Bentonite B5-r2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KEY PLAN:

-2 2015-09-15 KEPHAS TP CS CG APPROUVE HOLES HORIZONTAL BOLTS VLA


-1 2015-09-09 KEPHAS TP CS CG ISSED FOR APPROVAL VLA
-0 2015-07-06 KEPHAS TP CS CG ISSED FOR APPROVAL VLA
Ind DATE PREPARED Checked Reviewed Reason For New Issue Status
NATIONAL AUTHORITY FOR TUNNELS
GREATER CAIRO METRO LINE NO.3
CAIRO AIRPORT TO IMBABA
PHASE 4A
FROM HAROUN STATION TO KP5.487
CONTRACT N°68/METRO
350° 26°
DETAILED DRAWINGS

2042.50
785.50
180° 270° 0° 90° 180°
Level 5:
V5.1 V5.2 V5.3 V5.4 V5.5 V5.6 V5.7 V5.8
8 sheet metal 3505*970*5
V4.1 V4.2 V4.3 V4.4 V4.5 V4.6 V4.7 V4.8 Level 4:
8 sheet metal 3505*1980*5
Level 3:
V3.1 V3.2 V3.3 V3.4 V3.5 V3.6 V3.7 V3.8
8 sheet metal 3505*1980*5
Level 2:
V2.1 V2.2 V2.3 V2.4 V2.5 V2.6 V2.7 V2.8
8 sheet metal 3505*1980*5
Level 1: Type: Scale: Format:
V1.1 V1.2 V1.3 V1.4 V1.5 V1.6 V1.7 V1.8
8 sheet metal 3505*1980*5
BLACK 1:100 A1

w
o
n
n
u
o
u
a
n
d
o
se
d
e
ld
in
g
s
ti

cl
U

rw
Rubric Group Issuer Lot Ref Number Ind

n
le

o
th
e

e
ta
te
d
s
s

is
s

:
Manhole

m
=
a
0
.7
th

in
x
.

.
DN250

You might also like