COMPLIANCE STATEMENT

Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


SECTION 05811- ARCHITECTURAL JOINT SYSTEMS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A Drawings and general provisions of the Contract, including Noted Comply
General and Supplementary Conditions and Division 1
Specification Sections, apply to this Section.
1.2 SUMMARY
A This Section includes the following:

1 Architectural joint systems for expansion joints.


Prefabricated proprietary movement joint profiles includes Noted
within tile and paving floor finishes are not part of the work of
this Section and are covered with Division 3, Section “Cement-
Based Screed” and Division 9 Sections covering tile and
paving Sections.

B Related Sections include, but shall not be limited to, the


following:

Construction Specialties Middle East 1/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


1. Division 3 Section "Cement-Based Screed". Division 3 Section "Cast-in-Place Concrete" for
2. Division 3 Section "Cast-in-Place Concrete" for cast-in cast-in architectural-joint-system frames
architectural-joint-system frames furnished, but not installed, in furnished, but not installed, in this Section.
this Section. B18:B25
3. Division 4 Section "Unit Masonry" for masonry wall joint
systems.
4. Division 7 Section "Joint Sealants" for joint sealants.
1.3 DEFINITIONS
A Maximum Joint Width: Widest linear gap a joint system Maximum Joint Width: Widest linear gap a joint Comply
tolerates and in which it performs its designed function without system tolerates and in which it performs its
damaging its functional capabilities. designed function without damaging its
functional capabilities.

Construction Specialties Middle East 2/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


B Minimum Joint Width: Narrowest linear gap a joint system Minimum Joint Width: Narrowest linear gap a Comply
tolerates and in which it performs its designed function without joint system tolerates and in which it performs its
damaging its functional capabilities. designed function without damaging its
functional capabilities.

C. Movement Capability: Value obtained from the difference Movement Capability: Value obtained from the Comply
between widest and narrowest widths of a joint opening difference between maximum opening of the
typically expressed in numerical values (mm or inches) or a profile and minimum opening of the profile. The
percentage (plus or minus) of nominal value of joint width. joint opening typically expressed in numerical
values (mm & inches) of nominal value of joint
width.

D. Nominal Joint Width: The width of the linear opening specified Nominal Joint Width: The width of the linear Comply
in practice and in which the joint system is installed. opening specified in practice and in which the
joint system is installed.

1.4 SUBMITTALS SUBMITTALS


A. Manufacturer’s Standard Details: Sections, details, splices, CS will provide section details of all proposed Comply
block out requirement, and attachments to other work. model and the installation manual which shows
splices,blockout requirements.

Construction Specialties Middle East 3/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


B Placement Drawings: Include line diagrams showing plans, CS will provide line diagram showing planes, Comply
entire route of each joint system and elevations. Where joint entire route of each joints system and elevation.
systems change planes, provide isometric or clearly detailed CS will provide transition details of the
drawing depicting how components interconnect. expansion joint where it changes the plane. The
isometric drawing will be also provided which
shows the connection between the component.

C Architectural Joint System Schedule: Prepared by or under the Noted Comply


supervision of the supplier. Include the following information in
tabular form:
1. Manufacturer and model number for each joint system. 1. Manufacturer and model number for each Comply, Please
2. Joint system location cross-referenced to Drawings. joint system. refere technical data
3. Nominal joint width. 2. Joint system location cross-referenced to sheet, drawings and
4. Movement capability. Drawings. installation manual
5. Classification as thermal or seismic. 3. Nominal joint width. which has all the
6. Materials, colors, and finishes. 4. Movement capability. information listed in
7. Product options. 5. Classification as thermal or seismic. this specs.
8. Fire-resistance ratings. 6. Materials, colors, and finishes.
7. Product options.
8. Fire-resistance ratings.

Construction Specialties Middle East 4/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


D. Samples for Initial Selection: For each type of joint system Noted, CS will provide sample for each type of Comply
indicated. proposed model for review and approval.

1 Include manufacturer's color charts showing the full range of Noted, CS will provide color charts showing the Comply
colors and finishes available for each exposed metal and full range of colors and finishes available for
elastomeric seal material. each exposed metal and elastomeric seal
material.
E Samples for Verification: For each type of architectural joint Noted Comply
system indicated.

1 Full width by 150 mm long, for each system required. CS will provide sample 150mm long for each Comply
system proposed.

F Warranty: Sample copy of manufacturer's proposed warranty Noted, CS draft warranty enclosed in the Comply
complying with specified requirements, and stating obligations, submittal for reference.
remedies, limitations, and exclusions of warranty.

Construction Specialties Middle East 5/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


G Product Test Reports: Based on evaluation of comprehensive CS will provide performance test report for all Comply
tests performed by manufacturer for current products. proposed expansion joint covers model which
has been tested under Architectural Testing
Agency in USA and fire barrier test report tested
under UL.
H Maintenance Data: Include in project`s operation and CS Maintenance data sheet enclosed in the Comply
maintenance manual. submittal.

1.5 QUALITY ASSURANCE


A Installer Qualifications: An employer of workers trained and CS will provide training to the installation team. Comply
approved by manufacturer.

B Source Limitations: Obtain architectural joint systems through CS is supplying expansion joint covers and fire Comply
one source from a single manufacturer. barrier from single source.

C Product Options: Drawings indicate size, profiles, and CS will provide the section details of the Comply
dimensional requirements of architectural joint systems and proposed model which indicates size, profiles,
are based on the specific systems indicated. Refer to Division and dimensional requirements of architectural
1 Section "Product Requirements." joint systems and are based on the specific
systems indicated.

Construction Specialties Middle East 6/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


1 Do not modify intended aesthetic effects, as judged solely by Noted Comply
Engineer, except with Engineer's approval. If modifications are
proposed, submit comprehensive explanatory data to Engineer
for review.
D. Fire-Test-Response Characteristics: Provide architectural joint Fire-Test-Response Characteristics: Provide Comply, Please
system and fire-barrier assemblies identical to those of architectural joint system and fire-barrier refere CS enclosed
assemblies tested for fire resistance per UL 2079 or ASTM E assemblies identical to those of assemblies fire barrier test
1966 by a testing and inspecting agency acceptable to tested for fire resistance per UL 2079 or ASTM E report.
authorities having jurisdiction. 1966 by a testing and inspecting agency
acceptable to authorities having jurisdiction.

1. Floor- to-Floor Assemblies: All assemblies are fire rated. Noted Comply
2. Soffit-to-Soffit Assemblies: Where indicated on Drawings or
mandated by applicable fire code.
3. Floor-to-Wall Assemblies: All assemblies are fire rated.
4. Wall-to-Wall Assemblies: Assemblies in fire rated walls are
to be fire rated.
5. Fire resistance rating of joint assembly is to be identical to
fire rating of the construction to which joint assembly will be
installed.

PART 2 - PRODUCTS PART 2 - PRODUCTS

Construction Specialties Middle East 7/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


2.1 MANUFACTURERS MANUFACTURERS
Available Manufacturers: Subject to compliance with Construction Specialties Middle East LLC Comply
requirements, manufacturers offering products that may be 1705 World Trade Centre
incorporated into the Work include, but are not limited to, the P.O. Box 9260
following: DUBAI, U.A.E
1. Construction Specialties C/S, Inc.
2. Balco, Inc.
3. Nystrom, Inc.
4. Joint Master/InPro Corporation.
5. Michael Rizza Company, LLC.
6. Architectural Art Mfg., Inc.
2.2 MATERIALS
A. Aluminum: ASTM B 221M, Alloy 6063-T5 for extrusions; ASTM Aluminum: ASTM B 221, Alloy 6005A-T61, 6063- Comply
B 209M, Alloy 6061-T6 for sheet and plate. T5, 6061-T5, 6105-T5 for extrusions; ASTM B
209,Alloy 6061-T6, 3003-H14, 5005-H34 for
sheet and plate.

Construction Specialties Middle East 8/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


1. Apply manufacturer's standard protective coating on 1. CS standard protective coating on aluminum Class I ,Clear
aluminum surfaces to be placed in contact with cementitious surfaces to be placed in contact with Anodic Finish:
materials. cementitious materials. AAMA 611, AA-
2. Mill Finish: AA-M10 (Mechanical Finish: As fabricated, 2. Mill Finish: AA-M10 M12C22A41, Class
unspecified). 3. Class II, Clear Anodic Finish: AA-M12C22A31 I, 0.018 mm or
3. Clear Anodic Finish: AAMA 611, AA-M12C22A41, Class I, (Mechanical Finish: thicker can also be
0.018 mm or thicker nonspecular as fabricated; Chemical Finish: provided upon
etched, medium matte; Anodic Coating: request.
Architectural Class II, clear coating 0.010 mm or
thicker) complying with AAMA 611.
B Elastomeric Seals: Preformed elastomeric membranes or Noted Comply
extrusions to be installed in metal frames.
C Compression Seals: ASTM E 1612; preformed rectangular Compression Seals: ASTM D2000; preformed Please see attached
elastomeric extrusions having internal baffle system and rectangular elastomeric extrusions having technical data sheet
designed to function under compression. internal baffle system and designed to function for the proposed
under compression. rubber type model if
any for the
architectural
compression
performance.

Construction Specialties Middle East 9/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


D. Strip Seals: ASTM E 1783; preformed elastomeric membrane Compression Seals: ASTM D2000; preformed Please see attached
or tubular extrusions having an internal baffle system and rectangular elastomeric extrusions having technical data sheet
secured in or over a joint by a metal locking rail. internal baffle system and designed to function for the proposed
under compression. rubber type model if
any for the
architectural
compression
performance.

E Elastomeric Concrete: Modified epoxy or polyurethane Noted NA


extended into a prepackaged aggregate blend, specifically
designed for bonding to concrete substrates.

F Fire Barriers: Any material or material combination, when fire Fire Barriers:CS proposed fire barrier when fire Comply
tested after cycling, designated to resist the passage of flame tested after cycling, designated to resist the
and hot gases through a movement joint and to meet passage of flame and hot gases through a
performance criteria for required rating period. movement joint and to meet performance criteria
for required rating period.

1 Provide blanket-type fire barriers. Fire barriers in the form of CS has proposed blanket type fire barrier OFX Comply
joint sealant or intumescent blocks are not acceptable. series.

Construction Specialties Middle East 10/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


G Water Barrier: Flexible elastomeric material that is hot-air Noted Comply
weldable, so as the water stop setting in place shall form
continuous one integral piece that is perfectly watertight and
shall not allow any water leak.

1. Material: TPO. 1. Material: TPO. Comply


2. Material spliced with adhesive or adhesive tapes similar to 2. Material spliced with adhesive or adhesive
EPDM may also be used. tapes similar to EPDM may also be used.
3. Thickness: To be stated by manufacturer based on the 3. Thickness: 2mm
proposed type of membrane. 4. water barrier integrated with waterproofing
4. To be integrated with waterproofing membranes at sides of membranes at sides of the expansion joints,
the expansion joints, where applicable. where applicable.

H Accessories: Manufacturer's standard anchors, clips, CS standard anchors, clips, fasteners, set Comply
fasteners, set screws, spacers, and other accessories screws, spacers, and other accessories
compatible with material in contact, as indicated or required for compatible with material in contact, as indicated
complete installations. or required for complete installations.

Construction Specialties Middle East 11/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


I Cover-Plate: 10 mm thick serrated aluminum sheet with mill Cover-Plate: 10 mm thick serrated aluminum Comply, CS has
finish. sheet with mill finish. proposed based on
BOQ & Drawings.
Plate will be
proposed on
request.

2.3 ARCHITECTURAL JOINT SYSTEMS, GENERAL


A General: Provide architectural joint systems of design, basic Noted, CS standard length of expansion joint Comply
profile, materials, and operation indicated. Provide units with covers are 3meter and 6meter.
capability to accommodate variations in adjacent surfaces.
1. Furnish units in longest practicable lengths to minimize field
splicing. Install with hairline mitered corners where joint
changes direction or abuts other materials.

2. Include factory-fabricated closure materials and transition CS will provide factory-fabricated closure Comply
pieces, tee-joints, corners, curbs, cross-connections, and other materials and transition pieces, tee-joints,
accessories as required to provide continuous joint systems. corners, curbs, cross-connections, and other
accessories as required to provide continuous
joint systems.

Construction Specialties Middle East 12/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


B Design architectural joint systems for the following size and Noted Comply
movement characteristics:
1. Nominal Joint Width: As indicated on Drawings.
2. Movement Capability: As indicated on Drawings.
3. Type of Movement: Thermal and seismic.
a. Horizontal.
b. Vertical.

C. Fire Barriers: Provide fire barriers as follows: Noted Comply


1. In all floor-to-floor and floor-to-wall expansion joint
assemblies within suspended structural slabs.
2. In all wall-to-wall expansion joint assemblies in fire-rated
walls.
3. Where indicated on Drawings.

D. Water Stops: Provide water stops as follows: Noted Comply


1. In all floor-to-floor and floor-to-wall expansion joint
assemblies.
2. In all wall-to-wall expansion joint assemblies within exterior
walls at building periphery.
2.4 ARCHITECTURAL JOINT SYSTEMS

Construction Specialties Middle East 13/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


A. 1. Use: Joints 50 mm wide at expansion building ground floor. 1) Floor-to-Floor Joint Systems: CS proposed Comply
2. Type: Gasketed floor cover comprised santoprene seal model GFT-200x2''
firmly set between two metal 2) Type: The dual durometer TPR gasket has
frames anchored on top of structural slab. rigid edges designed to lock into the aluminum
a. Metal frame: Extruded Aluminum. side frames.
1) Finish: Mill. a. Metal frame: Extruded Aluminum.
b. Seal Material: Santoprene. 1) Finish: Mill.
1) Color: As selected by Engineer from manufacturer's full b. Seal Material: The dual durometer TPR
range. gasket
1) Color: Gasket is available in Black, White,
Gray, Greige and Platinum
3. Attachment Method: Stainless steel cast in place anchors. 3. Attachment Method: Stainless steel cast in
4. Load Capacity: Extra heavy duty. place anchors.
5. Movement Capability: As specified before. 4. Load Capacity: Extra heavy duty.
6. Type of Movement: Thermal and seismic. 5. Movement Capability: +/-50%
6. Type of Movement: Thermal and seismic.

Construction Specialties Middle East 14/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


7. Fire-Resistance Rating: Provide joint system and fire-barrier 7. Fire-Resistance Rating: Provide joint system Comply
assembly with a rating and fire-barrier assembly with a rating not less
not less than that of adjacent construction. than that of adjacent construction.
8. Fire Barrier: As specified before. 8. Fire Barrier: RFX-2F
9. Moisture Barrier: As specified before. 9. Moisture Barrier: EPDM water barrier
10. Reference Product: GFT-200 X 2’’ W/RFX-2F from C/S 10. Reference Product: CS proposed model
group or other equal and GFT-200 X 2’’ W/RFX-2F
approved product.

B. Floor-to-Floor Joint Systems: Floor-to-Floor Joint Systems:

Construction Specialties Middle East 15/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


1. Use: Joints more than 50 mm wide at raised floor typical and 1) CS proposed model: SSR series. Comply
roof floor and at piazza 2) Recessed type that allows deferred
slabs. installation of marble. This flush floor cover is
2. Recessed type that allows deferred installation of marble. ideal where a concealed cover is desired. The
3. Fully integrated seamless floor system cover plate has a deep recess that allows for
4. Heavy duty to be cable of withstands against the loads of the thicker floor finish materials (1-1/2” thick).
maintenance 3. Fully integrated seamless floor system
equipments. 4. Heavy duty to be cable of withstands against
5. Frame Material: Mill finish aluminum. the loads of the maintenance equipment's.
5. Frame Material: Mill finish aluminum.

Construction Specialties Middle East 16/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


6. Extruded aluminum base frames and center plate 6. Extruded aluminum base frames and center Comply
7. The aluminum center plate is an extruded modular section plate.
and is retained by a series 7. The aluminum center plate is an extruded
of steel channel turnbars. modular section and is retained by a series of
8. Backer rod and sealant to be installed between the frame steel channel turnbars.
and the center plate. 8. Backer rod and sealant to be installed
9. Fire resistance rating is to be not less than that of adjacent between the frame and the center plate.
construction. 9. CS proposed fire barrier are 2 Hours Fire
10. Movement Capability: 50-100 %. rated.
11. Type of Movement: Thermal and seismic. 10. Movement Capability: 50-100 %.
11. Type of Movement: Thermal and seismic.

Construction Specialties Middle East 17/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


12. Opening width: As indicated on Structural Drawings. 12. Opening width: As indicated on Structural Comply
13. Height: To be coordinated with height of finish flooring. Drawings, Technical data sheet enclosed which
14. Fire Barrier: As specified before. shows the movements in term of max. opening
15. Moisture Barrier: As specified before. and min. opening.
16. Reference Product: SSR from C/S group or other equal 13. Height: To be coordinated with height of
and approved product. finish flooring.
14. Fire Barrier: 2 Hours Fire barrier RFX-F or
OFX-F based on the joint sizes and
specification.
15. Moisture Barrier: EPDM Moisture barrier
16. Reference Product: CS proposed model
SSR series

C Floor-to-Wall Joint and Wall to Wall Systems: Shall be from Floor-to-Wall Joint and Wall to Wall Systems: Comply
same manufacturer of Floor-to-Floor assemblies, same series, CS will proposed Floor-to-Floor assemblies,
configuration, movement capability and finish material but same series, configuration, movement capability
fabricated for floor-to-wall joint system. and finish material but fabricated for floor-to-wall
joint system.

Construction Specialties Middle East 18/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


D. Floor-to-Floor and Floor-to-Wall Joint Systems: Floor-to-Floor and Floor-to-Wall Joint Systems: Comply
1. Use: Joints at piazza basement. 2. Type: Center plate.
2. Type: Center plate. a. Exposed Metal: Aluminum.
a. Exposed Metal: Aluminum. 1) Finish: Mill.
1) Finish: Mill. 3. Attachment Method: Mechanical anchors.
3. Attachment Method: Mechanical anchors. 4. Frame Material: Mill finish aluminum.
4. Frame Material: Mill finish aluminum.

5. Fire resistance rating is to be not less than that of adjacent 5. CS proposed fire barrier are 2 Hours fire rated Comply..
construction. 6. Fire Barrier: CS proposed fire barrier are RFX
6. Fire Barrier: As specified before. series or OFX series based on the joint sizes
7. Moisture Barrier: As specified before. 7. Moisture Barrier: As specified before.
8. Movement Capability: ± 50 %. 8. Movement Capability: ± 50 %.
9. Type of Movement: Thermal and seismic. 9. Type of Movement: Thermal and seismic.
10. Opening width: As indicated on Structural Drawings. 10. Opening width: As indicated on Structural
Drawings.

Construction Specialties Middle East 19/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


E Floor-to-Floor Joint Systems: 1. Use: Joints at structural Floor-to-Floor Joint Systems: CS proposal is
concrete slabs under raised floor in typical floor. 2. Type: Cover plate. based on the
2.. Type: Cover plate. a. Metal: Minimum 8.00 mm thick aluminum provided BOQ.
a. Metal: Minimum 8.00 mm thick aluminum plate. plate. Cover plate will be
1) Finish: Clear anodic, Class I. 1) Finish: Clear anodic, Class I. proposed upon
b. Cover-Plate Design: Plain with grooved (serrated) top. b. Cover-Plate Design: Plain with grooved request
3. Attachment Method: Stainless steel cast in place anchors at (serrated) top.
only one side of the joint. 3. Attachment Method: Stainless steel cast in
4. Load Capacity: Extra heavy duty. place anchors at only one side of the joint.
5. Joint Width: As indicated on Drawings. 4. Load Capacity: Extra heavy duty.
5. Joint Width: As indicated on Drawings.

6. Movement Capability: As specified before. 6. Movement Capability: As specified before. Comply


7. Type of Movement: Thermal and seismic. 7. Type of Movement: Thermal and seismic.
8. Fire-Resistance Rating: Provide fire-barrier with a rating not 8. Fire-Resistance Rating: Provide fire-barrier
less than that of adjacent construction (2 hours minimum). with a rating not less than that of adjacent
9. Moisture Barrier: As specified before to be coordinated with construction (2 hours minimum).
the waterproofing of the typical floor under raised floor. 9. Moisture Barrier: As specified before to be
coordinated with the waterproofing of the typical
floor under raised floor.

Construction Specialties Middle East 20/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


F. Floor-to-Floor Joint Systems: 1. Fire-retardant-impregnated CS will propose VF series with Aluminum cover CS proposal is
foam covered with trafficable grade silicone facing and plate on top as per the specs. This based on the
aluminum cover plate. precompressed fire retardant impregnated foam provided BOQ. Fire
2. The silicone-and-impregnated foam hybrid components act with both facing sides of waterproof silicone. rerardant
to anchor the system, ensure water tightness, absorb sound, Symmetrical in design, either side can face out impregnated foam
and dampen vibration. from an exterior or interior wall and maintain a 2 will be proposed
hour fire rating. upon request
3. Fire-retardant-impregnated foam is factory pre-coated on the This precompressed fire retardant impregnated Comply
underside with an intumescent fireproofing material. foam with both facing sides of waterproof
4. The traffic surface and the bottom both receive a watertight silicone. Symmetrical in design, either side can
silicone outer coating. face out from an exterior or interior wall and
5. Epoxy gel adhesive is to be applied to the faces of the joint maintain a 2 hour fire rating.
opening.

6. The fire-retardant foam ends are coated with a full layer of 6. The fire-retardant foam ends are coated with CS proposal is
intumescent sealant. a full layer of intumescent sealant. based on the
7. Cover plate is (10mm) shot-blasted aluminum. 7. Cover plate is (10mm) shot-blasted aluminum. provided BOQ.
8. Total 100% movement capability: +50% and -50%. 8. Total 100% movement capability: +50% and - Mentioned profiles
9. Fire resistance rating is to be not less than that of adjacent 50%. will be proposed
construction. 9. Fire resistance rating to be 2 Hours. upon request
10. Reference Product: SJS-FR1 as manufactured by Emseal 10. Reference Product: CS proposed model PC-
or other equal and approved product. MOD+VFR series

Construction Specialties Middle East 21/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


G Wall-to-Wall Joint Systems: Wall-to-Wall Joint Systems: CS proposed model CS proposal is
1. Multi-faced, silicone-coated, precompressed, primary seal in VF series based on the
structural. 1. Multi-faced, silicone-coated, precompressed, provided BOQ.
2. Hydrophobic-acrylic-impregnated foam sealant, factory pre- primary seal in structural. Mentioned profiles
coated with high-grade silicone. Watertight, odorless, clean 2. Hydrophobic-acrylic-impregnated foam will be proposed
handling, UV stable, non-staining, low temperature flexible, sealant, factory pre-coated with high-grade upon request
high-temperature stable. silicone. Watertight, odorless, clean handling,
3. Total 100% movement capability: +50% and -50%. UV stable, non-staining, low temperature
flexible, high-temperature stable.
3. Total 100% movement capability: +50% and -
50%.

Construction Specialties Middle East 22/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


4. Seals combine factory-applied, low-modulus silicone, with This precompressed low-modulus silicone with CS proposal is
open-cell polyurethane foam infused with a water-based, non- an open-cell polyurethane foam infused with a based on the
drying acrylic dispersion. water-based, non-drying acrylic dispersion. The provided BOQ.
5. Typical Physical Properties: precompressed foam is available in 12 standard Mentioned profiles
a. Durometer Hardness (as cured) as per ASTM C 661: colors and supplied in 6’-6” lengths. will be proposed
Silicone Coating: Not to exceed 25 pts (±5), Shore A. Durometer Hardness upon request
b. Tensile Strength as per ASTM D 3574: 145 kPa. • ASTM C661, Shore Al, Silicone coating - not to
6. Reference Product: Seismic Colorseal-DS as manufactured exceed 25pts (±5)
by Emseal or other equal and approved product. b. Tensile Strength as per ASTM D 3574: 145
kPa.
6. Reference Product: Seismic VF series

H Wall-to-Wall Joint Systems: 1. Use: Joints at piazza basement. Wall-to-Wall Joint Systems: Comply
2. Type: Vertical cover plate. 2. Type: Vertical cover plate.
a. Exposed Metal: Aluminum. a. Exposed Metal: Aluminum.
1) Finish: Class II, clear anodic. 1) Finish: Class II, clear anodic.
3. Attachment Method: Mechanical anchors. 3. Attachment Method: Mechanical anchors.
4. Frame Material: Mill finish aluminum. 4. Frame Material: Mill finish aluminum.

Construction Specialties Middle East 23/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


5. Fire resistance rating is to be not less than that of adjacent 5. Fire resistance rating is to be not less than Comply
construction. that of adjacent construction.
6. Fire Barrier: As specified before. 6. Fire Barrier: 2 Hours
7. Moisture Barrier: As specified before. 7. Moisture Barrier: EPDM
8. Movement Capability: ± 50%. 8. Movement Capability: ± 50%.
9. Type of Movement: Thermal and seismic. 9. Type of Movement: Thermal and seismic.
10. Opening width: As indicated on Structural Drawings. 10. Opening width: As indicated on Structural
Drawings.
I Wall-to-Wall Exterior Joint Systems: Recessed type that allows Wall-to-Wall Exterior Joint Systems: Recessed Comply
deferred installation of marble. type that allows deferred installation of marble.
2. Continuous extruded aluminum frame assemblies of suitable 2. Continuous extruded aluminum frame
profile to receive lightweight aluminum center pan of design assemblies of suitable profile to receive
indicated. lightweight aluminum center pan of design
3. Center pan to be held in place with hinge assembly on one indicated.
side and magnetic latch assembly opposite side. 3. Center pan to be held in place with hinge
assembly on one side and magnetic latch
assembly opposite side.

Construction Specialties Middle East 24/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


4. Center pan counter weighted to return cover and reset after 4. Center pan counter weighted to return cover Comply
movement and to secure cover under wind loads. and reset after movement and to secure cover
5. Center pan to have lightweight aluminum frame to allow for under wind loads.
attachment of Marble finish panels. 5. Center pan to have lightweight aluminum
6. Opening width: As indicated on Structural Drawings. frame to allow for attachment of Marble finish
panels.
6. Opening width: As indicated on Structural
Drawings.

7. Fire Barrier: As specified before. 7. Fire Barrier: As specified before. Comply


8. Movement Capability: 50-100%. 8. Movement Capability: 50-100%.
9. Type of Movement: Thermal and seismic. 9. Type of Movement: Thermal and seismic.
10. Reference Product: XLS 1000 from C/S group or other 10. Reference Product: XLS 1000 from C/S
equal and approved product. group or other equal and approved product.

Construction Specialties Middle East 25/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


J Ceiling-to-Ceiling Joint Systems: 1. Use: Joints at piazza slabs. Ceiling-to-Ceiling Joint Systems: Comply
2. Type: Compression seal. 2. Type: Compression seal.
a. Seal Material: EPDM. a. Seal Material: EPDM.
1) Color: As selected by Engineer from manufacturer's full 1) Color: As selected by Engineer from
range. manufacturer's full range.
3. Opening width: As indicated on Structural Drawings. 3. Opening width: As indicated on Structural
4. Attachment Method: Compressed and adhered with epoxy Drawings.
adhesive is to be applied to the faces of the joint opening. 4. Attachment Method: Compressed and
adhered with epoxy adhesive is to be applied to
the faces of the joint opening.

5. Fire Barrier: As specified before. 5. Fire Barrier: As specified before. Comply


6. Movement Capability: 50%. 6. Movement Capability: 50%.
7. Type of Movement: Thermal and seismic. 7. Type of Movement: Thermal and seismic.
8. Fire resistance rating is to be not less than that of adjacent 8. 2 Hours
construction. 9. Reference Product: CS proposed model HB
9. Reference Product: HB from C/S group or other equal and series
approved product.

Construction Specialties Middle East 26/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


K Ceiling-to-Ceiling Joint Systems: 1. Use: Joints 75 mm wide at Ceiling-to-Ceiling Joint Systems: Comply
suspended acoustical ceiling in expansion building. 2. Type: Accordion.
2. Type: Accordion. a. Seal Material: Dual durometer PVC.
a. Seal Material: Dual durometer PVC. 1) Color: White
1) Color: As selected by Engineer from manufacturer's full 3. Reference Product: CS proposed model HC
range. series
3. Reference Product: HC from C/S group or other equal and
approved product.

L Ceiling-to-Walls Joint Systems: 1. Use: Joints 75 mm wide at Ceiling-to-Ceiling Joint Systems: Comply
suspended acoustical ceiling in expansion building. 2. Type: Accordion.
2. Type: Accordion. a. Seal Material: Dual durometer PVC.
a. Seal Material: Dual durometer PVC. 1) Color: White
1) Color: As selected by Engineer from manufacturer's full 3. Reference Product: CS proposed model HCW
range. series
3. Reference Product: HCW from C/S group or other equal and
approved product

Construction Specialties Middle East 27/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


M Ceiling-to-Ceiling Joint Systems: 1. Use: Joints more than 75 Ceiling-to-Ceiling Joint Systems: Comply
mm wide at suspended acoustical ceiling in expansion 2. Type: cover panel
building a. Exposed Metal: Aluminum.
2. Type: cover panel 3. Panel Finish: Factory applied clear epoxy
a. Exposed Metal: Aluminum. primer and field applied paint or wall covering.
3. Panel Finish: Factory applied clear epoxy primer and field 4. Frame Finish: Class II, clear anodic.
applied paint or wall covering.
4. Frame Finish: Class II, clear anodic.

5. Panels held in place with hook and loop attachment system 5. Panels held in place with hook and loop Comply
and incorporate a secondary system comprised of a pre- attachment system and incorporate a secondary
tensioned shock cord. system comprised of a pre-tensioned shock
6. Covers that utilize turnbars or other similar centering devices cord.
limit lateral shear movement and are not acceptable. 6. Covers that utilize turnbars or other similar
7. Reference Product: LAF from C/S group or other equal and centering devices limit lateral shear movement
approved product. and are not acceptable.
7. Reference Product: CS proposed model LAF
series based on the drawing and specification

Construction Specialties Middle East 28/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


N Ceiling-to-Ceiling Joint Systems: . 1. Use: Joints at piazza Ceiling-to-Ceiling Joint Systems: Comply..
basement ceiling. 2. Type: Center plate.
2. Type: Center plate. a. Exposed Metal: Aluminum.
a. Exposed Metal: Aluminum. 1) Finish: Class II, clear anodic.
1) Finish: Class II, clear anodic. 3. Attachment Method: Mechanical anchors.
3. Attachment Method: Mechanical anchors. 4. Frame Material: Mill finish aluminum.
4. Frame Material: Mill finish aluminum. 5. Movement Capability: ± 50%.
5. Movement Capability: ± 50%. 6. Type of Movement: Thermal and seismic.
6. Type of Movement: Thermal and seismic. 7. Opening width: As indicated on Structural
7. Opening width: As indicated on Structural Drawings. Drawings.
O Ceiling-to-Walls Joint Systems: 1. Use: Joints more than 75 Ceiling-to-Walls Joint Systems: Comply
mm wide at suspended acoustical ceiling in expansion 2. Type: cover panel
building. a. Exposed Metal: Aluminum.
2. Type: cover panel 3. Panel Finish: Factory applied clear epoxy
a. Exposed Metal: Aluminum. primer and field applied paint or wall covering.
3. Panel Finish: Factory applied clear epoxy primer and field 4. Frame Finish: Class II, clear anodic.
applied paint or wall covering.
4. Frame Finish: Class II, clear anodic.

Construction Specialties Middle East 29/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


5. Panels held in place with hook and loop attachment system 5. Panels held in place with hook and loop Comply
and incorporate a secondary system comprised of a pre- attachment system and incorporate a secondary
tensioned shock cord. system comprised of a pre-tensioned shock
6. Covers that utilize turnbars or other similar centering devices cord.
limit lateral shear movement and are not acceptable. 6. Covers that utilize turnbars or other similar
7. Reference Product: LAFC from C/S group or other equal centering devices limit lateral shear movement
and approved product. and are not acceptable.
7. Reference Product: CS Proposed model
LAFC series
P Ceiling-to-Ceiling Joint System: To include aluminum framing Noted Comply
and vinyl seal of color selected by Engineer. Finish of
aluminum is to match finish of exposed ceiling suspension
system. Coordinated with suspended ceiling system.
1. Movement Capability: As specified before.

PART 3 - EXECUTION

3.1 EXAMINATION

Construction Specialties Middle East 30/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


A Examine surfaces and blockouts where architectural joint Noted
systems will be installed for installation tolerances and other
conditions affecting performance of work.

1 Proceed with installation only after unsatisfactory conditions Noted


have been corrected.
3.2 PREPARATION
A Prepare substrates according to architectural joint system Noted/ during installation.
manufacturer's written instructions.
B Repair concrete slabs and blockouts using manufacturer's Noted/ during installation.
recommended repair grout of compressive strength adequate
for anticipated structural loadings.

C Coordinate and furnish anchorages, setting drawings, and Noted/Included in installation Package
instructions for installing joint systems. Provide fasteners of
metal, type, and size to suit type of construction indicated and
to provide for secure attachment of joint systems.

Construction Specialties Middle East 31/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


D. Cast-In Frames: Coordinate and furnish frames to be cast into Noted/during installation
concrete.

3.3 INSTALLATION
A Comply with manufacturer's written instructions for storing, Noted CS is the manufacturer
handling, and installing architectural joint assemblies and
materials unless more stringent requirements are indicated.

B Water Barriers: Install water stops so as the installed Noted to be coordinated with slab isolation.
architectural joint assembly is perfectly watertight and shall not
allow leak of water between floors through joint opening:
1. Confirm that no surface water can leak through opening
under sides of water stop fixed to opening sides.
2. Prior to installing remaining parts of each architectural joint
assembly inclusive of a water stop, fluid test the water stop to
insure its water tightness. Submit test procedure to approval of
Engineer.

C Metal Frames: Perform cutting, drilling, and fitting required to Noted


install joint systems.

Construction Specialties Middle East 32/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


1. Install in true alignment and proper relationship to joints and Noted/during installation
adjoining finished surfaces measured from established lines
and levels.
2. Adjust for differences between actual structural gap and
nominal design gap due to ambient temperature at time of
installation. Notify Engineer where discrepancies occur that will
affect proper joint installation and performance.
3. Cut and fit ends to accommodate thermal expansion and
contraction of metal without buckling of frames

4. Locate in continuous contact with adjacent surfaces. Noted/during installation


5. Heavy-Duty Systems: Repair or grout block out as required
for continuous frame support and to bring frame to proper
level. Shimming is not allowed.
6. Locate anchors at interval recommended by manufacturer,
but not less than 75 mm from each end and not more than 600
mm o.c.

Construction Specialties Middle East 33/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


D. Seals in Metal Frames: Install elastomeric seals and Noted
membranes in frames to comply with manufacturer's written
instructions. Install with minimum number of end joints.
1. Provide in continuous lengths for straight sections.
2. Seal transitions according to manufacturer's written
instructions. Vulcanize or heat-weld field-spliced joints as
recommended by manufacturer.

3. Installation: Mechanically lock seals into frames or adhere to Noted


frames with adhesive or pressure-sensitive tape as
recommended by manufacturer.

E Compression Seals: Apply adhesive or lubricant adhesive as Noted


recommended by manufacturer to both frame interfaces before
installing compression seals.

F Terminate exposed ends of joint assemblies with field- or Noted


factory-fabricated termination devices.

Construction Specialties Middle East 34/35


COMPLIANCE STATEMENT
Project: King Abdullah Bin Abdulaziz Project- Holy Haram - Date: 14th July 2020
Service Building BID-807

Contractor: SBG- Haramain Division Product: Expansion Joint Cover / EJC


Proposal For This Bid Is As Per DWG S07102_1-3-AR-F (1) / S07102_1-3-AR-F& BOQ.

# Provided Specifications Proposed Material Specification Remarks


G Fire-Resistance-Rated Assemblies: Coordinate installation of Noted
architectural joint assembly materials and associated work so
complete assemblies comply with assembly performance
requirements.
1. Fire Barriers: Install fire barriers to provide continuous,
uninterrupted fire resistance throughout length of joint,
including transitions and field splices.

3.4 PROTECTION
A Do not remove protective covering until finish work in adjacent Noted
areas is complete. When protective covering is removed, clean
exposed metal surfaces to comply with manufacturer's written
instructions.
B Protect the installation from damage by work of other Sections. Noted
Where necessary due to heavy construction traffic, remove
and properly store cover plates or seals and install temporary
protection over joints. Reinstall cover plates or seals prior to
Substantial Completion of the Work.

Construction Specialties Middle East 35/35