Proper Training about height training
2) Proper working platform must be provided before start of work.
3) Hand railing must be provided.
4) Safety Belt must be used while working on the platform as well as climbing up & down
to the platform.
5) Using Proper PPE’s

1) Paint drum should be properly stacked; clearance is must from all sides near wall.
2) Used paint drum must be properly evacuated and should be safely discharges to avoid
any fire hazard.
3) Fire extinguishers must be kept near paint storage.
4) Should have proper ventilation system.
5) Using Proper PPE’s

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: PANELLING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Material Unloading Damaged of material,
Body injury,
Back pain,
Cut Injury,
Fracture
1

Shifting of Material to the Working Place Finger Injury,


Material damage,
Back Pain,
2

Placement of Material for Cutting Finger Injury,


Material damage,
Back Pain,
3

Cutting of Material Cutting of Material

Fixing of Material to the Designated Leg Injury,


place Brush injury or finger injury,
Cut injury due to sharp edge of stone,

5 Back pain due to handling of Material


Polishing of Material Breathing Problem,
Hearing problem,
Brush Injury
6

Debris Cleaning from the Site Breathing problems,


Brush injury,
7

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
T REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Just have a look of the stacking of the materials before commencing actual unloading.
3. No unwanted men should be there in vicinity.
4. safety shoe, helmet, gloves are mandatory for such operation.

5. Don’t lift the material from out of capacity,


6.Don’t wear lose cloth like lungi, kurta, gamchha etc during loading and unloading

1. Proper training of loading and unloading,


2. Uses of all required PPEs before starting the work,
3. Proper Information of the shifting place,
4. Never lift the material out of capacity.

1. Area Inspection before placement of Material


2. Be careful during the placement of Material on the place for cutting,
3. Avoid keeping finger under the Material,
4, Must wear Safety shoes, Hand gloves and safety helmet during job,
5. Avoid wearing loose clothes and ornaments like chain, ring or watches.

1. All workers must be trained and having the adequate knowledge of Material cutting
2. Material area must be free from any obstacle or tripping hazard,
3. Take the power supply safely with double insulated cable, Site engineer/ Site supervisor /
safety officer
4. There should be no open electrical joint,
5. All workers must wear all mandatory PPE’s like Hand gloves, Safety shoes, helmet, Safety
goggle, nose mask.
6. Always use machine guard in Cutter machine,

1. All workers must wear all required PPE


2. Lift the stone according your capacity,
4. Be careful during placing the Material on the wall or ground,
5. Wear nose mask and goggle during drilling the stone,
6. If working at height must wear safety harness,
7. During height work must barricade the area
1. Keep the Fire extinguisher nearby
2. No naked cable should be there near working area
3. If working on height must use safety harness,
4. Must use goggle, Nose mask hand gloves and all mandatory PPE’s

1. Debris must be kept at a suitable place to avoid any disturbance in other site activities.
2. It must be cleared from site at the earliest.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: PLUMBING WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Material Unloading Leg swelling,
Smashed toe,
Small injury,
Brush injury,
1 Back pain

Cutting the chase with cutter machine Scratch, Cut,


( at approachable place) Dust Allergy,
Breathing problem,
Impact injury,
Damage to ear and eye in long term.
2
Risk of injury from
equipment failure

Lifting of material from the ground level Cut Injury,


and placing at desired location Small injury,
Brush injury,
Back pain
3

Marking the Plumbing Pipe for cutting area.( Scratch, Small Injury.
4

Plumbing Pipe Cutting for fitting Scratch, Cut, Dust Allergy, Breathing
problem, Impact injury, respiratory problem,
Damage to ear and eye in long term.

Risk of injury from


5 equipment failure
Fixing of Pipe to the Designated place Leg Injury,
Brush injury or finger injury,
Cut injury due to sharp edge of stone,
Back pain due to handling of
6 stone

Removal of Residual materials from site. Scratch, Cut,


Dust Allergy,
7 Breathing problem,
back Pain.

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
T REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Just have a look of the stacking of the materials before commencing actual
unloading.
3. No unwanted men should be there in vicinity.
4. Positioning of the leg and back should be proper while manual lifting.(Back should
be straight.)

1. Backside guard must be there in the cutter to avoid backward through of the small
particles.
2. Goggles must be used to protect the eyes from small particle.
3. A firm grip on cutter machine must be maintained while cutting.
4.Powered hand tools shall be inspected by the Operator prior to use each day.
5. Tools that are not fully operational shall be tagged and labeled “Defective” &
removed from service

1. Training & Awareness


2. Just have a look of the stacking of the materials before commencing actual
unloading.
3. No unwanted men should be there in vicinity.
4. Positioning of the leg and back should be proper while manual lifting.(Back should
be straight.)

1. Have a look of the entire area for any protruded part or sharp edges to avoid cut or
brush injury.

1. Backside guard must be there in the cutter to avoid backward through of the small
particles.
2. Goggles must be used to protect the eyes from small particle.
3. A firm grip on cutter machine must be maintained while cutting.
4.Powered hand tools shall be inspected by the Operator prior to use each day.
5. Tools that are not fully operational shall be tagged and labeled “Defective” &
removed from service
1. All workers must wear all required PPE
2. Lift the Pipe according your capacity,
3. Be careful during placing the Pipe on the wall or ground,
5. Wear nose mask and goggle during drilling the Pipe,
6. If working at height must wear safety harness,
7. During height work must barricade the area

1. Debris must be kept at a suitable place to avoid any disturbance in other site
activities.
2. It must be cleared from site at the earliest.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: DEMOLITION WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Evacuation of all useful & unwanted 1. Fall materials on leg
1 materials from the area to safe zone 2. Repetitive strain on back.
3. Hand scratch during pulling materials

Barrication Of the Area 1. Fall vertical stand on legs


2

Providing scaffolding or working platform, as 1. Fall of tubes on leg or other body part,
applicable scratch or cut in hand
3 2. Person fall from height

Electric connection for power tool 1. Electric Shock during connection.


2. Body parts burn due to over load of
electric equipment.

1. Cut from moving part of machine .


2. Electric Shock, fire hazards
4 3. Dust hazards

1. Hit from loose Hammer or chisel,


2. Injury from other eqpt.

Work In height with all types of materials 1. Materials fall from height. 2.
and Tools Person fall from height. 3.
Materials fall on leg
4. Electrical shock or fire
5

Shifting of materials from site to outside 1.Fall of material on leg


6 2. Cut injury of hand
3. Repetitive strain on back.

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
T REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Proper training to workers about material handling, shifting properly
stacked

1. Proper training about


2. Material handle with care.

1. Proper training about Scaffolding work and height job safety.


2. Guard railing to prevent fall from height

1. Proper Training about electric work


2. Use cable wire, avoid of using loose and naked wire
3. Use of circuit breaker (ELCB/ MCB)
4. Use of Top Plug

1. Proper Training about electric work


2. Use cable wire, avoid of using loose and naked wire
3. Use of circuit breaker (ELCB/ MCB)
4. Use of Top Plug

1. Proper Training about demolition work and handling of tools tackle


2. Properly check of hand tools before use

1. Ensure proper mechanical guard to moving parts of machine


2. Before starting works properly check all tools & tackle.
3. Hand rail, toe guard and midrail should be mad in working platform
4. All materials hand with care
5. Life line provide where applicable

1. Training & Awareness


2. Workers should have materials shifting capacity - M<55 kg; F<30 kg.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: HVAC WORK
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Un loading of materials from vehicle to floor 1. Fall of materials on leg
level. 2. Brush injury to hand of the
workmen
3. Fall of HVAC materials on leg of
1 self or co-worker
4. Repetitive strain on back

Shifting materials from outside to specific 1. Fall of materials on leg


storage location.
2. Brush injury to hand of the
workmen
3. Fall of HVAC materials on leg of
2 self or co-worker
4. Repetitive strain on back

Stacking of Materials 1.Stacking time fall from stacking


area
2. Slip from hand fall on leg
3

Cutting the sheet as per size and shape of 1. Cutting hand or leg cut by sharp
duct edge.
2. Sparking during cutting 3. Hit
4 during handling materials.
4. Heavy noise produce during
cutting.

Folding the sheet as per wings of the duct 1. Hand cutting during folding and
handling the ducting sheet.
2. Hamer can run out of hand
5 3. Exessive noise during folding the
sheet by hamer

Applying insulation material on sheet 1. May be cut during fitting


material insulation materials
6
Fall hazard during working at height 1. Fall from height man or
materials get serious injured.
2. Bellow materials can damage by
fall of materials.

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
FORMAT REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Just have a look of the stacking of the materials before commencing actual unloading.
3. No unwanted men should be there in vicinity.
4.Positioning of the leg and back should be proper while manual lifting.(Back should be straight.)

1. Training & Awareness


2. Just have a look of the stacking of the materials before commencing actual unloading.
3. No unwanted men should be there in vicinity.
4.Positioning of the leg and back should be proper while manual lifting.(Back should be straight.)

1. All materials must be stacked clear from aisles and passageway.


2. All sharp edges of materials should be towards the wall side to avoid cut injury to the bypasses
nearby.
3. Suitable wedge block must be placed at both end of the pipe to avoid rolling of pipes.

1. Training & Awareness


2. Cutter and helper must be alert while cutting the sheet.
3. All the scrap sheet generated should be kept at safe place so that it don’t became a hazard for
others.
4. Scrap needs to be handled carefully.

1. Training & Awareness


2. Folder and helper must be alert while folding the sheet.

1. Mind should be alert while doing the work.


2. Proper training and awareness
1. Proper working platform must be provided before start of work.
2. Hand railing must be provided.
3. Safety Belt must be used while working on the platform as well as climbing up & down to the
platform.
4. While working with ladder always make sure that inclination of ladder should not be more than 75
degree.
5. While working on ladder make sure that no one should be working on top 4 lugs of ladder.
6. If ladder is being used at uneven surface then always make sure that someone should be holding
the ladder to avoid fall of ladder while working.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: INSTALLATION OF MATERIAL HOIST
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Site Selection Tilting or Collapse of hoist
Structure .
1

Fixing of Base structure Fall of material on leg.

Erection on Tower with Lower and Upper Fall of Frame


Pulley
3

Placement of Trolley on the frame Fall of Trolley


4

Fixing of Trolley with clamp of Lower Pulley Fall of trolley due to clamping
failure
5

Commissioning Twist of hand during wire rope


handling.

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
FORMAT REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


Area must be solid and levelled enough to avoid any settelment, crack or tilting of hoist. .

Carrying with suitble trolley or hydra

Movement of frame mjust be done with Mobile Crane or Chain Pulley.

Carrying with suitbae trolley or hydra, Chain must be fastened with the frame.

Trolley must be securely clampped with Lower Pulley Clamping Plate

1. Place the hoist about 3 mtrs in straight line with the tower.
2. Now the free end of the wire rope from the hoist is pulled and placed around the
bottom pulley of the tower.
3. It is pulled up the top of the tower and placed around the top pulley .
4. The wire rope is moved around the pulley to come down to the pulley attached to the
trolley.
5. The wire rope is moved around this pulley and pulled up to a point where it is fixed to a
hook and clamped with staples.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: MATERIAL HOIST OPERATION
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Switching ON Machine Serious Injury,
Fatal also ( In Extreme Condition)
1

Placing hoist bucket at required level. Impact injury,


Crush n Cut injury.

Loading Material in Bucket. Impact injury,


Crush n Cut injury.
3

Placing loaded hoist bucket at required level. Impact injury,


Brush n Cut injury
4

Unloading material from bucket Impact injury,


Crush n Cut injury.
5

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
MAT REV. NO :00 DATE : 01/04/2021

Rev. No.: 00 Date: 01/04/2021

Contractor's Name:ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


No un-authorised personel are allowed to enter the area.

1. A scaffold has been errected surrounding the bucket movement to avoid close vicinity
with bucket.
2. Rope has been marked on suitable place to get the idea about pacement of bucket.
3. Signalman is in continuous communication with operator.

1. Work is being done under proper supervision.


2. Regular Training on safety aspect being given.
3. Workmen doing putting the block or bags in bucket always uses safety belt.

1. Light has been provided for signalling.


2. Communication in different channel between Operator and signal man to avoid mis
communication.
3. Marking on wire rope has been done.

1. Work is being done under proper supervision.


2. Regular Training on safety aspect being given.
3. Workmen taking out block or bags from bucket always uses safety belt.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

Date:
Date:
Format. No : JSA-ASSA-CTC FORMAT REV. NO :00
Title : Job Safety Analysis / Job Hazard Analysis (Safe Work Method Statement)
Doc. No.: HIR-SAF-PM Department: OHSE Rev. No.: 00
Work/Activity: GRANITE MACHINE OPERATION
Project Name:
Prepared By:

Sl. No. Activity/Sub -Activity Potential Hazards


Material Unloading Damaged of material,
Body injury,
Back pain,
Cut Injury,
Fracture
1

Shifting of Material to the Material Damage,


Working Place Limbs Injury,
Cut Injury
2

Placement of Stone for Finger Injury,


Cutting at Ground Level Stone damage,
Back Pain,
3

Cutting of Stone Hearing and Breathing problem,Finger Injury,


Leg Injury, Electrical shock

Shifting of mateial from Leg Injury,


ground level to machine bed. Brush injury or finger injury,
Cut injury due to sharp edge of stone, Crush
5 injury to hand or finger,
Back pain due to handling of stone
Cutting of stone using Breathing Problem,
machine as per designated Hearing problem,
sizes Brush Injury

Debris Cleaning from the Site Breathing problems,


Brush injury,
7

Comments:

Safety Officer (ASSA CONSTRUCTION): Date:


Project Manager (ASSA CONSTRUCTION) Date:
FORMAT REV. NO :00 DATE : 01/04/2021
ent)
Rev. No.: 00 Date: 01/04/2021

Contractor's Name: ASSA CONSTRUCTION


Reviewed By:

Safety Control Measures


1. Training & Awareness
2. Just have a look of the stacking of the materials before commencing actual unloading.
3. No unwanted men should be there in vicinity.
4. safety shoe, helmet, gloves are mandatory for such operation.
5. Dont lift the material from out of capacity,
6.Dont wear lose cloth like lungi, kurta, gamchha etc during loading and unloading.

1. Propper training of loading and unloading,


2. Uses of all required PPEs before starting the work.
3. Propper Information of the shifting place.
4. Never lift the material out of capacity.

1. Area Inspection before placement of stone,


2. Be carefull during the placement of stone on the sand for cutting, 3.
Avoid keeping finger under the stone,
4. Must wear Safety shoes, Hand gloves and safety helmet during job,
5. Avoid wearing loose clothes and ornaments like chain, ring or watches.

1. All workers must be trained and having the adequate knowledge of stone cutting
2. Stone cutting area must be free from any obstacle or tripping hazard,
3. Take the power supply safely with double insulated cable, 4.
There should be no open electrical joint,
5. All workers must wear all mandatory ppes like Hand gloves, Safety shoes, helmet,
Safety goggle, nose mask.
6. Always use machine guard in Cutter machine.

1. All workers must wear all required ppe,


2. Lift the stone according your capacity,
3. Be carefull during placing the stone on the bed of the machine.
1. Only authorised operator whose phoograph affixed on the mechine can do any cutting
operation on the machine.
2. Stone cutting area must be free from any obstacle or tripping hazard,
3. Take the power supply safely with double insulated cable, 4.
There should be no open electrical joint,
5. All rotating parts of the machine must have suitable guards.
6. All workers must wear all mandatory ppes like Hand gloves, Safety shoes, helmet, Full
Covered Safety Goggles, Ear Muff and Nose Mask.
7. Always keep your fingers or any parts of hand clear from rotating wheel.
8. Never stack the material beyond 1 meter height.

1. Debris must be kept at a suitable place to avoid any disturbance in other site activities.
2. It must be cleared from site at the earliest.

Reviewed & Approved By: Date:


Project Manager (Client): Date:
DATE : 01/04/2021

Responsibility
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer
1.Site Engineer
2.Site Supervisor
3.Safety Officer

1.Site Engineer
2.Site Supervisor
3.Safety Officer