Hot Work New Tank
Job Description:
Welding and grinding For supports of (8” , 6” , 4”) Pipes around the New HFO tank by Using
arc welding and Grinder.
Sites NEW HFO TANK
Remove the flammable material from the
Yes
site permanently
Covering the flammable material by haram
Yes
fire insulation or sand
Main precautionary Closing the feeding valves for fuel, gas...)
measures Steam site cleaning
Injection and use of inert gas
Continuous monitoring process Yes
Manual extinguishers Yes
Processing fire hoses (hydrant)
Sand and buckets
Prevention tools Fire blanket Yes
Fire trucks and equipment (they are called
and coordinated with them for high-risk
cases)
Electrical separation
Work at high areas
Other permits
Confined areas
Isolation
helmet, safety shoes, safety
Necessary personal protective equipment:
gloves, eye protector, face
shield
Starting time Finishing time
Time: 07:00 Date: 24/03/2024 Time: 17:00 Date: 30/03 /2024
Signature
The person executing the work ibrahim
Signature
Head / Wardrobe Monitor Abdullah
Signature
Site manager