BBS SUMMARY

RELAY HUT

S.NO DESCRIPTION 8mm 10mm 12mm 16mm 20mm 25mm

1 RELAY HUT- FOOTING BBs 3,451.947

2 RELAY HUT- COLUMN BBs 1,228.594 457.538 1,670.321 3,734.568

3 RELAY HUT- Pedestal BBs 137.500

4 RELAY HUT-TIE BEAM BBs 664.652 913.610 1,338.420 1,703.704

Total qty in KG 2,030.746 - 3,451.947 1,371.148 3,008.741 5,438.272

Total qty in MT 2.031 - 3.452 1.371 3.009 5.438


32mm Total

3,451.947

7,091.021

137.500

4,620.386

- 15,300.854

- 15.301
Name of Agency:RKS Client: ECR

Name of Work: Railways Building Ref. Drg. Nos:


Location :Relay hut FOOTING

Dia Of
Sr. No. of No. of Total Measured
Description Shape Bar Spacing
No Member Sets No. Length
(mm) (mm) (m)
L B H
Type - F1 2.500 2.100 0.600
Type - F2 2.800 2.300 0.700
0.50

0.50
1 Type - F1 12 ø 0.133 8 19 152 3.000
2.000
0.50

0.50
12 ø 0.133 8 16 128 3.400
2.400
0.60

0.60
2 Type - F2 12 ø 0.123 20 23 460 3.400
2.200
0.60

0.60

12 ø 0.122 20 19 380 3.900


2.700
Consultant:

Laps / Bar Deductions for bends


Cutting
Nos of Bend Qty. Deduction per Bend
No. Length Length
(m) 45 90 135 180 45 90 135 180 (m)

2 0.048 - 2.952

2 0.048 - 3.352

2 0.048 - 3.352

2 0.048 - 3.852

Total Weight In (KG's)=


Total Weight In (MT) =
Grand Total Weight In (MT) =
Date:05-02-24
BBS Date:
Dia. Wise length (KG's)
Total Cutting
Length
8.00 10.00 12.00 16.00 20.00 25.00 32.00
(m)

448.704 - - 398.848 - - - -

429.056 - - 381.383 - - - -

1541.92 - - 1,370.596 - - - -

1463.76 - - 1,301.120 - - - -

Total Weight In (KG's)= - - 3,451.947 - - - -

Total Weight In (MT) = - - 3.452 - - - -

Grand Total Weight In (MT) = 3.452


Name of Agency:RKS Client: ECR Consultant:

Name of Work: Railway Building Ref. Drg. Nos:


Location :Relay hut COLUMN
Dia Of Laps / Bar
Sr. Spacing No. of No. of Total Measured
Description Shape Bar
No Member Sets No. Length No.
(mm) (mm) (m)
L B H
Type - C1 0.45 0.30 5.05
Type - C2 0.60 0.45 5.05
6.050

1 Type - C1 20 ø 8 2 16 6.500

0.450
5.050

2 20 ø 8 2 16 5.500
0.450
6.050

3 16 ø 8 3 24 6.500

0.450
5.050

4 16 ø 8 3 24 5.500
0.450
0.370
0.08
5 8ø 100,150 8 41 328 1.340
0.220

0.220

0.370
0.123
0.08
3 8ø 100,150 8 41 328 0.847
0.220

0.220

0.123
6.050

2 Type - C2 25 ø 20 4 80 6.500

0.450
5.050

2 25 ø 20 4 80 5.500
0.450
6.050

2 20 ø 20 2 40 6.500

0.450
5.050

2 20 ø 20 2 40 5.500
0.450
0.520
0.08
3 8ø 100,150 20 41 820 1.940
0.370

0.370

0.520
0.520
0.08
4 8ø 100,150 20 0 0 1.447
0.123

0.123

0.520
0.173
0.08
5 8ø 100,150 20 41 820 1.247
0.370

0.370

0.173
Consultant:

Date:05-02-24
BBS Date:
Laps / Bar Deductions for bends Total Cutting Dia. Wi
Cutting
Length Nos of Bend Qty. Deduction per Bend Length Length
8.00 10.00
(m) 45 90 135 180 45 90 135 180 (m) (m)

1 0.040 - 6.540 104.64 - -

1 0.040 - 5.540 88.64 - -

1 0.032 - 6.532 156.768 - -

1 0.032 - 5.532 132.768 - -

3 2 0.048 0.048 1.244 408.032 161.198 -

3 2 0.048 0.048 0.751 246.218666666666 97.272 -

1 0.050 - 6.550 524 - -

1 0.050 - 5.550 444 - -

1 0.040 - 6.540 261.6 - -

1 0.040 - 5.540 221.6 - -

3 2 0.048 0.048 1.844 1512.08 597.365 -

3 2 0.048 0.048 1.351 0 - -

3 2 0.048 0.048 1.151 943.546666666661 372.759 -

Total Weight In (KG's)= 1,228.594 -

Total Weight In (MT) = 1.229 -

Grand Total Weight In (MT) = 7.091


Dia. Wise length (KG's)

12.00 16.00 20.00 25.00 32.00

- - 258.370 - -

- - 218.864 - -

- 247.732 - - -

- 209.806 - - -

- - - - -

- - - - -

- - - 2,021.605 -

- - - 1,712.963 -

- - 645.926 - -

- - 547.160 - -

- - - - -

- - - - -

- - - - -

- 457.538 1,670.321 3,734.568 -

- 0.458 1.670 3.735 -


Name of Agency:RKS
Name of Work: Railway Building
Location :Relay hut

Dia Of
Sr. Bar
Spacing
Description Shape
No
(mm) (mm)
L B H
Type - F1 0.60 0.45 0.55
Type - F2 0.75 0.60 0.60

0.500
1 Type - F1 8ø 0.150
0.45

0.45
0.350
8ø 0.150
0.45

0.45
0.650
2 Type - F2 8ø 0.150
0.50

0.50

0.500
8ø 0.150
0.50

0.50
Client: ECR Consultant:
Ref. Drg. Nos:
PEDESTAL
Laps / Bar Deduction
No. of No. of Total Measured
Nos of Bend
Member Sets No. Length No. Length
(m) (m) 45 90 135

8 3 24 1.400 2

8 4 32 1.250 2

20 4 80 1.650 2

20 5 100 1.500 2
Date:05-02-24
BBS Date:
Deductions for bends D
Cutting Total Cutting
Bend Qty. Deduction per Bend Length
Length 8.00
180 45 90 135 180 (m) (m)

0.032 - 1.368 32.832 12.971

0.032 - 1.218 38.976 15.398

0.032 - 1.618 129.44 51.137

0.032 - 1.468 146.8 57.995

Total Weight In (KG's)= 137.500

Total Weight In (MT) = 0.138

Grand Total Weight In (MT) = 0.138


Date:05-02-24
BBS Date:
Dia. Wise length (KG's)

10.00 12.00 16.00 20.00 25.00 32.00

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
Name of Agency:RKS
Name of Work: Railway Building
Location: Relay hut

Dia Of
Sr. Member Bar
Types of Bar Shape
No Description
(mm)
1 TB1 - TB11

1.23

1.23
65.050 Bottom Bar 25 ø
65.000

0.98

0.98
65.050 Bottom Bar 20 ø
65.000

1.23

1.23
65.000
65.050 Top Bar 25 ø
0.98

0.98
65.000
65.050 Top Bar 20 ø
0.98

2.125
Top Extra 20 ø

0.98
1.775
Top Extra 20 ø

Extra @
20 ø
Junction 3.750

Extra @
20 ø
Junction 3.350

0.350

0.08
Stirrups 8ø
0.200

0.200

0.350
2 TB12 - TB14
0.98

0.98

15.000 Bottom Bar 20 ø


15.000 Bottom Bar 20 ø
14.950

0.78

0.78
15.000 Bottom Bar 16 ø
14.950

0.78

0.78
14.950
15.000 Top Bar 16 ø

0.98
1.800
Top Extra 20 ø

0.78
1.800
Top Extra 16 ø

0.98
1.700
Top Extra 20 ø

0.78
1.700
Top Extra 16 ø

Extra @
20 ø
Junction 3.100

Extra @
20 ø
Junction 3.000

0.350

0.08
Stirrups 8ø
0.200

0.200

0.350
3 A
0.30

0.30

1.650 Bottom Bar 16 ø


1.600
0.30

0.30

1.600
1.650 Top Bar 16 ø

0.450

0.08
Stirrups 8ø
0.350

0.350
Stirrups 8ø

0.350

0.350
0.450

0.30

0.30
1.850 Bottom Bar 16 ø
1.800

0.30

0.30
1.800
1.850 Top Bar 16 ø

0.450

0.08
Stirrups 8ø

0.350

0.350
0.450
Client: ECR Consultant:
Ref. Drg. Nos:
TIE BEAM
Laps / Bar D
No. of No. of Total Measured
Spacing Nos of Bend
Member Sets No. Length No. Length
(mm) (m) (m) 45 90

2 2 4 67.450 5 6.25 2

2 1 2 66.960 5 5.00 2

2 1 2 67.450 5 6.25 2

2 1 2 66.960 5 5.00 2

2 2 4 3.105 1

2 2 4 2.755 1

18 2 36 3.750

2 2 4 3.350

100,150 2 480 960 1.260 3

2 1 2 16.910 1 1.000 2
2 1 2 16.910 1 1.000 2

2 2 4 16.518 1 0.800 2

2 2 4 16.518 1 0.800 2

2 1 2 2.780 1

2 2 4 2.584 1

2 1 2 2.680 1

2 2 4 2.484 1

2 3 6 3.100

2 3 6 3.000

100,150 2 106 212 1.260 3

4 4 16 2.200 1 0.800 2

4 4 16 2.200 1 0.800 2

100,150 4 9 36 1.760 3
100,150 4 9 36 1.760 3

13 4 52 2.400 1 0.800 2

13 4 52 2.400 1 0.800 2

100,150 13 9 117 1.760 3


Deductions for bends
Total Cutting
Cutting
Nos of Bend Qty. Deduction per Bend Length
Length
135 180 45 90 135 180 (m) (m)

0.100 - 73.600 294.4

0.080 - 71.880 143.76

0.100 - 73.600 147.2

0.080 - 71.880 143.76

0.040 - 3.065 12.26

0.040 - 2.715 10.86

- - 3.750 135

- - 3.350 13.4

2 0.048 0 1.212 1163.52

0.080 - 17.830 35.66


0.080 - 17.830 35.66

0.064 - 17.254 69.016

0.064 - 17.254 69.016

0.040 - 2.740 5.48

0.032 - 2.552 10.208

0.040 - 2.640 5.28

0.032 - 2.452 9.808

- - 3.100 18.6

- - 3.000 18

2 0.048 0 1.212 256.944

0.064 - 2.936 46.976

0.064 - 2.936 46.976

2 0.048 0 1.712 61.632


2 0.048 0 1.712 61.632

0.064 - 3.136 163.072

0.064 - 3.136 163.072

2 0.048 0 1.712 200.304

Total Weight In (KG's)=


Total Weight In (MT) =
Grand Total Weight In (MT) =
Date:05-02-24
BBS Date:
Dia. Wise length (KG's)

8.00 10.00 12.00 16.00 20.00 25.00 32.00

- - - - - 1,135.802 -

- - - - 354.963 - -

- - - - - 567.901 -

- - - - 354.963 - -

- - - - 30.272 - -

- - - - 26.815 - -

- - - - 333.333 - -

- - - - 33.086 - -

459.662 - - - - - -

- - - - 88.049 - -
- - - - 88.049 - -

- - - 109.062 - - -

- - - 109.062 - - -

- - - - 13.531 - -

- - - 16.131 - - -

- - - - 13.037 - -

- - - 15.499 - - -

- - - - 45.926 - -

- - - - 44.444 - -

101.509 - - - - - -

- - - 74.234 - - -

- - - 74.234 - - -

24.348 - - - - - -
24.348 - - - - - -

- - - 257.694 - - -

- - - 257.694 - - -

79.132 - - - - - -

664.652 - - 913.610 1,338.420 1,703.704 -

0.665 - - 0.914 1.338 1.704 -


4.620