1- No or insignificant damage 1- Unlikely- no knowledge of such cases
TM08
Risk Register - OHSAS 2- Minor damage or illness.First aid treatment
3 - Serious damage or illness. Loss of working hrs.
2- No likely to occur but may occur
3 - Now and then, occurs occassionally
4- Serious damage or illness. Diablement
Rev .00
4- Likely, could occur more than once
5- Fatality or major injury of one or more persons. 5- Frequently, could occur regularly
Writer:BTAMI Main Process: Area: Valid from: September 08
Before Mitigation Linkage After Mitigation(Residual)
Activity R/N Potential Hazard Impact E/L L S T Mitigation plan to SMP L S T
Driving in the windfarm Over speed Accident 4 3 12 Speed limit / Driving safety Trg 2 3 6
Loose parts in the Nacelle Fall of parts 2 5 10 Keep loose parts in Bag / PPEs 2 3 6
Loose parts in the Hub Fall & Hit 2 5 10 Keep loose parts in Bag / PPEs 2 3 6
Actuator /Blade movement Hit & Stuck up 1 4 4 WKI/PPEs 1 2 2
Working inside the Blade Confined space Lack of oxygen 4 5 20 Air supplied respiratory mask 4 1 4
Chemical odur Ill health 4 3 12 PPEs-Mask/MSDS 4 1 4
Load in the blade platform Fall(Joint failure) 2 5 10 Donot stand on the platform 2 1 2
1.2 radiation:
2.1 explosive
2.3 toxic
2.5 irritating
2.6 carcinogenic
2.8 nitrogen
List of Hazards
3 ERGONOMIC HAZARDS
3.1 lifting (> 25 kg), carrying (> 15 kg) or
pushing/pulling heavy loads
5.2 spill
Frequently (daily) 6
Continuous (more than two times per day) 10
SEVERITY (*) FACTOR
Checks
Emergency measures
(Training – experience)
Quaterly
Identified Site Location
Work at height, operating manual , maintenance check list,
JSA, LOTO, trouble shooting manual, Fire Prevention and
Protection Manual, ESMS Manual, Site Specific ERP Plan,
PTW, PPE Manual, MSDS, Electric safety manual, Road
safety Guide line, CSM Manual, Material lifting and
Handling.
Insulated Tools - Spanner (Fixed/ Ring), Discharge rods,
LOTO, Multimeter, Non- Contact Voltage Detector, Lifting
Tools, Torque Wrench.
Spare and consumables for PV Module, Tracker, ICR,
MCR maintenance
N2, Electrical, Hydraulic, Water, Cleaners.
Oil, Grease, N2, Battery, Diesel, Selicagel, Zinc & Rust
Protector Spray, Petroleum Jelly, Cleaners. Sealant,
Thermal Adhesive.
CEA guide line, IE rule, CPCB guide lines, Descom
regulations, (referring to ReCAT compliance)
PM Check list, Annual TPI, Tool & tackles Calibrations
(Electrical & Mechanical) ,PPE Regular inspection checks,
Vehicle check, Earth mover's FTU.
Site specific ERP, Height rescue.
Checks
Emergency measures
(Training – experience)
Daily
Identified Site Location
Work at height, operating manual , maintenance check list,
JSA, LOTO, trouble shooting manual, Fire Prevention and
Protection Manual, ESMS Manual, Site Specific ERP Plan,
PTW, PPE Manual, MSDS, Electric safety manual, Road
safety Guide line, CSM Manual, Material lifting and
Handling.
Insulated Tools - Spanner (Fixed/ Ring), Discharge rods,
LOTO, Multimeter, Non- Contact Voltage Detector, Lifting
Tools, Torque Wrench.
Spare and consumables for PV Module, Tracker, ICR,
MCR operations
N2, Electrical, Hydraulic, Water, Cleaners.
Oil, Grease, N2, Battery, Diesel, Selicagel, Zinc & Rust
Protector Spray, Petroleum Jelly, Cleaners. Sealant,
Thermal Adhesive.
CEA guide line, IE rule, CPCB guide lines, Descom
regulations, (referring to ReCAT compliance)
Annual TPI, Tool & tackles Calibrations (Electrical &
Mechanical) ,PPE Regular inspection checks, Vehicle
check, Earth mover's FTU.
Site specific ERP, Height rescue.
Checks
Emergency measures
(Training – experience)
Daily
Identified Site Location
Work at height, operating manual , maintenance check list,
JSA, LOTO, trouble shooting manual, Fire Prevention and
Protection Manual, ESMS Manual, Site Specific ERP Plan,
PTW, PPE Manual, MSDS, Electric safety manual, Road
safety Guide line, CSM Manual, Material lifting and
Handling.
Insulated Tools - Spanner (Fixed/ Ring), Discharge rods,
LOTO, Multimeter, Non- Contact Voltage Detector, Lifting
Tools, Torque Wrench.
Spare and consumables for eBop maintenance
N2, Electrical, Hydraulic, Water, Cleaners.
Oil, Grease, N2, Battery, Diesel, Selicagel, Zinc & Rust
Protector Spray, Petroleum Jelly, Cleaners. Sealant,
Thermal Adhesive.
CEA guide line, IE rule, CPCB guide lines, Descom
regulations, (referring to ReCAT compliance)
PM Check list, Annual TPI, Tool & tackles Calibrations
(Electrical & Mechanical) ,PPE Regular inspection checks,
Vehicle check, Earth mover's FTU.
Site specific ERP, Height rescue.
Checks
Emergency measures
(Training – experience)
Quaterly
Identified Site Location
Work at height, operating manual , maintenance check list,
JSA, LOTO, trouble shooting manual, Fire Prevention and
Protection Manual, ESMS Manual, Site Specific ERP Plan,
PTW, PPE Manual, MSDS, Electric safety manual, Road
safety Guide line, CSM Manual, Material lifting and
Handling.
Insulated Tools - Spanner (Fixed/ Ring), Discharge rods,
LOTO, Multimeter, Non- Contact Voltage Detector, Lifting
Tools, Torque Wrench.
Spare and consumables for PV eBop operations
N2, Electrical, Hydraulic, Water, Cleaners.
Oil, Grease, N2, Battery, Diesel, Selicagel, Zinc & Rust
Protector Spray, Petroleum Jelly, Cleaners. Sealant,
Thermal Adhesive.
CEA guide line, IE rule, CPCB guide lines, Descom
regulations, (referring to ReCAT compliance)
Annual TPI, Tool & tackles Calibrations (Electrical &
Mechanical) ,PPE Regular inspection checks, Vehicle
check, Earth mover's FTU.
Site specific ERP, Height rescue.
Responsibility
S.No List of Activities (Ref Team Status
Details)
1 Open circuit voltage and Current MEASUREMENT in PV area. Complete
2 Earth connection checking & Measurement of Earth Resistance Complete
3 Module Replacement Complete
4 SMB/SCB MAINTENANCE Complete
Team A
5 Dismantaling of Faulty SMB/SCB Complete
6 Replacement of PV Connectors Complete
7 Mannual Tilting of MMS Complete
8 Replacement of Cable Conduits and Faulty String Cables Complete
9 MODULE Cleaning-wet Complete
10 INVERTER MAINTENANCE Complete
11 INVERTER ROOM BATTERY & BATTERY CHARGER Maintenance Complete
12 ACDB/SERVICE PANEL Maintenance Complete
13 INV ROOM SCADA PANEL Maintenance Team B Complete
14 CABLE TRENCH MAINTENANCE Complete
15 IDT TRANSFORMER MAINTENANCE Complete
16 HT SWITCHGEAR MAINTENANCE Complete
17 AUXILIARY TRANSFORMER Complete
18 HT SWITCHGEAR MAINTENANCE Complete
19 ISOLATOR Maintenance Complete
SWITCHYARD GANTRY ,GANTRY,CLAMPS & CONNECTORS,DISC
20 Cleaning. Team C Complete
21 Main control room BATTERY & BATTERY CHARGER maintenance Complete
22 PLANT OPERATION IN SCADA Complete
23 TRANSMISSION LINE PATROLLING Complete
24 TESTING OF EQUIPMENTS Complete
25 LDB & PHERIPHERY LIGHT Maintenance Complete
26 PAINTING Complete
27 DOOR RECTIFICATION Complete
28 DRAINAGE CLEANING Complete
29 GENERAL HOUSE KEEPING Team D Complete
30 Visual Inspection Complete
31 Grass cutting Complete
32 MCS Borewell Complete
33 Civil Activity Complete
34 Maintanance of Fire Extinguisher Complete
Total Activity 34
Completed 34
Inprogress 0
Name of the Main Activity : Operation & Maintenance Site / Project Head : V. Satavahana Reviewed By: V. Satavahana
Names of people performing HIRA State Name : Telangana Approved By: V. Satavahana
Business : Solar Asset Management 1/1/2024 Approved On:
S.No Sub Activity Mitigating Control Measures Residual Risk Factor After Mitigation
Actual Risk Evaluation Responsibility
Hazards / Risk People at Risk Priority
E S P Actual Elimination Substitution Supervisoring Administrative PPE By Whom By When E S P Residual
Risk Risk Score
(E*S*P)
1 Open Circuit Voltage & Current Measurement in PV area.
1. General PTW,
2. Tool Box Talk,
1. Cut resstant Hand Gloves,
3. JSA,
Physical Hazard: 1. Filing/ Grinding to remove sharp 2. Helmet, Before Starting the
Supervisor, Technician 6 1 10 60 3 4.SOP, PTW Issuer 6 1 0.2 1.2
Sharp Edges/ Cut Injury edges 3. Shoe, Activity
5.Bite Prevention Training,
4. Full Body Apron
6. DO's & Don''ts of Prevention & Response,
7. Signages
1. General PTW,
2. Tool Box Talk,
1. Cut resstant Hand Gloves,
3. JSA,
Physical Hazard: : Uneven 2. Helmet, Before Starting the
1.1 SMB/SCB front cover opening Supervisor, Technician 6 4 6 144 2 1. 1X1 meter P.C.C around SMB/SCB 4.SOP, PTW Issuer 6 4 0.5 12
Terrain/ Tripping 3. Shoe, Activity
5.Bite Prevention Training,
4. Full Body Apron
6. DO's & Don''ts of Prevention & Response,
7. Signages
1. General PTW,
2. Tool Box Talk,
1. Leather Hand Gloves,
1. Grass Removal, 3. JSA,
Environmental Hazard: Supervisor, Technician 3 15 6 270 2. Helmet, Site Manager Before Starting the 2 15 0.5 15
1 2. 1X1 meter P.C.C around SMB/SCB, 4.SOP,
Reptile, Insect/ Bites 3. Shoe, Activity
3. Anti Snake Venom 5.Bite Prevention Training,
4. Full Body Apron
6. DO's & Don''ts of Prevention & Response,
7. Signages
1. Electrical PTW,
1. Di-electric Hand Gloves,
Physical Hazard: Electical 2. Tool Box Talk, PTW Issuer,
1. Use rated Voltage Multimeter/ Clamp 2. Helmet, Before Starting the
System/ Shock, Supervisor, Technician 6 15 6 540 1 3. JSA, Supervisor & 2 15 0.5 15
meter 3. Shoe, Activity
Electrocusion 4. SOP, Technician
4. Full Body Apron,
5. Electrical Safety Standard
1. Electrical PTW,
1. Helmet, PTW Issuer,
Physical Hazard: Slippery 2. Tool Box Talk, Before Starting the
Supervisor, Technician 1 4 3 12 4 1. 1X1 meter P.C.C around SMB/SCB 2. Gum Boots, Supervisor & 1 1 0.2 0.2
Passage/ Slip, Trip & Fall 3. JSA, Activity
3. Full Body Apron Technician
4. SOP
1. Electrical PTW,
1. Isloate PV Connector from both end 1. Helmet,
Physical Hazard: Flash Supervisor, Technician 6 15 6 540 2. Tool Box Talk, Supervisor & While Executing the 2 15 0.5 15
1 String, Nomanculature of String, 2. Gum Boots,
over/Burn Injury 3. JSA, Technician Activity
2. Check Zero Current 3. Full Body Apron
4. SOP
1.4 SCB/ SMB PV Connectors Replacement
1. Electrical PTW,
1. Helmet, PTW Issuer,
Physical Hazard: 2. Tool Box Talk, Before Starting the
Supervisor, Technician 1 4 3 12 4 1. 1X1 meter P.C.C around SMB/SCB 2. Gum Boots, Supervisor & 1 4 0.2 0.8
Dug/ Shock 3. JSA, Activity
3. Full Body Apron Technician
4. SOP
2 Earth Connection Checking & Measurement of Earth Resistance
1. Electrical PTW,
Physical Hazard: 1. Helmet, PTW Issuer,
2. Tool Box Talk, Before Starting the
Fall of Material/ Supervisor, Technician 1 4 3 12 4 2.. Gum Boots, Supervisor & 1 4 0.2 0.8
3. JSA, Activity
Contusion 3. Full Body Apron Technician
4. SOP
1. Electrical PTW,
2. Tool Box Talk,
1. Leather Hand Gloves,
3. JSA,
Environmental Hazard: 2. Helmet, Before Starting the
Supervisor, Technician 3 15 6 270 1 1. Anti Snake Venom 4. SOP, Site Manager 2 15 0.5 15
2.1 Opening & Close Earth pit cover Reptile, Insect/ Bites 3. Shoe, Activity
5. Bite Prevention Training,
4. Full Body Apron
6. DO's & Don''ts of Prevention & Response, 7.
Signages
1. Electrical PTW,
1. Leather Hand Gloves,
Ergonomic Hazard: 2. Tool Box Talk,
2. Helmet, Supervisor & Before Starting the
Heavy Weight/ Supervisor, Technician 1 4 3 12 4 1. Use two person to lift the cover 3. JSA, 1 4 0.2 0.8
3. Shoe, Technician Activity
Muskoskeleton 4. SOP,
4. Full Body Apron
5. Material Lifting & Handling Standard
1.PTW
Cleaning and Tightness of SMB/SCB Environmental Hazard: 2.Conduct Trainings & TBT
4.2 Technician/Supervisor 1 Permit issuer Before Starting the
Busbar,Electronic cards connections and Fuse Dust/ Eye irritation, 2 4 6 72 2 3.Follow the Work protocols. 2 4 1 4
Activity
holders. Respiratory Disease 4.Follow the SOP
5.Maintain the all equipment operation manuals.
1. Isolate from Invertor & SCB/SMB, 1. Electrical PTW, 1. Di-electric Hand Gloves,
Physical Hazard: Electrical
Supervisor, Technician 6 15 6 540 2. Ensure Zero Radiation, 2. Tool Box Talk, 2. Helmet, Supervisor & While Executing the 2 15 0.5 15
Supply/ Shock, 1 3. Check Zero Voltage 3. JSA, 3. Shoe, Technician Activity
Electrocusion
4. Apply LOTO 4. SOP 4. Full Body Apron
1. General PTW,
1. Leather Hand Gloves,
Ergonomic Hazard: 2. Tool Box Talk,
Supervisor, Technician 1 4 3 12 2. Helmet, Supervisor & Before Starting the 1 4 0.2 0.8
Weight, Manual Lifting/ 4 3. JSA,
3. Shoe, Technician Activity
Muskoskeleton 4. SOP,
4. Full Body Apron
5. Material Lifting & Handling Standard
1. Electrical PTW,
1. Helmet, PTW Issuer,
Physical Hazard: Slippery 2. Tool Box Talk, Before Starting the
Supervisor, Technician 1 4 3 12 4 1. 1X1 meter P.C.C around SMB/SCB 2. Gum Boots, Supervisor & 1 4 0.2 0.8
passage/ Slip, Trip & Fall 3. JSA, Activity
3. Full Body Apron Technician
4. SOP
5 Replacement of Faulty SMB/SCB
1. General PTW,
1. Leather Hand Gloves,
Ergonomic Hazard: 2. Tool Box Talk,
2. Helmet, Supervisor & Before Starting the
Weight, Manual Lifting/ Supervisor, Technician 1 4 3 12 4 1. Use atleast two persons 3. JSA, 1 4 0.2 0.8
3. Shoe, Technician Activity
Muskoskeleton 4. SOP,
4. Full Body Apron
5. Material Lifting & Handling Standard
5.2 Unloading,lifting & Shifting
1. Electrical PTW,
1. Helmet, PTW Issuer,
Physical Hazard: Slippery Supervisor, Technician 1 4 3 12 1. 1X1 meter P.C.C around SMB/SCB 2. Tool Box Talk, Before Starting the 1 4 0.2 0.8
4 2. Gum Boots, Supervisor &
passage/ Slip, Trip & Fall 3. JSA, Activity
3. Full Body Apron Technician
4. SOP
6 Replacement of PV Connectors
2. Isolation form SCB/SMB & Both end 1. Electrical PTW, 1. Di-electric Hand Gloves,
Physical Hazard: Electrical
Supervisor, Technician 6 15 6 540 Strings 2. Tool Box Talk, 2. Helmet, Supervisor & While Executing the 2 15 0.5 15
Supply/ Shock, 1 2. Check Zero Voltage, 3. JSA, 3. Shoe, Technician Activity
Electrocusion
3. Apply LOTO 4. SOP 4. Full Body Apron
6.1 Identify and removal of damaged PV Connectors
2. Isolation form SCB/SMB & Both end 1. Electrical PTW,
1. Helmet, PTW Issuer,
Physical Hazard: Flash Strings 2. Tool Box Talk, Before Starting the
Supervisor, Technician 6 7 6 252 1 2. Gum Boots, Supervisor & 2 7 1 14
over/Burn Injury 2. Check Zero Voltage, 3. JSA, Activity
3. Full Body Apron Technician
3. Apply LOTO 4. SOP
1. Electrical PTW,
2. Tool Box Talk,
1. Leather Hand Gloves,
3. JSA,
Environmental Hazard: 2. Helmet, Before Starting the
Supervisor, Technician 3 15 6 270 1 1. Anti Snake Venom 4. SOP, Site Manager 2 15 0.5 15
Reptile, Insect/ Bites 3. Shoe, Activity
5. Bite Prevention Training,
4. Full Body Apron
6. DO's & Don''ts of Prevention & Response, 7.
Signages
7.2 Tilting the MMS Structures to desired angle 1. Follow Lifting Instruction from SOP,
Ergonomic Hazard: 2. Electrical PTW, 1. Leather Hand Gloves,
PTW Issuer,
Weight, Manual Lifting/ Supervisor, Technician 1 4 3 12 3. Tool Box Talk, 2. Helmet, Supervisor & 1 4 0.2 0.8
4 Supervisor &
Muskoskeleton, Fall of 4. JSA, 3. Shoe, Technician
Technician
Materail 5. SOP, 4. Full Body Apron
6. Material Lifting & Handling Standard
1. Electrical PTW,
1. Helmet, PTW Issuer,
Physical Hazard: Slippery Supervisor, Technician 1 4 3 12 2. Tool Box Talk, Before Starting the 1 4 0.2 0.8
4 2. Gum Boots, Supervisor &
passage/ Slip, Trip & Fall 3. JSA, Activity
3. Full Body Apron Technician
4. SOP
1. Electrical PTW,
2. Tool Box Talk,
1. Leather Hand Gloves,
3. JSA,
Environmental Hazard: 2. Helmet, Before Starting the
Supervisor, Technician 3 15 6 270 1 1. Anti Snake Venom 4. SOP, Site Manager 2 15 0.5 15
Reptile, Insect/ Bites 3. Shoe, Activity
5. Bite Prevention Training,
4. Full Body Apron
6. DO's & Don''ts of Prevention & Response, 7.
Signages
8 Replacement of Cable Conduits and Faulty String Cables
1. Electrical PTW,
1. Helmet, PTW Issuer,
Physical Hazard: Slippery Supervisor, Technician 1 4 3 12 2. Tool Box Talk, Before Starting the 1 4 0.2 0.8
4 2. Gum Boots, Supervisor &
passage/ Slip, Trip & Fall 3. JSA, Activity
3. Full Body Apron Technician
4. SOP
1. Electrical PTW,
2. Tool Box Talk,
1. Leather Hand Gloves,
3. JSA,
Environmental Hazard: Supervisor, Technician 3 15 6 270 1. Anti Snake Venom 2. Helmet, Site Manager Before Starting the 2 15 0.5 15
1 4. SOP,
Reptile, Insect/ Bites 3. Shoe, Activity
5. Bite Prevention Training,
4. Full Body Apron
6. DO's & Don''ts of Prevention & Response, 7.
8.1 Digging of DC trench Signages
1. Electrical PTW,
2. Tool Box Talk,
1. Leather Hand Gloves,
3. JSA,
Environmental Hazard: Workers 3 15 6 270 1. Anti Snake Venom 2. Helmet, Site Manager Before Starting the 2 15 0.5 15
1 4. SOP,
Animals/ reptiles attack 3. Shoe, Activity
5. Bite Prevention Training,
4. Full Body Apron
6. DO's & Don''ts of Prevention & Response,
7. Signages
10 INVERTER MAINTENANCE
Open the ISU compartment front door and 1) Pre-Survey of the work area before start of 1. Cut Resistant Hand Gloves,
10.3 Physical Hazard: Exposure PTW Issuer,
remove the safety shield the job 2. Helmet, Before Starting the
to sharp edges/Physical Supervisor, Technician 2 4 3 24 3 Supervisor & 2 4 1 8
2)Ensure no sharp edges tools/equipments 3. Gum Boots, Activity
Injury Technician
3)Work permit & TBT to prior to work 4. Full Body Apron
1. Helmet,
Environmental Hazard: 1. Interval break system to carried out 2. Shoe While Executing the
Workers 6 7 6 252 1 Permit issuer 6 7 0.2 8.4
Heat stroke 2.Carry sufficient water along 3. Full body apron Activity
PTW Issuer,
Physical Hazard: Before Starting the
Supervisor, Technician 2 7 3 42 3 Supervisor & 2 7 1 14
Slip & Trip Activity
Technician
PTW Issuer,
Physical Hazard: 1. Awareness session to be conducted before Before Starting the
Supervisor, Technician 2 4 3 24 3 Supervisor & 2 4 1 8
Fall of tools carrying work Activity
Technician
2. Workpermit & TBT 1. Full body harness,
2. Hand gloves
PTW Issuer,
Open the HV and LV side compartment door of Physical Hazard: 3. Ensure Competent/ Skill person for work. 3. Hand wrist lanyards Before Starting the
15.2 Supervisor, Technician 2 4 3 24 3 Supervisor & 2 4 1 8
Inverter Transformer (Height) Sharp edges 4. Helmet Activity
Technician
4. Use of FRP ladder, 5. Shoe.
6. Cut Ressistnant Hand Gloves
Physical Hazard: Electical 5. Isolation of energy sources PTW Issuer,
Before Starting the
System/ Shock, Supervisor, Technician 6 15 6 540 1 6.Work at height standard Supervisor & 2 15 0.5 15
Activity
Electrocusion Technician
PTW Issuer,
Physical Hazard: Before Starting the
Supervisor, Technician 2 7 3 42 3 Supervisor & 2 7 1 14
Fall from height Activity
Technician
16 HT SWITCHGEAR MAINTENANCE
1. Work Permit & TBT 1. Di electric Hand Gloves,
Physical Hazard: 1. Isolation PTW Issuer,
2. Ensure compitent person to operate / 2. Helmet, Before Starting the
16.1 Isolation of breaker Flash over/Electrical Supervisor, Technician 2 15 6 180 2 2. Check Zero Voltage, Supervisor & 2 15 0.5 15
Isolation 3. Shoe, Activity
shock 3. Apply LOTO Technician
3.Electrical safety standard 4. Arc Flash Suit
Physical Hazard: Cut resstant Hand Gloves, Helmet, Shoe, Full Body Before Starting the
Supervisor, Technician 6 1 10 60 3 Filing/ Grinding to remove sharp edges Electrical PTW, Tool Box Talk, JSA, SOP Permit issuer 6 1 0.2 1.2
Sharp Edges/ Cut Injury Apron Activity
Physical Hazard: PTW Issuer,
Replacement of breaker/faulty Di-electric Hand Gloves, Helmet, Shoe, Full Body Before Starting the
Damaged hand tools/ Supervisor, Technician 2 4 6 48 2 Use insulated Tools Tools inspection, Electical PTW, JSA, SOP Supervisor & 2 4 0.2 1.6
16.3 cable/relays/support insulators/CT/PT/Indore Apron Activity
Tools Slip Technician
LA
1. Awareness session to be conducted before
carrying work
2. Workpermit & TBT 1. Full body harness,
2. Hand gloves
PTW Issuer,
Physical Hazard: Supervisor, Technician 2 7 3 42 3. Ensure Competent/ Skill person for work. 3. Hand wrist lanyards Before Starting the 2 7 1 14
3 Supervisor &
Fall from Height 4. Helmet Activity
Technician
4. Use of FRP ladder/working platfrom 5. Shoe.
6. Cut Ressistnant Hand Gloves
5. Isolation of energy sources
6.Work at height standard requirements
17 AUXILIARY TRANSFORMER
PTW Issuer,
Physical Hazard: Supervisor, Technician 2 7 3 42 While Executing the 2 7 1 14
3 Supervisor &
Slip & Trip Activity
Technician
PTW Issuer,
Physical Hazard: Before Starting the
Supervisor, Technician 2 7 3 42 3 Supervisor & 2 7 1 14
Fall from height Activity
Technician
18 HT SWITCHGEAR MAINTENANCE
1. Cut Resistant Hand Gloves,
1) Pre-Survey of the work area before start of
Physical Hazard: Slippery Supervisor, Technician 2 4 6 48 2. Helmet, PTW Issuer Before Starting the 2 4 1 8
3 the job
floor (Gravity) 3. Gum Boots, Activity
2)Ensure no obstructions near work area
4. Full Body Apron
1. Electrical PTW,LOTO
1. Isolation of breker through 2. Tool Box Talk, 1)Use basic PPE (Safety helmet,refelecting jacket
Physical Hazard: Electical
SCADA/remote/local 3. JSA, and safety shoes) and di electrical hand gloves Before Starting the
System/ Shock, Supervisor, Technician 6 15 6 540 1 PTW Issuer 2 15 0.5 15
2. Check Zero Voltage, 4. SOP 2)Basic PPE and arc flash sute for local switch Activity
Electrocusion
3. Apply LOTO 5.Electrical safety standard operation
18.1 Rackin/out of VCB 6.Barricading
1. Electrical PTW,
2. Tool Box Talk,
1. Leather Hand Gloves,
3. JSA,
Physical Hazard: Reptile/ 2. Helmet, Before Starting the
Supervisor, Technician 2 15 6 270 1 1. Anti Snake Venom 4. SOP, Site Manager 2 15 0.2 6
Bites 3. Shoe, Activity
5. Bite Prevention Training,
4. Full Body Apron
6. DO's & Don''ts of Prevention & Response, 7.
Signages
1. Tools inspection,
1. Di-electric Hand Gloves,
2. Electical PTW, PTW Issuer,
Damaged hand tools/ 2. Helmet, Before Starting the
Supervisor, Technician 2 4 6 48 3 1. Use insulated Tools 3. JSA, Supervisor & 2 4 1 8
Tools Slip 3. Shoe, Activity
4. SOP Technician
4. Full Body Apron
5. Electrical safety standard
1. Tools inspection,
1. Di-electric Hand Gloves,
Physical Hazard: 2. Electical PTW, PTW Issuer,
2. Helmet, Before Starting the
Damaged hand tools Supervisor, Technician 2 4 6 48 3 1. Use insulated Tools 3. JSA, Supervisor & 1 4 1 4
3. Shoe, Activity
(Electrical) 4. SOP Technician
4. Full Body Apron
Cleaning and tightness of all the HV termination 5. Electrical safety standard
18.2 and control wiring
Cleaning and tightness of all the HV termination
18.2 and control wiring
1. Electrical PTW,LOTO
1. Di-electric Hand Gloves,
1.Isolation of breaker through 2. Tool Box Talk,
Physical Hazard: Electical 2. Helmet, PTW Issuer,
Supervisor, Technician 2 15 6 180 SCADA/remote/local 3. JSA, Before Starting the 2 15 0.5 15
System/ Shock, 1 3. Gum Boots, Supervisor &
2.Ensure no voltage in line with voltage 4. SOP Activity
Electrocusion 4. Full Body Apron Technician
detector 5.Electrical safety standard
5. Arc Flash Suit
6.Barricading
1. Electrical PTW,LOTO
1.Isolation of breaker through 2. Tool Box Talk, 1. Di-electric Hand Gloves,
Physical Hazard: Electical PTW Issuer,
SCADA/remote/local 3. JSA, 2. Helmet, Before Starting the
System/ Shock, Supervisor, Technician 2 15 6 480 1 Supervisor & 1 15 1 15
2.Ensure no voltage in line with voltage 4. SOP 3. Gum Boots, Activity
Electrocusion Technician
detector 5.Electrical safety standard 4. Full Body Apron
6.Barricading
1. Electrical PTW,LOTO
1. Di-electric Hand Gloves,
1. Isolation of breker through 2. Tool Box Talk,
2. Helmet,
Physical Hazard: Flash SCADA/remote/local 3. JSA, Before Starting the
Supervisor, Technician 6 15 6 540 1 3. Gum Boots, PTW Issuer 2 15 0.5 15
over/Burn Injury 2. Check Zero Voltage, 4. SOP Activity
4. Full Body Apron
3. Apply LOTO 5.Electrical safety standard
5. Arc Flash Suit
18.3 Replacement of breaker 6.Barricading
1. Electrical PTW,
Physical Hazard: Exposure 1. Di electric Hand Gloves,
2. Tool Box Talk,
to live parts 1.Ensure insulated tools 2. Helmet, Before Starting the
Supervisor, Technician 0.5 7 6 21 3 3. JSA, PTW Issuer 0.5 7 3 10.5
(Electrical)/Electrical 2.LOTO 3. Shoe, Activity
4. SOP
shock 4. Arc Flash Suit
5.Barricading
18.4 Replacement of faulty cable
1. Tools inspection,
1. Di-electric Hand Gloves,
Physical Hazard: 2. Electical PTW, PTW Issuer,
2. Helmet, Before Starting the
Damaged hand tools Supervisor, Technician 2 4 6 48 3 1. Use insulated Tools 3. JSA, Supervisor & 2 4 1 8
3. Shoe, Activity
(Electrical) 4. SOP Technician
4. Full Body Apron
5. Electrical safety standard
1. Electrical PTW,LOTO
Physical Hazard: Exposure 1. Di-electric Hand Gloves,
2. Tool Box Talk, PTW Issuer,
to live parts 2. Helmet, Before Starting the
Supervisor, Technician 2 7 6 84 3 3. JSA, Supervisor & 2 7 1 14
(Electrical)/Electrical 3. Gum Boots, Activity
4. SOP Technician
shock 4. Full Body Apron
5.Electrical safety standard
18.5 Replacement of relays
1. Tools inspection,
1. Di-electric Hand Gloves,
Physical Hazard: 2. Electical PTW, PTW Issuer,
Supervisor, Technician 2 4 6 48 1. Use insulated Tools 2. Helmet, Before Starting the 2 4 1 8
Damaged hand tools 3 3. JSA, Supervisor &
3. Shoe, Activity
(Electrical) 4. SOP Technician
4. Full Body Apron
5. Electrical safety standard
1. Electrical PTW,LOTO
Physical Hazard: Exposure 1. Di-electric Hand Gloves,
2. Tool Box Talk, PTW Issuer,
to live parts Supervisor, Technician 2 7 6 84 2. Helmet, Before Starting the 2 7 1 14
3 3. JSA, Supervisor &
(Electrical)/Electrical 3. Gum Boots, Activity
4. SOP Technician
shock 4. Full Body Apron
5.Electrical safety standard
1. Tools inspection,
1. Di-electric Hand Gloves,
Physical Hazard: 2. Electical PTW, PTW Issuer,
2. Helmet, Before Starting the
Damaged hand tools Supervisor, Technician 2 4 6 48 3 1. Use insulated Tools 3. JSA, Supervisor & 2 4 1 8
3. Shoe, Activity
(Electrical) 4. SOP Technician
4. Full Body Apron
5. Electrical safety standard
19 ISOLATOR Maintenance
1. Tools inspection,
1. Di-electric Hand Gloves,
Physical Hazard: 2. Electical PTW, PTW Issuer,
Supervisor, Technician 2 4 6 48 1. Use insulated Tools 2. Helmet, Before Starting the 2 4 1 8
Damaged hand tools 3 3. JSA, Supervisor &
3. Shoe, Activity
(Electrical) 4. SOP Technician
4. Full Body Apron
5. Electrical safety standard
1. Awareness session to be conducted before
carrying work
1. Full body harness,
2. Workpermit & TBT
2. Hand gloves
PTW Issuer,
Physical Hazard: 3. Hand wrist lanyards Before Starting the
19.2 Installation Of Scaffold Fall from height
Supervisor, Technician 2 7 3 42 3 1.Proper working scaffold platform 3. Ensure Competent/ Skill person for work.
4. Helmet
Supervisor &
Activity
2 7 1 14
Technician
5. Shoe.
6. Cut Ressistnant Hand Gloves
5. Isolation of energy sources
6.Work at height standard
1. Di-electric Hand Gloves,
1.Ensure insulation mats 1. Electrical PTW,LOTO
2. Arc Flash Suit
Physical Hazard: 2.Isolation of breaker through 2. Tool Box Talk,
3. Helmet,
33/110 KV electrical Supervisor, Technician 2 15 6 180 SCADA/remote/local 3. JSA, PTW Issuer Before Starting the 1 15 1 15
2 4. Gum Boots,
supply -Electric shock/Arc 2.Ensure no voltage in line with voltage 4. SOP Activity
5. Full Body Apron
Falshover detector 5.Electrical safety standard
6. Nose Mask
3.Follow LOTO 6.Barricading
7. Goggles
1. Electrical & WAH PTW, Tool Box Talk, JSA, PTW Issuer,
Physical Hazard: Supervisor, Technician, 1.Use safety helmet,safety shoes and Full Body Before Starting the
1 15 3 45 3 SOP, materila handling standard,work at height Supervisor & 1 15 0.5 7.5
Fall of Material Worker 1.Lifting plan Apron and full body safety harness with laynyard Activity
standard Technician
21 Main control room BATTERY & BATTERY CHARGER maintenance
1.Safety Shoes
Physical Hazard: Electical 1. Isolation 1. Work Permit & TBT 2.Arc flash suit. PTW Issuer,
21.1 Isolation of battery charger/UPS Supervisor, Technician 6 15 6 540 Before Starting the 2 15 0.5 15
System/ Shock, 1 2. Check Zero Voltage, 2. Ensure compitent person to operate / 3.Di-electric Hand Gloves Supervisor &
Activity
Electrocusion 3. Apply LOTO Isolation 4.Helmets Technician
1.Safety Shoes
Physical Hazard: Electical 1. Isolation 1. Work Permit & TBT 2.Arc flash suit. PTW Issuer,
Supervisor, Technician 6 15 6 540 Before Starting the 2 15 0.5 15
System/ Shock, 1 2. Check Zero Voltage, 2. Ensure compitent person to operate / 3.Di-electric Hand Gloves Supervisor &
Activity
Electrocusion 3. Apply LOTO Isolation 4.Helmets Technician
Battery and battery charger Cleaning and
21.2
tightness checking
1. Use double insulated power/hand tools,
1. Cut resstant Hand Gloves,
2 Train the workmen on Work activity
Physical Hazard: 2. Helmet, Before Starting the
Supervisor, Technician 2 4 3 24 3 3. Skilled person to allow the operate tools Permit issuer 2 4 1 8
Sharp edges 3. Shoe, Activity
4. Temporary Power connectoin draw through
4. Full Body Apron
RCCB/ELCB
1.Safety Shoes
Physical Hazard: Electical 1. Isolation 1. Work Permit & TBT 2.Arc flash suit. PTW Issuer,
Before Starting the
21.3 Normalisation of Battery & Battery charger System/ Shock, Supervisor, Technician 6 15 6 540 1 2. Check Zero Voltage, 2. Ensure compitent person to operate / 3.Di-electric Hand Gloves Supervisor & 2 15 0.5 15
Activity
Electrocusion 3. Apply LOTO Isolation 4.Helmets Technician
1. Electrical PTW,
2. Tool Box Talk, 1. Hand Gloves,
Ergonomic hazard: 1.Carrying sufficient water canes upto
3. JSA, 2. Helmet, Permit
Sprain of Muscules,Eye Technician/Supervisor 2 4 6 48 completion of work While Executing the 2 4 1 8
3 4. SOP 5.Break 3. Shoe, issuer/Executin
irritation,Heat 2.Glucon d /lemons Activity
intervals to be ensured 4. Full Body Apron, g team
Stroke,Dehydration. 3.Aware on De Hyedration colour chart
6.Buddy system while working 7.Heat 5.Googles(Preferred Block)
stroke training
1. Electrical PTW,
2. Tool Box Talk, 1. Hand Gloves,
Ergonomic hazard: 1.Carrying sufficient water canes upto
3. JSA, 2. Helmet, Permit
Sprain of Muscules,Eye completion of work While Executing the
Technician/Supervisor 2 4 6 48 3 4. SOP 5.Break 3. Shoe, issuer/Executin 2 4 1 8
irritation,Heat 2.Glucon d /lemons Activity
intervals to be ensured 4. Full Body Apron, g team
Stroke,Dehydration. 3.Aware on De Hyedration colour chart
6.Buddy system while working 7.Heat 5.Googles(Preferred Block)
stroke training
Hot spot
23.2 measurement using Thermography camera.
24 TESTING OF EQUIPMENTS
Physical Hazard:
Tecnicians, Supervisors 1 7 3 21 3 1 7 1 7
Fall from height
Physical Hazard:
Fall and trip & slip/Major Tecnicians, Supervisors 1 4 3 12 4 1 4 1 4
inuries and bone fracture 1.Safety Shoes
1.Maintain Permit to work system.
2.Reflection Jockets.
2.Maintain for Sinage's for all electrical / non
Biological Hazard: 3.Safety Goggles
Tecnicians, Supervisors 1 4 3 12 4 1) Maintain sufficient measument oil electrical 1 4 0.2 0.8
Heat Oil burns 1.Remove damaged tools&tackles 4.Safety Golves
soak pit in IDT & Transformer Yard 3.Maintain first aid facilites.
2.Unfitted workers 5.Cut resistance gloves.
2)Maintain Oil drain funnel. 4.Maintain MSDS for transformer oil & other
Physical Hazard: 6.Helmets
equipments
Material hit with head Tecnicians, Supervisors 1 4 3 12 4 7.Ladder 1 4 1 4
5.Maintain oil spill kit Work
8.Safety belt
24.3 Insulating Oil BDV & DGA (Common for due to low height Supervisior and During testing
CT/PT/Transformer)
Shift incharge
Environmental Hazard:
Tecnicians, Supervisors 1 4 3 12 4 1 4 0.5 2
Oil Spillage
Physical Hazard:
Technicians 0.5 4 1 2 4 0.5 4 0.5 1
Fall, trip & slip
26 PAINTING
1.Safety Shoes
1.Ventilation or exhaust facility shall be provided
2.Reflection Jockets.
at
Physical Hazard: 3.Safety Goggles Work
1.Maintain equipment inspection check the place where painting and coating operations
26.1 Installation of scaffold Fall, trip & slip / Major Workers / Technicians 1 15 6 90 3 Ensure adequate ventilation 4.Safety Golves Supervisior and During work 1 15 1 15
list are carried out.
inuries and bone fracture 5.Arc flash suit. Shift incharge
2.Suitable PPE’s (such as appropriate mask, Eye
6.Cut resistance gloves.
Glass, Gloves, Safety shoes) and Hard hat shall be
7.Helmets 8.Ladder
1.Safety Shoes
2.Reflection Jockets.
1.Maintain Permit to work system.
Physical Hazard: 1.Conduct the Trainings & TBT 3.Safety Goggles Work
2.Maintain for Sinage's for all electrical / non
Slip & trip / Minor cuts & Workers / Technicians 2 7 6 84 2 2.Implement monthly tools 4.Safety Golves Supervisior and During House keeping 2 7 0.5 7
electrical
sprains inspection activity. 5.Cut resistance gloves. Shift incharge
3.Maintain first aid facilites.
6.Helmets
7,Gum shoes
Work
Physical Hazard:
29.2 Cleaning of utensils & cups Office Boy 10 4 0.5 20 3 Maintain first aid facilites. 1.Safety Shoes s 2.Cut resistance gloves. Supervisior and During House keeping 10 4 0.2 8
Sharp Edges/ Cut Injury
Shift incharge
Work
Biological Hazard:
Office Boy 3 4 1 12 4 Maintain first aid facilites. 1.Safety Shoes s 2.Cut resistance gloves. Supervisior and During House keeping 3 4 0.5 6
Chemical Spill in Eye
Shift incharge
Work
29.3 Toilet & Bathroom cleaning Physical Hazard: Office Boy 3 4 1 12 4 Maintain first aid facilites. 1.Safety Shoes s 2.Cut resistance gloves. Supervisior and During House keeping 3 4 0.5 6
Minor cuts & sprains
Shift incharge
Work
Environmental Hazard:
Office Boy 3 4 1 12 4 Maintain first aid facilites. 1.Safety Shoes s 2.Cut resistance gloves. Supervisior and During House keeping 3 4 0.2 2.4
Skin Allergy
Shift incharge
30 Visual Inspection
31 Grass cutting
1.Safety Shoes
2.Reflection Jockets.
1.Maintain Permit to work system.
3.Safety Goggles Work
Physical Hazard: Workers / Technicians 2 7 1 14 4 2.Maintain for Sinage's for all electrical / non
4.Safety Golves Supervisior and During grass cutting 2 7 0.5 7
Slip & trip electrical
5.Cut resistance gloves. Shift incharge
3.Maintain first aid facilites.
6.Helmets
7.Gum shoes
1.Safety Shoes
2.Reflection Jockets.
1.Maintain Permit to work system.
Environmental Hazard: 3.Safety Goggles Work
Workers / Technicians 2 7 3 42 3 2.Maintain for Sinage's for all electrical / non
Dust/ Eye irritation, 4.Safety Golves Supervisior and During grass cutting 2 7 1 14
electrical
Respiratory Disease 5.Cut resistance gloves. Shift incharge
3.Maintain first aid facilites.
6.Helmets
7.Gum shoes
1.Safety Shoes
2.Reflection Jockets.
1.Maintain Permit to work system.
3.Safety Goggles Work
Physical Hazard: 2.Maintain for Sinage's for all electrical / non
Workers / Technicians 2 4 3 24 3 4.Safety Golves Supervisior and During grass cutting 2 4 0.5 4
Skin rash electrical
5.Cut resistance gloves. Shift incharge
3.Maintain first aid facilites.
6.Helmets
7.Gum shoes
32 MCS Borewell
1.Allot the work to skilled persons.
2.Follow the Work 1.Safety Shoes
protocols. 2.Reflection Jockets.
1.Maintain Permit to work system.
3.Follow the SOP 3.Safety Goggles Work
Physical Hazard: 2.Maintain for Sinage's for all electrical / non During borewell
Workers / Technicians 0.5 4 3 6 4 4.Maintain the all equipment operation 4.Safety Golves Supervisior and 0.5 4 1 2
Slip & Trip electrical replement
manuals. 5.Cut resistance gloves. Shift incharge
3.Maintain first aid facilites.
5.Conduct Trainings & TBT 6.Helmets
6.Implement monthly tools inspection 7.Gum shoes
activity
33 Civil Activity
Environmental Hazard:
1.Allot the work to skilled persons.
Dust / Lung damage /
2.Follow the Work
Difficulty
protocols. 3.Follow the SOP 1.Maintain Permit to work system.
breathing from Work
Workers / Supervisors / 0.5 7 3 10.5 4 4.Maintain the all equipment 2.Maintain for Sinage's for all electrical / non Use nose masks
mixing and Supervisior and During civil works 0.5 7 1 3.5
Techinicians operation manuals. electrical
usage of sand paper Shift incharge
5.Conduct Trainings & TBT 3.Maintain first aid facilites
for surface
6.Implement monthly tools inspection
preparation
activity
1.Safety Shoes
2.Reflection Jockets.
1.Maintain Permit to work system.
1.Conduct the Trainings & TBT 3.Safety Goggles Work
Physical Hazard: Workers / Supervisors / 0.5 1 3 1.5 4 2.Maintain for Sinage's for all electrical / non
2.Implement monthly tools 4.Safety Golves Supervisior and During civil works 0.5 1 0.5 0.25
Slip / Trip / Falls Techinicians electrical
inspection activity. 5.Cut resistance gloves. Shift incharge
3.Maintain first aid facilites.
6.Helmets
7,Gum shoes
1.Safety Shoes
2.Reflection Jockets.
3.Safety Goggles Work
Environmental Hazard: Workers / Supervisors / Use proper clothing, avoid dhotis and
0.5 1 1 0.5 4 4.Safety Golves Supervisior and During civil works 0.5 1 0.2 0.1
Skin allergy Techinicians vests
5.Cut resistance gloves. Shift incharge
6.Helmets
7.Gum shoes
1.Safety Shoes
33.6 Concrete mixers / Concrete batch plant 2.Reflection Jockets.
3.Safety Goggles Work
Physical Hazard: Workers / Supervisors / 0.5 7 1 3.5 4 Guarding to be provided for moving Signages to be provided 4.Safety Golves Supervisior and During civil works 0.5 7 0.5 1.75
Moving Parts Techinicians parts
5.Cut resistance gloves. Shift incharge
6.Helmets
7.Gum shoes
Work
Physical Hazard: Workers / Supervisors / 0.5 4 1 2 4 Sprinking of water to be done at work Dust masks to be sued Supervisior and During civil works 0.5 4 0.5 1
Dust Techinicians area
Shift incharge
Work
34.1 Visual inspection Physical Hazard: Techinician / Supervisors 2 4 1 8 4 Allow skilled persons in work Use basic PPE's at all times while working Supervisior and During maintenance 2 4 0.5 4
Slip & Trip
Shift incharge
Work
Physical Hazard:
Techinician / Supervisors 2 4 1 8 4 Allow skilled persons in work Use basic PPE's at all times while working Supervisior and During maintenance 2 4 0.5 4
Slip & Trip
Shift incharge
Work
Ergonomic Hazard:
34.2 Manual handling of extinguishers Techinician / Supervisors 2 4 3 24 3 Allow skilled persons in work Use basic PPE's at all times while working Supervisior and During maintenance 2 4 1 8
Minor Sprains
Shift incharge
Work
Physical Hazard:
Techinician / Supervisors 2 4 3 24 3 Handle with care Use basic PPE's at all times while working Supervisior and During maintenance 2 4 1 8
Fall of Fire extinguishers
Shift incharge