Electrical Works Permit

Ship’s Name :
IMO No. :

Guidelines

 All permits are to be authorized by the Master before commencement of work


 Checks are carried out by the officer in charge of the place the work will be done, the chief engineer or chief officer.
 The competent person for the work endorses the permit. After signing, the permit shall be retained by the person in
charge of the space where the work is being carried out, until the work is complete, and the clearance section signed.

Section 1 – Scope of Work


Location :
Apparatus Description :
Required work :

Permit issued to the competent person in charge of the work

Name : Rank :
Person in Charge of Work

Section 2 – Checklist / Isolation Data

1 The above apparatus has been isolated at the following points ☐

2 Circuit earths applied to the equipment at the following points ☐

Signature :
Responsible Person

Signature :
Master / Chief Engineer

Hot Work Permit - Dated: Saturday, March 30, 2024 11:43:30 AM Page 1 of 1