Electrical Audit
Electrical Audit
1 CABLES
2 Distribution Board
Is earth conductor continued up to DB /
2.1
SDB?
Whether DBs & extension boards are
2.2
protected from rain / water?
3 ELCB / RCCB
Whether the connections are routed through
3.1
ELCB / RCCB?
Is ELCB / RCCB sensitivity maintained at
3.2
30 mA?
4 EARTHING
Is neutral earthing ensured at the source of
4.1
power (Main DB at Gen. or Transformer)?
Whether the continuity & tightness of earth
4.2
conductor are checked?