Download as pdf
Download as pdf
You are on page 1of 2
>ROFOSED: KENAN DENTAL CLINIC MODIFICATION OFFICE No. # IS, FLOOR ONLY {EVIOUSLY 2Nou OFFICE N025836) ON EXISTING 84042 OFFICE 8 COMML BLDG. SHEIKH ABDULAZIZ JADOR.1J AL-THANL ‘GOOD Approved Dawg Ret No PE Tessas [Peet EO ‘SYSTEM INFORMATION = - Le fy Supplies baliigs ] Hyd Test 1 P3\) Duwn 3 | Sprinklers Thvougbou Coverage Paria Covenge None vue Yar rape ee ee eo | ar | [ALARM VALVE OR FLOW INDICATOR ras Nici Teo Oper = ese Fr Al ike Ma Te Niner coat PRESSURE REDUCING VANE Mice | PS Reidel Prowse | Rowiine ation state Prear mnset | Stine Pram “oniee ‘com ‘Spar Stem instatiaon ane oars with CDD a Diack [Tamper pot sch Sedan Tas Dotee “SLBIPE —_TypeotPipe ___MITHREADED yp of Fins TTTERELY Type rm ee hake ss a pony Pagel ot Tesla and tng confomn to approved plan and NFPA Standard a “Flushing done i szordance with NFPA 13) “A pipings and washed apprtenancesbydastacally tied a 200PST o SUPST above wave] 7 essen excess of 180 PSI or 2 hour. ‘Puma est has Den established at 4OPSIC7 Ba) and pressure drop ot excend | “ (Ba) in 24 hours Forvard flow testo bcilow prevents primed ia acondance Wit NFPA TS requirements skage test fasbeen done Flow Test his been done in asordance with NFPA 13 Requirement ‘Dp you cei at adives and coosive chemicals were not used for esting or Hoping ake ‘Dp you cei at you have econo feature wo ensre ht all cut utes) are reteved paul dt ame plate provided ‘Sprinkler caps and tps removed ‘ressur-Reguling device sting in asordance with CDD approved plan and NFPA TS 7 ‘All aboveground pip, joins Tings and apparanances eds onto wt he za agproved plan, NFPA Requirement nd with CDD prauet approval Automatic ai Yet of ise shall be ouside the blsipoof deck Z SPRINKLER SYSTEM CHECKLIST. oy Tis Mp Tl saps cot 8 FAVED WARHOUD 2526104712/4618614 (QCDD Cee No./IDNo./ Mobile No) (UPA Ne TID Nob) age ot

You might also like