Issue No: 2 Document Title: Page No.

:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) Page |0
ቅጽ

Ethiopian Construction Works Corporation

Construction Inputs Production Center

Product Monitoring and Control team

Work execution report for the month of September

September 2023E.C

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities
በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) Page |1
ቅጽ

Introduction

Product monitoring and control team is among the teams working under input and production
monitoring department.

The main goal of the team is

1. Each production unit can achieve required standard (production target), optimum utilization of
resources and also minimize cost by controlling raw material consumption for products and
reduced the wastage.

2. Ensure the delivery of different products produced at input production center at the intended
time and in accordance to the customer request. And also minimize cost by controlling raw
material consumption for products and reduced the wastage.

This report are four parts

 The results of Production Monitoring and controlling tasks


 Work order status
 Problem encore and remedial actions
 Recommendation and conclusion

The major portion of our report that presented the summary of production unit's performance this
month that emplace daily and weekly production monitoring works are the sections of this
report, as well as work order status.

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) Page |2
ቅጽ
1.1 Summary of results of monitoring tasks

1.1.1 Prefabricated elements

physica Physical
financial financial
l plan executio
Description for the n for the
plan for the execution
month for
month month

3,542,0
1 743 280 38% 10%
Girder 29.37 355,876.04
8,128,7 1,002,06
288 34 12% 12%
2 Footing 20.80 4.36
6,789,3
162 39 24% 24%
3 Shear wall 11.46 1,634,463.87
8,924,5 3,368,11
360 136 38% 38%
4 Cantilever 47.35 3.11

567 30,128,401.1 13,071,581.4


5 Slab N34 246 43% 7 6 43%
16.5
6 Landing 6 36% 733,893.93 266,870.52 36%
24,855,2
704 27% 34%
7 Column 192 78.42 8,416,264.02
72
8 Stair case 0 0% 1,829,540.88 - 0%
94,9
290 511 176%
9 Curb stone 08.30 167,234.97 176%

44,631,224.6
Total 1578 2356 149% 30,994,750 8 144%

 Whereas the physical performance according to the production unit’s plan is 149%. On
the other hand, the financial performance is 144%. And generally, 1578 pcs product was
planned to produce in September.
 Boiler stares works that used as increase the slab production week one up to know
increase

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) Page |3
ቅጽ

 This indicates the need to revise the plan for each product and also boiler staring works
so slab production is increase 9 to18 the production capacity is increase.

1.1.2 Ready mix concrete production unit

Total Total
physica Financial
quantit shipping Financial
l plan execution
y for quantity Plan for the
for the for the
the for the month
month month
month month
1,270,432.0
201.1 5,921,882.2
Ready mix concrete 910.8 118.0 59% 0 21%
62. 6 600,346
1 C- 15 0 2.0 .00
6. 61,548
2 C- 20 0 6.0 .00
44. 1 133,704
3 C- 25 5 2.0 .00
60. 2 258,082
4 C- 30 8 2.0 .00
723. 1 216,752
5 C- 40 8 6.0 .00
13.
6 C- 05 8 - -

 In the reporting month, 910.81meter cube of different grade concrete was produced
 Out of this amount 755.62meter cube was consumed for prefabricated elements (based on
standard bill of material analysis) and -meter cube was consumed for curbstone production.
 Generally, the plan performance was good in physical performance that is 101% but financial
performance is poor that is 89% in the reporting month. This discrepancy of the performance
between the physical and financial execution shall be narrowed by revision of the plan.

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) Page |4
ቅጽ

1.1.3 Hollow Concrete block

 The performance with regard to physical and finance plan in the month is 63% and 31%
respectively. This shows a poor productivity; thus, we recommend feedback to be given to
the production unit as to improve the production in the next month.
 This discrepancy of the performance between the physical and financial execution shall be
narrowed by revision of the plan.
 Raw material shortage, machinery maintenance and mold repair shall be given due attention
to keep the productivity at the intended level.

physical physical financial financial


plan for execution plan for execution
the for the the for the
month month month month
102,583. 64,25 4,044,13
Concrete block 1 2.0 63% 9.9 31%
HCB 20*20*40 22,1 1,455,5
1 class C 74.0 01.4
HCB 15*20*40 42,0 2,588,6
2 class C 78.0 38.6
HCB 10*20*40
3 class C - -
HCB 20*20*40
4 class B - -
HCB 15*20*40
5 class B - -
HCB 10*20*40
6 class B - -

1.1.4 Flexi flume production unit

Physical financial
Ite Production/ physica physical financial
Product plan vs financial plan vs
m Process/ l plan execution physical execution
Code plan for financial
No Delivery for the for the for the
execution the month execution
month month month

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) Page |5
ቅጽ
Flexi production 4166.7 4,002.00 96% 421,203.00 1,255,747.30 298%
3,680.0
1 PP sheet 2.5 0 1,103,043.20
117.0
2 Canvas 2.5 0 84,509.10
1,150.0
3 PP Bag 0 68,195.00

 As can be seen in the tables above 4002 pieces of different products (pp sheet and pp
bag) were produced in the month, making the financial and physical performance of
298% and 96% consecutively.
 This discrepancy of the performance between the physical and financial execution shall
be narrowed by revision of the plan.

1.1.5 Gypsum production unit

The physical plan of the month for the production of gypsum product was 23,000 pieces when
this is compared to the production of the month 123559 it shows 53.73 % physical performance
is low its compere to plan of the month.

The financial plan was 5,231,928 ETB as per the unit price taken from shipping, we have found
the financial performance of the month to be 1,714,722ETB which shows a performance 6.09 %
performance is very low production compare to plan of. Give attention to produced pre plan.

Physical
Ite Financial
Physical Physical Execution vs Financial Financial
m product name Execution vs
plan Execution Physical plan Execution
no financial plan
plan
1 Gypsum Ceiling 11,500 11594 101% 2,615,964 1,599,972
2 Gypsum Block 11,500 765 6.65% 2,615,964 114,750
Total 23,000 12,359 53.73% 5,231,928 1,714,722 32.77%

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) Page |6
ቅጽ

1.1.6 Wood products production unit

 This discrepancy of the performance between the physical and financial execution as
the results of Product seat product and wooden partition have not a work order.
 As this results 6555.6*6=45,889.2 ETB loss from wood partition products and
645*34.54 =22,278.3 ETB total loss from two products is 68,167.5ETB

Physical
Financial
Item Physical Physical Execution vs Financial Financial
product name Execution vs
no plan Execution Physical plan Execution
financial plan
plan
1 Wooden door 141 146 104% 1,977,725 3,335,122.51
Laminated MDF
2
shelf 1 0 0% -
Laminated MDF
3
cupboard 0.5 0 0% 15,654.90 -
4 Bed with drawers 0.334 0 0% -
Total 143 2177 1520% 1,993,380 5,212,338.76 261%
Unplanned Activity
Physical
Financial
Item Physical Physical Execution vs Financial Financial
product name Execution vs
no plan Execution Physical plan Execution
financial plan
plan
1 Table 0
2 Product seat 915 95,618
3 Wooden partition
4 Wooden cladding
5 Wooden flowerpot
L-shape Girder
6
reducer
7 Wooden wage 1 93.75
HCB box
8
50*40*20 915 1,178,505.00
9 Morale 200
Total 2031 1,877,216.25

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) Page |7
ቅጽ

1.1.7 Metal products production unit

physical Financial
Ite Physical
physica Financial Financial plan vs plan vs
m Production/ Process/ Delivery executio
l plan plan execution physical financial
No n
execution execution
1,091,074.0
Anchur nut 6181.75 802.00
1 0 450724.0 13% 41%
1,091,074.0
Plate 80mm*80mm*8mm 1000.00 520.00
2 0 191661.6 52% 18%
1,091,074.0
barrel 1000.00 0.00
3 0 0.0 0% 0%
1,091,074.0
wedge 1000.00 0.00
4 0 0.0 0% 0%
Upland works
5 Metal bed frame 1.10*1.20*2 46.00 548,525.16
6 sheet metal 3.5m*0.6m 0.00 -
7 Frame and stand for 2m*1m signs 3.00 25,149.00
8 cantilever bolt 10.00 8,599.30
Slide door accessory for top 6m for
8.00
9 input production center -
10 Angle iron 40mm 26.00 -
11 Metal bed frame 188*148*25cm 1.00 5,198.60
12 plate20cm*20cm*5mm 200.00 268,364.00
13 Anchur bolt 150.00 33,258.00
14 RHS cutting 30*30*3mm L=625m 40.00 5,320.00
15 RHS cutting 50*50*3mm L=41m 8.00 3,368.00
16 RHS cutting 50*50*3mm L=2.67m 2.00 5,878.00
17 RHS cutting 30*30*3mm L=1.00m 8.00 3,858.72
18 RHS cutting 30*30*3mm L=2.80m 8.00 11,539.92
19 RHS cutting 100*60*3mm L=0.87m 4.00 4,592.40
20 RHS cutting 100*60*3mm L=2.80m 4.00 13,759.08
4,364,296.0 1,579,795.
9,181.75
Total 1,840.0 0 8 20.04% 36.20%

The physical performance of the production unit is 20.04% this figure shows the physical
performance is very low. The financial performance of the production unit is 36.20%. This figure
shows the financial performance is very low on September.

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) Page |8
ቅጽ

1.1.8 PVC and aluminum products production unit

physical Financial
Production/
Item physical Physical plan vs plan vs
Process/ Financial plan Financial execution
No plan execution physical financial
Delivery
execution execution
1320.00 1609.85 122% 32,408,778.27 155%
20,943,339.00
Aluminum
275 478.84 174%
1 door 10,011,272.15
Aluminum
146.67 458.91 313%
2 window 8,616,906.98
Aluminum
146.67 0.19 0%
3 kerketo 1,955.30
Aluminum
146.67 0.00 0%
4 LTZ window -
Aluminum
275 171.70 62%
5 partition 3,374,546.45
6 PVC window 110 0.00 0% -
Aluminum
7 window door 34.22 500.21 10,404,097.39

There is a discrepancy in the plan as can be seen from the gap between the financial and physical
performance it’s come from the different products unit price are not the same it’s the plan are not
detailed so it expects.

As can be seen from the above table the productivity was very good productivity overall
products. This can also be related to the physical performance 122% which is the financial 155%

1.1.9 Paving block production units

This month's Test Production is focused on the facility that makes paving blocks, and the
physical execution rate is 14.75 percent, so it counts as Test Production.
የተሻለ ነገንእንገንባለን! We build a better tomorrow!
+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) Page |9
ቅጽ

Physical Financial
Financia
Ite Physical Execution Execution
product Descriptio Physica Financi l
m Executio vs vs
name n/ size l plan al plan Executio
no n Physical financial
n
plan plan
Paving
1 40*40*5
block 13,628 2,201 16% 749,546
Paving
2 30*30*6
block 13,628 1,515 11% 749,546
Paving
3 25*25*5
block 13,628 2,316 16.99% 749,546
2,248
Total
40,884 6,032 14.75% ,639 - 0.00%

1.1.10 Traffic sign and road marking production unit

physical Financia
Ite Production Physical plan vs l plan vs
physica Financial Financial unit
m / Process/ executio physical financial
l plan plan execution price
No Delivery n executio executio
n n

Rectangular 138,3
138.77 14.00
1 traffic sign 949,087.00 34.38 10.09% 14.58%
Triangle
106.33 0.00
6 90*90*90 949,087.00 0.0 4602 0.00% 0.00%
Circular
93.10 0.00
7 60*60*60 949,087.00 0.0 4146 0.00% 0.00%
Unplanned work
8 Scotch light 0.00 0.00 0.0
T-shirt on 1
99.00
11 priming 990.0 0.00

691 2,847,261.0
Total 113 0 139,324.38 16.35% 4.89%

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) P a g e | 10
ቅጽ

The production unit was able to produce products amounting 139,324.387ETB which makes the
financial performance 4.89%. This figure shows the financial performance is very low than plan
of the month.

The physical performance of the production unit is 16.35%. This figure shows the physical
performance is very low than plan of the month.

As can be seen from the above table the productivity of the production unit in the month was
very poor. Thus, we recommend feedback to be forwarded to the production unit for
improvement.

1.1.11 Tire recapping and rubber products production unit

In this reporting month there was no production as well as shipping in the production unit.

1.1.12 Summary of all production units

Physical PP FP
production Physical Financial Financial
Executio VS VS
units plan plan Execution
n PE FE
2,356. 30,994,750. 44,631,224.
149%
1 prefab 1,578.00 00 00 68 144%
aluminum and 1,609. 20,943,339. 32,408,778.
122%
2 PVC 1,320.00 85 00 27 155%
64,252. 12,921,052. 4,044,139.
63%
3 HCB 102,583.15 00 00 92 31%
1,977,725.
649%
4 wood 202.00 1,311.00 00 3,559,560.07 180%
12,359. 5,231,928. 1,714,722.
54%
5 gypsum 23,000.00 00 00 00 33%
1,840. 4,364,296. 1,579,795.
20%
6 metal 9,181.75 00 00 78 36%
118. 5,921,882. 1,270,432.
59%
7 ready mix 201.07 00 00 00 21%
4,002. 421,203. 1,255,747.
96%
8 Felix flume 4,166.70 00 00 30 298%
9 traffic sign 113. 16% 2,847,261. 139,324. 5%
የተሻለ ነገንእንገንባለን! We build a better tomorrow!
+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) P a g e | 11
ቅጽ
691.00 00 00 38
1 6,032. 2,248,639.
15%
0 paving 40,884.00 00 00 0%

87,872,075.0 90,603,724.4
TOTAL 183,807.66 93,992.85 51% 0 0 103%

 Over all execution of production unit was good in august but some production units are
very poor completion give an action those production units work per plan.
1. Prefab, flexi flume, wood and aluminum and PVC production unit achieve their financial
plan 100%.
2. Metal and ready mix concrete production unit are achieve their financial plan respectively
36% and 21 %.
3. Gypsum, traffic sign and road making, HCB and paving block are achieve their plan
respectively 33%,5%,31%, and 0%

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Page No.:
Document Title:
P a g e | 12
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) ቅጽ

44,631,224.68 F in a n cia l E x ecu tio n v s F in a n cia l p la n o n sep tem b er

Financial plan

32,408,778.27
30,994,750.00

Financial Ex-
ecution
20,943,339.00

12,921,052.00

5,921,882.00
5,231,928.00

4,364,296.00
4,044,139.92

3,559,560.07

2,847,261.00

2,248,639.00
1,977,725.00

1,714,722.00

1,579,795.78

1,270,432.00

1,255,747.30
421,203.00

139,324.38
p refab ALU and HC B wood gypsum metal read y mix felxi flu m traffic p avin g
PV C

Figure 1 summary of all production units

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO CERTIFIED (በ ISO 9001:2015,በ ISO
45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and related activities
በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣ በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) P a g e | 13
ቅጽ

1.2 Problem encountered and solution

production units Problem encountered solution


Lack Slider connector Purchasing proses
1 Aluminum and PVC production unit Lack Roller
Puncher machine failed
Man power Purchasing proses
2 Metal production unit
Raw material
Raw material
3 Traffic and road making production unit
Lack of demand (market)
Lack of raw material Problem was fix
4 Gypsum production unit
20/12/2015
Laminated MDF
5 Wood production unit hinge
Lock and Key Purchasing proses
Problem solved and
6 staring working
HCB production unit sub-contractors lack man power activity
Scheduled next month
8 Ready mix concrete production unit Raw material demand
Metal production unit
bolt prepared and it’s
9 prefab production unit Lack cement, lack anchor nut on progress
schedule of material
crane failed
1 Lack of raw material
Tire recapping and rubber products production unit
0

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO CERTIFIED (በ ISO 9001:2015,በ ISO
45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) P a g e | 14
ቅጽ
7 flexi flume

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO CERTIFIED (በ ISO 9001:2015,በ ISO
45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) P a g e | 15
ቅጽ

1.3 Work order status

We have 116 work orders in number and 160 works on physical last three-month 56 work order
are complete and 39 are delivered and 23 works on progress and others finished next month and
81 not stared duet lack of raw material, some of are to give reagents works and other are new
orders.

status
work order delivered completed on progress not started
160 39 27 23 81

Metal and wood production units are produced below products without work order

 Metal production unit


34 Products produced on this month without work order on metal production unit and not
generate income

 Slide door accessory =8 pcs


 Angle iron 40mm =26pcs

1.4 Recommendation and conclusion

 The production of the month cannot generally said to have a timely work order for most
products.
 Besides the timely issue of work order, the overall issue of work order shall be closely
checked from the project's requisition up to the final content of the work order.
 There was discrepancy between physical and financial plan of some production units as
reported in the above sections. Thus, we recommend an in-depth review of the plan
before it is approved by corporate planning.

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities
በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!
Issue No: 2 Document Title: Page No.:
የኦፕሬሽናልእናየመደበኛሥራዎችዕቅድአፈጻጸምሪፖርትማቅረቢያ (Narrative Summary Report) ቅጽ P a g e | 16

 Measurement issue, raw material shortage, and machinery maintenance shall be given a
critical attention to keep the productivity of each production unit at the expected level and
lack man power on metal and HCB give attention.
 Updated unit prices and standard outputs shall be communicated to us whenever applied.
Thus, we recommend the responsible departments to be communicated to ensure the
same.

የተሻለ ነገንእንገንባለን! We build a better tomorrow!


+ 251 116675473 + 251 116461138 Fax:- + 251 116676090  21952/1000 Addis Ababa – EthiopiaISO
CERTIFIED (በ ISO 9001:2015,በ ISO 45001:2018,በ ISO 14001:2015)
For Transport, Water Works, Building, Dam & Irrigation Construction, Project Management Service and
related activities በትራንስፖርት፣በውሃሥራ፣በሕንፃ፣
በግድብናመስኖኮንስትራክሽን፣ፕሮጀክትማኔጅመንትአገልግሎትእናበሌሎችተመሳሳይሥራዎችየጥራትሥራአመራርምስክርወረቀትያለው!

You might also like