Cover Poto N Calculation N DRWNG
Cover Poto N Calculation N DRWNG
AMJ47103
GROUP NO : 2
DECLARATION
I hereby declare that the report is based on my original work except where assistance and
sources of information have been suitably acknowledged. I also declare that none of the work
in this report has been previously or concurrently submitted for any other laboratory reports
at UniMAP or any other institutions
___________________________________________________________________________
Student Signature
DRAINAGE DESIGN
REFERENCE CALCULATION
Equation 2.2
𝝀𝑻𝒌
ⅈ= 𝜼
𝒅+𝜽
where:
i = the average rainfall intensity (mm/hr) for selected ARI (T)
and storm duration (d)
Table 1.1 T = average recurrence interval, ARI (years); = 5 year ARI
d = storm duration (hours); 0.20 ≤ d ≤ 72and = 20 minutes
λ, κ, θ and η = fitting constants dependent on the raingauge location
𝟎.𝟑𝟑𝟒
𝟔𝟕. 𝟔𝟒𝟏 𝟓
𝝀𝑻𝒌 = = 174.98 mm/h
ⅈ= 𝟎.𝟖𝟐𝟖
𝒅+𝜽 𝜼 𝟐𝟎
𝟔𝟎 + 𝟎. 𝟐𝟕𝟒
𝑪⋅𝑰⋅𝑨
𝑸=
Equation 2.3 𝟑𝟔𝟎
where : Q = peak flow (m3/s)
Table 2.5 C = dimensionless runoff coefficient = 0.9
I = average rainfall intensity over time
of concentration, t c (mm/hr) = 174.98 mm/h
A = drainage area (ha). = 0.716 ha
Assuming : S, = 1/500
Drain longitudinal slope = 0.20% (1 in 500)
Width, b = 0.6
Side slope, Z = 3
Q= v x A
Where :
1 1/2 2Τ3
𝑣= 𝑆 𝑅 𝑃 = b + 2𝐷 1 + 𝑧 2 = 0.60 + 2𝐷
𝑛 0
A=(b+ ZD)D=0.60+2D B= b+2(ZD) R= A/P
Depth Bottom Slope, z Top width Area,A P R V Q
(m) D,y width,b (m) B (m) (m2) (m) (m/s) (m³/s)
0.8 0.6 3 5.4 2.4 5.4 0.444444 1.445 3.468
Refer Section The drain dimension are 0.85 x 0.85 m deep, which is within the
14.2.4.1 recommended limits.
Service opening shall be provided along open drain with maximum interval
spacing at every 100m.
REFERENCE
Table 2.5
FLEXIBLE PAVEMENT THICKNESS DESIGN
● Design Input:-
● Sub-Grade Category :-
(Refer Table 2.6) Sub-Grade Category SG1 because the CBR(%)
is 5%. SG1
● Pavement Structure;-
( Refer Figure 3.3:
Pavement Structures Conventinal flexible with unmodified PEN 50/70
for Traffc Category bitumen:-
T3)
▪Bituminous Surface Course(AC-10 or AC-14) : 5cm 5 cm
▪Bituminous Binder/Base Course (AC28) : 13 cm 13 cm
▪Crushed Aggregate Base or Wet-Mix Base : 20 cm 20 cm
▪Granular Sub-Base : 20 cm 20 cm
REFERENCES
Table 2.2
Table 2.3
Table 2.4
Table 2.5
Table 2.6
Figure 3.3
DESIGN STEPS of ON SITE DETENTITION POND (OSD)
SSR/ha = GxC
= 325.1548 m³
Pipe Diameter :-
[P] Inlet : 410 mm Based on Table 5.A3
(Adopt with 450 mm)
[Q] Outlet : 159 mm Based on Table 5.A3
(Adopt with 140 mm)
Inlet [K] = 0.157564 m³/s
From the table, we select 410 mm as pipe diameter since the inlet is 0.16 the
range is 410 mm.
Outlet[Q] = 140 mm
Outlet[S] = 290 mm Take smallest
[U] #Outlet= 140mm
850
850
50 mm
130 mm
200 mm
200 mm
50 mm
130 mm
200 mm
200 mm
P.Y.H CONSULTANT
SDN BHD
140
140