a) This is a group assignment consisting of 5 or 6 members.
b) The submission should be in the form stated in the tasks by using good English. c) Each member of the group shall be part of the group’s written report. d) Issue: Week 2 and Submission: Week 4 e) Submission of Softcopy Written Report via the platform as required by the respective lecturer
Write a REPORT on a Construction Case Law:
1.0 CRITERIA FOR CASE LAW
1. Must be ONE (1) Malaysian construction case law 2. The case must be either on the construction disputes on the formation of a contract, the validity of the contract, terms of the contract, discharge of contract, or remedies for breach of contract 3. All groups must have different case laws
2.0 WRITTEN REPORT should include as follows:
1. Name of case law – i.e., Plaintiff v Defendant 2. Identification of case e.g., MLJ 1 2006, CLJ… 3. Facts of the case 4. Decision by the court i.e., Held: …. 5. Conclusion and Lessons Learnt in accordance with Construction Law 6. References: Related Clauses in PWD or PAM or Contract Act 1950
END OF TASK
RUBRIC
MARKS GIVEN
WRITTEN REPORT (Group)
1. Name and identification of case 10 2. Facts of the case 20 3. Decision by the court 20 4. Conclusion and lesson learned 40 5. Related references 10 SUB-TOTAL 100 Reduced to 20% 20