Machine Data

The figure on the cover may not exactly represent the delivery state of the machine.

Machine Data
Type HTP 40
Number MA XXXXX-X-X
Ident number X-XXXX-XXXXXX-X
Year of manufacture 2020

Electrical Data
Voltage X x XXX V
Frequency XX Hz
Power consumption 4 kVA

Manual
Pre-Installation Requirements 28480
Printed 13/10/2020
Imprint
Publisher HERZOG Maschinenfabrik GmbH & Co. KG
Auf dem Gehren 1
D-49086 Osnabrück
E-Mail info@herzog-maschinenfabrik.de

Translation of the manufacturer's original Pre-Installation Requirements. All


other foreign language versions of this manual are exclusively translations of
the original german Pre-Installation Requirements. Reproduction or duplication,
even in extracts, only with the express permission of the publisher.

XXXXX-X-X 28480 Pre-Installation Requirements 2/10


HTP 40 Table of content

Table of content

1. Requirements of the installation site ........................................................... 4


1.1. Space required for operation and maintenance ............................. 4
1.1.1. Required Space..................................................................... 4
1.2. Ground, foundation ........................................................................ 5
1.2.1. Surface .................................................................................. 5
2. Energy requirements .................................................................................. 6
2.1. Electricity ....................................................................................... 6
2.1.1. Compressed air (option) ........................................................ 6
3. Supply and waste connections ................................................................... 7
3.1. Supply connections........................................................................ 7
4. Safety devices for the operator................................................................... 8
4.1. Additional safety devices ............................................................... 8
5. Permissible environmental impact, emissions ............................................ 9
5.1. Permissible environmental impact ................................................. 9
5.2. Emissions ...................................................................................... 9

XXXXX-X-X 28480 Pre-Installation Requirements 3/10


HTP 40 Requirements of the installation site
Space required for operation and maintenance

1. Requirements of the installation site


GB-00204

1.1. Space required for operation and maintenance


GB-00335

1.1.1. Required Space


GB-36093

Required Space
bd435384-3

GB-00481

NOTE!
The data can change if customer-specific options are fitted

XXXXX-X-X 28480 Pre-Installation Requirements 4/10


HTP 40 Requirements of the installation site
Ground, foundation

1.2. Ground, foundation


GB-00345

1.2.1. Surface
GB-36094

Foundation surface
bd435385-0

Ø14 Fastening holes in the machine bases (4 x Ø 14 mm)

HTP 40 HTP 60
Weight kg 324 415
2
Floor load kg/m 950 1175
Standing area mm 620 x 550
Foundation not required
Surface level, can be loaded with the machine's weight.

XXXXX-X-X 28480 Pre-Installation Requirements 5/10


HTP 40 Energy requirements
Electricity

2. Energy requirements
GB-00207

2.1. Electricity
EN-45818

Alternating current X x XXX V AC


Permissible deviation ±5%
Frequency XX Hz
Permissible deviation ±5%
Connected load 4 kVA

Further information can be found in the enclosed electrical diagram.

NOTE!
The machine is not suitable for operation with a residual current circuit
breaker (RCD).

2.1.1. Compressed air (option)


GB-36095

NOTE
Only on a machine with semi-automatic ring cleaner!

Overpressure 10 bar max.


Working pressure 5 - 6 bar
Consumption max. 15 l / cleaning operation (3 rings)
Permissible contamination Filtered with pore size 5 µm
free of oil and water

XXXXX-X-X 28480 Pre-Installation Requirements 6/10


HTP 40 Supply and waste connections
Supply connections

3. Supply and waste connections


GB-00209

3.1. Supply connections


GB-36096

Connections
HTP 40

1 equipotential bonding M 8
2 electrical cable duct (M 25 x 1.5)
3 electrical terminal strip (in the switch cabinet, see circuit diagram)
4 pneumatic connection (option) (threaded connection R 1/4" with screwed
in hose sleeve ∅ 6 mm)
The supply connections items 1, 2 (and 4) are located on the rear of the
machine.

XXXXX-X-X 28480 Pre-Installation Requirements 7/10


HTP 40 Safety devices for the operator
Additional safety devices

4. Safety devices for the operator


GB-00211

4.1. Additional safety devices


GB-00351

NOTE
No special safety equipment is required on customer side for the machine
operation.

XXXXX-X-X 28480 Pre-Installation Requirements 8/10


HTP 40 Permissible environmental impact, emissions
Permissible environmental impact

5. Permissible environmental impact, emissions


GB-00213

5.1. Permissible environmental impact


GB-00214

Ambient temperature max. + 40°C


min. + 10°C
Altitude of the installation site max. 1000 m
Humidity 92 % relative
Vibrations 0.2 g

NOTE!
Aggressive air components are not permissible.

5.2. Emissions
GB-06775

Mean duration of a working cycle


• approx. 110 sec. (the cycle time depends on selected processing parameters)
Noise emission
• mean emission with proper use 74 dB (A)
• peak levels 78 dB (A)
Vibrations
• low
Dust
Amount of dust
• small: may be generated when fine-grained sample material is being
processed
Constituents
• sample material
Gases
• none
Thermal radiation
• low, only from motors and switchgear

XXXXX-X-X 28480 Pre-Installation Requirements 9/10


Deutschland USA Japan China
HERZOG Maschinenfabrik HERZOG Automation Corp. HERZOG JAPAN Co., Ltd. HERZOG (Shanghai) Automation
GmbH & Co. KG 16000 Sprague Rd., Suite 400 3-7, Komagome 2-chome Equipment Co., Ltd.
Auf dem Gehren 1 Cleveland, Ohio 44130 Toshima-ku Section A2,2/F, Building 6,
D-49086 Osnabrück Fon +1 440-891-9777 Tokio 170-0003, Japan No.473, West Fute 1st Road,
Fon +49 541 9332-0 Fax +1 440-891-9778 Fon +81 3-5907-1771 Waigaoqiao F.T.Z, Shanghai
Fax +49 541 9332-32 herzog@herzogautomation.com Fax +81 3-5907-1770 200131, P.R. China
info@herzog-maschinenfabrik.de http://www.herzogautomation.com herzog-jp@herzog.co.jp Fon +86 21 50375915
http://www.herzog-maschinenfabrik.de http://www.herzog.co.jp Fax +86 21 50375713
MP +86 15 80 07 50 53 3
xc.zeng@herzog-automation.com.cn
www.herzogautomation.com.cn

You might also like