>ROFOSED: KENAN DENTAL CLINIC MODIFICATION OFFICE No. # IS, FLOOR ONLY
{EVIOUSLY 2Nou OFFICE N025836) ON EXISTING 84042 OFFICE 8 COMML BLDG.
SHEIKH ABDULAZIZ JADOR.1J AL-THANL
‘GOOD Approved Dawg Ret No PE
Tessas [Peet EO
‘SYSTEM INFORMATION = -
Le fy Supplies baliigs ]
Hyd Test 1 P3\) Duwn 3 |
Sprinklers Thvougbou Coverage Paria Covenge None
vue Yar rape
ee ee eo | ar |
[ALARM VALVE OR FLOW INDICATOR
ras Nici Teo Oper
= ese Fr Al
ike Ma Te Niner coat
PRESSURE REDUCING VANE
Mice | PS Reidel Prowse | Rowiine
ation state Prear
mnset | Stine Pram “oniee ‘com
‘Spar Stem instatiaon ane oars with CDD a
Diack [Tamper pot sch
Sedan Tas Dotee
“SLBIPE —_TypeotPipe ___MITHREADED yp of Fins
TTTERELY Type rm
ee
hake ss a pony
Pagel otTesla and tng confomn to approved plan and NFPA Standard a
“Flushing done i szordance with NFPA 13)
“A pipings and washed apprtenancesbydastacally tied a 200PST o SUPST above wave] 7
essen excess of 180 PSI or 2 hour.
‘Puma est has Den established at 4OPSIC7 Ba) and pressure drop ot excend | “
(Ba) in 24 hours
Forvard flow testo bcilow prevents primed ia acondance Wit NFPA TS requirements
skage test fasbeen done
Flow Test his been done in asordance with NFPA 13 Requirement
‘Dp you cei at adives and coosive chemicals were not used for esting or Hoping ake
‘Dp you cei at you have econo feature wo ensre ht all cut utes) are reteved
paul dt ame plate provided
‘Sprinkler caps and tps removed
‘ressur-Reguling device sting in asordance with CDD approved plan and NFPA TS 7
‘All aboveground pip, joins Tings and apparanances eds onto wt he za
agproved plan, NFPA Requirement nd with CDD prauet approval
Automatic ai Yet of ise shall be ouside the blsipoof deck Z
SPRINKLER SYSTEM CHECKLIST.
oy
Tis Mp Tl
saps cot
8 FAVED WARHOUD 2526104712/4618614
(QCDD Cee No./IDNo./ Mobile No)
(UPA Ne TID Nob)
age ot