Ga Plan Anonymized

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Intellian

Intellian

PROFILE

E.R.
VENT.

SEWAGE W.
DN

MDO
OFFAL EMPTY
TANK

MDO MDO
BILGE W.
SLUDGE BASE LINE

FWD. Pp.
AFT Pp.
WHEELHOUSE DECK
FRAME SPACE 500 MM. FRAME SPACE A 500 MM.

SHELTER DECK
Intellian

DN E.R.
VENT.

DN

1 CREW 1 CREW
1 CREW
1 CREW

UP DN

LINNEN

UP

CENTRE LINE
ACCOM. VENT. ROOM
UP GALLEY
MESS GYMNASIUM

VENT.

1 CREW
1 CREW

DRY STORE DAY ROOM

E.R.
VENT.

WINCHES SWITSHBOARD ROOM

UP
478

DN

UP
Boots
Dryer.
Gloves
Dryer.
Waterclothes
Dryer.
DRYING UPPER DECK
1600

LAUNDRY ROOM
BASE LINE

CENTRE LINE
478

ACTIVE INTERFACE ACTIVE INTERFACE


AFE'S UNITS MAIN TRAWL WINCH COOLING UNIT

CENTRE LINE

DECK STORE / WORKSHOP 1 CREW 1 CREW


CHIEF ENG.
C02

BUNKER
STATION

MEDICINE
CHEST

SAFETY
LKR
SHIP OFFICE
ELECTRONIC ROOM

E.R.
VENT.
LOWER DECK
FISH FACTORY
LOUNGE

1 CREW SKIPPER
1 CREW

FISH PROCESSING AREA

REFRIGERATING MACHINERY ROOM


TOTAL 117 TUBS OF 460 L CENTRE LINE

SEWAGE W.

SEWAGE
WATER PLANT

MAIN CHARACTERISTICS
ENGINE CONTROL ROOM LENGTH OVERALL (approx.) 45.5 M

MAIN SWITCHBOARD E.R.


LENGTH BETWEEN PERPENDICULARS 39.53 M
VENT.
BREADTH MOULDED 13.00 M
DEPTH TO LOWER DECK 5.10 M
DEPTH TO UPPER DECK 7.60 M
CREW 12 CREW

BOX
DOUBLE BOTTOM
COOLER

FRESH
WATER TOTAL 539 TUBS OF 460 L
MDO

OVERFLOW
SEA
LUBE OIL MDO CHEST MDO MDO
OFFAL
MDO TANK BOW
MDO THRUSTER 03
EMPTY DAILY SERVICE COMP. CENTRE LINE
02
MDO SLUDGE
01
SETTLING TANK OFFAL
TANK REV. REVISION SUBJECT DATE NAME

SEA SCALE: FORMAT: MEASURES: DATE: DRAWN BY: CHECKED:


OVERFLOW FRESH CHEST MDO
LUBE OIL MDO
MDO WATER 1/125 A1 MM J.L.S.B. J.L.S.B.
CLIENT:

MDO

BOX
COOLER

VESSEL: 46 m. L.O.A. TRAWLER


CONST. NUM.:
TYPE OF VESSEL: TRAWLER

DESIGNATION DOCUMENT: SHEET: 1/1


GENERAL ARRANGEMENT

You might also like